| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01420503 ↗ | 346 EAST 105 STREET MANHATTAN | Alteration | Permit Issued | 07/17/2026 | 09/25/2026 | Filer JACK JAFFA & ASSOCIATES | GENERAL CONSTRUCTION TO RENOVATE APT (1E & 2E) AT 1ST & 2ND FLOOR FROM FIRE DAMAGE, WORK WILL INCLUDE NEW PARTITIONS & FINISHES, NEW FLOORIN… |
| M01447220 ↗ | 437 EAST 80 STREET MANHATTAN | Alteration | Permit Issued | 08/18/2026 | 09/15/2026 | Design CHERNY ARCHITECT PLLC | Renovation of Apt. 28 on sixth floor, partition work per plans. No change in use egress or occupancy. PL work will be files subsequently. |
| M01424005 ↗ | 161 PRINCE STREET MANHATTAN | Alteration | Permit Issued | 07/07/2026 | 09/09/2026 | Design GRASSO-MENZIUSO ARCHITECTS | Minor partition work with general carpentry work in apt 18. No change to use , bulk or egress |
| M01425308 ↗ | 161 PRINCE STREET MANHATTAN | Alteration | Permit Issued | 07/07/2026 | 09/09/2026 | Design GRASSO-MENZIUSO ARCHITECTS | Minor partition work with general carpentry work in apt 19. No change to use , bulk or egress |
| M01426684 ↗ | 161 PRINCE STREET MANHATTAN | Alteration | Permit Issued | 07/16/2026 | 09/09/2026 | Design GRASSO-MENZIUSO ARCHITECTS | Minor partition work with general carpentry work in apt 12. No change to use , bulk or egress |
| M01443053 ↗ | 437 EAST 80 STREET MANHATTAN | Alteration | Permit Issued | 08/10/2026 | 09/01/2026 | Design CHERNY ARCHITECT PLLC | Renovation of Apt. 23 on fifth floor, partition work per plans. No change in use egress or occupancy. PL work will be files subsequently. |
| Name | Projects together | Most recent |
|---|---|---|
| BASIC GROUPS CORP | 21 | 05/01/2026 |
| GRASSO-MENZIUSO ARCHITECTS | 17 | 07/27/2026 |
| SUSTAINABLE DESIGN ENGINEERING PLLC | 14 | 07/17/2026 |
| DAVID CHAGNON ARCHITECTURAL DESIGN | 11 | 06/20/2025 |
| WILLIAM LENART, ARCHITEC PLLC | 8 | 12/27/2022 |
| CHERNY ARCHITECT PLLC | 6 | 08/28/2026 |
| NS ENGINEERS, P.C. | 6 | 03/26/2026 |
| LONGTIN SOLUTIONS LLC | 4 | 09/27/2024 |
| BLUE SKY DESIGN, INC. | 3 | 04/05/2024 |
| HSU & ASSOCIATES | 3 | 02/21/2022 |
| MCCRAY ARCHITECT P.C. | 3 | 06/14/2022 |
| L & C ASSOCIATES | 2 | 08/01/2022 |
| SPACE 4 ARCHITECTURE | 2 | 07/07/2025 |
| ASIF JAMIL, RA | 1 | 08/16/2021 |
| BEALIN GROUPS CORP | 1 | 11/17/2022 |
| DAVID TURNER ARCHITECT PC | 1 | 01/12/2025 |
| IKRA CONSULTING LLC | 1 | 04/26/2026 |
| KV LAMBIRIS ARCHITECT | 1 | 01/31/2025 |
| LUKE LICALZI, P.E., P.C. | 1 | 02/05/2021 |
| MAKS ENGINEERS P.C. | 1 | 01/21/2025 |
| OFFICE OF JAMES RUDERMAN | 1 | 05/23/2022 |
| PETER CHIANG ARCHITECT, PLLC | 1 | 08/19/2026 |
| PETER V STOREY | 1 | 06/18/2021 |
| R.J. MCGEE ENGINEERING, PLLC | 1 | 01/28/2025 |
| ST ENGINEERING SERVICES LLP | 1 | 07/07/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| HOD PIPING & HEATING CORP | 19 | 08/28/2026 |
| AMC PLBG, HTG & CLNG, INC | 4 | 05/01/2026 |
| BLUESKY DEVELOPMENT | 3 | 02/08/2023 |
| STEEL TONE CONSTRUCTION | 2 | 06/13/2025 |
| A & A BUILDING RENOVATION | 1 | 12/29/2022 |
| CUBE BUILDERS GROUP NY | 1 | 06/18/2021 |
| Name | Projects together | Most recent |
|---|---|---|
| TRISTAR MANAGEMENT ASSOCIATES LLC | 17 | 07/27/2026 |
| WITNICK MANAGEMENT LLC | 16 | 07/07/2025 |
| TBF - 19 ELDRIDGE LLC | 5 | 08/05/2025 |
| BLUE SKY GROUP | 4 | 02/08/2023 |
| PRESENTATION OF THE BLESSED VIRGIN | 3 | 04/26/2026 |
| 1881 GRAND CONCOURSE REALTY, LLC | 2 | 02/10/2023 |
| ORION INVESTMENTS GROUP LLC | 2 | 02/21/2022 |
| 405 MYRTLE AVE CORP | 1 | 11/19/2020 |
| GUMLEY HAFT | 1 | 04/16/2021 |
| MANAGEMENT OFFICE | 1 | 08/29/2022 |
| NIRCO INVESTORS CORP | 1 | 01/31/2025 |
