| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01294934 ↗ | 159 BLEECKER STREET MANHATTAN | Alteration | Permit Issued | 11/11/2025 | 05/22/2026 | Design HITE STUDIO ARCHITECTURE PC Owner Real Estate Management Filer BROOKLYNROOTDESIGN | NEW ENTRANCE DOORS AND WINDOWS AT THE EXISTING GROUND FLOOR COMMERCIAL STOREFRONT AND FINISH AND LIGHTING RENOVATIONS TO THE EXISTING MARQUE… |
| M01358107 ↗ | 29 UNION SQUARE MANHATTAN | Alteration | Signed-off | 03/17/2026 | 04/08/2026 | Design John Yurchyk Architect PLLC Filer ARCHVISION DESIGN STUDIO | INTERIOR RENOVATION OF COMMERCIAL SPACE. NO INCREASE IN THE BULK . NO IMPACT ON ZONING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| B00781910 ↗ | 326 WYTHE AVENUE BROOKLYN | Alteration CO | Permit Issued | 08/15/2022 | 06/24/2025 | Filer MBE CODE & ZONING LLC | HEREBY FILING TO CHANGE USE FROM F2 FACTORY TO E-BUISNESS. |
| M01163325 ↗ | 110 WEST 17 STREET MANHATTAN | Alteration | Signed-off | 03/27/2025 | 05/15/2025 | Design GNE ARCHITECTURE | INTERIOR GENERAL CONSTRUCTION FOR THE RENOVATION OF THE EXISTING 5TH FLOOR APARTMENT. REPAIR AND REPLACE EXISTING FINISHES ONLY. AS PER PLAN… |
| B01032427 ↗ | 689 6 AVENUE BROOKLYN | Alteration | Permit Issued | 07/22/2024 | 03/18/2025 | Design DRAFT MASTER ENGINEERING PC Owner ADIR PARTNERS LLC Filer S&G EXPEDITING CORP | Structural work involves reinforcing floor joints on the 1st floor |
| M01111135 ↗ | 91 CROSBY STREET MANHATTAN | Alteration | Permit Issued | 10/02/2024 | 10/17/2024 | Design ERIK SCHULTZ ARCHITECTURE Owner JAVERI CAPITAL | Filing for the renovation of an existing retail space at the 1st flr and mezzanine. Work includes removal & installation of interior non loa… |
| Name | Projects together | Most recent |
|---|---|---|
| ARCHYTECX DESIGN AND ARCHITECTURE | 3 | 06/10/2026 |
| BUILDTECH ENGINEERING DPC | 3 | 04/29/2024 |
| EP ENGINEERING LLC | 2 | 08/29/2023 |
| 2LS CONSULTING ENGINEERING, DPC | 1 | 01/27/2023 |
| BCHEN ARCHITECT PLLC | 1 | 10/06/2023 |
| DRAFT MASTER ENGINEERING PC | 1 | 03/14/2025 |
| ERIK SCHULTZ ARCHITECTURE | 1 | 10/02/2024 |
| GNE ARCHITECTURE | 1 | 03/27/2025 |
| HITE STUDIO ARCHITECTURE PC | 1 | 12/12/2025 |
| John Yurchyk Architect PLLC | 1 | 03/17/2026 |
| KCE CONSULTING ENGINEERING PLLC | 1 | 03/14/2025 |
| MARCO GIARDINA ARCHITECTURE, PLLC | 1 | 01/15/2025 |
| PATTI & ANTHES CONSULTING ENGINEERS | 1 | 01/15/2025 |
| PORTER CLAPP ARCHITECTS, PC | 1 | 05/02/2024 |
| STUDIO JS2 ARCHITECT P.C. | 1 | 01/27/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| JNR PLUMBING INC DBA | 2 | 03/14/2025 |
| CARA PLUMBING GROUP INC | 1 | 04/29/2024 |
| J. PETROCELLI CONTRACTING | 1 | 06/10/2026 |
| SCARPONI&SON PLBG&HTG COR | 1 | 01/15/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| STREAMLINE BUILDING MANAGEMENT LLC | 2 | 08/29/2023 |
| 235 PARK AVENUE SOUTH LLC | 1 | 01/27/2023 |
