← Back
BuildNYC
Elevator cooperative
66 EAST 79TH STREET
MANHATTAN · BIN 1041880
💬 Discuss this project
1926Year Built
15Stories
D4Building Class
R10Zoning
55,760 sfGross Floor Area
21Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SAFE
Elevator cooperative · Owner of record: 66 E 79th St · 5,970 sf lot · 9.34 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
PenthouseUnit PH4p · 1 filing · 14 docs
Floor 15Plumbing and gas work, 14th and 15th floors74p · 4 filings · 20 docs
Floor 14Plumbing and gas work, 14th and 15th floors73p · 5 filings · 20 docs
Floor 13
Floor 12Unit 12N16p · 2 filings · 16 docs
Floor 11
Floor 10
Floor 9Plumbing work for 9th floor unit renovation17p · 1 filing · 20 docs
Floor 8
Floor 7
Floor 6Under Construction16p · 3 filings · 17 docs
Floor 5
Floor 4
Floor 3
Floor 2Unit 2N, Unit 2SUnder Construction53p · 3 filings · 20 docs
Floor 1Unit 1S, Unit 1WUnder Construction22p · 3 filings · 20 docs
CellarDomestic water heating plant upgradeUnder Construction1p · 2 filings · 20 docs
Site & exteriorHeavy duty sidewalk shed9p · 3 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
66 East 79th St3703/21/2026
66 E. 79th Corp C/O Brown, Har S2403/22/2026
Julia Shepard 2012 GST Trust1107/08/2026
Phoenix303/21/2026
Brown, Harris, Stevens103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Code3003/21/2026
Anthony Morali Architect1003/21/2026
Agouti Construction Consulting803/21/2026
New Amsterdam Expediting803/21/2026
East Coast Expediting203/21/2026
Direct Access Expediting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
West New York Restoration of CTScaffold1107/08/2026
UbertoGeneral Contractor907/08/2026
Grey Street BuildersGeneral Contractor507/08/2026
The Metro Group ElectricElectrical403/21/2026
Rusk ApartmentGeneral Contractor303/21/2026
Orbit Plumbing & HeatingPlumbing307/08/2026
Dola ContractingGeneral Contractor303/21/2026
RRP PlumbingPlumbing208/08/2026
Einstein ElectricalElectrical203/21/2026
Cortlandt ContractingGeneral Contractor210/04/2026
Hudson Green CraftGeneral Contractor204/09/2026
Quality Building ConstrutionGeneral Contractor203/21/2026
Donato PlumbingPlumbing207/08/2026
Amn PlumbingPlumbing107/08/2026
P&H Electric D/B/A Mage ElectricElectrical103/21/2026
Hydro MechanicalPlumbing108/16/2026
MCM Plumbing & HeatingPlumbing109/24/2026
Peter DI Natale & Associates IGeneral Contractor108/12/2026
West New York Restoration of CTspecialty_contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Lawrence V McDonald Architects6039309/15/2026
Fsi Architecture354112/19/2025
James Dixon Architect4606208/28/2025
RHL Engineering712108/27/2025
Davis Architecture Studio8513206/02/2025
C.M. Testing Laboratory1352206/02/2025
Concrete Solutions Lab Co5344205/07/2024
HT Engineering6274804/25/2023
Integrity Consulting Service666501/30/2023
Amaracon Testing & Inspec5842210/14/2022
Piro Studio7503207/05/2022
Joseph Martines PE1428107/28/2021
JMV Consulting Engineering804111/11/2020
Building Lifecycle
All (263)Filed (43)Permit Issued (35)Signed Off (18)Facade (FISP) (15)Violation (40)Inspection (11)Objection (71)Special Inspection (30)
09/30/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/28/2026
Permit issued — Mechanical Systems
M01426254-I1-MS
09/28/2026
Permit issued — General Construction
M01386668-I1-GC
09/23/2026
Permit issued — Plumbing
M01426242-I1-PL
09/15/2026
Filed — Alteration
Install new split system central AC system and exhaust duct for kitchen range hood for apt. 6
M01426254-I1
09/15/2026
Filed — Alteration
Herewith file plans to renovate apartment 6. Minor removal and construction of partitions and finishes. No change to use egress or occupancy.