| URBAN STANDARD CAPITAL | 1 | 12/29/2022 |
| VARIANT SERVICES, INC | 1 | 11/21/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| JACK JAFFA & ASSOCIATES | 21 | 07/17/2026 |
| BASIC GROUPS CORP | 19 | 05/01/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 16 | 07/07/2025 |
| Bealin Groups Corp | 3 | 05/01/2026 |
| ALPHA HOME DESIGN LLC | 2 | 02/21/2022 |
| EA DESIGN GROUP, INC. | 2 | 11/14/2022 |
| BLANCO DESIGN, INC. | 1 | 08/29/2022 |
| CORNERSTONE CONSULTING | 1 | 01/28/2025 |
| JAM CONSULTANTS, INC. | 1 | 04/16/2021 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01420503 ↗ | 346 EAST 105 STREET MANHATTAN | Alteration | Permit Issued | 07/17/2026 | 09/25/2026 | Filer JACK JAFFA & ASSOCIATES | GENERAL CONSTRUCTION TO RENOVATE APT (1E & 2E) AT 1ST & 2ND FLOOR FROM FIRE DAMAGE, WORK WILL INCLUDE NEW PARTITIONS & FINISHES, NEW FLOORIN… |
| M01447220 ↗ | 437 EAST 80 STREET MANHATTAN | Alteration | Permit Issued | 08/18/2026 | 09/15/2026 | Design CHERNY ARCHITECT PLLC | Renovation of Apt. 28 on sixth floor, partition work per plans. No change in use egress or occupancy. PL work will be files subsequently. |
| M01424005 ↗ | 161 PRINCE STREET MANHATTAN | Alteration | Permit Issued | 07/07/2026 | 09/09/2026 | Design GRASSO-MENZIUSO ARCHITECTS | Minor partition work with general carpentry work in apt 18. No change to use , bulk or egress |
| M01425308 ↗ | 161 PRINCE STREET MANHATTAN | Alteration | Permit Issued | 07/07/2026 | 09/09/2026 | Design GRASSO-MENZIUSO ARCHITECTS | Minor partition work with general carpentry work in apt 19. No change to use , bulk or egress |
| M01426684 ↗ | 161 PRINCE STREET MANHATTAN | Alteration | Permit Issued | 07/16/2026 | 09/09/2026 | Design GRASSO-MENZIUSO ARCHITECTS | Minor partition work with general carpentry work in apt 12. No change to use , bulk or egress |
| M01443053 ↗ | 437 EAST 80 STREET MANHATTAN | Alteration | Permit Issued | 08/10/2026 | 09/01/2026 | Design CHERNY ARCHITECT PLLC | Renovation of Apt. 23 on fifth floor, partition work per plans. No change in use egress or occupancy. PL work will be files subsequently. |
| B01322023 ↗ | 391 PACIFIC STREET BROOKLYN | Alteration | Permit Issued | 06/25/2026 | 08/25/2026 | Design PETER CHIANG ARCHITECT, PLLC | Proposed minor interior renovation, no change in use, egress or occupancy. |
| M01251323 ↗ | 335 EAST 22 STREET MANHATTAN | Alteration | Permit Issued | 07/17/2025 | 08/12/2026 | — | RENOVATE 1ST THROUGH 5TH FLOOR HALLWAYS. WORK WILL INCLUDE NEW FURRED-OUT WALLS, DROPPED CEILING, AND FLOOR TILES. NO CHANGE IN USE, EGRESS,… |
| M01369771 ↗ | 159 PRINCE STREET MANHATTAN | Alteration | Permit Issued | 03/19/2026 | 06/25/2026 | Design GRASSO-MENZIUSO ARCHITECTS | Minor partition work in apt 15 with general Carpentry work. No change to use bulk or egress |
| M01389789 ↗ | 159 PRINCE STREET MANHATTAN | Alteration | Permit Issued | 04/27/2026 | 06/24/2026 | Design GRASSO-MENZIUSO ARCHITECTS | Proposed to renovate unit 9 on the 4th flr, work to include removal & installation of interior non load bearing partitions, general carpentr… |
| M01400297 ↗ | 159 PRINCE STREET MANHATTAN | Alteration | Permit Issued | 05/12/2026 | 06/18/2026 | Design GRASSO-MENZIUSO ARCHITECTS | renovate pubic halls on 1st -6th floor only , no change to use, bulk or egress |
| Q01382699 ↗ | 88-13 PARSONS BOULEVARD QUEENS | Alteration | Signed-off | 04/26/2026 | 05/05/2026 | Design IKRA CONSULTING LLC Filer JACK JAFFA & ASSOCIATES | REPLACE PLUMBING FIXTURES WITH NEW (1 LAV, 1 WC); INSTALL NEW PLUMBING FIXTURES AT NEW ROUGHING (1 LAV, 1 WC, 3 F.D., 1 SINK) AT 1ST FLOOR. |
