Condo, commercial tower (mixed-use) [derived]
The 666 Fifth Avenue Condominium
666 5 AVENUE · BIN 1034520
💬 Discuss this project
1958Year Built
40Stories
RCBuilding Class
C5-2.5Zoning
1,341,058 sfGross Floor Area
125Units
LL97 Covered3 Open Violations ▸FISP: SWARMP
Condo, commercial tower (mixed-use) [derived] · 61,755 sf lot · 21.72 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionLandscapeCivilGeneralOther
Permit Issued — active, not yet Signed-off
Roof4p · 4 filings · 20 docs
Bulkhead1p · 1 filing · 20 docs
Penthouse1p · 1 filing · 12 docs
Floor 4039p · 5 filings · 20 docs
Floor 3939p · 3 filings · 20 docs
Floor 386p · 9 filings · 20 docs
Floor 3742p · 5 filings · 20 docs
Floor 3642p · 4 filings · 20 docs
Floor 3542p · 5 filings · 20 docs
Floor 3442p · 4 filings · 20 docs
Floor 33Under Construction19p · 5 filings · 20 docs
Floor 32Under Construction18p · 5 filings · 20 docs
Floor 31Under Construction19p · 6 filings · 20 docs
Floor 30Under Construction20p · 5 filings · 20 docs
Floor 2941p · 8 filings · 20 docs
Floor 2830p · 5 filings · 20 docs
Floor 2711p · 6 filings · 20 docs
Floor 26Under Construction46p · 6 filings · 20 docs
Floor 2523p · 12 filings · 20 docs
Floor 2413p · 7 filings · 20 docs
Floor 2314p · 6 filings · 20 docs
Floor 2214p · 6 filings · 20 docs
Floor 2110p · 5 filings · 20 docs
Floor 2011p · 6 filings · 20 docs
Floor 198p · 5 filings · 20 docs
Floor 189p · 5 filings · 20 docs
Floor 178p · 5 filings · 20 docs
Floor 161p · 1 filing · 13 docs
Floor 15Under Construction21p · 4 filings · 20 docs
Floor 14Under Construction28p · 4 filings · 20 docs
Floor 13Under Construction13p · 6 filings · 20 docs
Floor 12Under Construction15p · 7 filings · 20 docs
Floor 11Under Construction9p · 5 filings · 20 docs
Floor 10Under Construction27p · 8 filings · 20 docs
Floor 9Under Construction28p · 8 filings · 20 docs
Floor 8134p · 12 filings · 20 docs
Floor 7Under Construction65p · 10 filings · 20 docs
Floor 6Under Construction81p · 14 filings · 20 docs
Floor 579p · 17 filings · 20 docs
Floor 4Under Construction26p · 10 filings · 20 docs
Floor 3Under Construction33p · 7 filings · 20 docs
Floor 2122p · 21 filings · 20 docs
Floor 1134p · 25 filings · 20 docs
Mezzanine4p · 3 filings · 20 docs
Cellar126p · 29 filings · 20 docs
Sub-Cellar95p · 17 filings · 20 docs
Basement1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BOP WEST 31ST STREET43107/08/2026
VORNADO REALTY TRUSTEE3407/08/2026
TURNER CONSTRUCTION COMPA1403/22/2026
UNIGLO USA INC703/22/2026
UNIQLO USA LLC4403/22/2026
ABLE RIGGING CONTRACTORS103/22/2026
666 5TH ASSOCIATES4203/22/2026
CINTAS203/22/2026
ZARA'S303/22/2026
VORNADO OFFICE MANAGEMENT, LLC32203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WILLIAM VITACCO ASSOCIATES23503/21/2026
A1 EXPEDITING SERVICE4603/21/2026
A1 EXPEDITING SERVICE CORP.9903/21/2026
WM ARCH1003/21/2026
LOUIS STRIAR403/21/2026
ARCHETYPE CONSULTANTS1403/21/2026
FRAMEWORK CONSULTANTS803/21/2026
NYC PERMITTING803/21/2026
RIZZO GROUP703/21/2026
MUNICIPAL BUILDING CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JRM CONSTRUCTION MGMT LLCGeneral Contractor7407/08/2026
SAFWAY ATLANTIC, LLCGeneral Contractor5607/08/2026
JT MAGEN & COMPANY INCGeneral Contractor2507/08/2026
STRUCTURE TONE, LLCGeneral Contractor2307/10/2026
TURNER CONSTRUCTION COMPANYGeneral Contractor1907/08/2026
SIRINA FIRE PROT CORPFire Protection1407/08/2026
TULLA CONTRACTING CORPGeneral Contractor807/08/2026
SCHIMENTI CONSTRUCTION COGeneral Contractor704/11/2026
LAB PLBG & HTG CO INCPlumbing708/27/2026
NYC FIRE SPRINKLER CORPFire Protection709/26/2026
PAR PLUMBING CO., INCPlumbing607/08/2026
TOM RECTENWALD CONSTRUCTIGeneral Contractor603/21/2026
PHASE 3 INTERIORS LLCGeneral Contractor607/08/2026
MAC FELDER INCPlumbing607/08/2026