M01386668-I1
09/15/2026
Filed — Alteration
Herewith file plans to renovate bathroom and kitchen in apartment 6. Replace and install new plumbing fixtures. No change to use egress or occupancy
M01426242-I1
08/19/2026
Signed off — Alteration
Interior renovation of the existing residential unit on 9th floor. No change in use, zoning or egress with this filing.
M01182985-I1
08/19/2026
Signed off — Alteration
Interior renovation of the existing residential unit on 9th floor. No change in use, zoning or egress with this filing.
M01182985-S1
08/14/2026
Permit issued — Plumbing
M00759496-S3-PL
08/11/2026
Permit issued — General Construction
M00759496-I1-GC
08/07/2026
Signed off — Alteration CO
Filing for change of use at 1st & 2nd floors. Doctors offices & maids rooms now being converted to apartments at units 1W, 1S and 2N. Most of the physical construction work filed under separate buildouts. Minor updates filed on this application to unit 2N
M00961645-S2
08/07/2026
Permit issued — Plumbing
M00961645-S1-PL
08/07/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/21/2026
Signed off — Alteration
Interior renovation of the existing residential unit on 9th floor. No change in use, zoning or egress with this filing.
M01182985-S2
07/03/2026
Special inspection requirement — Final
Lawrence McDonald
07/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Lawrence McDonald
07/03/2026
Special inspection requirement — Energy Code Compliance Inspections
Lawrence McDonald
07/03/2026
Special inspection requirement — HVAC-R and service water heating system controls
Lawrence McDonald
07/03/2026
Special inspection requirement — Energy Code Compliance Inspections
Lawrence McDonald
07/03/2026
Special inspection requirement — Maintenance information
Lawrence McDonald
07/03/2026
Special inspection requirement — HVAC-R and service water heating equipment
Lawrence McDonald
07/03/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Lawrence McDonald
07/03/2026
Special inspection requirement — Post-installed Anchors
Lawrence McDonald
07/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Lawrence McDonald
07/03/2026
Special inspection requirement — Mechanical Systems
Lawrence McDonald
01/06/2026
Objection resolved — Addressed
01/06/2026
Objection resolved — Addressed
01/05/2026
Objection resolved — Addressed
01/05/2026
Objection resolved — Addressed
01/02/2026
Objection raised — Scope
01/02/2026
Objection raised — Plumbing
01/02/2026
Objection raised — Admin
01/02/2026
Objection raised — Energy
12/19/2025
Filed — Alteration
Filing to upgrade domestic water heating plant.
M01307677-I1
11/21/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
James Cicalo
10/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Cicalo
10/21/2025
Permit issued — Mechanical Systems
M01182985-S2-MS
09/29/2025
Permit issued — Plumbing
M01182985-S1-PL
09/12/2025
Permit issued — General Construction
M01182985-I1-GC
09/10/2025
Objection resolved — Addressed
09/10/2025
Objection resolved — Addressed
09/10/2025
Objection resolved — Addressed
09/09/2025
Objection raised — Scope
09/09/2025
Objection raised — Other
09/09/2025
Objection raised — Cost
09/08/2025
Objection raised — Cost
09/08/2025
Objection resolved — Addressed
09/04/2025
Filed — Alteration CO
Filing for change of use at 1st & 2nd floors. Doctors offices & maids rooms now being converted to apartments at units 1W, 1S and 2N. Most of the physical construction work filed under separate buildouts. Minor updates filed on this application to unit 2N
M00961645-P2
08/28/2025
Filed — Alteration
Interior renovation of the existing residential unit on 9th floor. No change in use, zoning or egress with this filing.