| M01368138 ↗ | 335 EAST 22 STREET MANHATTAN | Alteration | Permit Issued | 03/26/2026 | 04/28/2026 | Design NS ENGINEERS, P.C. Filer JACK JAFFA & ASSOCIATES | RELOCATE PLUMBING FIXTURES WITH NEW (1 SINK, 1 LAV, 1 WC); INSTALL NEW PLUMBING FIXTURES (1 SHOWER, 1 W/M, 1 DW); CAP & REMOVE (1 TUB) AT AP… |
| M01369792 ↗ | 159 PRINCE STREET MANHATTAN | Alteration | Permit Issued | 03/20/2026 | 04/24/2026 | Design GRASSO-MENZIUSO ARCHITECTS | Minor partition work in apt 2 with general Carpentry work. No change to use bulk or egress |
| M01376789 ↗ | 161 PRINCE STREET MANHATTAN | Alteration | Permit Issued | 03/30/2026 | 04/22/2026 | Design GRASSO-MENZIUSO ARCHITECTS | Minor partition work with general carpentry work in apt 10. No change to use , bulk or egress |
| B00825794 ↗ | 151 NORTH 7 STREET BROOKLYN | Alteration CO | Permit Issued | 02/21/2023 | 04/21/2026 | Design BASIC GROUPS CORP Filer BASIC GROUPS CORP | SUBMIT PLUMBING PLAN IN CONJUNCTION WITH ALT-1 APPLICATION #B00825794-I1. |
| B01245383 ↗ | 232 STANHOPE STREET BROOKLYN | Alteration | Permit Issued | 06/23/2025 | 04/21/2026 | Design BASIC GROUPS CORP Filer Bealin Groups Corp | REPAIR AND RE-TILE EXISTING STAIRCASE AND HALLWAY FROM 1ST FLOOR THRU 3RD FLOOR. WORKS AS PER PLAN. NO CHANGE ON EGRESS, USE OR OCCUPANCY. |
| M01361361 ↗ | 161 PRINCE STREET MANHATTAN | Alteration | Permit Issued | 03/02/2026 | 04/20/2026 | Design GRASSO-MENZIUSO ARCHITECTS | renovate pubic halls on 1st -6th floor only , no change to use, bulk or egress |
| M01351005 ↗ | 159 PRINCE STREET MANHATTAN | Alteration | Permit Issued | 02/06/2026 | 04/13/2026 | Design GRASSO-MENZIUSO ARCHITECTS | Minor partition work in apt 12 with general Carpentry . No change to use bulk or egress |
| M01351001 ↗ | 159 PRINCE STREET MANHATTAN | Alteration | Permit Issued | 02/06/2026 | 04/10/2026 | Design GRASSO-MENZIUSO ARCHITECTS | Minor partition work in apt 1 with general Carpentry . No change to use bulk or egress |
| M01351004 ↗ | 159 PRINCE STREET MANHATTAN | Alteration | Permit Issued | 02/06/2026 | 04/10/2026 | Design GRASSO-MENZIUSO ARCHITECTS | Minor partition work in apt 10 with general Carpentry . No change to use bulk or egress |
| Q01239854 ↗ | 88-19 PARSONS BOULEVARD QUEENS | Alteration | Permit Issued | 06/13/2025 | 03/31/2026 | Design BASIC GROUPS CORP Filer Bealin Groups Corp | INTERIOR RENOVATION OF PARTIAL 1ST FLOOR . CONSTRUCTION WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01355157 ↗ | 161 PRINCE STREET MANHATTAN | Alteration | Permit Issued | 02/20/2026 | 03/25/2026 | Design GRASSO-MENZIUSO ARCHITECTS | Minor partition work with general carpentry in apt 7. No change to use , bulk or egress |
| M01290887 ↗ | 403 EAST 77 STREET MANHATTAN | Alteration | Signed-off | 10/03/2025 | 02/19/2026 | Design CHERNY ARCHITECT PLLC | Replace existing plumbing fixtures and add new plumbing fixtures. |
| M01047478 ↗ | 104 BAYARD STREET MANHATTAN | Alteration | Signed-off | 07/30/2024 | 02/13/2026 | Design MAKS ENGINEERS P.C. | REPLACE EXISTING DEFECTIVE WOOD JOISTS TO MATCH EXISTING AT THE 2ND FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUAPNCY UNDER THIS FILING. |
| B01291140 ↗ | 190 FLATBUSH AVENUE BROOKLYN | Alteration | Permit Issued | 09/26/2025 | 01/28/2026 | Design GRASSO-MENZIUSO ARCHITECTS | Minor partition work with general carpentry in apt 4W. No change to use , bulk or egress |
| B01297376 ↗ | 190 FLATBUSH AVENUE BROOKLYN | Alteration | Permit Issued | 10/09/2025 | 01/21/2026 | Design GRASSO-MENZIUSO ARCHITECTS | relocate 1 dw, 1 sink, replace 1 wc,, 1 tub, 1 lav, 1 new washer, 1 new wc, 1 new lav, 1 new shower, cap and remove 1 range |
