← Back
BuildNYC
City university
Queens College
66-20 KISSENA BOULEVARD · BIN 4442883
💬 Discuss this project
1907Year Built
3Stories
W5Building Class
R4Zoning
2,096,206 sfGross Floor Area
35Units
LL97 Covered11 Active Violations 9 unresolved · 2 paperwork only 2 old, status unconfirmed ▸FDNY Report ↗
City university · Owner of record: Dormitory Authority of the State of New York · 2,567,000 sf lot · 0.82 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalEquipmentOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofQueens CollegeUnder Construction1p · 1 filing · 7 docs
Floor 4Queens CollegeUnder Construction2p · 1 filing · 7 docs
Floor 3Queens CollegeUnder Construction4p · 1 filing · 7 docs
Floor 2Queens CollegeUnder Construction2p · 1 filing · 7 docs
Floor 1Queens College, CUNY the City of University of New YorkUnder Construction10p · 4 filings · 18 docs
BasementQueens CollegeUnder Construction1p · 1 filing · 7 docs
Sub-BasementQueens College1 filing · 4 docs
Site & exteriorQueens CollegeUnder Construction31p · 4 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Dasny4410/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK Consulting Services603/21/2026
Superstructures Engineering + Architects203/21/2026
Municipal Building Consultants203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
P B ContractingScaffold807/08/2026
P B ContractingGeneral Contractor508/06/2026
Aks InternationalGeneral Contractor106/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tectonic Engineering Cons106310/20/2026
Socotec Engineering4983109/05/2025
Ikra Consulting7032104/22/2025
Building Lifecycle
All (89)Filed (8)Permit Issued (12)Signed Off (2)Violation (43)Special Inspection (24)
10/20/2026
Filed — Alteration
Queens College, Delany Hall, Replacement/Recoating/Repairs of existing damaged wood framing, stucco & membrane roofing system, exterior windows, entrance concrete stair, brick masonry, clay tiles, coping and scupper at tower as per plans filed.
Q00902486-P1
08/05/2026
Permit issued — Structural
Q00902486-I1-GC
07/30/2026
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD AT AS 66-20 KISSENA BOULEVARD, QUEENS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
Q01213769-I1
07/22/2026
Signed off — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 66-20 KISSENA BOULEVARD, QUEENS AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
Q01213762-I1
05/13/2026
Permit issued — Structural
Q00902486-I1-ST
05/06/2026
Permit issued — Mechanical Systems
Q01230145-I1-MS
01/16/2026
Permit issued — Supported Scaffold
Q01213769-I1-SF
01/16/2026
Permit issued — Construction Fence
Q01213757-I1-FN
01/16/2026
Permit issued — Structural
Q00902486-I1-GC
01/16/2026
Permit issued — Sidewalk Shed
Q01213762-I1-SH
09/05/2025
Filed — Alteration
INSTALLATION OF NEW UNDERGROUND CHILLED WATER SUPPLY, RETURN PIPING AND CONNECTION FROM RAZRAN HALL TO DELANY HALL FOR FUTURE USE.
Q01230145-I1
06/02/2025
Permit issued — Sidewalk Shed
Q01213762-I1-SH
06/02/2025
Permit issued — Supported Scaffold
Q01213769-I1-SF
06/02/2025
Permit issued — Construction Fence
Q01213757-I1-FN
05/23/2025
Permit issued — Structural
Q00902486-I1-GC
05/23/2025
Permit issued — General Construction
Q00902486-I1-ST
04/22/2025
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD AT AS 66-20 KISSENA BOULEVARD, QUEENS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
Q01213769-I1
04/22/2025
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 66-20 KISSENA BOULEVARD, QUEENS AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
Q01213762-I1
04/22/2025
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 66-20 KISSENA BOULEVARD, QUEENS AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Q01213757-I1
04/21/2025
Special inspection requirement — Post-installed Anchors
MD MOSTAFA
02/11/2025
Filed — Alteration
MECHANICAL WORK INCLUDES HIGH PRESSURE TO LOW PRESSURE STEAM CONVERSION AT DELANEY HALL AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
Q01130772-I1
01/14/2025
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
01/14/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
GEORGE GHEBRYAL
01/14/2025
Special inspection requirement — HVAC-R and service water heating system controls
GEORGE GHEBRYAL
10/22/2024
Special inspection requirement — Maintenance information
GEORGE GHEBRYAL
10/22/2024
Special inspection requirement — Energy Code Compliance Inspections
GEORGE GHEBRYAL
10/22/2024
Special inspection requirement — Mechanical Systems
GEORGE GHEBRYAL
10/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
10/22/2024
Special inspection requirement — Final
07/14/2023
Filed — Alteration
Queens College, Delany Hall, Replacement/Recoating/Repairs of existing damaged wood framing, stucco & membrane roofing system, exterior windows, entrance concrete stair, brick masonry, clay tiles, coping and scupper at tower as per plans filed.
