← Back
Two family converted from one family
65-11 75 PLACE
QUEENS · BIN 4070738
💬 Discuss this project
1920Year Built
2.5Stories
B3Building Class
R4AZoning
2,440 sfGross Floor Area
2Units
0 Open Violations
Two family converted from one family · 3,099 sf lot · 0.79 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Floor 26p · 2 filings · 20 docs
Floor 15p · 1 filing · 20 docs
Cellar7p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
197 RUSSELL STREET, L.L.C.703/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/18/2015$850K—— → —$348/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC111/22/2024
JOSEPH GIANNETTI ARCHITECT901/12/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
MONICA SANTOS EXP603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMERICAN RESIDENTIAL CON*General Contractor407/08/2026
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
ORBIT PLBG & HTG INCPlumbing207/08/2026
PREMIER FLOW PLBG AND HTGPlumbing207/08/2026
FSM ELECTRICAL CORPORATIOElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272111/22/2024
A&B ENGINEERING AND LAND2470501/12/2024
Building Lifecycle
All (73)Filed (10)Permit Issued (7)Signed Off (4)Violation (2)Inspection (6)Objection (14)Special Inspection (30)
05/15/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/13/2025
Signed off — Alteration
Q01144709-I1
12/05/2024
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
11/27/2024
Permit issued — Solar
Q01144709-I1-SL
11/22/2024
Filed — Alteration
Q01144709-I1
11/19/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
11/19/2024
Special inspection requirement — Final
Walid Abdulla
11/19/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
11/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
11/19/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
02/02/2024
Special inspection requirement — Fenestration air leakage
JOSEPH GIANNETTI
02/02/2024
Special inspection requirement — Air barrier - visual inspection
JOSEPH GIANNETTI
02/02/2024
Special inspection requirement — Metering
JOSEPH GIANNETTI
02/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
David Arabi
02/02/2024
Special inspection requirement — Energy Code Compliance Inspections
JOSEPH GIANNETTI
02/02/2024
Special inspection requirement — Fire-Resistance Rated Construction
JOSEPH GIANNETTI
02/02/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
JOSEPH GIANNETTI
02/02/2024
Special inspection requirement — Permanent certificate
JOSEPH GIANNETTI
02/02/2024
Special inspection requirement — Fenestration areas
JOSEPH GIANNETTI
02/02/2024
Special inspection requirement — Interior lighting power
JOSEPH GIANNETTI
02/02/2024
Special inspection requirement — Insulation placement and R values
JOSEPH GIANNETTI
01/12/2024
Filed — Alteration CO
FILING TO CONVERT EXISTING TWO-FAMILY RESIDENCE TO A ONE-FAMILY RESIDENCE.
Q00524495-P5
01/12/2024
Special inspection requirement — Insulation placement and R values
JOSEPH GIANNETTI
01/12/2024
Special inspection requirement — Permanent certificate
JOSEPH GIANNETTI
01/12/2024
Special inspection requirement — Fenestration air leakage
JOSEPH GIANNETTI
01/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
David Arabi
01/12/2024
Special inspection requirement — Energy Code Compliance Inspections
JOSEPH GIANNETTI
01/12/2024
Special inspection requirement — Fire-Resistance Rated Construction
JOSEPH GIANNETTI
01/12/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
JOSEPH GIANNETTI
01/12/2024
Special inspection requirement — Metering
JOSEPH GIANNETTI
01/12/2024
Special inspection requirement — Air barrier - visual inspection
JOSEPH GIANNETTI
01/12/2024
Special inspection requirement — Fenestration areas
JOSEPH GIANNETTI
01/12/2024
Special inspection requirement — Interior lighting power
JOSEPH GIANNETTI
11/13/2023
Signed off — Alteration CO
FILING TO CONVERT EXISTING TWO-FAMILY RESIDENCE TO A ONE-FAMILY RESIDENCE.
Q00524495-S1
11/02/2023
Filed — Alteration CO
FILING TO CONVERT EXISTING TWO-FAMILY RESIDENCE TO A ONE-FAMILY RESIDENCE.
Q00524495-P2
11/02/2023
Special inspection requirement — Maintenance information
JOSEPH GIANNETTI
11/02/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
JOSEPH GIANNETTI
11/02/2023
Special inspection requirement — Final
JOSEPH GIANNETTI
09/26/2023
Filed — Alteration CO
FILING TO CONVERT EXISTING TWO-FAMILY RESIDENCE TO A ONE-FAMILY RESIDENCE.
Q00524495-P1
09/26/2023
Signed off — Alteration
INSTALL NEW, REPLACE EXISTING AND REMOVAL OF PLUMBING FIXTURES AS PER PLAN.
