Roof4p · 1 filing · 5 docs
Architecture
FACADE RESTORATION AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
On file for this project
5 documents · 4 drawing sheets
Bulkhead1p · 1 filing · 5 docs
Architecture
FACADE RESTORATION AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
On file for this project
5 documents · 1 drawing sheet
Floor 381p · 1 filing · 20 docs
Fire Protection
MODIFICATIONS TO THE EXISTING SPRINKLER SYSTEM THROUGHOUT THE BUILDING IN ACCORDANCE WITH LL 26. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
20 documents · 1 drawing sheet
Floor 371p · 1 filing · 20 docs
Fire Protection
MODIFICATIONS TO THE EXISTING SPRINKLER SYSTEM THROUGHOUT THE BUILDING IN ACCORDANCE WITH LL 26. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
20 documents · 1 drawing sheet
Floor 36
Floor 3510p · 4 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Modification to the existing plumbing system on the 29th & 35th floor - Cushman Wakefield as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 2 drawing sheets
Modification to the existing sprinkler system on the 29th & 35th floor - Cushman & Wakefield as per plans. No change to use, egress or occupancy.
On file for this project
8 documents · 3 drawing sheets
Modification to the existing HVAC system on the 29th & 35th floor - Cushman & Wakefield as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 3416p · 5 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
Mechanical Systems
Modifications to the existing sprinkler system on the 20th, 31st, 32nd & 34th floors ( Core Restrooms) as per plans. No change to use, egress or occupancy
On file for this project
4 documents · 1 drawing sheet
Modifications to the existing HVAC system on the 20th, 31st, 32nd & 34th floors (Core Restrooms) as per plans. No change to use, egress or occupancy
On file for this project
6 documents
Modifications to the existing plumbing system on the 20th, 31st, 32nd & 34th floors (Core Restrooms) as per plans. No change to use, egress or occupancy
On file for this project
10 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 338p · 4 filings · 17 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 33rd floor (Suite 3300) as per plans. No change to use, egress or occupancy.
On file for this project
5 documents · 2 drawing sheets
Modifications to the existing HVAC system on the 33rd floor (Suite 3300) as per plans. No change to use, egress or occupancy.
On file for this project
5 documents · 2 drawing sheets
Modifications to the existing plumbing system on the 33rd floor (Suite 3300) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 32Under Construction60p · 7 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Modification to the existing sprinkler system on the 32nd floor as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 4 drawing sheets
Minor demolition. Installation of interior partitions, fixtures, suspended ceilings & floor finishes on the 32nd floor as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 4 drawing sheets
Modification to the existing HVAC system on the 32nd floor as per plans. No change to use, egress or occupancy.
On file for this project
10 documents
Latest 3 of 7 filings on this floor.
Floor 31Under Construction25p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Removal of existing sprinkler fixtures on the 31st floor as per plans. No change to use, egress or occupancy.
On file for this project
6 documents
Removal of existing plumbing fixtures on the 31st floor as per plans. No change to use, egress or occupancy
On file for this project
3 documents
Removal and disposal of interior partitions, fixtures, suspended ceilings & floor finishes on the 31st floor as per plans. No change to use, egress or occupancy.
On file for this project
4 documents
Latest 3 of 7 filings on this floor.
Floor 3013p · 3 filings · 16 docs
CivilFire ProtectionMechanicalPlumbing
Modifications to the existing Sprinkler System as per plans (LL Work/ Buildout.) No change to use, egress or occupancy.
On file for this project
10 documents · 1 drawing sheet
Installation of plumbing fixtures and associated piping as per plans (LL Work/ Buildout.) No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Modifications to the existing HVAC System and new distribution of duct work and diffusers as per plans (LL Work/ Buildout.) No change to use, egress or occupancy.
On file for this project
3 documents · 11 drawing sheets
Floor 29Under Construction52p · 7 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Modifications to the existing plumbing system on the 29th floor (Sapient Capital) as per plans. No change to use, egress or occupancy
On file for this project
4 documents · 1 drawing sheet
Project M01333240Permit Issued · 01/23/2026
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 29th floor (Sapient Capital) as per plans. No change to use, egress or occupancy.
On file for this project
6 drawing sheets
Project M01333304Permit Issued · 01/22/2026
Modifications to the existing sprinkler system on the 29th floor (Sapient Capital) as per plans. No change to use, egress or occupancy
On file for this project
1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 28
Floor 278p · 3 filings · 20 docs
ArchitectureFire ProtectionPlumbing
Modifications to the existing Sprinkler System as per plans (LL Work - Buildout.) No change to use, egress or occupancy.