| 37TH STREET PARTNERS CAFE LLC | 1 | 03/17/2026 |
| ADIR PARTNERS LLC | 1 | 03/14/2025 |
| BROADWAY 922 ENTERPRISES LLC | 1 | 10/06/2023 |
| INDUSTRY PROPERTY MANAGEMENT | 1 | 01/15/2025 |
| JAVERI CAPITAL | 1 | 10/02/2024 |
| RFR REALTY LLC | 1 | 12/06/2022 |
| Real Estate Management | 1 | 12/12/2025 |
| TIDAL REAL ESTATE PARTNERS LP | 1 | 06/10/2026 |
| Two Trees Management | 1 | 04/29/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| JENNY FLORES EXPEDITING | 2 | 08/29/2023 |
| WILLIAM VITACCO ASSOCIATES | 2 | 10/02/2024 |
| ALPHA HOME DESIGN LLC | 1 | 10/06/2023 |
| ARCHVISION DESIGN STUDIO | 1 | 03/17/2026 |
| BROOKLYNROOTDESIGN | 1 | 12/12/2025 |
| MBE CODE & ZONING LLC | 1 | 06/10/2026 |
| METROPOLIS GROUP INC | 1 | 01/15/2025 |
| PWF | 1 | 12/06/2022 |
| S&G EXPEDITING CORP | 1 | 03/14/2025 |
| STUDIO JS2 ARCHITECT PC. | 1 | 01/27/2023 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01294934 ↗ | 159 BLEECKER STREET MANHATTAN | Alteration | Permit Issued | 11/11/2025 | 05/22/2026 | Design HITE STUDIO ARCHITECTURE PC Owner Real Estate Management Filer BROOKLYNROOTDESIGN | NEW ENTRANCE DOORS AND WINDOWS AT THE EXISTING GROUND FLOOR COMMERCIAL STOREFRONT AND FINISH AND LIGHTING RENOVATIONS TO THE EXISTING MARQUE… |
| M01358107 ↗ | 29 UNION SQUARE MANHATTAN | Alteration | Signed-off | 03/17/2026 | 04/08/2026 | Design John Yurchyk Architect PLLC Filer ARCHVISION DESIGN STUDIO | INTERIOR RENOVATION OF COMMERCIAL SPACE. NO INCREASE IN THE BULK . NO IMPACT ON ZONING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| B00781910 ↗ | 326 WYTHE AVENUE BROOKLYN | Alteration CO | Permit Issued | 08/15/2022 | 06/24/2025 | Filer MBE CODE & ZONING LLC | HEREBY FILING TO CHANGE USE FROM F2 FACTORY TO E-BUISNESS. |
| M01163325 ↗ | 110 WEST 17 STREET MANHATTAN | Alteration | Signed-off | 03/27/2025 | 05/15/2025 | Design GNE ARCHITECTURE | INTERIOR GENERAL CONSTRUCTION FOR THE RENOVATION OF THE EXISTING 5TH FLOOR APARTMENT. REPAIR AND REPLACE EXISTING FINISHES ONLY. AS PER PLAN… |
| B01032427 ↗ | 689 6 AVENUE BROOKLYN | Alteration | Permit Issued | 07/22/2024 | 03/18/2025 | Design DRAFT MASTER ENGINEERING PC Owner ADIR PARTNERS LLC Filer S&G EXPEDITING CORP | Structural work involves reinforcing floor joints on the 1st floor |
| M01111135 ↗ | 91 CROSBY STREET MANHATTAN | Alteration | Permit Issued | 10/02/2024 | 10/17/2024 | Design ERIK SCHULTZ ARCHITECTURE Owner JAVERI CAPITAL | Filing for the renovation of an existing retail space at the 1st flr and mezzanine. Work includes removal & installation of interior non loa… |
| B01096468 ↗ | 333 ATLANTIC AVENUE BROOKLYN | Alteration | Signed-off | 08/30/2024 | 10/03/2024 | Filer METROPOLIS GROUP INC | HEREWITH FILING SPRINKLER MODIFICATIONS IN CONJUNCTION WITH GYM FIT-OUT PER PLANS. |
