← Back
BuildNYC
Elevator cooperative
65-15 ALDERTON STREET
QUEENS · Rego Park · BIN 4074536
💬 Discuss this project
1964Year Built
6Stories
D4Building Class
R3-1Zoning
42,948 sfGross Floor Area
45Units
LL97 CoveredRent Stabilized15 Active Violations ▸FISP: SWARMP
Elevator cooperative · Owner of record: 65-15 Alderton Ownrs · 13,023 sf lot · 3.3 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofExterior facade repair and masonry work1p · 1 filing · 11 docs
Floor 2Unit 2B5p · 1 filing · 13 docs
Floor 1
CellarDelkap Management1 filing · 5 docs
Site & exteriorHeavy duty sidewalk shed9p · 3 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
65-15 Alderton Owners403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MJM Associates208/08/2025
Ashraf108/14/2024
Basic Groups208/17/2023
Joel Phagoo P.E109/13/2019
New York & Company109/05/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Oculus Consulting Group203/21/2026
Basic Groups403/21/2026
New York & Company103/21/2026
A1 Expediting Service203/21/2026
Rigid Structural Design203/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Andamio ScaffoldingScaffold603/21/2026
NYC Best RemodelingGeneral Contractor303/21/2026
Schnellbacher-Sendon Group*General Contractor304/09/2026
Falco Electrical ServicesElectrical103/22/2026
Green Power ElectricElectrical103/22/2026
BS GroupScaffold107/08/2026
Varsity Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Sag Engineering & Consulting608208/08/2025
Andrew Goodrich, P.E., PL965208/17/2023
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
07/29/2026
Co-op apartment 1G sold for $190,000
07/28/2026
Elevator Category 1 inspection report filed
06/12/2026
Boiler inspection report filed
Initial · no defects · Accepted
05/07/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
192 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding08/08/2025
DOB NOWSuspended ScaffoldSigned-offSchnellbacher-Sendon Group05/20/2025
DOB NOWGeneral ConstructionSigned-offSchnellbacher-Sendon Group*05/19/2025
DOB NOWGeneral ConstructionSigned-offSchnellbacher-Sendon Group*09/18/2024
DOB NOWSuspended ScaffoldSigned-offSchnellbacher-Sendon Group09/10/2024
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding08/15/2024
DOB NOWGeneral ConstructionSigned-offNYC Best Remodeling06/28/2023
DOB NOWPlumbingSigned-offVarsity Plumbing & Heating09/17/2019
DOB NOWSidewalk ShedSigned-offBS Group09/14/2019
BISEQISSUEDXinos Construction04/26/2012
BISOTISSUEDXinos Construction04/24/2012
BISPLISSUEDElite P & H10/06/2005
BISBLISSUEDGeecee Mechanical Services10/06/2005
BISFSISSUEDAbilene12/18/2003
BISEQISSUEDBridgeworks of Greater New York12/30/1998
BISEQISSUEDPSG Construction Co11/04/1998
BISOTISSUEDApollon Waterproofing and Resto10/21/1998
BISFBISSUEDCastle Petroleum06/28/1991
4 projects · most recent 08/23/2024
General Wiring
FiledStatusContractorScope
08/23/2024CompleteBorowide Elect'l Contractors—
02/14/2023CompleteFalco Electrical ServicesGeneral Wiring
06/20/2022CompleteJam Electrical—
09/11/2019CompleteGreen Power Electric—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/21/2023Pass-Final General Construction Non-Directive 14PassView ↗
07/31/2023Fail-Final General Construction Non-Directive 14FailView ↗
07/26/2023Fail-Final General Construction Non-Directive 14FailView ↗
07/03/2023Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
08/12/2025MasonryChester Kowalskispecial
08/12/2025Tenant Protection Plan ComplianceChester Kowalskispecial
08/12/2025FinalChester Kowalskiprogress
07/21/2025Tenant Protection Plan Compliance—special
07/14/2025FinalChester Kowalskiprogress
07/14/2025MasonryChester Kowalskispecial
08/21/2023Fire-Resistance Rated ConstructionANDREW GOODRICHprogress
08/21/2023Insulation placement and R valuesANDREW GOODRICHenergy_progress
08/21/2023Fire-Resistant Penetrations and JointsANDREW GOODRICHspecial
08/21/2023Tenant Protection Plan ComplianceANDREW GOODRICHspecial
08/21/2023Energy Code Compliance InspectionsANDREW GOODRICHprogress
08/21/2023Interior lighting powerANDREW GOODRICHenergy_progress
08/15/2023Energy Code Compliance InspectionsANDREW GOODRICHprogress
08/15/2023Tenant Protection Plan Compliance—special
08/15/2023Fire-Resistant Penetrations and JointsANDREW GOODRICHspecial
08/15/2023Fire-Resistance Rated ConstructionANDREW GOODRICHprogress
08/15/2023Interior lighting powerANDREW GOODRICHenergy_progress
08/15/2023Insulation placement and R valuesANDREW GOODRICHenergy_progress
08/15/2019Energy Code Compliance InspectionsLOUIS ARENAprogress
84 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account