| M01251965 ↗ | 347 EAST 78 STREET MANHATTAN | Alteration | Permit Issued | 08/14/2025 | 01/05/2026 | Design NS ENGINEERS, P.C. Filer JACK JAFFA & ASSOCIATES | RELOCATE PLUMBING FIXTURES WITH NEW (1 SHOWER, 1 LAV, 1 WC, 1 SINK) AT 1ST; INSTALL NEW PLUMBING FIXTURES (1 DW) AT 1ST AND (1 LAV, 1 WC, 1 … |
| M01285338 ↗ | 51 MONROE STREET MANHATTAN | Alteration | Permit Issued | 09/30/2025 | 12/09/2025 | Filer JACK JAFFA & ASSOCIATES | RENOVATE 1ST THROUGH 5TH FLOOR HALLWAYS. WORK WILL INCLUDE NEW FURRED-OUT WALLS, DROPPED CEILING, AND FLOOR TILES. NO CHANGE IN USE, EGRESS,… |
| B01287989 ↗ | 216 FLATBUSH AVENUE BROOKLYN | Alteration | Permit Issued | 09/19/2025 | 11/18/2025 | Design GRASSO-MENZIUSO ARCHITECTS | Minor partition work with general carpentry in apt 2. No Change to use, bulk or egress |
| B01300464 ↗ | 234 FLATBUSH AVENUE BROOKLYN | Alteration | Permit Issued | 10/15/2025 | 11/17/2025 | Design GRASSO-MENZIUSO ARCHITECTS | REL 1 DW, 1 SINK, 1 WC, , 1 LAV, 1 new washer. 1 new wc, 2 new showers, 1 new lav, cap and remove 1 range |
| M01290403 ↗ | 53 MONROE STREET MANHATTAN | Alteration | Permit Issued | 09/24/2025 | 11/03/2025 | Filer JACK JAFFA & ASSOCIATES | RENOVATE 1ST THROUGH 5TH FLOOR HALLWAYS. WORK WILL INCLUDE NEW FURRED-OUT WALLS, DROPPED CEILING, AND FLOOR TILES. NO CHANGE IN USE, EGRESS,… |
| M01251800 ↗ | 335 EAST 22 STREET MANHATTAN | Alteration | Signed-off | 07/20/2025 | 09/30/2025 | Design NS ENGINEERS, P.C. Filer JACK JAFFA & ASSOCIATES | RELOCATE PLUMBING FIXTURES WITH NEW (1 SINK, 1 LAV, 1 WC); INSTALL NEW PLUMBING FIXTURES (1 SHOWER, 1 W/M, 1 DW); CAP & REMOVE (1 TUB) AT AP… |
| M01251903 ↗ | 345 EAST 78 STREET MANHATTAN | Alteration | Signed-off | 07/20/2025 | 09/30/2025 | Design NS ENGINEERS, P.C. Filer JACK JAFFA & ASSOCIATES | REPLACE PLUMBING FIXTURES WITH NEW AT EXISTING ROUGHING (1 WC, 1 LAV); RELOCATE PLUMBING FIXTURES WITH NEW (1 SINK); INSTALL NEW PLUMBING FI… |
| M01251963 ↗ | 347 EAST 78 STREET MANHATTAN | Alteration | Signed-off | 07/21/2025 | 09/30/2025 | Filer JACK JAFFA & ASSOCIATES | REPLACE PLUMBING FIXTURES WITH NEW AT EXISTING ROUGHING (1 LAV, 1 WC, 1 SHOWER); RELOCATE PLUMBING FIXTURES WITH NEW (1 SINK); INSTALL NEW P… |
| B01250187 ↗ | 145 HENRY STREET BROOKLYN | Alteration | Signed-off | 07/07/2025 | 09/26/2025 | Design ST ENGINEERING SERVICES LLP Owner WITNICK MANAGEMENT LLC | PLUMBING FIXTURES INSTALLATION FOR APT. 3F AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY |
| M01025799 ↗ | 262 WEST 22 STREET MANHATTAN | Alteration | Signed-off | 04/14/2025 | 09/23/2025 | Design CHERNY ARCHITECT PLLC | Renovation of Apt. 5 and Apt. 6 on 2nd floor. Partition work per plans. No change in use, egress or occupancy. PL work will be filed subs… |
| 123876430BIS | 212 LAFAYETTE STREET MANHATTAN | — | ISSUED | 11/23/2021 | 08/27/2025 | — | — |
| M01251333 ↗ | 345 EAST 78 STREET MANHATTAN | Alteration | Permit Issued | 07/18/2025 | 08/12/2025 | Filer JACK JAFFA & ASSOCIATES | RENOVATE 1ST THROUGH 5TH FLOOR HALLWAYS. WORK WILL INCLUDE NEW FURRED-OUT WALLS, DROPPED CEILING, AND FLOOR TILES. NO CHANGE IN USE, EGRESS,… |
| M01251950 ↗ | 347 EAST 78 STREET MANHATTAN | Alteration | Permit Issued | 07/18/2025 | 08/12/2025 | Filer JACK JAFFA & ASSOCIATES | RENOVATE 1ST THROUGH 5TH FLOOR HALLWAYS. WORK WILL INCLUDE NEW FUR-OUT WALLS, DROPPED CEILING, AND FLOOR TILES. NO CHANGE IN USE, EGRESS, OR… |
| M01234495 ↗ | 110 9 AVENUE MANHATTAN | Alteration | Signed-off | 06/20/2025 | 07/17/2025 | Owner WITNICK MANAGEMENT LLC | INTERIOR PARTITIONS AND FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY |
| M01193489 ↗ | 318 EAST 9 STREET MANHATTAN | Alteration | Permit Issued | 03/25/2025 | 07/07/2025 | Filer JACK JAFFA & ASSOCIATES | RENOVATE 1ST THROUGH 6TH FLOOR HALLWAYS AND BULKHEAD. WORK WILL INCLUDE NEW FURRED-OUT WALLS, DROPPED CEILING, AND FLOOR TILES. NO CHANGE IN… |
| M01156375 ↗ | 104 BAYARD STREET MANHATTAN | Alteration | Signed-off | 01/03/2025 | 07/03/2025 | Owner TBF - 19 ELDRIDGE LLC Filer JACK JAFFA & ASSOCIATES | RENOVATE 1ST THROUGH 5TH FLOOR HALLWAYS. WORK WILL INCLUDE NEW FURRED-OUT WALLS AND NEW FLOOR TILES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY … |
| B01144444 ↗ | 79 BRIDGE STREET BROOKLYN | Alteration | Signed-off | 01/27/2025 | 07/02/2025 | TENANT RENNOVATION OF FIRST FLOOR SPACE TO INCLUDE NON LOAD BEARING INTERIOR PARTITIONS AND DOORS AS PER PLANS. | |
| B01144464 ↗ | 79 BRIDGE STREET BROOKLYN | Alteration | Signed-off | 01/28/2025 | 07/02/2025 | Design R.J. MCGEE ENGINEERING, PLLC Filer CORNERSTONE CONSULTING | MINOR MECHANICAL WORK AS PER PLANS |
| M01049747 ↗ | 104 BAYARD STREET MANHATTAN | Alteration | Signed-off | 07/04/2024 | 07/02/2025 | Design NS ENGINEERS, P.C. Owner TBF - 19 ELDRIDGE LLC Filer JACK JAFFA & ASSOCIATES | RELOCATE PLUMBING FIXTURES WITH NEW (1 SINK, 1 WC) AT APT 9 & (1 SHOWER, 1 WC, 1 LAV, 1 SINK) AT APT 12. INSTALL NEW PLUMBING FIXTURES AT NE… |
| M01156317 ↗ | 104 BAYARD STREET MANHATTAN | Alteration | Signed-off | 01/03/2025 | 07/02/2025 | Owner TBF - 19 ELDRIDGE LLC Filer JACK JAFFA & ASSOCIATES | RELOCATE PLUMBING FIXTURES WITH NEW (1 WC, 1 SHOWER, 1 SINK) AND INSTALL NEW PLUMBING FIXTURES AT NEW ROUGHING (1 LAV, 1 DW, 1 W/M) AT APT 4… |
| M01156335 ↗ | 104 BAYARD STREET MANHATTAN | Alteration | Signed-off | 01/03/2025 | 07/02/2025 | Owner TBF - 19 ELDRIDGE LLC Filer JACK JAFFA & ASSOCIATES | RENOVATE 1ST THROUGH 5TH FLOOR HALLWAYS. WORK WILL INCLUDE NEW FURRED-OUT WALLS AND FLOOR TILES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDE… |
| M01156381 ↗ | 448 EAST 78 STREET MANHATTAN | Alteration | Permit Issued | 01/10/2025 | 07/02/2025 | Design NS ENGINEERS, P.C. Filer JACK JAFFA & ASSOCIATES | RENOVATE 1ST THROUGH 4TH FLOOR HALLWAYS. WORK WILL INCLUDE NEW FURRED-OUT WALLS AND NEW FLOOR TILES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY … |
| M01169661 ↗ | 163 RIVINGTON STREET MANHATTAN | Alteration | Signed-off | 02/07/2025 | 03/06/2025 | INTERIOR RENOVATION OF APT. 4 AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | |
| M01118089 ↗ | 319 EAST 14 STREET MANHATTAN | Alteration | Permit Issued | 10/28/2024 | 02/25/2025 | Filer JACK JAFFA & ASSOCIATES | REPLACE PLUMBING FIXTURES WITH NEW AT EXISTING ROUGHING (1 SINK, 1 WC, 1 LAV), CAP & REMOVE (1 TUB), AND INSTALL NEW PLUMBING FIXTURES (1 DW… |
| M01164717 ↗ | 19 ELDRIDGE STREET MANHATTAN | Alteration | Signed-off | 01/12/2025 | 02/25/2025 | Design DAVID TURNER ARCHITECT PC | At kitchen sister fire damage joists with new joists, New fire rated ceiling. |
| M01165258 ↗ | 93 2 AVENUE MANHATTAN | Alteration | Signed-off | 01/27/2025 | 02/06/2025 | Design KV LAMBIRIS ARCHITECT Owner NIRCO INVESTORS CORP | RENOVATION OF EXISTING APARTMENT 1F AT FIRST FLOOR, NEW FINISHES. ALL WORK AS PER DRAWINGS. |
| M01118121 ↗ | 317 EAST 14 STREET MANHATTAN | Alteration | Permit Issued | 10/24/2024 | 12/09/2024 | Filer JACK JAFFA & ASSOCIATES | RENOVATE BASEMENT, 1ST THRU 4TH FLOOR HALLWAYS. WORK WILL INCLUDE NEW FURRED-OUT WALLS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FI… |
| 340756550BIS | 15 WYCKOFF STREET BROOKLYN | — | ISSUED | 06/08/2021 | 10/29/2024 | — | — |
