← Back
BuildNYC
Walk-up cooperative
659 41ST STREET
BROOKLYN · BIN 3345909
💬 Discuss this project
1924Year Built
5Stories
C6Building Class
R6BZoning
51,200 sfGross Floor Area
68Units
LL97 CoveredRent Stabilized25 Active Violations ▸FDNY Report ↗
Walk-up cooperative · 20,033 sf lot · 2.56 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof27p · 1 filing · 20 docs
Bulkhead2p · 1 filing · 20 docs
Floor 426p · 1 filing · 20 docs
Floor 326p · 1 filing · 20 docs
Floor 2Unit 2A31p · 3 filings · 20 docs
Floor 126p · 1 filing · 20 docs
Cellar25p · 1 filing · 20 docs
Site & exteriorTemporary sidewalk shed installation15p · 5 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Sun Garden Homes Association3107/08/2026
Sun Garden Apartments103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Darius Toraby Architects303/17/2025
Paul Perdek, Prof. Engineering108/31/2023
CNY Engineering403/14/2023
Enthink Engineers106/09/2022
Ashraf105/17/2022
Royal T&E309/04/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution403/21/2026
Rennon Construction103/21/2026
AEC Consulting Expediting603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Rennon ConstructionScaffold1407/08/2026
Skyline Restorationspecialty_contractor907/08/2026
PipestylistsPlumbing607/08/2026
Powers Bridging & ScaffoldingScaffold403/21/2026
Andamio ScaffoldingScaffold207/08/2026
Optimal ElectricElectrical103/21/2026
SJ Electrical ServicesElectrical103/22/2026
SJ Electrical ServicesElectrical103/21/2026
Borowide Elect'l ContractorsElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Darius Toraby Architects116303/17/2025
CNY Engineering3304403/14/2023
Building Lifecycle
All (87)Filed (14)Permit Issued (22)Signed Off (9)Violation (13)Inspection (5)Objection (8)Special Inspection (16)
11/11/2025
Violation issued (HPD, open)
B
11/11/2025
Violation issued (HPD, closed)
A
11/11/2025
Violation issued (HPD, open)
B
11/11/2025
Violation issued (HPD, open)
B
11/11/2025
Violation issued (HPD, open)
B
11/11/2025
Violation issued (HPD, open)
B
08/12/2025
Signed off — Alteration
B00220186-I1
07/15/2025
Signed off — Alteration
Subsequent filing for structural work.
B00716428-S1
07/14/2025
Signed off — Alteration
Subsequent filing for structural work.
B00716428-I1
06/30/2025
Signed off — Alteration
B00220172-I1
06/30/2025
Signed off — Alteration
B00221776-I1
06/27/2025
Permit issued — Structural
B00716428-S1-ST
05/30/2025
Special inspection requirement — Masonry
DARIUS TORABY
05/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
DARIUS TORABY
05/30/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
DARIUS TORABY
05/30/2025
Special inspection requirement — Final
DARIUS TORABY
05/30/2025
Special inspection requirement — Energy Code Compliance Inspections
DARIUS TORABY
05/30/2025
Special inspection requirement — Air barrier - visual inspection
DARIUS TORABY
05/20/2025
Objection resolved — Addressed
04/28/2025
Signed off — Alteration
Renewal of SR22/1244
B01009024-I1
03/27/2025
Objection raised — Other
03/19/2025
Objection resolved — Addressed
03/18/2025
Objection raised — Scope
03/17/2025
Filed — Alteration
Subsequent filing for structural work.
B00716428-S1
03/17/2025
Filed — Alteration
Subsequent filing for structural work.
B00716428-P1
02/25/2025
Permit issued — Suspended Scaffold
B01009024-I1-SC
02/07/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
DARIUS TORABY
02/07/2025
Special inspection requirement — Masonry
DARIUS TORABY
02/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
DARIUS TORABY
02/07/2025
Special inspection requirement — Energy Code Compliance Inspections
DARIUS TORABY
02/07/2025
Special inspection requirement — Final
DARIUS TORABY
02/07/2025
Special inspection requirement — Air barrier - visual inspection
DARIUS TORABY
02/03/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00909668-I1
08/28/2024
Permit issued — Sidewalk Shed
B00909668-I1-SH
02/22/2024
Permit issued — Suspended Scaffold
B01009024-I1-SC
02/21/2024
Filed — Alteration
Renewal of SR22/1244
B01009024-I1
02/20/2024
Permit issued — General Construction
B00716428-I1-GC
12/05/2023
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00740265-I1
09/07/2023
Permit issued — Supported Scaffold
B00740265-I1-SF
09/01/2023
Permit issued — Sidewalk Shed
B00909668-I1-SH
08/31/2023
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00909668-I1
08/31/2023
Inspection — Pass-Final Shed Withdrawal
Pass
View inspection ↗
06/14/2023
Signed off — Alteration
REPLACE KITCHEN PLUMBING FIXTURES AND RELOCATE GAS STOVE IN UNIT #2A ON THE 2ND FLOOR PER LAYOUT TO SUPERSEDE THE DOB NOW JOB#B00207907 DUE TO FILING ISSUE. NO CHANGE IN USE,EGRESS AND OCCUPANCY.