Q00451347-I1
09/25/2023
Signed off — Alteration CO
FILING TO CONVERT EXISTING TWO-FAMILY RESIDENCE TO A ONE-FAMILY RESIDENCE.
Q00524495-S2
09/05/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/31/2023
Permit issued — Plumbing
Q00524495-S2-PL
07/13/2023
Filed — Alteration CO
FILING TO CONVERT EXISTING TWO-FAMILY RESIDENCE TO A ONE-FAMILY RESIDENCE.
Q00524495-S2
04/03/2023
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
01/23/2023
Permit issued — Plumbing
Q00451347-I1-PL
09/06/2022
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
08/16/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/22/2022
Permit issued — General Construction
Q00524495-I1-GC
07/19/2022
Permit issued — Mechanical Systems
Q00524495-S1-MS
07/12/2022
Filed — Alteration CO
FILING TO CONVERT EXISTING TWO-FAMILY RESIDENCE TO A ONE-FAMILY RESIDENCE.
Q00524495-S1
06/29/2022
Objection resolved — Addressed
06/10/2022
Filed — Alteration
INSTALL NEW, REPLACE EXISTING AND REMOVAL OF PLUMBING FIXTURES AS PER PLAN.
Q00451347-P4
07/28/2021
Objection resolved — Addressed
07/28/2021
Objection resolved — Addressed
07/28/2021
Objection resolved — Addressed
06/23/2021
Objection resolved — Addressed
06/23/2021
Objection resolved — Addressed
06/23/2021
Objection resolved — Addressed
06/01/2021
Objection raised — Other
Latest 60 of 73 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC11/27/2024
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC08/31/2023
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC01/23/2023
DOB NOWGeneral ConstructionPermit IssuedAMERICAN RESIDENTIAL CON*07/22/2022
DOB NOWMechanical SystemsSigned-offAMERICAN RESIDENTIAL CON*07/19/2022
DOB NOWPlumbingSigned-offGALICJA PLBG AND HTG.CORP05/07/2021
DOB NOWPlumbingSigned-offGALICJA PLBG AND HTG.CORP01/20/2021
BISOTISSUEDAMERICAN RESIDENTIAL CON*07/01/2022
BISOTISSUEDAMERICAN RESIDENTIAL CON*09/28/2021
BISOTISSUEDAMERICAN RESIDENTIAL CON*12/18/2020
BISOTISSUEDA101 CONSTRUCTION+DESIGN11/03/2010
BISPLISSUEDHYDRO MECHANICAL INC03/11/2002
BISOTISSUEDNONE08/20/2001
1 project · most recent 01/12/2024
Associated Ducts and Piping Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/12/2024Permit IssuedAMERICAN RESIDENTIAL CON*Associated Ducts and Piping, Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric PKFY-P012NLMU-E 12,000 BTU · Vrf Indoor ×3
PKFY-P18NLMU-E 18,000 BTU · Vrf Indoor ×6
PKFY-P08NLMU-E 8,000 BTU · Vrf Indoor ×4
PKFY-P06NLMU-E 6,000 BTU · Vrf Indoor ×2
PUMY-P48NKMU3 48,000 BTU · Vrf Outdoor ×2
PUMY-P60NKMU3 60,000 BTU · Vrf Outdoor ×2
PKFY-P12NLMU-E 12,000 BTU · Vrf Indoor ×3
Ventilation
Broan BROAN MODEL 688 VENTILATION FAN 50 CFM · Exhaust Fan ×2
3 projects · most recent 11/22/2024
General Wiring
FiledStatusContractorScope
11/22/2024CompleteSUNRUN SOLAR ELECTL CORP—
06/18/2024CompleteFSM ELECTRICAL CORPORATIO—
06/02/2023CompleteFSM ELECTRICAL CORPORATIOGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
05/15/2025Pass-Final Boiler Equipment InspectionPassView ↗
12/05/2024Fail-Final Boiler Equipment InspectionFailView ↗
09/05/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/03/2023Fail-Final PL - Up to 9 Requested FloorsFailView ↗
09/06/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/16/2022Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 51
DateRequirementInspectorRole
11/19/2024Energy Code Compliance InspectionsWalid Abdullaprogress
11/19/2024FinalWalid Abdullaprogress
11/19/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
11/19/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
11/19/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
02/02/2024Fenestration air leakageJOSEPH GIANNETTIenergy_progress
02/02/2024Air barrier - visual inspectionJOSEPH GIANNETTIenergy_progress
02/02/2024MeteringJOSEPH GIANNETTIenergy_progress
02/02/2024Fire-Resistant Penetrations and JointsDavid Arabispecial
02/02/2024Energy Code Compliance InspectionsJOSEPH GIANNETTIprogress
02/02/2024Fire-Resistance Rated ConstructionJOSEPH GIANNETTIprogress
02/02/2024Fenestration and door U-factor and product ratingsJOSEPH GIANNETTIenergy_progress
02/02/2024Permanent certificateJOSEPH GIANNETTIenergy_progress
02/02/2024Fenestration areasJOSEPH GIANNETTIenergy_progress
02/02/2024Interior lighting powerJOSEPH GIANNETTIenergy_progress
02/02/2024Insulation placement and R valuesJOSEPH GIANNETTIenergy_progress
01/12/2024Insulation placement and R valuesJOSEPH GIANNETTIenergy_progress
01/12/2024Permanent certificateJOSEPH GIANNETTIenergy_progress