| B01067902 ↗ | 231 STANHOPE STREET BROOKLYN | Alteration | Signed-off | 06/26/2024 | 10/22/2024 | Filer JACK JAFFA & ASSOCIATES | RELOCATE PLUMBING FIXTURES WITH NEW (1 SINK, 1 WC); CAP AND REMOVE (1 TUB); AND INSTALL NEW PLUMBING FIXTURES AT NEW ROUGHING (1 SHOWER, 2 L… |
| M01039963 ↗ | 104 BAYARD STREET MANHATTAN | Alteration | Signed-off | 04/26/2024 | 08/21/2024 | Owner TBF - 19 ELDRIDGE LLC Filer JACK JAFFA & ASSOCIATES | GENERAL CONSTRUCTION TO RENOVATE APT 3 ON THE 3RD, APT 6 ON THE 4TH, AND APT 7 ON THE 5TH FLOOR. WORK WILL INCLUDE NEW PARTITIONS & FINISHES… |
| M01055960 ↗ | 108 9 AVENUE MANHATTAN | Alteration | Signed-off | 05/31/2024 | 06/27/2024 | APT. 2C INTERIOR RENOVATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | |
| 123527120BIS | 122 EAST 102 STREET MANHATTAN | — | ISSUED | 04/12/2019 | 04/26/2024 | — | MH, OT, PL |
| B00993752 ↗ | 308 STANHOPE STREET BROOKLYN | Alteration | Permit Issued | 01/24/2024 | 02/05/2024 | Design BASIC GROUPS CORP Filer BASIC GROUPS CORP | PROPOSED INTERIOR RENOVATION OF EXISTING SECOND FLOOR. NO CHANGE IN USE EGRESS OR OCCUPANCY. |
| M00781344 ↗ | 317 EAST 78 STREET MANHATTAN | Alteration | Permit Issued | 07/29/2022 | 01/22/2024 | Design LONGTIN SOLUTIONS LLC Filer BASIC GROUPS CORP | PROPOSED INTERIOR RENOVATION OF APT#1A, 3C, 3D, 4A, 4C & LOBBY ON EXISTING 4 STORYBUILDING. PARTITION WORK AS PER PLANS. NO CHANGE ON EGRESS… |
| M00989201 ↗ | 1567 YORK AVENUE MANHATTAN | Alteration | Permit Issued | 01/15/2024 | 01/19/2024 | Design BASIC GROUPS CORP | REPAIR AND RE-TILE EXISTING STAIRCASE AND HALLWAY FROM 1ST FLOOR THRU 3RD FLOOR. NO CHANGE ON EGRESS, USE OR OCCUPANCY. |
| M00989205 ↗ | 1571 YORK AVENUE MANHATTAN | Alteration | Permit Issued | 01/15/2024 | 01/19/2024 | Design BASIC GROUPS CORP | REPAIR AND RE-TILE EXISTING STAIRCASE AND HALLWAY FROM 1ST FLOOR THRU 5TH FLOOR. NO CHANGE ON EGRESS, USE OR OCCUPANCY. |
| M00919807 ↗ | 307 EAST 104 STREET MANHATTAN | Alteration | Signed-off | 08/24/2023 | 12/14/2023 | Design BASIC GROUPS CORP Filer BASIC GROUPS CORP | PROPOSED INTERIOR RENOVATION ON BASEMENT AND 1ST FLOOR OF EXISTING 4 STORY BUILDING, PARTITION WORKS AS PER PLANS. NO CHANGE USE OR OCCUPAN… |
| B00593709 ↗ | 285 QUINCY STREET BROOKLYN | Alteration | Permit Issued | 10/12/2021 | 12/12/2023 | Design BASIC GROUPS CORP Filer BASIC GROUPS CORP | PROPOSED INTERIOR RENOVATION OF EXISTING APARTMENT #C ON 1ST FLOOR AND SUPER'S APARTMENT #CEL IN CELLAR. PARTITION WORK AS PER PLAN. ALL PLU… |
| B00967948 ↗ | 151 NORTH 7 STREET BROOKLYN | Alteration | Signed-off | 11/28/2023 | 12/05/2023 | Design BASIC GROUPS CORP Filer BASIC GROUPS CORP | INSTALL A TEMPORARY CONSTRUCTION FENCE AT OPEN SPACE AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00953411 ↗ | 238 EAST 58 STREET MANHATTAN | Alteration | Signed-off | 11/09/2023 | 11/20/2023 | Owner WITNICK MANAGEMENT LLC | INTERIOR RENOVATIONS FOR APT. 11 AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00935500 ↗ | 109 ELDRIDGE STREET MANHATTAN | Alteration | Signed-off | 09/22/2023 | 10/11/2023 | INTERIOR RENOVATIONS FOR APT. 14 AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | |
| M00939088 ↗ | 116 EAST 31 STREET MANHATTAN | Alteration | Signed-off | 09/28/2023 | 09/29/2023 | INSTALLATION OF AN 8 FEET HIGH TEMPORARY CONSTRUCTION FENCE AS PER THE PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCUPANCY. | |
| M00823473 ↗ | 170 1 AVENUE MANHATTAN | Alteration | Permit Issued | 07/12/2023 | 09/11/2023 | Design BASIC GROUPS CORP Filer BASIC GROUPS CORP | PROPOSED INTERIOR RENOVATION OF APT#0 ON 1ST FLOOR , INSTALL NEW METAL STAIRS FROM CELLAR TO APT#0 . CONSTRUCTIONS WORKS AS PER PLAN, NO CH… |
