Condo, residential tower (mixed-use, multi-family elevator) [derived]
320 Wythe Condominium
326 WYTHE AVENUE · BIN 3335768
💬 Discuss this project
2017Year Built
3Stories
RMBuilding Class
M1-2/R6Zoning
25,961 sfGross Floor Area
2Units
LL97 Covered0 Open ViolationsFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: GRAND/WYTHE OWNER LLC · 10,400 sf lot · 2.5 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof2p · 1 filing · 15 docs
Floor 124p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TIDAL REAL ESTATE PARTNERS2709/01/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARCHYTECX DESIGN AND ARCHITECTURE306/10/2026
EP ENGINEERING LLC712/17/2025
ESNYC CONSULTING INC108/14/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHVISION DESIGN STUDIO103/21/2026
MBE CODE ZONING1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J. PETROCELLI CONTRACTINGGeneral Contractor204/09/2026
GENET PLBG AND HTG CORPFire Protection207/08/2026
GENET PLBG AND HTG CORPPlumbing207/08/2026
DH EAGLE PLBG & HTG INCPlumbing107/08/2026
RENOVATION STATION INCGeneral Contractor104/09/2026
PRECISION SPKLR SVCS LLCFire Protection107/08/2026
S TERRANOVA LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EP INSPECTIONS AND COMMIS7079712/17/2025
ESNYC CONSULTING INC4099108/14/2025
Building Lifecycle
All (68)Filed (11)Permit Issued (10)Signed Off (3)Violation (2)Inspection (9)Objection (4)Special Inspection (29)
06/10/2026
Filed — Alteration CO
HEREBY FILING TO CHANGE USE FROM F2 FACTORY TO E-BUISNESS.
B00781910-P2
05/27/2026
Objection resolved — Addressed
05/22/2026
Objection raised — Cost
05/18/2026
Objection raised — Zoning
05/18/2026
Objection resolved — Addressed
05/13/2026
Filed — Alteration CO
HEREBY FILING TO CHANGE USE FROM F2 FACTORY TO E-BUISNESS.
B00781910-P1
04/30/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/10/2026
Violation issued (FDNY_ORDER, closed)
02/09/2026
Signed off — Alteration
HEREBY FILING FOR THE INSTALLATION OF PLUMBING FIXTURES/SPRINKLERS AT FIRST FLOOR COMMERCIAL SPACE. FILED IN CONJUNCTION WITH B00781910-I1.
B00782873-I1
12/19/2025
Signed off — Alteration
MECHANICAL MODIFICATIONS TO INCLUDE HVAC REPLACEMENT AND REPLACEMENT OF ASSOCIATED DUCTWORK, INSTALLATION OF COMMERCIAL COOKING AND EXHAUST SYSTEM IN 1ST FLOOR KITCHEN. NO CHANGE IN USE,OCCUAPNCY OR EGRESS UNDER THIS APPLICATION.
B00782900-I1
12/19/2025
Special inspection requirement — Duct leakage testing, insulation and design
MOLLY GLENN
12/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOLLY GLENN
12/19/2025
Special inspection requirement — Energy Code Compliance Inspections
MOLLY GLENN
12/19/2025
Special inspection requirement — Final
MOLLY GLENN
12/19/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MOLLY GLENN
12/19/2025
Special inspection requirement — HVAC-R and service water heating equipment
MOLLY GLENN
12/19/2025
Special inspection requirement — Shutoff dampers
MOLLY GLENN
12/19/2025
Special inspection requirement — HVAC-R and service water heating system controls
MOLLY GLENN
12/19/2025
Special inspection requirement — Maintenance information
MOLLY GLENN
12/19/2025
Special inspection requirement — Mechanical Systems
MOLLY GLENN
12/17/2025
Filed — Alteration
MECHANICAL MODIFICATIONS TO INCLUDE HVAC REPLACEMENT AND REPLACEMENT OF ASSOCIATED DUCTWORK, INSTALLATION OF COMMERCIAL COOKING AND EXHAUST SYSTEM IN 1ST FLOOR KITCHEN. NO CHANGE IN USE,OCCUAPNCY OR EGRESS UNDER THIS APPLICATION.
B00782900-P2
11/13/2025
Filed — Alteration
HEREBY FILING FOR THE INSTALLATION OF PLUMBING FIXTURES/SPRINKLERS AT FIRST FLOOR COMMERCIAL SPACE. FILED IN CONJUNCTION WITH B00781910-I1.