01/12/2024Fenestration air leakageJOSEPH GIANNETTIenergy_progress
01/12/2024Fire-Resistant Penetrations and JointsDavid Arabispecial
01/12/2024Energy Code Compliance InspectionsJOSEPH GIANNETTIprogress
01/12/2024Fire-Resistance Rated ConstructionJOSEPH GIANNETTIprogress
01/12/2024Fenestration and door U-factor and product ratingsJOSEPH GIANNETTIenergy_progress
01/12/2024MeteringJOSEPH GIANNETTIenergy_progress
01/12/2024Air barrier - visual inspectionJOSEPH GIANNETTIenergy_progress
Latest 25 of 51.
▾Documents — 134 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch7
08/23/2026Q00524495-S2Request digital key ↗
08/23/2026Q00524495-S1Request digital key ↗
08/23/2026Q00524495-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
08/27/2026Q00451347-I1Request digital key ↗
08/27/2026Q00451347-P4Request digital key ↗
08/15/2026Q00451347-P1Request digital key ↗
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION4
04/30/2021440649577Open ↗
04/22/2021440649577Open ↗
12/03/2020440649577Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION2
12/18/2020440649577Open ↗
11/03/2010420280109Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
12/18/2020440649577Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
12/18/2020440649577Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00524495-I1Open ↗
▸Seals & Professional Certifications69
▸DOB NOWProgress Inspector Seal & Signature45
09/02/2026Q00524495-P1Open ↗
09/02/2026Q00524495-P1Open ↗
09/02/2026Q00524495-P1Open ↗
Showing 3 of 45 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/27/2026Q00451347-P4Open ↗
08/27/2026Q00451347-I1Open ↗
08/27/2026Q00451347-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026Q00524495-P1Open ↗
09/01/2026Q01144709-I1Open ↗
09/01/2026Q01144709-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
12/29/2010420280109Open ↗
12/29/2010420280109Open ↗
10/27/2010420280109Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/03/2020440649577Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/03/2020440649577Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
12/03/2020440649577Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/23/2026Q00524495-P5Open ↗
08/14/2026Q00524495-I1Open ↗
▸BISSTREET TREE CHECKLIST1
10/27/2010420280109Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/27/2026Q00451347-I1Open ↗
08/27/2026Q00451347-P1Open ↗
08/27/2026Q00451347-P4Open ↗
Showing 3 of 10 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/27/2010420280109Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/03/2020440649577Open ↗
▸Energy Compliance9
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00524495-I1Open ↗
08/13/2026Q00451347-I1Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
11/15/2023440649577Open ↗
▸BISINTERIOR LIGHTING POWER1
11/15/2023440649577Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/15/2023440649577Open ↗
▸BISNYCECC ANALYSIS1
12/03/2020440649577Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
11/15/2023440649577Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
11/15/2023440649577Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/03/2020440649577Open ↗
▸Inspections & Test Reports5
▸BISFRAME (2008)/STRUCTURAL WOOD FRAME (2014) INSPECTION1
11/15/2023440649577Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
11/15/2023440649577Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
11/15/2023440649577Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
11/15/2023440649577Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
12/18/2020440649577Open ↗
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
11/16/2023440649577Open ↗
12/29/2010420280109Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
12/29/2010420280109Open ↗
▸BISFINAL1
11/15/2023440649577Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01144709-I1Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
12/03/2020440649577Open ↗
12/29/2010420280109Open ↗
10/27/2010420280109Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
11/15/2023440649577Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION2
04/30/2021440649577Open ↗
10/27/2010420280109Open ↗
▸BISEFILING COVER SHEET1
10/27/2010420280109Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
12/03/2020440649577Open ↗
▸Other Documents4
▸DOB NOWSURVEY: INITIAL2
08/13/2026Q00524495-I1Open ↗
08/13/2026Q00524495-P5Open ↗
▸BISPERMANENT CERTIFICATE1
11/15/2023440649577Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00524495-I1Open ↗