M01182985-S1
08/28/2025
Objection resolved — Addressed
08/28/2025
Objection resolved — Addressed
08/28/2025
Objection resolved — Addressed
08/27/2025
Filed — Alteration
Interior renovation of the existing residential unit on 9th floor. No change in use, zoning or egress with this filing.
M01182985-S2
08/26/2025
Objection raised — Scope
08/26/2025
Objection raised — Accessibility
08/26/2025
Objection raised — Cost
08/20/2025
Objection raised — Accessibility
08/20/2025
Objection raised — Other
Latest 60 of 263 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedCortlandt Contracting09/28/2026
DOB NOWGeneral ConstructionPermit IssuedCortlandt Contracting09/28/2026
DOB NOWPlumbingPermit IssuedMCM Plumbing & Heating09/23/2026
DOB NOWPlumbingSigned-offHydro Mechanical08/14/2026
DOB NOWGeneral ConstructionPermit IssuedPeter DI Natale & Associates I08/11/2026
DOB NOWPlumbingPermit IssuedRRP Plumbing08/07/2026
DOB NOWMechanical SystemsSigned-offHudson Green Craft10/21/2025
DOB NOWPlumbingSigned-offDonato Plumbing09/29/2025
DOB NOWGeneral ConstructionSigned-offHudson Green Craft09/12/2025
DOB NOWPlumbingPermit IssuedRRP Plumbing07/15/2025
DOB NOWGeneral ConstructionPermit IssuedDola Contracting02/11/2025
DOB NOWStructuralSigned-offQuality Building Construt11/08/2024
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating08/21/2023
DOB NOWMechanical SystemsSigned-offUberto03/30/2023
DOB NOWGeneral ConstructionSigned-offUberto03/24/2023
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating09/20/2022
DOB NOWGeneral ConstructionSigned-offUberto09/17/2022
DOB NOWGeneral ConstructionSigned-offGrey Street Builders05/09/2022
DOB NOWStructuralSigned-offA. Peter Luger Construction04/20/2022
DOB NOWPlumbingSigned-offAmn Plumbing02/10/2022
DOB NOWGeneral ConstructionSigned-offGrey Street Builders10/25/2021
DOB NOWMechanical SystemsSigned-offGrey Street Builders10/25/2021
DOB NOWMechanical SystemsSigned-offUberto10/20/2021
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating10/20/2021
DOB NOWGeneral ConstructionSigned-offUberto09/17/2021
DOB NOWGeneral ConstructionSigned-offUberto09/13/2021
DOB NOWMechanical SystemsSigned-offRusk Apartment06/01/2021
DOB NOWSidewalk ShedSigned-offA. Peter Luger Construction04/22/2021
DOB NOWSupported ScaffoldSigned-offA. Peter Luger Construction04/06/2021
DOB NOWPlumbingSigned-offDonato Plumbing11/04/2020
DOB NOWSidewalk ShedSigned-offA. Peter Luger Construction10/01/2020
DOB NOWSupported ScaffoldSigned-offA. Peter Luger Construction04/15/2020
DOB NOWSidewalk ShedSigned-offA. Peter Luger Construction04/15/2020
DOB NOWSupported ScaffoldSigned-offA. Peter Luger Construction01/29/2020
DOB NOWSidewalk ShedSigned-offA. Peter Luger Construction01/06/2020
BISOTISSUEDWest New York Restoration of CT03/24/2021
BISOTISSUEDRusk Apartment02/12/2021
BISEQISSUEDWest New York Restoration of CT01/20/2021
BISOTISSUEDRusk Apartment09/30/2020
BISOTISSUEDWest New York Restoration of CT06/10/2020
+ 45 more permits on file
2 projects · most recent 09/15/2026
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/15/2026Permit IssuedCortlandt ContractingAir Conditioning Systems, Ventilation Systems
06/02/2025Permit IssuedPeter DI Natale & Associates IAir Conditioning Systems
Cooling
Magic-Aire MAGIC AIRE MODEL#DHB - 10 30,000 BTU · Ahu ×1
National Comfort NATIONAL COMFORT PRODUCTS - MODEL#NCPE-424-3010 30,000 BTU · Condensing Unit ×1
5 projects · most recent 09/15/2026
Water/Sanitary Gas
FiledStatusContractorScope
09/15/2026Permit IssuedMCM Plumbing & HeatingGas, Water/Sanitary
