1912Year Built
8Stories
O6Building Class
C5-3Zoning
75,871 sfGross Floor Area
2Units
LL97 Covered3 Open Violations ▸FISP: SAFE
Office with commercial, 7-19 stories · Owner of record: SATOR REALTY INC · 8,800 sf lot · 8.62 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction4p · 5 filings · 20 docs
Bulkhead1p · 1 filing · 3 docs
Floor 83p · 2 filings · 6 docs
Floor 72p · 1 filing · 3 docs
Floor 63p · 2 filings · 6 docs
Floor 51p · 1 filing · 3 docs
Floor 410p · 3 filings · 20 docs
Floor 3Under Construction2p · 6 filings · 20 docs
Floor 2Under Construction3p · 6 filings · 20 docs
Floor 1Under Construction2p · 5 filings · 20 docs
CellarUnder Construction3p · 7 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SATDR REALTY INC103/22/2026
SADOR REALTY INC103/22/2026
HIRO REAL ESTATE303/21/2026
SATRO REALTY103/21/2026
MUFSON PARTNERSHIP603/21/2026
ALAN REAL ESTATE503/21/2026
SATOR REALTY INC ROBERT KADEN203/21/2026
OWNERQ103/21/2026
ASTOR REALTY103/21/2026
COLLIERS ABR INC AS AGENT103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE CORP.803/21/2026
OUTSOURCE CONSULTANTS, INC.1003/21/2026
SPRING SCAFFOLDING LLC1003/21/2026
UNITED SAFETY CONSULTANTS203/21/2026
SYNERGY BUILDING CONSULTANTS203/21/2026
A1 EXPEDITING SERVICE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPRING SCAFFOLDING LLCGeneral Contractor1107/08/2026
SFFTS INCGeneral Contractor903/21/2026
TITAN CONSTRUCTION SERVICGeneral Contractor603/21/2026
SAFWAY ATLANTIC, LLCGeneral Contractor509/22/2026
MICHILLI INCGeneral Contractor306/28/2026
BERGER, HElectrical103/21/2026
SIRINA FIRE PROT CORPFire Protection107/08/2026
JOSEPH SORTINOElectrical103/21/2026
RYBACKI, DAVIDElectrical103/21/2026
TJ SIGNS UNLIMITED INCElectrical103/21/2026
LEVINE, GEORGEFire Protection103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MILROSE CONSULTANTS LLC2003808/10/2026
KZ ENGINEERING, P.C.4665210/16/2024
OUTSOURCE SPECIAL INSPECT2827404/15/2024
Building Lifecycle
All (178)Filed (23)Permit Issued (22)Signed Off (7)Facade (FISP) (27)Violation (60)Objection (9)Special Inspection (30)
09/21/2026
Permit issued — Protection and Mechanical Methods
M08052704-I1-PMM
08/10/2026
Filed — Alteration
Modifying sprinkler heads to accommodate separation of 655 and 663 buildings.
M01411297-I1
08/10/2026
Filed — Alteration
DEMOLITION AND REMOVAL FROM SITE OF EXISTING SUPPLY DUCTWORK, CEILING DIFFUSERS, ETC., AS INDICATED ON THE DRAWINGS.
M01411255-I1
08/10/2026
Filed — Alteration
The purpose of this phase of the project is to complete the separation of the buildings located at 663 and 655 Fifth Avenue. Existing openings on masonry party walls are to be infilled with CMU block from the cellar all the way up to the roof.
M01411247-I1
08/10/2026
Objection raised — Admin
07/15/2026
Filed — Alteration CO
INFILL OF EXISTING WALL OPENINGS ON CELLAR THROUGH NINTH FLOORS CREATED FOR EGRESS BETWEEN ADJACENT 655 AND 663 FIFTH AVENUE BUILDINGS, AND REMOVAL OF BUILDING EASEMENT CONDITIONS ON CELLAR THROUGH EIGHTH FLOORS.