B00782873-P3
11/12/2025
Special inspection requirement — Post-installed Anchors
Christopher Burgess
11/12/2025
Special inspection requirement — Sprinkler Systems
Christopher Burgess
11/12/2025
Special inspection requirement — Energy Code Compliance Inspections
Christopher Burgess
11/12/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Burgess
11/12/2025
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Burgess
11/12/2025
Special inspection requirement — Maintenance information
Christopher Burgess
11/12/2025
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Burgess
11/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Burgess
11/07/2025
Signed off — Alteration
GROUND FLOOR RETAIL UPGRADES FOR ALTERATION TYPE 2. WORK LIMITED TO INSIDE THE DEMISED PREMISES ONLY ON APPROXIMATELY 2200 GSF OF IMPACTED RETAIL AREA. THERE SHALL BE NO CHANGE OF USE, NO CHANGE OF OCCUPANCY, AND NO CHANGE OF EGRESS WITH APPLICATION.
B01270776-I1
10/16/2025
Filed — Alteration
HEREBY FILING FOR THE INSTALLATION OF PLUMBING FIXTURES/SPRINKLERS AT FIRST FLOOR COMMERCIAL SPACE. FILED IN CONJUNCTION WITH B00781910-I1.
B00782873-P2
10/14/2025
Filed — Alteration
MECHANICAL MODIFICATIONS TO INCLUDE HVAC REPLACEMENT AND REPLACEMENT OF ASSOCIATED DUCTWORK, INSTALLATION OF COMMERCIAL COOKING AND EXHAUST SYSTEM IN 1ST FLOOR KITCHEN. NO CHANGE IN USE,OCCUAPNCY OR EGRESS UNDER THIS APPLICATION.
B00782900-P1
09/23/2025
Filed — Alteration
HEREBY FILING FOR THE INSTALLATION OF PLUMBING FIXTURES/SPRINKLERS AT FIRST FLOOR COMMERCIAL SPACE. FILED IN CONJUNCTION WITH B00781910-I1.
B00782873-P1
09/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Burgess
09/05/2025
Special inspection requirement — Post-installed Anchors
Christopher Burgess
09/05/2025
Special inspection requirement — Sprinkler Systems
Christopher Burgess
09/05/2025
Special inspection requirement — Energy Code Compliance Inspections
Christopher Burgess
09/05/2025
Special inspection requirement — Maintenance information
Christopher Burgess
09/05/2025
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Burgess
09/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Burgess
09/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Burgess
08/22/2025
Permit issued — General Construction
B01270776-I1-GC
08/18/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/18/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/14/2025
Filed — Alteration
GROUND FLOOR RETAIL UPGRADES FOR ALTERATION TYPE 2. WORK LIMITED TO INSIDE THE DEMISED PREMISES ONLY ON APPROXIMATELY 2200 GSF OF IMPACTED RETAIL AREA. THERE SHALL BE NO CHANGE OF USE, NO CHANGE OF OCCUPANCY, AND NO CHANGE OF EGRESS WITH APPLICATION.
B01270776-I1
08/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
sajjad javaid
08/13/2025
Special inspection requirement — Final
sajjad javaid
08/13/2025
Special inspection requirement — Fire-Resistance Rated Construction
sajjad javaid
07/30/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/25/2025
Permit issued — Mechanical Systems
B00782900-I1-MS
07/25/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/22/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/16/2025
Filed — Alteration
MECHANICAL MODIFICATIONS TO INCLUDE HVAC REPLACEMENT AND REPLACEMENT OF ASSOCIATED DUCTWORK, INSTALLATION OF COMMERCIAL COOKING AND EXHAUST SYSTEM IN 1ST FLOOR KITCHEN. NO CHANGE IN USE,OCCUAPNCY OR EGRESS UNDER THIS APPLICATION.