AGGRESSIVE FIRE PROT LLCFire Protection607/08/2026
LEVINE, GEORGEFire Protection503/21/2026
PAR FIRE PROTECTION LLCFire Protection507/25/2026
KHAIKA CONSTRUCTION INCGeneral Contractor407/08/2026
JDP MECHANICAL INCGeneral Contractor403/21/2026
COCOZZA GROUP LLCGeneral Contractor407/08/2026
PREFERRED SPKLR AND MECHFire Protection407/08/2026
ASHLAR MECHANICAL CORPFire Protection407/08/2026
MITER CONSTRUCTION CORPGeneral Contractor407/08/2026
STEPHEN ROSTOWSKYElectrical303/21/2026
CPM BUILDERS N.A. LLCGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DELTA TESTING LABS6877208/26/2026
AK ENGINEERING PC6783107/06/2026
ALAN MARGOLIN & ASSOC4231206/02/2026
MEP INSPECTIONS, INC11022104/02/2026
GILSANZ MURRAY STEFICEK240503/31/2026
BIG APPLE GROUP NY A RMA91686211/05/2025
BIG APPLE GROUP NY, LLC1258602/10/2025
CODEGREEN510401/10/2025
NAPACH ARCHITECTU2945111/25/2024
HANSEN ENGINEERING PC8174710/16/2024
Building Lifecycle
All (300)Filed (68)Permit Issued (72)Signed Off (17)Violation (1)Inspection (54)Objection (58)Special Inspection (30)
09/25/2026
Permit issued — Sprinklers
M01444765-I1-EW-SP
09/17/2026
Signed off — Alteration
Removal and installation of non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
M01170137-I1
08/26/2026
Filed — Alteration
Removal and installation of non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
M01170132-P2
08/26/2026
Filed — Alteration
Removal and installation of non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
M01170137-P1
08/26/2026
Permit issued — Plumbing
M01395125-S2-PL
08/25/2026
Permit issued — Plumbing
M01398592-S2-PL
08/25/2026
Permit issued — Plumbing
M01395209-S2-PL
08/20/2026
Special inspection requirement — Fire-Resistance Rated Construction
RICHARD GREENWALD
08/20/2026
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
RICHARD GREENWALD
08/20/2026
Special inspection requirement — Sprayed fire-resistant materials
RICHARD GREENWALD
08/20/2026
Special inspection requirement — Final
Stephanie Lan
08/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
08/19/2026
Filed — Alteration
SPRINKLER MODIFICATIONS IN CELLAR, 1-2 FLOORS. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M01444765-I1
08/19/2026
Permit issued — Sidewalk Shed
M01409168-I1-SH
08/17/2026
Signed off — Alteration
modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
M01197520-I1
08/17/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/13/2026
Signed off — Alteration
Structural modification as per plans filed herewith. No change in use, egress or occupancy under this application.
M01144491-I1
08/13/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicolas Crosetto
08/13/2026
Special inspection requirement — Final
Ted Moudis
08/13/2026
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
Nicolas Crosetto
08/13/2026
Special inspection requirement — Sprayed fire-resistant materials
Nicolas Crosetto
08/13/2026
Special inspection requirement — Fire-Resistance Rated Construction
Nicolas Crosetto
08/07/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/04/2026
Signed off — Alteration
MODIFICATION OF PLUMBING FIXTURES AND SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH, NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01144077-I1
08/04/2026
Signed off — Alteration
MODIFICATION OF PLUMBING FIXTURES AND SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH, NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01147615-I1
08/04/2026
Signed off — Alteration
Installation of pre-action sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application
M01163898-I1
08/04/2026
Signed off — Alteration
MODIFICATION OF PLUMBING FIXTURES AND SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH, NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01147625-I1