M01412375-I1
07/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
Benjamin Plotnick
07/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
Benjamin Plotnick
06/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Benjamin Plotnick
06/22/2026
Special inspection requirement — Fire-Resistance Rated Construction
06/03/2026
Special inspection requirement — Final
Benjamin Plotnick
06/03/2026
Special inspection requirement — Mechanical Systems
Benjamin Plotnick
06/03/2026
Special inspection requirement — HVAC-R and service water heating equipment
Benjamin Plotnick
06/03/2026
Special inspection requirement — Sprinkler Systems
Benjamin Plotnick
06/03/2026
Special inspection requirement — HVAC-R and service water heating system controls
Benjamin Plotnick
04/24/2026
Permit issued — Sprinklers
M01356921-I1-EW-SP
04/13/2026
Permit issued — Mechanical Systems
M01355636-I1-MS
04/13/2026
Permit issued — General Construction
M01355713-I1-GC
04/13/2026
Permit issued — Structural
M01357509-I1-ST
03/12/2026
Filed — Alteration
Limited demolition of the 663 space for future Ferragamo Flagship, including Floors 1-3, Structural filing for slab infills, & new non-load bearing party wall separating building no. 663 from 655 5th Ave. No change in use in this app
M01355713-I1
03/11/2026
Filed — Alteration
The project includes the installation of new steel beams to close existing floor openings at the second and third floors. A new non-load-bearing party wall separating building no. 663 from 655 fifth avenue will be constructed from the cellar level through
M01357509-I1
03/11/2026
Filed — Alteration
M01356921-I1
03/11/2026
Filed — Alteration
Modifying ductwork & supply diffuser to accommodate new partition layout, Demolition of existing AC systems & ductwork .Adding air conditioning units to the 2nd floor to supplement the removed systems. Reconnecting to existing ductwork
M01355636-I1
02/27/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Christopher Drutjons
02/27/2026
Special inspection requirement — Concrete - Cast-In-Place
Christopher Drutjons
02/27/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Christopher Drutjons
02/27/2026
Special inspection requirement — Structural Steel - Welding
Christopher Drutjons
02/25/2026
Special inspection requirement — Structural Steel - Details
Christopher Drutjons
02/25/2026
Special inspection requirement — Post-installed Anchors
Christopher Drutjons
02/25/2026
Special inspection requirement — Masonry
Christopher Drutjons
02/09/2026
Special inspection requirement — Final
Christopher Drutjons
02/06/2026
Special inspection requirement — Sprinkler Systems
Christopher Drutjons
02/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Drutjons
02/04/2026
Special inspection requirement — Fire-Resistance Rated Construction
Christopher Drutjons
02/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Drutjons
02/04/2026
Special inspection requirement — Final
Christopher Drutjons
02/04/2026
Special inspection requirement — Final
Christopher Drutjons
02/04/2026
Special inspection requirement — Mechanical Systems
Christopher Drutjons
10/02/2025
Permit issued — Protection and Mechanical Methods
M08052704-I1-PMM
08/01/2025
Signed off — Alteration
M01018668-I1
07/10/2025
Signed off — Alteration
Installation of suspended scaffold for facade inspection/ Repair
M01027106-I1
07/09/2025
Permit issued — Suspended Scaffold
M01027106-I1-SC
04/21/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01027265-I1
04/02/2025
Permit issued — Sidewalk Shed
M01027265-I1-SH
03/05/2025
Cycle 9 facade report signed — SAFE
02/21/2025