B00782900-I1
07/15/2025
Permit issued — Plumbing
B00782873-I1-EW-SP
07/11/2025
Permit issued — Plumbing
B00782873-I1-PL
06/24/2025
Permit issued — General Construction
B00781910-I1-GC
08/09/2024
Violation issued (FDNY_NOV, closed)
10/19/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/28/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
Latest 60 of 68 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offRENOVATION STATION INC08/22/2025
DOB NOWMechanical SystemsSigned-offJ. PETROCELLI CONTRACTING07/25/2025
DOB NOWPlumbingSigned-offPRECISION SPKLR SVCS LLC07/15/2025
DOB NOWPlumbingSigned-offL.SPINA PLUMB & HTG INC07/11/2025
DOB NOWGeneral ConstructionPermit IssuedJ. PETROCELLI CONTRACTING06/24/2025
DOB NOWSprinklersSigned-offGENET PLBG AND HTG CORP09/20/2023
DOB NOWSprinklersSigned-offGENET PLBG AND HTG CORP09/19/2023
DOB NOWPlumbingSigned-offGENET PLBG AND HTG CORP09/26/2022
DOB NOWSprinklersSigned-offGENET PLBG AND HTG CORP09/26/2022
DOB NOWGeneral ConstructionPermit IssuedS TERRANOVA LLC09/16/2022
BISPLISSUEDTT MECHANICAL CORP12/18/2020
BISPLISSUEDTT MECHANICAL CORP01/22/2019
BIS—ISSUEDJ. PETROCELLI CONTRACTING10/23/2018
BISSPISSUEDCRESTWOOD MECH. CO., INC07/05/2018
BISPLISSUEDCREATIVE PLUMBING IN04/26/2018
BIS—ISSUEDJ. PETROCELLI CONTRACTING04/11/2018
BISEQISSUEDJ. PETROCELLI CONTRACTING04/06/2018
2 projects · most recent 09/27/2023
General Wiring
FiledStatusContractorScope
09/27/2023CompleteMARTINEZ ELECTRICAL CONTGeneral Wiring
01/11/2018CompleteLIPPOLIS ELECTRIC, INC.General Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
04/30/2026Pass-Final CND-Occupancy InspectionPassView ↗
08/18/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/18/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/30/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/25/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/22/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/19/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/28/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/20/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
12/19/2025Duct leakage testing, insulation and designMOLLY GLENNenergy_progress
12/19/2025Fire-Resistant Penetrations and JointsMOLLY GLENNspecial
12/19/2025Energy Code Compliance InspectionsMOLLY GLENNprogress
12/19/2025FinalMOLLY GLENNprogress
12/19/2025HVAC-R and service water piping design and insulationMOLLY GLENNenergy_progress
12/19/2025HVAC-R and service water heating equipmentMOLLY GLENNenergy_progress
12/19/2025Shutoff dampersMOLLY GLENNenergy_progress
12/19/2025HVAC-R and service water heating system controlsMOLLY GLENNenergy_progress
12/19/2025Maintenance informationMOLLY GLENNenergy_progress
12/19/2025Mechanical SystemsMOLLY GLENNspecial
11/12/2025Post-installed AnchorsChristopher Burgessspecial
11/12/2025Sprinkler SystemsChristopher Burgessspecial
11/12/2025Energy Code Compliance InspectionsChristopher Burgessprogress
11/12/2025HVAC-R and service water piping design and insulationChristopher Burgessenergy_progress
11/12/2025HVAC-R and service water heating system controlsChristopher Burgessenergy_progress
11/12/2025Maintenance informationChristopher Burgessenergy_progress
11/12/2025HVAC-R and service water heating equipmentChristopher Burgessenergy_progress
11/12/2025Fire-Resistant Penetrations and JointsChristopher Burgessspecial
09/05/2025Fire-Resistant Penetrations and JointsChristopher Burgessspecial
09/05/2025Post-installed AnchorsChristopher Burgessspecial
09/05/2025Sprinkler SystemsChristopher Burgessspecial
09/05/2025Energy Code Compliance InspectionsChristopher Burgessprogress
09/05/2025Maintenance informationChristopher Burgessenergy_progress
09/05/2025HVAC-R and service water heating equipmentChristopher Burgessenergy_progress
09/05/2025HVAC-R and service water heating system controlsChristopher Burgessenergy_progress
Latest 25 of 29.