12/19/2025——Water/Sanitary
09/04/2025Permit IssuedRRP PlumbingGas, Water/Sanitary
08/28/2025Signed-offDonato PlumbingWater/Sanitary
06/02/2025Signed-offHydro MechanicalWater/Sanitary
18 projects · most recent 09/25/2026
General Wiring
FiledStatusContractorScope
09/25/2026Permit IssuedConductor Electrical ServicesGeneral Wiring
09/22/2026Permit IssuedConductor Electrical Services—
09/17/2026Permit IssuedAccurate Electrical ContractorsGeneral Wiring
09/15/2025CompleteEinstein Electrical—
09/15/2025CompleteThe Metro Group ElectricGeneral Wiring
09/15/2025CompleteEinstein ElectricalGeneral Wiring
09/10/2025CompleteThe Metro Group ElectricGeneral Wiring
08/26/2025CompleteP&H Electric D/B/A Mage Electric21 meters, 1 new_meters
09/06/2024CompleteP.S. Marcato Elev. Co—
06/12/2024CompleteInfinity ElectricGeneral Wiring
09/22/2023CompleteApollo ElectricGeneral Wiring
01/31/2023CompleteInfinity ElectricGeneral Wiring
11/08/2021CompleteEinstein ElectricalGeneral Wiring
10/28/2020CompleteWarren Ostroff ElectricGeneral Wiring
10/26/2020CompleteWarren Ostroff Electric—
1 project · most recent 09/04/2025
FiledStatusContractorScope
09/04/2025Permit IssuedRRP Plumbing1 scope_items
1 project · most recent 08/28/2025
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
08/28/2025Signed-offHudson Green CraftTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
09/30/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/07/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/31/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/15/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/11/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/22/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/16/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/23/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/22/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/25/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 88
DateRequirementInspectorRole
07/03/2026Maintenance informationLawrence McDonaldenergy_progress
07/03/2026Fire-Resistant Penetrations and JointsLawrence McDonaldspecial
07/03/2026HVAC-R and service water heating system controlsLawrence McDonaldenergy_progress
07/03/2026FinalLawrence McDonaldprogress
07/03/2026Energy Code Compliance InspectionsLawrence McDonaldprogress
07/03/2026Mechanical SystemsLawrence McDonaldspecial
07/03/2026Post-installed AnchorsLawrence McDonaldspecial
07/03/2026Fire-Resistant Penetrations and JointsLawrence McDonaldspecial
07/03/2026Energy Code Compliance InspectionsLawrence McDonaldprogress
07/03/2026HVAC-R and service water piping design and insulationLawrence McDonaldenergy_progress
07/03/2026HVAC-R and service water heating equipmentLawrence McDonaldenergy_progress
10/27/2025Tenant Protection Plan ComplianceJames Cicalospecial
10/27/2025Fire-Resistant Penetrations and JointsJames Cicalospecial
06/06/2025Fire-Resistant Penetrations and JointsVincent Gentilespecial
06/02/2025Tenant Protection Plan ComplianceJOHN SEMIOLIspecial
06/02/2025Fire-Resistant Penetrations and JointsJOSHUA DAVISspecial
04/22/2025Fire-Resistance Rated ConstructionJames Dixonprogress
04/22/2025Fire-Resistant Penetrations and JointsJames Dixonspecial
02/18/2025Mechanical SystemsVincent Gentilespecial
02/18/2025FinalJames Dixonprogress
02/18/2025FinalRICHARD LEMANSKYprogress
11/13/2023Structural Steel - High Strength BoltingMINA HANNAspecial
11/13/2023Structural Steel - WeldingMINA HANNAspecial
11/13/2023Structural Steel - DetailsMINA HANNAspecial
11/13/2023FinalMINA HANNAprogress
Latest 25 of 88.
