← Back
BuildNYC
Elevator apt, miscellaneous
Marcy towers
652 PARK AVENUE · BIN 3390077
💬 Discuss this project
2005Year Built
9Stories
D9Building Class
R6AZoning
46,133 sfGross Floor Area
58Units
LL97 CoveredRent Stabilized6 Active Violations 1 old, status unconfirmed ▸FISP: SAFEFDNY Report ↗
Elevator apt, miscellaneous · Owner of record: Marcy Tower · 8,400 sf lot · 5.49 FAR built · Flood zone X
Locations of Work
Plumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsMarcy Towers LLC1 filing
Floor 7Unit 7D1p · 1 filing · 8 docs
Floor 61 filing · 8 docs
Floor 51 filing · 8 docs
Floor 4Unit 4D, Unit 4F2p · 1 filing · 8 docs
Floor 3Unit 3H1 filing · 8 docs
Floor 21 filing · 8 docs
Floor 1Unit 1G1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
405 Bedford Avenue Development1703/21/2026
Marcy Towers1303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Andrew Katz Engineers112/12/2022
Roman Onatsko, P.E211/11/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Laszlo Kovacs103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Smalls Mechanical & Electrical ServiceElectrical303/21/2026
B&B Mechanical Plumbing & HeatingPlumbing207/08/2026
Smalls Mechanical & Electrical ServiceElectrical103/22/2026
Mmi Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Andrew Katz1030112/12/2022
A Tech Engineering NYC, P6738107/28/2020
Building Lifecycle
All (79)Filed (3)Permit Issued (2)Signed Off (1)Facade (FISP) (6)Violation (60)Inspection (2)Special Inspection (5)
06/02/2026
Violation issued (ECB, open)
Elevators
06/02/2026
Violation issued (ECB, open)
Boilers
06/02/2026
Violation issued (ECB, open)
Boilers
06/02/2026
Violation issued (ECB, open)
Boilers
06/02/2026
Violation issued (ECB, open)
Boilers
08/11/2025
Violation issued (FDNY_NOV, closed)
07/03/2025
Violation issued (ECB, closed)
Construction
07/03/2025
Violation issued (ECB, closed)
Construction
06/13/2025
Violation issued (HPD, closed)
A
06/10/2025
Violation issued (FDNY_ORDER, closed)
04/19/2024
Violation issued (ECB, closed)
Elevators
04/18/2024
Violation issued (ECB, closed)
Construction
04/18/2024
Violation issued (ECB, closed)
Construction
01/10/2024
Violation issued (ECB, closed)
Construction
10/04/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/21/2023
Signed off — Alteration
DIRECT REPLACEMENT OF 41 EXISTING COMBI BOILERS AS PER PLANS SUBMITTED. RECONNECT TO EXISTING GAS/HW/CW/DRAIN AND VENTING PIPING. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B08051320-I1
06/19/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/16/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
03/31/2023
Violation issued (HPD, closed)
A
01/20/2023
Violation issued (ECB, closed)
Construction
01/20/2023
Violation issued (ECB, closed)
Unknown
01/20/2023
Violation issued (ECB, closed)
Construction
01/20/2023
Violation issued (ECB, closed)
Unknown
01/20/2023
Violation issued (ECB, open)
Construction
01/20/2023
Violation issued (ECB, closed)
Unknown
01/20/2023
Violation issued (ECB, closed)
Construction
01/20/2023
Violation issued (ECB, closed)
Construction
01/20/2023
Violation issued (ECB, closed)
Construction
01/20/2023
Violation issued (ECB, closed)
Construction
01/20/2023
Violation issued (ECB, closed)
Construction
01/20/2023
Violation issued (ECB, closed)
Unknown
01/20/2023
Violation issued (ECB, closed)
Construction
12/19/2022
Permit issued — Plumbing
B08051320-I1-PL
12/12/2022
Filed — Alteration
DIRECT REPLACEMENT OF 41 EXISTING COMBI BOILERS AS PER PLANS SUBMITTED. RECONNECT TO EXISTING GAS/HW/CW/DRAIN AND VENTING PIPING. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B08051320-I1
12/08/2022
Special inspection requirement — Tenant Protection Plan Compliance
ANDREW KATZ
10/05/2022
Violation issued (HPD, closed)
B
10/05/2022
Violation issued (HPD, closed)
B
10/05/2022
Violation issued (HPD, closed)
C
06/22/2022
Cycle 9 facade report signed — SAFE
06/21/2022
Cycle 9 facade report submitted
06/21/2022
Cycle 9 facade inspection completed
03/10/2022
Violation issued (HPD, closed)
A
02/22/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/06/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/29/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/20/2021
Violation issued (HPD, closed)
A
02/02/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/11/2020
Filed — Alteration
Refiled B00358566-I1 approved application to revised approved plans to answer Plumbing inspector objections for install 5 new combi boilers servicing apt #1G,3H,4D,4F&7D, including gas piping,fittings, supports,and connections.