On file for this project
10 documents · 2 drawing sheets
Installation of new plumbing fixtures and associated piping as per plans (LL Work - Buildout.) No change to use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Modifications to the existing HVAC system, new distribution of duct work and diffusers as per plans (LL Work - Buildout.) No change to use, egress or occupancy.
On file for this project
10 documents · 4 drawing sheets
Floor 26
Floor 2539p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Modifications to the existing sprinkler systems on the 22nd, 23rd and 25th floors as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 22nd, 23rd and 25th floor as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 6 drawing sheets
Modifications of the existing HVAC system on the 22nd, 23rd and 25th floor as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 24
Floor 2341p · 7 filings · 20 docs
ArchitectureDMFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Modifications to the existing sprinkler systems on the 22nd, 23rd and 25th floors as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 22nd, 23rd and 25th floor as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 4 drawing sheets
Modifications of the existing HVAC system on the 22nd, 23rd and 25th floor as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 2 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 2241p · 6 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 29th & 35th floor - Cushman & Wakefield as per plans. No change to use, egress or occupancy.
On file for this project
5 documents · 2 drawing sheets
Modifications to the existing sprinkler systems on the 22nd, 23rd and 25th floors as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 3 drawing sheets
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 22nd, 23rd and 25th floor as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 6 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 21
Floor 2014p · 5 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
Mechanical Systems
Modifications to the existing sprinkler system on the 20th floor (Tredway) as per plans. No change to use, egress or occupancy
On file for this project
7 documents · 1 drawing sheet
Modifications to the existing sprinkler system on the 20th, 31st, 32nd & 34th floors ( Core Restrooms) as per plans. No change to use, egress or occupancy
On file for this project
4 documents · 1 drawing sheet
Modifications to the existing HVAC system on the 20th, 31st, 32nd & 34th floors (Core Restrooms) as per plans. No change to use, egress or occupancy
On file for this project
6 documents
Latest 3 of 5 filings on this floor.
Floor 19Under Construction58p · 4 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingOther
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Modifications to the existing plumbing system on the 19th floor (Buildout) as per plans. No change to use, egress or occupancy
On file for this project
7 documents · 3 drawing sheets
Modifications to the existing sprinkler system on the 19th floor (Buildout) as per plans. No change to use, egress or occupancy
On file for this project
6 documents · 2 drawing sheets
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 19th floor (Buildout) as per plans. No change to use, egress or occupancy.
On file for this project
8 documents · 6 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 189p · 4 filings · 19 docs
ArchitectureFire ProtectionMechanicalPlumbing
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 18th floor (Suite 1801) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 3 drawing sheets
Modifications to the existing HVAC system on the 18th floor (Suite 1801) as per plans. No change to use, egress or occupancy.
On file for this project
5 documents · 2 drawing sheets
Modifications to the existing plumbing system on the 18th floor (Suite 1801) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 1711p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Additions / modifications to existing plumbing system and existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
11 documents · 2 drawing sheets
Modification to existing HVAC system and plumbing fixtures as per plans filed herewith. NO change in use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Removal and installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
5 documents · 5 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 16
Floor 1510p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Additions / modifications to existing plumbing system and existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
11 documents · 2 drawing sheets
Modification to existing HVAC system and plumbing fixtures as per plans filed herewith. NO change in use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Removal and installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
5 documents · 4 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 141p · 1 filing · 20 docs
Fire Protection
MODIFICATIONS TO THE EXISTING SPRINKLER SYSTEM THROUGHOUT THE BUILDING IN ACCORDANCE WITH LL 26. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
20 documents · 1 drawing sheet
Floor 1314p · 8 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Additions / modifications to existing plumbing system and existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
11 documents · 2 drawing sheets
Modification to existing HVAC system and plumbing fixtures as per plans filed herewith. NO change in use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Removal and installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
5 documents · 4 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 12
Floor 1114p · 7 filings · 20 docs
ArchitectureElectricalFire ProtectionGeneralMechanicalPlumbing
Plumbing (PL): Modification to existing Plumbing fixtures as per plans filed herewith Sprinkler (SP): Modification to existing Sprinkler system as per plans filed herewith.
On file for this project
12 documents · 2 drawing sheets
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application
On file for this project
4 documents · 2 drawing sheets
New interior office build out. Scope to include private offices, open workstation area, support spaces.