Cycle 9 facade report submitted
01/29/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01027265-S1
01/29/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01027265-S2
01/28/2025
Cycle 9 facade report submitted
01/27/2025
Cycle 9 facade inspection completed
01/27/2025
Cycle 9 facade inspection completed
11/21/2024
Objection raised — Other
11/21/2024
Objection resolved — Addressed
11/18/2024
Objection raised — Other
11/18/2024
Objection resolved — Addressed
11/12/2024
Objection raised — Other
11/12/2024
Objection resolved — Addressed
11/06/2024
Objection resolved — Addressed
10/24/2024
Objection raised — Other
10/21/2024
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01027265-P2
Latest 60 of 178 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsPermit IssuedSAFWAY ATLANTIC, LLC09/21/2026
DOB NOWSprinklersPermit IssuedSIRINA FIRE PROT CORP04/24/2026
DOB NOWMechanical SystemsPermit IssuedMICHILLI INC04/13/2026
DOB NOWGeneral ConstructionPermit IssuedMICHILLI INC04/13/2026
DOB NOWStructuralPermit IssuedMICHILLI INC04/13/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSAFWAY ATLANTIC, LLC10/02/2025
DOB NOWSuspended ScaffoldSigned-offTITAN CONST SERVICES LLC07/09/2025
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC04/02/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedSAFWAY ATLANTIC, LLC10/02/2024
DOB NOWProtection and Mechanical MethodsSigned-offSPRING SCAFFOLDING LLC08/27/2024
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC08/27/2024
DOB NOWSuspended ScaffoldSigned-offTITAN CONST SERVICES LLC05/14/2024
DOB NOWGeneral ConstructionSigned-offTITAN CONSTRUCTION SERVIC04/19/2024
DOB NOWStructuralPermit IssuedSFFTS INC04/12/2024
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC04/02/2024
DOB NOWSuspended ScaffoldSigned-offTITAN CONST SERVICES LLC03/29/2024
DOB NOWGeneral ConstructionPermit IssuedSFFTS INC01/19/2024
DOB NOWStructuralPermit IssuedSFFTS INC01/19/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedSAFWAY ATLANTIC, LLC09/27/2023
DOB NOWGeneral ConstructionSigned-offTITAN CONSTRUCTION SERVIC08/10/2023
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC08/07/2023
DOB NOWProtection and Mechanical MethodsPermit IssuedBBI-M2PROS JV, LLC12/13/2022
BISOTISSUEDMYND SPA & SALON, INC11/20/2019
BISOTISSUEDRED DOOR SALONS INC12/18/2018
BISMHISSUEDMANHATTAN MECHANICAL CONT09/26/2018
BISOTISSUEDRED DOOR SALONS INC11/21/2017
BISOTISSUEDRED DOOR SALONS INC11/22/2016
BISOTISSUEDRED DOOR SALONS INC10/29/2015
BISSPISSUEDSKH MECHANICAL CORP03/02/2015
BISOTISSUEDRED DOOR SALONS INC11/07/2014
BIS—ISSUEDARCHITECTURAL RESOURCES & TECHNO06/12/2014
BISOTISSUEDMDB DEVELOPMENT CORP04/23/2014
BISEQISSUEDEVEREST SCAFFOLDING INC04/16/2014
BISEQISSUEDEVEREST SCAFFOLDING INC04/15/2014
BISMHISSUEDARISTA AIR CONDITIONING CORP01/14/2014
BISSPISSUEDSKH MECHANICAL CORP03/25/2013
BIS—ISSUEDGREY DOG CONSTRUCTION INC.01/29/2013
BISPLISSUEDKAPNAG HTG & PLBG CORP.09/17/2012
BISOTISSUEDRED DOOR SALONS INC05/16/2012
BISOTISSUEDINTERIOR BUILDERS GROUP12/09/2011
+ 32 more permits on file
2 projects · most recent 08/10/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/10/2026——Air Conditioning Systems
Cooling
N/A NA 1 CFM ×4
03/11/2026Permit IssuedMICHILLI INCAir Conditioning Systems
Cooling
Climatemaster TC-060 Wshp ×2
1 project · most recent 08/10/2026
FiledStatusContractorScope
08/10/2026——1 heads
1 project · most recent 08/10/2026
FiledStatusContractorScope
08/10/2026———
6 projects · most recent 09/28/2026
General Wiring
FiledStatusContractorScope
09/28/2026Permit IssuedMANHATTAN SUFFOLK ELECTGeneral Wiring