08/04/2026
Signed off — Alteration
MODIFICATION OF PLUMBING FIXTURES AND SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH, NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01144068-I1
07/30/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/29/2026
Special inspection requirement — Post-installed Anchors
Nicolas Crosetto
07/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicolas Crosetto
07/24/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/23/2026
Permit issued — Sprinklers
M01398592-S3-EW-SP
07/23/2026
Permit issued — Sprinklers
M01395209-S3-EW-SD
07/23/2026
Permit issued — Sprinklers
M01395125-S3-EW-SP
07/23/2026
Permit issued — Standpipe
M01395209-S3-EW-SP
07/23/2026
Permit issued — Standpipe
M01395125-S3-EW-SD
07/22/2026
Special inspection requirement — HVAC-R and service water heating equipment
RICHARD GREENWALD
07/22/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
RICHARD GREENWALD
07/22/2026
Special inspection requirement — Final
RICHARD GREENWALD
07/22/2026
Special inspection requirement — Mechanical Systems
RICHARD GREENWALD
07/22/2026
Special inspection requirement — Interior lighting power
RICHARD GREENWALD
07/22/2026
Special inspection requirement — Energy Code Compliance Inspections
RICHARD GREENWALD
07/22/2026
Special inspection requirement — Lighting controls
RICHARD GREENWALD
07/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
RICHARD GREENWALD
07/22/2026
Special inspection requirement — Maintenance information
RICHARD GREENWALD
07/21/2026
Filed — No Work
M01419082-I1
07/21/2026
Filed — Alteration
modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
M01144012-P1
07/21/2026
Filed — Alteration
M01144007-P1
07/21/2026
Filed — No Work
M01419074-I1
07/21/2026
Filed — Alteration
modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
M01144059-P1
07/21/2026
Filed — Alteration
modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
M01143982-P1
07/21/2026
Filed — Alteration
modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
M01144020-P1
07/21/2026
Inspection — Certified StandPipe - SD - Alarm Sys 64/09 - Finish
Certified
View inspection ↗
07/21/2026
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)
Certified
View inspection ↗
07/21/2026
Special inspection requirement — HVAC-R and service water heating equipment
RICHARD GREENWALD
07/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
RICHARD GREENWALD
07/21/2026
Special inspection requirement — Mechanical Systems
RICHARD GREENWALD
07/21/2026
Special inspection requirement — Final
RICHARD GREENWALD
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedNYC FIRE SPRINKLER CORP09/25/2026
DOB NOWPlumbingPermit IssuedLAB PLBG & HTG CO INC08/26/2026
DOB NOWPlumbingPermit IssuedLAB PLBG & HTG CO INC08/25/2026
DOB NOWPlumbingPermit IssuedLAB PLBG & HTG CO INC08/25/2026
DOB NOWSidewalk ShedPermit IssuedPLATFORM SOLUTIONS, INC08/19/2026
DOB NOWStandpipePermit IssuedPAR FIRE PROTECTION LLC07/23/2026
DOB NOWStandpipePermit IssuedPAR FIRE PROTECTION LLC07/23/2026
DOB NOWSprinklersPermit IssuedPAR FIRE PROTECTION LLC07/23/2026
DOB NOWSprinklersPermit IssuedPAR FIRE PROTECTION LLC07/23/2026
DOB NOWSprinklersPermit IssuedPAR FIRE PROTECTION LLC07/23/2026
DOB NOWMechanical SystemsPermit IssuedSTRUCTURE TONE, LLC07/09/2026
DOB NOWMechanical SystemsPermit IssuedSTRUCTURE TONE, LLC07/07/2026
DOB NOWMechanical SystemsPermit IssuedSTRUCTURE TONE, LLC07/06/2026
DOB NOWMechanical SystemsPermit IssuedSTRUCTURE TONE, LLC07/02/2026
DOB NOWBoiler EquipmentPermit IssuedCHAMPION COMBUSTION CORP07/02/2026
DOB NOWGeneral ConstructionPermit IssuedSTRUCTURE TONE, LLC06/30/2026
DOB NOWGeneral ConstructionPermit IssuedSTRUCTURE TONE, LLC06/30/2026