Q00902486-I1
07/11/2023
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
07/11/2023
Special inspection requirement — Air barrier - visual inspection
GEORGE GHEBRYAL
07/11/2023
Special inspection requirement — Fenestration areas
GEORGE GHEBRYAL
07/11/2023
Special inspection requirement — Insulation placement and R values
GEORGE GHEBRYAL
07/11/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
GEORGE GHEBRYAL
07/11/2023
Special inspection requirement — Masonry
GEORGE GHEBRYAL
07/11/2023
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
07/11/2023
Special inspection requirement — Structural Steel - Welding
GEORGE GHEBRYAL
07/11/2023
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
GEORGE GHEBRYAL
07/11/2023
Special inspection requirement — Final
Paul Millman
07/11/2023
Special inspection requirement — Fenestration air leakage
GEORGE GHEBRYAL
05/17/2023
Filed — Alteration
Queens College - Delany Hall, Emergency Steel Column Stabilization/Reinforcement as per the plans filed including: Structural Steel Column - Reinforcement with New HSS.
Q00873224-I1
05/10/2023
Special inspection requirement — Final
Paul Millman
05/10/2023
Special inspection requirement — Structural Steel - Welding
05/10/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/10/2023
Special inspection requirement — Structural Steel - Details
05/20/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/06/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/12/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/31/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/30/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/25/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/21/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/02/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/30/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/13/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 89 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedP B Contracting08/05/2026
DOB NOWStructuralPermit IssuedP B Contracting05/13/2026
DOB NOWMechanical SystemsPermit IssuedBryant Park05/06/2026
DOB NOWSupported ScaffoldSigned-offP B Contracting01/16/2026
DOB NOWConstruction FencePermit IssuedP B Contracting01/16/2026
DOB NOWStructuralPermit IssuedP B Contracting01/16/2026
DOB NOWSidewalk ShedSigned-offP B Contracting01/16/2026
DOB NOWSidewalk ShedSigned-offP B Contracting06/02/2025
DOB NOWSupported ScaffoldSigned-offP B Contracting06/02/2025
DOB NOWConstruction FencePermit IssuedP B Contracting06/02/2025
DOB NOWStructuralPermit IssuedP B Contracting05/23/2025
DOB NOWGeneral ConstructionPermit IssuedP B Contracting05/23/2025
BISPLISSUEDDynamic Contracting10/14/2016
BISPLISSUEDPinnacle Plumbing & Heating05/24/2002
BISOTISSUEDEuro-Craft Restoration02/11/2002
BISMHISSUEDEuro-Craft Restoration02/11/2002
BISPLISSUEDPinnacle Plumbing & Heating11/01/2001
BISPLISSUEDPinnacle Plumbing & Heating10/30/2001
BISPLISSUEDPinnacle Plumbing & Heating10/16/2001
BISPLISSUEDPinnacle Plumbing & Heating10/05/2001
BISOTISSUEDEuro Craft Restoration10/03/2001
BISMHISSUEDEuro Craft Restoration10/03/2001
BISOTISSUEDWil Tom Construction Co02/16/1995
BISMHISSUEDCavlier Mechanical10/06/1989
BISOTISSUEDJ & J Construction & Restoration10/05/1989
1 project · most recent 02/11/2025
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
02/11/2025——Heating Systems
Heating
Armstrong Air WS-0802-200E-1-CSSSSNN-20 ×1
1 project · most recent 05/06/2025
General Wiring
FiledStatusContractorScope
05/06/2025CompleteEldor ElectricGeneral Wiring
2 projects · most recent 10/20/2026
FiledStatusContractorScope
10/20/2026Permit IssuedP B Contracting1 scope_items
05/17/2023——1 scope_items
3 projects · most recent 04/22/2025
Fence Sidewalk Shed Scaffold
FiledStatusContractorScope
04/22/2025Permit IssuedP B ContractingFence
04/22/2025Signed-offP B ContractingSidewalk Shed
04/22/2025Signed-offP B ContractingScaffold
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
04/21/2025Post-installed AnchorsMD MOSTAFAspecial
01/14/2025Post-installed AnchorsGEORGE GHEBRYALspecial