B08038250-I1
06/06/2023
Permit issued — Sidewalk Shed
B00748705-I1-SH
03/15/2023
Special inspection requirement — Tenant Protection Plan Compliance
YUE ZHOU
03/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
YUE ZHOU
03/14/2023
Filed — Alteration
REPLACE KITCHEN PLUMBING FIXTURES AND RELOCATE GAS STOVE IN UNIT #2A ON THE 2ND FLOOR PER LAYOUT TO SUPERSEDE THE DOB NOW JOB#B00207907 DUE TO FILING ISSUE. NO CHANGE IN USE,EGRESS AND OCCUPANCY.
B08038250-P2
03/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
YUE ZHOU
03/10/2023
Special inspection requirement — Tenant Protection Plan Compliance
03/03/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/28/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/28/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/24/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/16/2023
Permit issued — General Construction
B00716428-I1-GC
01/17/2023
Filed — Alteration
REPLACE KITCHEN PLUMBING FIXTURES AND RELOCATE GAS STOVE IN UNIT #2A ON THE 2ND FLOOR PER LAYOUT TO SUPERSEDE THE DOB NOW JOB#B00207907 DUE TO FILING ISSUE. NO CHANGE IN USE,EGRESS AND OCCUPANCY.
B08038250-P1
01/17/2023
Permit issued — Plumbing
B08038250-I1-PL
12/19/2022
Permit issued — General Construction
B00716428-I1-GC
12/14/2022
Violation issued (ECB, closed)
Construction
11/14/2022
Filed — Alteration
REPLACE KITCHEN PLUMBING FIXTURES AND RELOCATE GAS STOVE IN UNIT #2A ON THE 2ND FLOOR PER LAYOUT TO SUPERSEDE THE DOB NOW JOB#B00207907 DUE TO FILING ISSUE. NO CHANGE IN USE,EGRESS AND OCCUPANCY.
B08038250-I1
10/13/2022
Violation issued (ECB, closed)
Plumbing
Latest 60 of 87 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offSkyline Restoration06/27/2025
DOB NOWSuspended ScaffoldSigned-offSkyline Restoration02/25/2025
DOB NOWSidewalk ShedSigned-offExo Industries08/28/2024
DOB NOWSuspended ScaffoldSigned-offSkyline Restoration02/22/2024
DOB NOWGeneral ConstructionSigned-offSkyline Restoration02/20/2024
DOB NOWSupported ScaffoldSigned-offRennon Construction09/07/2023
DOB NOWSidewalk ShedSigned-offPowers Bridging & Scaffol09/01/2023
DOB NOWSidewalk ShedPermit IssuedAndamio Scaffolding06/06/2023
DOB NOWGeneral ConstructionSigned-offSkyline Restoration02/16/2023
DOB NOWPlumbingSigned-offT & T Plumbing01/17/2023
DOB NOWGeneral ConstructionSigned-offSkyline Restoration12/19/2022
DOB NOWGeneral ConstructionSigned-offSkyline Restoration09/16/2022
DOB NOWPlumbingPermit IssuedT & T Plumbing07/22/2022
DOB NOWSidewalk ShedPermit IssuedAndamio Scaffolding06/09/2022
DOB NOWSupported ScaffoldSigned-offRennon Construction05/18/2022
DOB NOWSupported ScaffoldSigned-offRennon Construction08/12/2021
DOB NOWSupported ScaffoldSigned-offRennon Construction12/03/2020
DOB NOWSupported ScaffoldSigned-offRennon Construction10/05/2020
DOB NOWSupported ScaffoldSigned-offRennon Construction09/04/2020
DOB NOWSupported ScaffoldSigned-offRennon Construction09/04/2019
DOB NOWSupported ScaffoldSigned-offRennon Construction09/03/2019
DOB NOWSupported ScaffoldSigned-offRennon Construction09/03/2019
BISOTISSUEDFiveboro Solar10/16/2012
4 projects · most recent 06/03/2024
General Wiring
FiledStatusContractorScope
06/03/2024CompleteSJ Electrical ServicesGeneral Wiring
08/09/2023Permit IssuedOptimal Electric—
06/16/2022CancelledBorowide Elect'l Contractors—
11/09/2020CompleteAntonio Ceriello ElectricGeneral Wiring
1 project · most recent 06/09/2022
Sidewalk Shed
FiledStatusContractorScope
06/09/2022Permit IssuedAndamio ScaffoldingSidewalk Shed
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/31/2023Pass-Final Shed WithdrawalPassView ↗
03/03/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/28/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/28/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/24/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