| M00728940 ↗ | 170 1 AVENUE MANHATTAN | Alteration | Permit Issued | 05/05/2022 | 08/18/2023 | Design LONGTIN SOLUTIONS LLC Filer BASIC GROUPS CORP | REPAIR STAIRCASE OF EXISTING 5 STORY BUILDING. CONSTRUCTIONS WORKS AS PER PLAN, NO CHANGE ON EGRESS, USE OR OCCUPANCY. |
| M00892050 ↗ | 116 EAST 31 STREET MANHATTAN | Alteration | Signed-off | 07/18/2023 | 08/04/2023 | Design BLUE SKY DESIGN, INC. Owner WITNICK MANAGEMENT LLC | STRUCTURAL FRAMING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00904509 ↗ | 1727 2 AVENUE MANHATTAN | Alteration | Permit Issued | 07/21/2023 | 07/29/2023 | Design BASIC GROUPS CORP | COMBINE APARTMENTS 2RS AND 2RN ON 2ND FLOOR AND APARTMENTS 3RS AND 3RN ON 3RD FLOOR; NO CHANGES TO USE EGREES OR OCCUPANCY |
| Q00870959 ↗ | 65-15 ALDERTON STREET QUEENS | Alteration | Signed-off | 05/08/2023 | 06/28/2023 | Design BASIC GROUPS CORP Filer BASIC GROUPS CORP | PROPOSED INTERIOR RENOVATION OF APT#2B ON 2ND FLOOR. PARTITION WORKS AS PER PLANS. NO CHANGE ON EGRESS, USE OR OCCUPANCY. |
| M00893325 ↗ | 1725 2 AVENUE MANHATTAN | Alteration | Permit Issued | 06/20/2023 | 06/23/2023 | Design BASIC GROUPS CORP Filer BASIC GROUPS CORP | PROPOSED INTERIOR RENOVATION OF APT#1RN,1RS ON 1ST FLOOR, APT#2RN, 2RS, 2FN, 2FS ON 2ND FLOOR APT#5FN, 5FS ON 5TH FLOOR. COMBINE APARTMENTS … |
| 321924520BIS | 914 47 STREET BROOKLYN | — | ISSUED | 03/28/2019 | 06/05/2023 | — | OT |
| 321924539BIS | 926 47 STREET BROOKLYN | — | ISSUED | 03/28/2019 | 06/05/2023 | — | OT, PL |
| M00876327 ↗ | 108 9 AVENUE MANHATTAN | Alteration | Signed-off | 05/18/2023 | 05/31/2023 | Owner WITNICK MANAGEMENT LLC | APT. 3C INTERIOR RENOVATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00819575 ↗ | 403 EAST 77 STREET MANHATTAN | Alteration | Signed-off | 02/28/2023 | 05/30/2023 | Design CHERNY ARCHITECT PLLC | Replace existing plumbing fixtures and add new plumbing fixtures. |
| M00865799 ↗ | 417 EAST 9 STREET MANHATTAN | Alteration | Signed-off | 05/05/2023 | 05/23/2023 | LEGALIZATION OF WORK FOR APT. 5 IN BASEMENT AND ON 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | |
| B00801261 ↗ | 187 ST MARKS AVENUE BROOKLYN | Alteration | Signed-off | 12/29/2022 | 04/28/2023 | Design BASIC GROUPS CORP Owner URBAN STANDARD CAPITAL Filer BASIC GROUPS CORP | PROPOSED INTERIOR RENOVATION OF APT#1R ON 1ST FLOOR. CONSTRUCTION WORKS AS PER PLAN, NO CHANGE ON EGRESS, USE OR OCCUPANCY. |
| B00686817 ↗ | 191 BEDFORD AVENUE BROOKLYN | Alteration | Signed-off | 03/01/2022 | 04/27/2023 | Design MCCRAY ARCHITECT P.C. Owner BLUE SKY GROUP Filer BASIC GROUPS CORP | INSTALL A TEMPORARY CONSTRUCTION FENCE AT OPEN SPACE AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00843632 ↗ | 225 EAST 14 STREET MANHATTAN | Alteration | Signed-off | 04/04/2023 | 04/22/2023 | Owner WITNICK MANAGEMENT LLC | APARTMENT 3D RENOVATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| Q00849929 ↗ | 88-19 PARSONS BOULEVARD QUEENS | Alteration | Signed-off | 03/28/2023 | 03/29/2023 | Design BASIC GROUPS CORP Filer BASIC GROUPS CORP | Interior renovation of existing building floor 1,2,3. Construction and mechanical work as per plan. |
| X00822222 ↗ | 1881 GRAND CONCOURSE BRONX | Alteration | Permit Issued | 02/10/2023 | 03/20/2023 | Design BASIC GROUPS CORP | PROPOSED INTERIOR RENOVATION OF APT#B1 ON 2ND FLOOR, APT#C1 ON 3RD FLOOR, APT#E1 ON 5TH FLOOR. COMBINE APARTMENTS ON 2ND FLOOR, 3RD FLOOR. P… |
| M00813522 ↗ | 728 AMSTERDAM AVENUE MANHATTAN | Alteration | Signed-off | 01/18/2023 | 03/15/2023 | Design CHERNY ARCHITECT PLLC | Renovation of Apt. 3N on 3rd floor. Partition work per plans. No change in use, egress or occupancy under this application. Plumbing work… |