01/14/2025HVAC-R and service water piping design and insulationGEORGE GHEBRYALenergy_progress
01/14/2025HVAC-R and service water heating system controlsGEORGE GHEBRYALenergy_progress
10/22/2024Maintenance informationGEORGE GHEBRYALenergy_progress
10/22/2024Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
10/22/2024Mechanical SystemsGEORGE GHEBRYALspecial
10/22/2024Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
10/22/2024Final—progress
07/11/2023Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
07/11/2023Air barrier - visual inspectionGEORGE GHEBRYALenergy_progress
07/11/2023Fenestration areasGEORGE GHEBRYALenergy_progress
07/11/2023Insulation placement and R valuesGEORGE GHEBRYALenergy_progress
07/11/2023Fenestration and door U-factor and product ratingsGEORGE GHEBRYALenergy_progress
07/11/2023MasonryGEORGE GHEBRYALspecial
07/11/2023Post-installed AnchorsGEORGE GHEBRYALspecial
07/11/2023Structural Steel - WeldingGEORGE GHEBRYALspecial
07/11/2023Exterior Insulation and Finish Systems (EIFS)GEORGE GHEBRYALspecial
07/11/2023FinalPaul Millmanprogress
07/11/2023Fenestration air leakageGEORGE GHEBRYALenergy_progress
05/10/2023FinalPaul Millmanprogress
05/10/2023Structural Steel - Welding—special
05/10/2023Structural Stability – Alterations of existing buildings—special
05/10/2023Structural Steel - Details—special
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Queens CollegeEducationSub-basement, Floors 1–4
Project Q01230145 Alteration · Permit Entire · 09/05/2025
Project Q01213757 Alteration · Permit Entire · 04/22/2025
Project Q01213762 Alteration · LOC Issued · 04/22/2025
Project Q01213769 Alteration · LOC Issued · 04/22/2025
Project Q00902486 Alteration · Permit Entire · 07/14/2023
Project Q00873224 Alteration · Approved · 05/17/2023
CUNY the City of University of New YorkEducationFloor 1
Project Q01130772 Alteration · Approved · 02/11/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 51 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/24/2026Q00873224-I1Request digital key ↗
08/24/2026Q00902486-I1Request digital key ↗
08/20/2026Q01130772-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
03/01/2017421344655Open ↗
07/12/2016421344655Open ↗
▸BISWORK PERMIT APPLICATION1
10/17/2016421344655Open ↗
▸Seals & Professional Certifications21
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/24/2026Q00873224-I1Open ↗
08/24/2026Q00902486-I1Open ↗
08/20/2026Q01130772-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/26/2026Q01130772-I1Open ↗
09/26/2026Q01130772-I1Open ↗
08/24/2026Q00902486-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/26/2026Q01130772-I1Open ↗
08/27/2026Q01213769-I1Open ↗
08/24/2026Q00902486-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
03/20/2017421344655Open ↗
07/12/2016421344655Open ↗
07/12/2016421344655Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/12/2016421344655Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
07/12/2016421344655Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
07/12/2016421344655Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/24/2026Q00873224-I1Open ↗
08/20/2026Q01130772-I1Open ↗
08/13/2026Q01230145-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/12/2016421344655Open ↗
▸Approvals, Objections & Sign-offs11
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/13/2026Q01213769-I1Open ↗
08/13/2026Q01213762-I1Open ↗
08/13/2026Q01130772-I1Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
06/13/2017421344655Open ↗
03/20/2017421344655Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
07/12/2016421344655Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
07/12/2016421344655Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026Q00902486-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
03/20/2017421344655Open ↗
07/12/2016421344655Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
03/15/2017421344655Open ↗
▸BISEFILING COVER SHEET1
07/12/2016421344655Open ↗
▸Other Documents1
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll1
08/13/2026Q01230145-I1Open ↗