▾Documents — 775 on file (BIS + DOB NOW)
▸Plans & Drawings43
▸DOB NOWPlans/Sketch35
10/04/2026M01426254-I1Request digital key ↗
10/04/2026M01386668-I1Request digital key ↗
09/23/2026M01426242-I1Request digital key ↗
Showing 3 of 35 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed4
09/05/2026M00290461-I1Request digital key ↗
09/05/2026M00290461-P1Request digital key ↗
09/05/2026M00290461-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/04/2026M00368493-I1Request digital key ↗
08/15/2026M00368493-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00305666-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/15/2026M00368494-I1Request digital key ↗
▸Applications & Permits145
▸BISPLAN / WORK APPROVAL APPLICATION58
03/05/2026121588424Open ↗
01/09/2026121588424Open ↗
12/31/2025121588424Open ↗
Showing 3 of 58 on file for this type
▸BISWORK PERMIT APPLICATION51
09/30/2020140907865Open ↗
06/10/2020140908329Open ↗
01/29/2020123802073Open ↗
Showing 3 of 51 on file for this type
▸DOB NOWLPC Approval/Permit34
10/04/2026M01426254-I1Open ↗
09/29/2026M01386668-I1Open ↗
09/23/2026M01426242-I1Open ↗
Showing 3 of 34 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
10/24/2023102116247Open ↗
09/05/2023102116247Open ↗
▸Seals & Professional Certifications202
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION58
03/06/2020123491113Open ↗
03/06/2020123491113Open ↗
03/06/2020123491113Open ↗
Showing 3 of 58 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature43
10/04/2026M01426254-I1Open ↗
09/29/2026M01386668-I1Open ↗
09/23/2026M01426242-I1Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWProgress Inspector Seal & Signature35
10/04/2026M01426254-I1Open ↗
09/28/2026M00532913-P1Open ↗
09/28/2026M00532913-P1Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature32
10/04/2026M01426254-I1Open ↗
09/28/2026M00532913-P1Open ↗
09/28/2026M00532913-P1Open ↗
Showing 3 of 32 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
03/25/2021140999016Open ↗
06/05/2020140908329Open ↗
01/29/2020123802073Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY7
03/25/2021140999016Open ↗
06/05/2020140908329Open ↗
09/25/2019140870715Open ↗
Showing 3 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION7
03/25/2021140999016Open ↗
06/05/2020140908329Open ↗
09/25/2019140870715Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
01/29/2020123802073Open ↗
Showing 1 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
10/27/2020140959880Open ↗
08/05/2020140907865Open ↗
▸Trade Schedules & Equipment34
▸BISSELF-CERT PLUMBING NOTICE17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISSCHEDULE B - PLUMBING9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
10/17/2019123491113Open ↗
09/24/2019123491113Open ↗
Showing 2 of 6 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
08/08/2023123352987Open ↗
▸BISEQUIPMENT USE PERMITS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection20
▸BISTenant Protection Plan and Notes10
08/05/2020140907865Open ↗
01/29/2020123802073Open ↗
02/20/2019123683460Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWTenant Protection Plan8
09/05/2026M00290461-P2Open ↗
09/05/2026M00290461-P1Open ↗
09/05/2026M00290461-I1Open ↗
Showing 3 of 8 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Tree Checklist1
08/13/2026M00961645-I1Open ↗
▸Environmental & Asbestos53
▸DOB NOWDEP ACP-5: Asbestos Assessment Report20
10/04/2026M01426254-I1Open ↗
09/29/2026M01386668-I1Open ↗
09/23/2026M01426242-I1Open ↗
Showing 3 of 20 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)12
