← Back
Primarily 5-6 family with 1 store or office
6517 11 AVENUE
BROOKLYN · BIN 3142210
💬 Discuss this project
1931Year Built
3Stories
S5Building Class
R6BZoning
4,980 sfGross Floor Area
6Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Primarily 5-6 family with 1 store or office · 2,000 sf lot · 2.49 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Floor 12p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
2 BY 4 ARCHITECTURE PC608/11/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A-G HOME IMPROVEMENT CORPGeneral Contractor407/08/2026
WASOFF PLBG & UTILITY COPlumbing307/08/2026
MAC ELECT'L CONTR. INC.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
2 BY 4 ARCHITECTURE P.C.4737608/11/2023
SD TESTING & INSPECTION S7010104/06/2023
Building Lifecycle
All (54)Filed (6)Permit Issued (5)Signed Off (2)Violation (12)Inspection (6)Special Inspection (23)
04/30/2026
Violation issued (HPD, closed)
A
06/05/2025
Violation issued (HPD, closed)
A
04/03/2024
Violation issued (HPD, closed)
A
11/20/2023
Violation issued (HPD, closed)
I
09/29/2023
Signed off — Alteration
INTERIOR RENOVATION WITH REPAIRING PARTITION, FLOORING, CEILING ON 1ST FLOOR STORE & CELLAR. INSTALL BUSINESS AWNING. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION.
B07995421-I1
09/29/2023
Signed off — Alteration
SUBMIT BOILER WORK TYPE AS PER PLAN. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION.
B08039771-I1
09/25/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/07/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/27/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHI WANG LEE
08/13/2023
Special inspection requirement — Energy Code Compliance Inspections
CHI WANG LEE
08/13/2023
Special inspection requirement — Fire-Resistance Rated Construction
CHI WANG LEE
08/13/2023
Special inspection requirement — Interior lighting power
CHI WANG LEE
08/11/2023
Filed — Alteration
INTERIOR RENOVATION WITH REPAIRING PARTITION, FLOORING, CEILING ON 1ST FLOOR STORE & CELLAR. INSTALL BUSINESS AWNING. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION.
B07995421-P1
07/25/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
07/22/2023
Special inspection requirement — Maintenance information
CHI WANG LEE
07/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHI WANG LEE
07/22/2023
Special inspection requirement — Energy Code Compliance Inspections
CHI WANG LEE
07/22/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
CHI WANG LEE
07/22/2023
Special inspection requirement — HVAC-R and service water heating system controls
CHI WANG LEE
07/22/2023
Special inspection requirement — HVAC-R and service water heating equipment
CHI WANG LEE
07/21/2023
Filed — Alteration
PROPOSED PLUMBING WORK ON CELLAR. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION.
B07995423-P2
07/20/2023
Special inspection requirement — HVAC-R and service water heating system controls
CHI WANG LEE
07/20/2023
Special inspection requirement — Energy Code Compliance Inspections
CHI WANG LEE
07/20/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
CHI WANG LEE
07/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHI WANG LEE
07/20/2023
Special inspection requirement — Maintenance information
CHI WANG LEE
07/20/2023
Special inspection requirement — HVAC-R and service water heating equipment
CHI WANG LEE
07/14/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/27/2023
Filed — Alteration
PROPOSED PLUMBING WORK ON CELLAR. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION.
B07995423-P1
06/27/2023
Permit issued — General Construction
B07995421-I1-GC
05/25/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/08/2023
Permit issued — Boiler Equipment
B08039771-I1-BE
04/28/2023
Permit issued — Plumbing
B07995423-I1-PL
04/06/2023
Filed — Alteration
SUBMIT BOILER WORK TYPE AS PER PLAN. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION.
B08039771-I1
03/20/2023
Violation issued (HPD, closed)
A
03/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHI WANG LEE
03/01/2023
Permit issued — General Construction
B07995421-I1-GC
02/24/2023
Permit issued — Plumbing
B07995423-I1-PL
11/17/2022
Filed — Alteration
PROPOSED PLUMBING WORK ON CELLAR. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION.
B07995423-I1
11/14/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
CHI WANG LEE
11/14/2022
Special inspection requirement — Tenant Protection Plan Compliance
XIUCHENG LI
11/14/2022
Special inspection requirement — Heating Systems
CHI WANG LEE
11/14/2022
Special inspection requirement — HVAC-R and service water heating equipment
CHI WANG LEE
11/14/2022
Special inspection requirement — Maintenance information
CHI WANG LEE
11/14/2022
Special inspection requirement — HVAC-R and service water heating system controls
CHI WANG LEE
11/02/2022
Filed — Alteration
INTERIOR RENOVATION WITH REPAIRING PARTITION, FLOORING, CEILING ON 1ST FLOOR STORE & CELLAR. INSTALL BUSINESS AWNING. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION.