▾Documents — 209 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/28/2026B00782873-P1Request digital key ↗
08/28/2026B00782873-P2Request digital key ↗
08/28/2026B00782873-P3Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits23
▸BISPLAN / WORK APPROVAL APPLICATION17
02/25/2021321189511Open ↗
01/11/2021321189511Open ↗
04/02/2020321189511Open ↗
Showing 3 of 17 on file for this type
▸BISWORK PERMIT APPLICATION5
01/23/2019321189511Open ↗
10/25/2018321189511Open ↗
07/05/2018321685663Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
09/13/2018321189511Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZoning Exhibit form (1-5)2
08/16/2026B00781910-P2Open ↗
08/16/2026B00781910-I1Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
03/16/2018321189511Open ↗
▸BISVERIFY TAX LOT1
08/11/2021321189511Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
01/06/2021321189511Open ↗
▸BISZONING DIAGRAM1
03/16/2018321189511Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
03/16/2018321189511Open ↗
▸Seals & Professional Certifications34
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
07/12/2019321189511Open ↗
07/12/2019321189511Open ↗
07/12/2019321189511Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/28/2026B00782873-I1Open ↗
08/28/2026B00782873-P1Open ↗
08/28/2026B00782873-P2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/02/2026B00782873-P3Open ↗
09/02/2026B00782873-P3Open ↗
08/30/2026B00782900-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026B00782873-P3Open ↗
08/30/2026B00782900-I1Open ↗
08/28/2026B00782873-P1Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment13
▸BISSCHEDULE B - PLUMBING5
01/11/2021321189511Open ↗
04/02/2020321189511Open ↗
04/27/2019321189511Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
08/23/2018321189511Open ↗
08/22/2018321189511Open ↗
03/29/2018321685663Open ↗
Showing 3 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
02/12/2021321189511Open ↗
12/12/2019321189511Open ↗
06/26/2019321685681Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
07/12/2019321189511Open ↗
▸Safety & Tenant Protection22
▸DOB NOWHPD-1: Anti-Harassment Area Checklist10
08/28/2026B00782873-I1Open ↗
08/28/2026B00782873-P1Open ↗
08/28/2026B00782873-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWStreet Tree Checklist3
08/16/2026B00781910-P2Open ↗
08/15/2026B00781910-P1Open ↗
08/13/2026B00781910-I1Open ↗
▸DOB NOWCertificate of No Harassment3
08/16/2026B00781910-P2Open ↗
08/15/2026B00781910-P1Open ↗
08/13/2026B00781910-I1Open ↗
▸BISSTREET TREE CHECKLIST1
01/25/2018321189511Open ↗
▸BISSTREET TREE SIGNOFF1
03/16/2021321189511Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
01/25/2018321189511Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
04/06/2018321189511Open ↗
▸BISRESOLVE STREET TREE S/O.1
08/11/2021321189511Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00781910-I1Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/28/2026B00782873-P1Open ↗
08/28/2026B00782873-P2Open ↗
08/28/2026B00782873-I1Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
03/30/2018321685663Open ↗
03/16/2018321189511Open ↗
11/16/2017321685681Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
07/12/2019321189511Open ↗
07/10/2019321189511Open ↗
07/10/2019321189511Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
03/16/2018321189511Open ↗
03/16/2018321189511Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
11/10/2020321189511Open ↗
07/12/2019321189511Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/06/2021321189511Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY2
03/16/2018321189511Open ↗
02/08/2017321189511Open ↗
▸BISHYDRO FLOW TEST LETTER1
01/23/2018321685663Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
01/23/2018321685663Open ↗
▸Approvals, Objections & Sign-offs20
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST13
01/06/2021321189511Open ↗
10/21/2020321189511Open ↗
07/23/2020321189511Open ↗
Showing 3 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
02/12/2021321189511Open ↗
01/06/2021321189511Open ↗
09/25/2019321189511Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
02/09/2018321189511Open ↗
04/14/2017321189511Open ↗
04/14/2017321189511Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT5
02/12/2021321189511Open ↗
02/27/2020321685681Open ↗
03/16/2018321189511Open ↗
Showing 3 of 5 on file for this type
▸BISDEPT OF FINANCE VERIFICATION1
08/11/2021321189511Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
10/25/2018321189511Open ↗
▸Filing & Intake Forms27
▸BISBOROUGH INTAKE FORM14
02/12/2021321189511Open ↗
01/15/2021321189511Open ↗
11/10/2020321189511Open ↗
Showing 3 of 14 on file for this type
▸BISADDITIONAL INFORMATION10
01/15/2021321189511Open ↗
11/23/2020321189511Open ↗
04/10/2019321685663Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING COVER SHEET3
11/16/2017321685681Open ↗
11/16/2017321685663Open ↗
12/07/2016321189511Open ↗
▸Other Documents16
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION8
12/12/2019321189511Open ↗
12/08/2017321189511Open ↗
12/08/2017321189511Open ↗
Showing 3 of 8 on file for this type
▸BISPLOT DIAGRAM3
11/10/2020321189511Open ↗
03/16/2018321189511Open ↗
03/16/2018321189511Open ↗
▸DOB NOWProperty Ownership Certification3
08/16/2026B00781910-P2Open ↗
08/15/2026B00781910-P1Open ↗
08/13/2026B00781910-I1Open ↗
▸BISUnknown1
02/25/2020321685663Open ↗
▸BISSAFETY MONITORING PLAN1
01/23/2019321189511Open ↗