← Back
Pier, dock, bulkhead
652 KENT AVENUE
BROOKLYN · Brooklyn Navy Yard · BIN 3335134
💬 Discuss this project
1958Year Built
15Stories
T2Building Class
M3-1Zoning
7,058,736 sfGross Floor Area
1Units
LL97 Covered22 Open Violations 1 unresolved · 21 paperwork only ▸FDNY Report ↗
Pier, dock, bulkhead · Owner of record: NYC DEPARTMENT OF SMALL BUSINESS SERVICES · 6,429,961 sf lot · 1.1 FAR built · Flood zone X500
Locations of Work
Structural
Roof1p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
H2M ARCHITECTS + ENGINEERS401/28/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METROPOLIS GROUP INC803/21/2026
Building Lifecycle
All (36)Filed (4)Objection (12)Special Inspection (20)
07/21/2026
Objection raised — Other
07/07/2026
Objection resolved — Addressed
07/06/2026
Objection raised — Other
07/01/2026
Objection resolved — Addressed
06/15/2026
Objection raised — Other
06/15/2026
Objection raised — Energy
03/19/2026
Objection resolved — Addressed
03/12/2026
Objection raised — Energy
03/11/2026
Objection resolved — Addressed
03/05/2026
Objection resolved — Addressed
02/02/2026
Objection raised — Scope
01/30/2026
Objection raised — Admin
01/28/2026
Filed — Alteration CO
PLEASE ASSIGN TO HUB CDU. HORIZONTAL ENLARGEMENT TO CREATE NEW 1-STORY ELECTRICAL SUBSTATION. WORK ON FLOORS OSP, 01, ROF.
B01313470-S3
01/28/2026
Filed — Alteration CO
PLEASE ASSIGN TO HUB CDU. HORIZONTAL ENLARGEMENT TO CREATE NEW 1-STORY ELECTRICAL SUBSTATION. WORK ON FLOORS OSP, 01, ROF.
B01313470-S1
01/27/2026
Filed — Alteration CO
PLEASE ASSIGN TO HUB CDU. HORIZONTAL ENLARGEMENT TO CREATE NEW 1-STORY ELECTRICAL SUBSTATION. WORK ON FLOORS OSP, 01, ROF.
B01313470-S2
01/22/2026
Filed — Alteration CO
PLEASE ASSIGN TO HUB CDU. HORIZONTAL ENLARGEMENT TO CREATE NEW 1-STORY ELECTRICAL SUBSTATION. WORK ON FLOORS OSP, 01, ROF.
B01313470-I1
12/15/2025
Special inspection requirement — Structural Cold-Formed Steel
12/15/2025
Special inspection requirement — Sprayed fire-resistant materials
12/15/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
12/15/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
12/15/2025
Special inspection requirement — Open-web Steel Joists and Joist Girders
11/20/2025
Special inspection requirement — Concrete - Cast-In-Place
11/20/2025
Special inspection requirement — Post-installed Anchors
11/20/2025
Special inspection requirement — Concrete - Cast-In-Place
11/20/2025
Special inspection requirement — Structural Steel - Details
11/20/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
11/20/2025
Special inspection requirement — Deep Foundation Elements
11/20/2025
Special inspection requirement — Structural Steel - High Strength Bolting
11/20/2025
Special inspection requirement — Structural Steel - Welding
11/04/2025
Special inspection requirement — Lowest Floor Elevation
11/04/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
11/04/2025
Special inspection requirement — Lowest Floor Elevation
11/04/2025
Special inspection requirement — Final
11/04/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
11/04/2025
Special inspection requirement — Final
11/04/2025
Special inspection requirement — Footing and Foundation
Nothing on file for this building.
1 project · most recent 01/28/2026
Heating and Air Conditioning Systems
FiledStatusContractorScope
01/28/2026——Heating and Air Conditioning Systems
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
12/15/2025Structural Cold-Formed Steel—special
12/15/2025Sprayed fire-resistant materials—special
12/15/2025Construction Operations Influencing Adjacent Structures—special
12/15/2025Construction Operations Influencing Adjacent Structures—special
12/15/2025Open-web Steel Joists and Joist Girders—special
11/20/2025Concrete - Cast-In-Place—special
11/20/2025Post-installed Anchors—special
11/20/2025Concrete - Cast-In-Place—special
11/20/2025Structural Steel - Details—special
11/20/2025Subsurface Investigations (Borings/Test Pits)—special
11/20/2025Deep Foundation Elements—special
11/20/2025Structural Steel - High Strength Bolting—special
11/20/2025Structural Steel - Welding—special
11/04/2025Lowest Floor Elevation—progress
11/04/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)—special
11/04/2025Lowest Floor Elevation—progress
11/04/2025Final—progress
11/04/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)—special
11/04/2025Final—progress
11/04/2025Footing and Foundation—progress
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/18/2026B01313470-S1Request digital key ↗
08/18/2026B01313470-S3Request digital key ↗
08/15/2026B01313470-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B01313470-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026B01313470-I1Open ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/13/2026B01313470-S2Open ↗
08/13/2026B01313470-I1Open ↗
08/13/2026B01313470-S1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/15/2026B01313470-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/13/2026B01313470-S1Open ↗
08/13/2026B01313470-S2Open ↗
08/13/2026B01313470-I1Open ↗
Showing 3 of 4 on file for this type
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/13/2026B01313470-S1Open ↗
▸Approvals, Objections & Sign-offs8
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/13/2026B01313470-I1Open ↗
08/13/2026B01313470-S3Open ↗
08/13/2026B01313470-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)4
08/13/2026B01313470-I1Open ↗
08/13/2026B01313470-S1Open ↗
08/13/2026B01313470-S3Open ↗
Showing 3 of 4 on file for this type
▸Other Documents5
▸DOB NOWPlot Diagram3
08/18/2026B01313470-S1Open ↗
08/15/2026B01313470-I1Open ↗
08/13/2026B01313470-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B01313470-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01313470-I1Open ↗