B07995421-I1
02/18/2022
Violation issued (HPD, closed)
I
02/18/2022
Violation issued (HPD, closed)
A
04/05/2021
Violation issued (HPD, closed)
A
04/05/2021
Violation issued (HPD, closed)
I
10/12/2018
Violation issued (HPD, closed)
I
10/06/2015
Violation issued (HPD, closed)
I
05/26/2013
Violation issued (HPD, closed)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offA-G HOME IMPROVEMENT CORP06/27/2023
DOB NOWBoiler EquipmentSigned-offWASOFF PLBG & UTILITY CO05/08/2023
DOB NOWPlumbingSigned-offWASOFF PLBG & UTILITY CO04/28/2023
DOB NOWGeneral ConstructionSigned-offA-G HOME IMPROVEMENT CORP03/01/2023
DOB NOWPlumbingSigned-offWASOFF PLBG & UTILITY CO02/24/2023
1 job · most recent 07/21/2023
Gas Water/Sanitary
FiledStatusContractorScope
07/21/2023Signed-offWASOFF PLBG & UTILITY COGas, Water/Sanitary
2 jobs · most recent 03/14/2023
General Wiring
FiledStatusContractorScope
03/14/2023CompleteNEAD ELECTRIC INC.General Wiring
10/03/2020CompleteMAC ELECT'L CONTR. INC.7 meters, 7 new_meters
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
09/25/2023Pass-Final General Construction Non-Directive 14PassView ↗
09/07/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/27/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/25/2023Pass-Final Boiler Equipment InspectionPassView ↗
07/14/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/25/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
08/13/2023Fire-Resistant Penetrations and JointsCHI WANG LEEspecial
08/13/2023Energy Code Compliance InspectionsCHI WANG LEEprogress
08/13/2023Fire-Resistance Rated ConstructionCHI WANG LEEprogress
08/13/2023Interior lighting powerCHI WANG LEEenergy_progress
07/22/2023Maintenance informationCHI WANG LEEenergy_progress
07/22/2023Fire-Resistant Penetrations and JointsCHI WANG LEEspecial
07/22/2023Energy Code Compliance InspectionsCHI WANG LEEprogress
07/22/2023HVAC-R and service water piping design and insulationCHI WANG LEEenergy_progress
07/22/2023HVAC-R and service water heating system controlsCHI WANG LEEenergy_progress
07/22/2023HVAC-R and service water heating equipmentCHI WANG LEEenergy_progress
07/20/2023HVAC-R and service water heating system controlsCHI WANG LEEenergy_progress
07/20/2023Energy Code Compliance InspectionsCHI WANG LEEprogress
07/20/2023HVAC-R and service water piping design and insulationCHI WANG LEEenergy_progress
07/20/2023Fire-Resistant Penetrations and JointsCHI WANG LEEspecial
07/20/2023Maintenance informationCHI WANG LEEenergy_progress
07/20/2023HVAC-R and service water heating equipmentCHI WANG LEEenergy_progress
03/20/2023Fire-Resistant Penetrations and JointsCHI WANG LEEspecial
11/14/2022HVAC-R and service water piping design and insulationCHI WANG LEEenergy_progress
11/14/2022Tenant Protection Plan ComplianceXIUCHENG LIspecial
11/14/2022Heating SystemsCHI WANG LEEspecial
11/14/2022HVAC-R and service water heating equipmentCHI WANG LEEenergy_progress
11/14/2022Maintenance informationCHI WANG LEEenergy_progress
11/14/2022HVAC-R and service water heating system controlsCHI WANG LEEenergy_progress
▾Documents — 41 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/28/2026B07995421-I1Request digital key ↗
08/28/2026B07995421-P1Request digital key ↗
08/28/2026B07995423-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications29
▸DOB NOWProgress Inspector Seal & Signature17
09/23/2026B08039771-I1Open ↗
09/23/2026B08039771-I1Open ↗
09/23/2026B08039771-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/28/2026B07995421-I1Open ↗
08/28/2026B07995421-P1Open ↗
08/28/2026B07995423-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026B08039771-I1Open ↗
09/23/2026B08039771-I1Open ↗
09/23/2026B08039771-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/28/2026B07995421-P1Open ↗
08/28/2026B07995421-I1Open ↗
08/28/2026B07995423-P1Open ↗
Showing 3 of 6 on file for this type