09/30/2020140907865Open ↗
09/25/2019140870715Open ↗
02/20/2019123683460Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form9
09/04/2026M00368493-I1Open ↗
09/03/2026M00532897-I1Open ↗
09/03/2026M00532913-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance36
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
01/21/2020140870715Open ↗
02/20/2019123683460Open ↗
Showing 2 of 10 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
04/29/2024123352987Open ↗
03/18/2024123352987Open ↗
09/28/2023123352987Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
04/29/2024123352987Open ↗
03/18/2024123352987Open ↗
09/28/2023123352987Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
08/08/2023123352987Open ↗
02/08/2022140959880Open ↗
▸BISENERGY CODE 1ST REVIEW COMPLETE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISNYCECC EXEMPTION1
08/05/2020140907865Open ↗
▸BIS* HVAC INSULATION AND SEALING1
08/08/2023123352987Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/08/2022140959880Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports33
▸BISTECHNICAL REPORT: RESPONSIBILITY30
01/07/2026121588424Open ↗
01/05/2026121588424Open ↗
04/29/2024123352987Open ↗
Showing 3 of 30 on file for this type
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
08/31/2023102116247Open ↗
▸BISSTRUCTURAL SAFETY - STRUCTURAL STABILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISMECHANICAL SYSTEMS1
08/08/2023123352987Open ↗
▸Approvals, Objections & Sign-offs88
▸BISLANDMARKS APPROVAL30
09/29/2023123352987Open ↗
03/25/2021140999016Open ↗
10/27/2020140959880Open ↗
Showing 3 of 30 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST26
04/29/2024123352987Open ↗
04/04/2024102544454Open ↗
02/29/2024120151968Open ↗
Showing 3 of 26 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION13
03/25/2021140999016Open ↗
08/24/2020140907865Open ↗
01/24/2019123491113Open ↗
Showing 3 of 13 on file for this type
▸BISADMINISTRATIVE OBJECTIONS9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISLANDMARKS SIGNOFF6
04/29/2024123352987Open ↗
02/12/2024120151968Open ↗
10/24/2023102116247Open ↗
Showing 3 of 6 on file for this type
▸BISFINAL2
02/08/2022140959880Open ↗
11/23/2021123802073Open ↗
▸BISCONSTRUCTION CODE DETERMINATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership51
▸BISCOST AFFIDAVIT45
04/29/2024123352987Open ↗
02/28/2024120151968Open ↗
02/27/2024120151968Open ↗
Showing 3 of 45 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
02/08/2022140959880Open ↗
12/03/2021140908329Open ↗
▸Filing & Intake Forms51
▸BISEFILING COVER SHEET18
01/29/2020123802073Open ↗
02/20/2019123683460Open ↗
Showing 2 of 18 on file for this type
▸BISADDITIONAL INFORMATION16
03/05/2026121588424Open ↗
01/04/2022140959880Open ↗
02/13/2020123491113Open ↗
Showing 3 of 16 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET10
03/25/2021140999016Open ↗
10/27/2020140959880Open ↗
08/05/2020140907865Open ↗
Showing 3 of 10 on file for this type
▸BISBOROUGH INTAKE FORM7
03/06/2020123491113Open ↗
01/21/2020140870715Open ↗
10/17/2019123491113Open ↗
Showing 3 of 7 on file for this type
▸Other Documents10
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
04/29/2024123352987Open ↗
03/19/2024123352987Open ↗
Showing 2 of 4 on file for this type
▸DOB NOWProof of Historic Building3
08/13/2026M00759496-I1Open ↗
Showing 1 of 3 on file for this type
▸BISSHUTOFF DAMPERS1
08/08/2023123352987Open ↗
▸BISMAINTENANCE INFORMATION1
08/08/2023123352987Open ↗
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type