09/28/2026Permit IssuedMANHATTAN SUFFOLK ELECTGeneral Wiring
06/12/2026Permit IssuedJSP ELECTL CNTNG CORP—
03/28/2024CompleteTOP SHELF ELECTRIC CORP—
10/04/2023CompleteOMD ELECTRICAL CORP1 meters, 1 new_meters
08/04/2023CompleteTOP SHELF ELECTRIC CORP—
3 projects · most recent 08/10/2026
Steel Concrete Masonry
FiledStatusContractorScope
08/10/2026——Steel, Concrete, Masonry
03/11/2026Permit IssuedMICHILLI INCSteel, Concrete, Masonry
03/28/2024Permit IssuedSFFTS INCSteel
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
07/07/2026HVAC-R and service water heating system controlsBenjamin Plotnickenergy_progress
07/07/2026HVAC-R and service water heating equipmentBenjamin Plotnickenergy_progress
06/22/2026Fire-Resistant Penetrations and JointsBenjamin Plotnickspecial
06/22/2026Fire-Resistance Rated Construction—progress
06/03/2026FinalBenjamin Plotnickprogress
06/03/2026Mechanical SystemsBenjamin Plotnickspecial
06/03/2026HVAC-R and service water heating equipmentBenjamin Plotnickenergy_progress
06/03/2026Sprinkler SystemsBenjamin Plotnickspecial
06/03/2026HVAC-R and service water heating system controlsBenjamin Plotnickenergy_progress
02/27/2026Structural Stability – Alterations of existing buildingsChristopher Drutjonsspecial
02/27/2026Concrete - Cast-In-PlaceChristopher Drutjonsspecial
02/27/2026Structural Steel - High Strength BoltingChristopher Drutjonsspecial
02/27/2026Structural Steel - WeldingChristopher Drutjonsspecial
02/25/2026Structural Steel - DetailsChristopher Drutjonsspecial
02/25/2026Post-installed AnchorsChristopher Drutjonsspecial
02/25/2026MasonryChristopher Drutjonsspecial
02/09/2026FinalChristopher Drutjonsprogress
02/06/2026Sprinkler SystemsChristopher Drutjonsspecial
02/04/2026Fire-Resistant Penetrations and JointsChristopher Drutjonsspecial
02/04/2026Fire-Resistance Rated ConstructionChristopher Drutjonsprogress
02/04/2026Fire-Resistant Penetrations and JointsChristopher Drutjonsspecial
02/04/2026FinalChristopher Drutjonsprogress
02/04/2026FinalChristopher Drutjonsprogress
02/04/2026Mechanical SystemsChristopher Drutjonsspecial
10/15/2024Post-installed AnchorsKarol Zdancewiczspecial
Latest 25 of 32.
▾Documents — 352 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch22
09/01/2026M08052704-I1Request digital key ↗
08/29/2026M00900871-I1Request digital key ↗
08/29/2026M00914414-I1Request digital key ↗
Showing 3 of 22 on file for this type
▸Applications & Permits57
▸BISPLAN / WORK APPROVAL APPLICATION32
02/23/2024121504158Open ↗
02/22/2024121504158Open ↗
08/08/2023121177127Open ↗
Showing 3 of 32 on file for this type
▸BISWORK PERMIT APPLICATION22
11/21/2019122023425Open ↗
12/19/2018122023425Open ↗
09/26/2018123268409Open ↗
Showing 3 of 22 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
06/23/2014121928628Open ↗
Showing 1 of 2 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
09/20/2021121928628Open ↗
▸Seals & Professional Certifications84
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION21
01/03/2020123268409Open ↗
01/03/2020123268409Open ↗
04/30/2019123268409Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature20
09/01/2026M08052704-I1Open ↗
08/29/2026M00900871-I1Open ↗
08/29/2026M00914414-I1Open ↗
Showing 3 of 20 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT10
01/22/2018123268409Open ↗
10/31/2014122023425Open ↗
04/28/2014121988019Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST10
01/22/2018123268409Open ↗
10/31/2014122023425Open ↗
04/28/2014121988019Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026M01355636-I1Open ↗
09/01/2026M01355713-I1Open ↗