On file for this project
8 documents · 5 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 1016p · 8 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Plumbing (PL): Modification to existing Plumbing fixtures as per plans filed herewith Sprinkler (SP): Modification to existing Sprinkler system as per plans filed herewith.
On file for this project
12 documents · 3 drawing sheets
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application
On file for this project
4 documents · 1 drawing sheet
New interior office build out. Scope to include private offices, open workstation area, support spaces.
On file for this project
8 documents · 4 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 917p · 8 filings · 20 docs
ArchitectureElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Plumbing (PL): Modification to existing Plumbing fixtures as per plans filed herewith Sprinkler (SP): Modification to existing Sprinkler system as per plans filed herewith.
On file for this project
12 documents · 2 drawing sheets
Installation of steel plates to support moving fixtures.
On file for this project
3 documents · 1 drawing sheet
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application
On file for this project
4 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 8
Floor 717p · 7 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Additions / modifications to existing plumbing system and existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
11 documents · 2 drawing sheets
Modification to existing HVAC system and plumbing fixtures as per plans filed herewith. NO change in use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Removal and installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
5 documents · 6 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 6
Floor 5Under Construction76p · 3 filings · 20 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Modifications to the existing sprinkler system on the 2nd thru 5th floors (NIKE HOI) as per plans. No change to use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Modifications to the existing HVAC system on the Cellar, 1st - 5th floors (Nike - HOI) as per plans. No change to use, egress or occupancy
On file for this project
9 documents
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the Cellar, 1st - 5th floor (Nike HOI) as per plans. No change to use, egress or occupancy.
On file for this project
20 documents · 3 drawing sheets
Floor 4Under Construction74p · 3 filings · 20 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Modifications to the existing sprinkler system on the 2nd thru 5th floors (NIKE HOI) as per plans. No change to use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Modifications to the existing HVAC system on the Cellar, 1st - 5th floors (Nike - HOI) as per plans. No change to use, egress or occupancy
On file for this project
9 documents
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the Cellar, 1st - 5th floor (Nike HOI) as per plans. No change to use, egress or occupancy.
On file for this project
20 documents · 1 drawing sheet
Floor 3Under Construction74p · 3 filings · 20 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Modifications to the existing sprinkler system on the 2nd thru 5th floors (NIKE HOI) as per plans. No change to use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Modifications to the existing HVAC system on the Cellar, 1st - 5th floors (Nike - HOI) as per plans. No change to use, egress or occupancy
On file for this project
9 documents
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the Cellar, 1st - 5th floor (Nike HOI) as per plans. No change to use, egress or occupancy.
On file for this project
20 documents · 1 drawing sheet
Floor 2Under Construction75p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Modifications to the existing sprinkler system on the 2nd thru 5th floors (NIKE HOI) as per plans. No change to use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Modifications to the existing HVAC system on the Cellar, 1st - 5th floors (Nike - HOI) as per plans. No change to use, egress or occupancy
On file for this project
9 documents
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the Cellar, 1st - 5th floor (Nike HOI) as per plans. No change to use, egress or occupancy.
On file for this project
20 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 1Under Construction65p · 2 filings · 20 docs
ArchitectureMechanical
Issued Permit Scope
General Construction · Mechanical Systems
Modifications to the existing HVAC system on the Cellar, 1st - 5th floors (Nike - HOI) as per plans. No change to use, egress or occupancy
On file for this project
9 documents
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the Cellar, 1st - 5th floor (Nike HOI) as per plans. No change to use, egress or occupancy.
On file for this project
20 documents · 1 drawing sheet
CellarUnder Construction85p · 4 filings · 20 docs
ArchitectureDMFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Modifications to the existing sprinkler system on the 2nd thru 5th floors (NIKE HOI) as per plans. No change to use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Modifications to the existing HVAC system on the Cellar, 1st - 5th floors (Nike - HOI) as per plans. No change to use, egress or occupancy
On file for this project
9 documents · 1 drawing sheet
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the Cellar, 1st - 5th floor (Nike HOI) as per plans. No change to use, egress or occupancy.
On file for this project
20 documents · 10 drawing sheets
Latest 3 of 4 filings on this floor.
Sub-Cellar2p · 1 filing · 20 docs
Fire Protection
MODIFICATIONS TO THE EXISTING SPRINKLER SYSTEM THROUGHOUT THE BUILDING IN ACCORDANCE WITH LL 26. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
20 documents · 2 drawing sheets