| M01044752 ↗ | 300 EAST 77 STREET MANHATTAN | Alteration | Signed-off | 05/02/2024 | 05/23/2024 | Design PORTER CLAPP ARCHITECTS, PC | Combine Apts B and C at 8th Floor. Remove & install new interior non-bearing partitions. Remove and change existing kitchen at Apt 8B to a s… |
| B00943270 ↗ | 20 JAY STREET BROOKLYN | Alteration | Signed-off | 12/07/2023 | 03/07/2024 | Design BUILDTECH ENGINEERING DPC Owner Two Trees Management | Renovations to the existing plumbing system. No change in egress, use or occupancy. |
| M00794555 ↗ | 922 BROADWAY MANHATTAN | Alteration | Signed-off | 09/08/2022 | 06/27/2023 | Design BCHEN ARCHITECT PLLC Filer ALPHA HOME DESIGN LLC | Install new 5 ton mini-split heating and cooling heat pump unit. No change to use, egress or occupancy |
| M00848459 ↗ | 114 RIVINGTON STREET MANHATTAN | Alteration | Permit Issued | 04/11/2023 | 04/19/2023 | Design BUILDTECH ENGINEERING DPC Filer JENNY FLORES EXPEDITING | MECHANICAL MODIFICATIONS TO INCLUDE HVAC REPLACEMENT AND ASSOCIATED DUCTWORK FOR EATING/DRINKING ESTABLISHMENT. NO CHANGE IN USE, EGRESS OR … |
| M00848406 ↗ | 114 RIVINGTON STREET MANHATTAN | Alteration | Permit Issued | 04/04/2023 | 04/06/2023 | Design BUILDTECH ENGINEERING DPC Filer JENNY FLORES EXPEDITING | HEREBY FILING FOR THE RENOVATION OF EXISTING COMMERCIAL SPACE ON FIRST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M08044303 ↗ | 477 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 12/06/2022 | 12/09/2022 | Design EP ENGINEERING LLC Owner RFR REALTY, LLC Filer PWF | MODIFICATIONS TO EXISTING MECHANICAL SYSTEMS. NO CHANGE TO USE, OCCUPANCY OR EGRESS |
| M08045925 ↗ | 477 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 12/06/2022 | 12/09/2022 | INTERIOR ALTERATIONS OF EXISTING COMMERCIAL SPACE TO INCLUDE MINOR DEMO AND PARTITION WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS | |
| B08005462 ↗ | 55 WATER STREET BROOKLYN | Alteration | Signed-off | 09/29/2022 | 10/07/2022 | GENERAL CONSTRUCTION: INTERIOR ARCHITECTURAL RENOVATION FOR CHA CHA MATCHA A NEW COMMERCIAL TENANT FIT OUT OF SPACE 1H, NO CHANGE TO USE, EG… | |
| M00684135 ↗ | 235 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 04/03/2022 | 08/17/2022 | Design STUDIO JS2 ARCHITECT P.C. Filer STUDIO JS2 ARCHITECT PC. | Minor partition work and lights. No change in egress, use or occupancy |
| Building | Filings | Most Recent |
|---|---|---|
| 159 BLEECKER STREET ↗ | 1 | 07/08/2026 |
| 326 WYTHE AVENUE ↗ | 1 | 07/08/2026 |
| 333 ATLANTIC AVENUE ↗ | 2 | 07/08/2026 |
| 477 MADISON AVENUE ↗ | 4 | 07/08/2026 |
| 20 JAY STREET ↗ | 5 | 07/08/2026 |
| 114 RIVINGTON STREET ↗ | 4 | 07/08/2026 |
| 300 EAST 77 STREET ↗ | 1 | 07/08/2026 |
| 91 CROSBY STREET ↗ | 2 | 07/08/2026 |
| 29 UNION SQUARE ↗ | 1 | 04/10/2026 |
| 689 6 AVENUE ↗ | 6 | 04/09/2026 |
| 110 WEST 17 STREET ↗ | 1 | 04/08/2026 |
| 55 WATER STREET ↗ | 3 | 03/21/2026 |
| 235 PARK AVENUE SOUTH ↗ | 3 | 03/21/2026 |
| 922 BROADWAY ↗ | 3 | 03/21/2026 |