B00358566-S2
11/09/2020
Special inspection requirement — HVAC and service water heating equipment
anthony santoro
11/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/08/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/13/2020
Permit issued — Plumbing
B00358566-I1-PL
08/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/28/2020
Filed — Alteration
Refiled B00358566-I1 approved application to revised approved plans to answer Plumbing inspector objections for install 5 new combi boilers servicing apt #1G,3H,4D,4F&7D, including gas piping,fittings, supports,and connections.
B00358566-I1
07/22/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
07/22/2020
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
07/22/2020
Special inspection requirement — HVAC and service water heating equipment
anthony santoro
05/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 79 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offTarget Piping NY12/19/2022
DOB NOWPlumbingPermit IssuedMichael Itskovich08/13/2020
BISSDISSUEDMmi Plumbing & Heating12/01/2006
BISPLISSUEDMmi Plumbing & Heating12/01/2006
BISPLISSUEDMmi Plumbing & Heating10/27/2006
BIS—ISSUEDKai Construction08/29/2006
BISSDISSUEDAriel Services03/02/2006
BISPLISSUEDAriel Services03/02/2006
BISEQISSUEDKai Construction01/17/2006
BISPLISSUEDAriel Services12/07/2005
BISEQISSUEDKai Construction11/03/2005
BISEQISSUEDKai Construction08/12/2005
BISEQISSUEDKai Construction04/11/2005
BIS—ISSUEDKai Construction04/11/2005
BISEQISSUEDKai Construction04/11/2005
BIS—RE-ISSUEDFive M Construction02/24/2004
BISEQISSUEDFive M Construction02/24/2004
BISEQISSUEDFive M Construction02/24/2004
BISEQISSUEDRoni Development11/19/2003
BISEQISSUEDRoni Development11/19/2003
BISEQISSUEDRoni Development08/21/2003
1 project · most recent 11/11/2020
Gas
FiledStatusContractorScope
11/11/2020Permit IssuedMmi Plumbing & HeatingGas
3 projects · most recent 07/31/2024
General Wiring
FiledStatusContractorScope
07/31/2024CompleteSmalls Mechanical & Electrical ServiceGeneral Wiring
04/27/2023CompleteSmalls Mechanical & Electrical ServiceGeneral Wiring
07/12/2020Permit IssuedBLZ ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
06/19/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/16/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
12/08/2022Tenant Protection Plan ComplianceANDREW KATZspecial
11/09/2020HVAC and service water heating equipment anthony santoroenergy_progress
07/22/2020Fire-Resistant Penetrations and Jointsanthony santorospecial
07/22/2020Fire-Resistance Rated Constructionanthony santoroprogress
07/22/2020HVAC and service water heating equipment anthony santoroenergy_progress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch - Plumbing1
09/02/2026B00358566-S2Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing Legalization1
09/02/2026B00358566-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/28/2026B08051320-I1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/28/2026B08051320-I1Open ↗
08/13/2026B00358566-I1Open ↗
08/13/2026B00358566-S2Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
10/03/2026B00358566-S2Open ↗
10/02/2026B00358566-I1Open ↗
10/02/2026B00358566-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
10/02/2026B00358566-I1Open ↗
09/01/2026B08051320-I1Open ↗