05/30/2025MasonryDARIUS TORABYspecial
05/30/2025Structural Stability – Alterations of existing buildingsDARIUS TORABYspecial
05/30/2025Exterior Insulation and Finish Systems (EIFS)DARIUS TORABYspecial
05/30/2025FinalDARIUS TORABYprogress
05/30/2025Energy Code Compliance InspectionsDARIUS TORABYprogress
05/30/2025Air barrier - visual inspectionDARIUS TORABYenergy_progress
02/07/2025Exterior Insulation and Finish Systems (EIFS)DARIUS TORABYspecial
02/07/2025MasonryDARIUS TORABYspecial
02/07/2025Structural Stability – Alterations of existing buildingsDARIUS TORABYspecial
02/07/2025Energy Code Compliance InspectionsDARIUS TORABYprogress
02/07/2025FinalDARIUS TORABYprogress
02/07/2025Air barrier - visual inspectionDARIUS TORABYenergy_progress
03/15/2023Tenant Protection Plan ComplianceYUE ZHOUspecial
03/15/2023Fire-Resistant Penetrations and JointsYUE ZHOUspecial
03/10/2023Fire-Resistant Penetrations and JointsYUE ZHOUspecial
03/10/2023Tenant Protection Plan Compliance—special
▾Documents — 73 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch10
08/29/2026B00716428-S1Request digital key ↗
08/29/2026B00740265-I1Request digital key ↗
08/29/2026B00748705-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold3
09/02/2026B00220172-I1Request digital key ↗
09/02/2026B00220186-I1Request digital key ↗
09/02/2026B00221776-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/02/2026B00207907-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
09/28/2012320376963Open ↗
▸BISWORK PERMIT APPLICATION1
10/17/2012320376963Open ↗
▸Seals & Professional Certifications30
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/29/2026B00716428-I1Open ↗
08/29/2026B00716428-S1Open ↗
08/29/2026B00716428-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/02/2026B00716428-P1Open ↗
09/02/2026B00716428-P1Open ↗
09/02/2026B00716428-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026B00716428-P1Open ↗
09/02/2026B00716428-P1Open ↗
09/02/2026B00716428-P1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY-CERTIFICATION2
01/22/2013320376963Open ↗
10/03/2012320376963Open ↗
▸Safety & Tenant Protection4
▸DOB NOWTenant Protection Plan4
08/13/2026B00207907-I1Open ↗
08/13/2026B00220186-I1Open ↗
08/13/2026B00220172-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/29/2026B00716428-S1Open ↗
08/15/2026B00716428-I1Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
09/28/2012320376963Open ↗
▸Energy Compliance6
▸BISTR8: Energy Code Progress Inspections2
01/22/2013320376963Open ↗
10/03/2012320376963Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION (PTA4)1
01/17/2013320376963Open ↗
▸BISEN2 - As Built Energy Analysis1
01/22/2013320376963Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
09/28/2012320376963Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/15/2026B00716428-I1Open ↗
▸Approvals, Objections & Sign-offs7
▸BISLETTERS - SUPPORTING DOCUMENTATION3
01/22/2013320376963Open ↗
01/22/2013320376963Open ↗
10/15/2012320376963Open ↗
▸BISUtility Company PV System Interconnection Acknowledgement Letter2
01/22/2013320376963Open ↗
01/22/2013320376963Open ↗
▸BISCERTIFICATE OF OCCUPANCY - LOC: REQUEST1
01/22/2013320376963Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/15/2026B00716428-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
01/22/2013320376963Open ↗
10/15/2012320376963Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
01/23/2013320376963Open ↗
01/22/2013320376963Open ↗
▸BISeFiling Job Application Cover Sheet1
09/28/2012320376963Open ↗
▸Other Documents2
▸DOB NOWManufacturer's Specifications1
08/13/2026B01009024-I1Open ↗
▸DOB NOWCalculations1
08/13/2026B01009024-I1Open ↗