| M08021230 ↗ | 515 WEST 48 STREET MANHATTAN | Alteration | Permit Issued | 10/18/2022 | 03/02/2023 | Design BASIC GROUPS CORP | PROPOSED INTERIOR RENOVATION OF APT#3RW ON 3RD FLOOR, APT#5RW, 5FE ON 5TH FLOOR, REPAIR EXISTING STAIRCASE. PARTITION WORKS AS PER PLANS. NO… |
| Q08055648 ↗ | 30-91 14 STREET QUEENS | Alteration | Signed-off | 01/13/2023 | 02/24/2023 | Design BLUE SKY DESIGN, INC. Owner VARIANT SERVICES, INC | STRUCTURAL REPAIRS FOR GARAGE TO ADDRESS DOB VIOLATIONS RELATED TO DAMAGE DUE TO FIRE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS … |
| B08034594 ↗ | 232 STANHOPE STREET BROOKLYN | Alteration | Permit Issued | 11/09/2022 | 02/11/2023 | Design BASIC GROUPS CORP Filer BASIC GROUPS CORP | REPAIR AND RE-TILE EXISTING STAIRCASE AND HALLWAY FROM 1ST FLOOR THRU 3RD FLOOR. PARTITION WORKS AS PER PLANS. NO CHANGE ON EGRESS, USE OR … |
| M00786053 ↗ | 410 ST NICHOLAS AVENUE MANHATTAN | Alteration | Signed-off | 08/29/2022 | 01/30/2023 | Design WILLIAM MADDEN ENGINEER Owner MANAGEMENT OFFICE Filer BLANCO DESIGN, INC. | Interior alteration of apartment lobby K and J, including changing layout, removal of non-bearing walls and install new. Flooring to be repa… |
| 322033973BIS | 145 HENRY STREET BROOKLYN | — | ISSUED | 06/24/2020 | 01/19/2023 | — | OT |
| M08032223 ↗ | 403 EAST 77 STREET MANHATTAN | Alteration | Permit Issued | 11/17/2022 | 01/10/2023 | Design BEALIN GROUPS CORP | REPAIR AND RE-TILE EXISTING STAIRCASE FROM 1ST FLOOR TO ROOF. PARTITION WORK AS PER PLANS. NO CHANGE ON EGRESS, USE OR OCCUPANCY. |
| X08053193 ↗ | 553 WALTON AVENUE BRONX | Alteration | Permit Issued | 12/14/2022 | 01/10/2023 | Design BASIC GROUPS CORP | PROPOSED INTERIOR RENOVATION OF APT#3, 6, COMBINE APT#8 &11. PARTITION WORKS AS PER PLANS. NO CHANGE ON EGRESS, USE OR OCCUPANCY. |
| M08052614 ↗ | 116 EAST 31 STREET MANHATTAN | Alteration | Signed-off | 12/27/2022 | 01/06/2023 | MEDICAL OFFICE RENOVATION IN BASEMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | |
| B00628364 ↗ | 93 HICKS STREET BROOKLYN | Alteration | Signed-off | 11/19/2021 | 12/24/2022 | Design SPACE 4 ARCHITECTURE Owner WITNICK MANAGEMENT LLC | APARTMENTS RENOVATION AND INTERIOR STAIR REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M08035012 ↗ | 220 EAST 49 STREET MANHATTAN | Alteration | Permit Issued | 11/14/2022 | 12/01/2022 | Filer EA DESIGN GROUP, INC. | APPLICATION FILED INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 5TH FL (APT 5A & 5B) AS PER PLANS FILED … |
| X00658861 ↗ | 336 EAST 166 STREET BRONX | Alteration | Signed-off | 02/03/2022 | 11/16/2022 | Design BASIC GROUPS CORP Owner BLUE SKY GROUP Filer BASIC GROUPS CORP | PROPOSED INTERIOR RENOVATION OF EXISTING CELLAR, 2ND, 3RD AND 5TH FLOOR.CONSTRUCTION WORK AS PER PLAN. NO CHANGE IN EGRESS, USE OROCCUPANCY. |
| B08026619 ↗ | 261 DEVOE STREET BROOKLYN | Alteration | Permit Issued | 11/01/2022 | 11/12/2022 | Filer EA DESIGN GROUP, INC. | APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 3RD FLOOR (APT 3R & 3L) AS PER PLANS… |
| B08008143 ↗ | 187 BOND STREET BROOKLYN | Alteration | Signed-off | 10/01/2022 | 10/14/2022 | Owner WITNICK MANAGEMENT LLC | Apt 2R: Interior renovations as per plans filed herewith, No change to use, egress or occupancy. |
| M07996050 ↗ | 180 1 AVENUE MANHATTAN | Alteration | Permit Issued | 08/31/2022 | 09/06/2022 | Design LONGTIN SOLUTIONS LLC Filer BASIC GROUPS CORP | INTERIOR RENOVATION ON 2ND FLOOR, 3RD FLOOR, 4TH FLOOR AND 5TH FLOOR. COMBINE APARTMENTS ON 2ND FLOOR AND 4TH FLOORS. PARTITION WORKS AS PER… |