09/01/2026M00970009-S1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026M00900871-I1Open ↗
09/01/2026M01355636-I1Open ↗
09/01/2026M01355713-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
04/16/2014140186199Open ↗
04/14/2014140185403Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
04/16/2014140186199Open ↗
04/14/2014140185403Open ↗
▸Trade Schedules & Equipment23
▸BISFA - FDNY APPROVAL : FD-FAA7
06/25/2019122958237Open ↗
06/17/2019122958237Open ↗
01/09/2019122102731Open ↗
Showing 3 of 7 on file for this type
▸BISSELF-CERT PLUMBING NOTICE5
09/09/2015121369358Open ↗
03/31/2015121504158Open ↗
Showing 2 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
01/03/2020123268409Open ↗
04/30/2019123268409Open ↗
10/23/2014121663814Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEQUIPMENT USE PERMITS2
01/03/2020123268409Open ↗
10/23/2014121663814Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
06/11/2014121369358Open ↗
06/07/2014121369358Open ↗
▸Environmental & Asbestos28
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/29/2026M00900871-I1Open ↗
08/27/2026M00970009-I1Open ↗
08/27/2026M00970009-S3Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)11
01/22/2018123268409Open ↗
01/12/2017122958237Open ↗
08/15/2014122102731Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
10/31/2014122023425Open ↗
03/05/2014121928628Open ↗
Showing 2 of 5 on file for this type
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
04/30/2019123268409Open ↗
01/22/2018123268409Open ↗
10/28/2014121663814Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
04/30/2019123268409Open ↗
10/28/2015121788173Open ↗
10/28/2014121663814Open ↗
Showing 3 of 4 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
04/14/2014140185403Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
04/16/2014140186199Open ↗
04/14/2014140185403Open ↗
▸Approvals, Objections & Sign-offs53
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST40
05/29/2020121928628Open ↗
04/20/2020121928628Open ↗
04/13/2020121928628Open ↗
Showing 3 of 40 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
10/20/2021121928628Open ↗
05/04/2015121928628Open ↗
03/05/2014121928628Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/28/2014121663814Open ↗
▸Cost, Insurance & Ownership34
▸BISCOST AFFIDAVIT28
06/25/2019122958237Open ↗
04/30/2019123268409Open ↗
01/09/2019122102731Open ↗
Showing 3 of 28 on file for this type
▸BISOK TO ISSUE TCO PENDING RESOLUTION OFOPEN FACADE VIOLATION - AFFIDAVIT ATTACHED3
09/04/2025121928628Open ↗
05/22/2025121928628Open ↗
01/24/2025121928628Open ↗
▸BISOK TO ISSUE TCO PENDING RESOLTION OF OPEN FACADE VIOLATION - AFFIDAVIT ATTACHED1
09/11/2024121928628Open ↗
▸BISOK TO ISSUE TCO PENDING RESOLUTION OFOPEN FACADE VIOLATIONS - AFFIDAVIT ATTACHED1
08/09/2023121928628Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
03/05/2024121928628Open ↗
▸Filing & Intake Forms31
▸BISEFILING COVER SHEET15
01/22/2018123268409Open ↗
01/12/2017122958237Open ↗
10/31/2014122023425Open ↗
Showing 3 of 15 on file for this type
▸BISBOROUGH INTAKE FORM11
04/20/2020121928628Open ↗
04/13/2020121928628Open ↗
01/27/2020121928628Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
04/16/2014140186199Open ↗
04/14/2014140185403Open ↗
Showing 2 of 3 on file for this type
▸BISADDITIONAL INFORMATION2
06/11/2014121369358Open ↗
06/07/2014121369358Open ↗
▸Other Documents6
▸DOB NOWManufacturer's Specifications2
08/13/2026M01027106-I1Open ↗
08/13/2026M01027106-P1Open ↗
▸DOB NOWCalculations2
08/13/2026M01027106-I1Open ↗
08/13/2026M01027106-P1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBSA VARIANCE1
11/08/2021121928628Open ↗