DOB NOWGeneral ConstructionPermit IssuedSTRUCTURE TONE, LLC06/30/2026
DOB NOWGeneral ConstructionPermit IssuedSTRUCTURE TONE, LLC06/24/2026
DOB NOWStructuralPermit IssuedSTRUCTURE TONE, LLC06/17/2026
DOB NOWSprinklersPermit IssuedSIRINA FIRE PROT CORP06/12/2026
DOB NOWGeneral ConstructionPermit IssuedSTRUCTURE TONE, LLC06/11/2026
DOB NOWSidewalk ShedPermit IssuedPLATFORM SOLUTIONS, INC06/02/2026
DOB NOWGeneral ConstructionSigned-offJRM CONSTRUCTION MGMT LLC05/27/2026
DOB NOWMechanical SystemsSigned-offJRM CONSTRUCTION MGMT LLC05/27/2026
DOB NOWMechanical SystemsPermit IssuedSTRUCTURE TONE, LLC05/21/2026
DOB NOWPlumbingPermit IssuedTRISTATE PLBG SVCS CORP05/21/2026
DOB NOWStructuralPermit IssuedSTRUCTURE TONE, LLC05/21/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedPLATFORM SOLUTIONS, INC05/05/2026
DOB NOWPlumbingPermit IssuedPAR PLUMBING CO., INC04/09/2026
DOB NOWGeneral ConstructionPermit IssuedSCHIMENTI CONSTRUCTION CO04/09/2026
DOB NOWPlumbingSigned-offMAC FELDER INC04/07/2026
DOB NOWMechanical SystemsPermit IssuedSCHIMENTI CONSTRUCTION CO04/06/2026
DOB NOWPlumbingSigned-offMAC FELDER INC04/06/2026
DOB NOWGeneral ConstructionSigned-offJRM CONSTRUCTION MGMT LLC03/03/2026
DOB NOWMechanical SystemsSigned-offJRM CONSTRUCTION MGMT LLC03/03/2026
DOB NOWMechanical SystemsPermit IssuedJRM CONSTRUCTION MGMT LLC02/02/2026
DOB NOWMechanical SystemsSigned-offJRM CONSTRUCTION MGMT LLC02/02/2026
DOB NOWMechanical SystemsPermit IssuedSTRUCTURE TONE, LLC01/23/2026
DOB NOWSprinklersPermit IssuedBEDROCK MECHANICAL INC01/22/2026
+ 60 more permits on file
13 jobs · most recent 07/21/2026
Air Conditioning Systems Ventilation Systems Heating and Air Conditioning Systems Refrigeration Systems
FiledStatusContractorScopeMake / Model / Capacity
07/21/2026Permit IssuedJRM CONSTRUCTION MGMT LLCAir Conditioning Systems
Cooling
Above Air MCW-007 30,000 BTU · Crac Unit ×2
07/21/2026Signed-offJRM CONSTRUCTION MGMT LLCAir Conditioning Systems
Cooling
Above Air MCW-007 30,000 BTU · Crac Unit ×4
07/21/2026Signed-offJRM CONSTRUCTION MGMT LLCAir Conditioning Systems
Cooling
Above Air FCW-007 28,000 BTU · Crac Unit ×3
FCW-007S1-7-00000-EC-00-UFF-FA 2 tons · Crac Unit ×3
07/21/2026Permit IssuedJRM CONSTRUCTION MGMT LLCAir Conditioning Systems
Cooling
Above Air MCW-007 30,000 BTU · Crac Unit ×3
FCW-011 42,000 BTU · Crac Unit ×2
07/06/2026Permit IssuedSTRUCTURE TONE, LLCVentilation Systems
Ventilation
Greenheck CSP-A200 150 CFM · Exhaust Fan ×2
06/29/2026Permit IssuedSTRUCTURE TONE, LLCAir Conditioning Systems
Cooling
Compu-Aire MKW-534 EM 54,300 BTU · Crac Unit ×2
06/29/2026Permit IssuedSTRUCTURE TONE, LLCAir Conditioning Systems
Cooling
Above Air MCW-028C 66,500 BTU · Crac Unit ×2
MCW-053C 123,300 BTU · Crac Unit ×2
Compu-Aire MKW-534 EM 54,300 BTU · Crac Unit ×2
Florida Heat Pump CL012 9,200 BTU · Wshp ×1
CL036 28,700 BTU · Wshp ×1
06/29/2026Permit IssuedSTRUCTURE TONE, LLCAir Conditioning Systems, Refrigeration Systems
Cooling
Above Air MCW-028C 66,500 BTU · Crac Unit ×2
MCW-053C 123,300 BTU · Crac Unit ×2
Compu-Aire MKW-534 EM 54,300 BTU · Crac Unit ×4
Refrigeration
Multistack (5) MSS030K 150 tons · Water Cooled Chiller ×1
06/05/2026Signed-offJRM CONSTRUCTION MGMT LLCAir Conditioning Systems
Cooling
Florida Heat Pump CL036 36,400 BTU · Wshp ×4
CL048 45,500 BTU · Wshp ×4
CL030 28,600 BTU · Wshp ×2
CL060 57,200 BTU · Wshp ×2
Above Air FCW-004 18,500 BTU · Crac Unit ×2
06/02/2026Permit IssuedSTRUCTURE TONE, LLCVentilation Systems
Ventilation
04/02/2026Permit IssuedSTRUCTURE TONE, LLCAir Conditioning Systems
Cooling
Johnson Controls FHP Series D 1,200 CFM · Fan Powered Box ×28
03/20/2026Permit IssuedSCHIMENTI CONSTRUCTION COHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin FXMQ48TBVJU 50,500 BTU · Vrf Indoor ×15
FXFQ18TVJU 18,900 BTU · Vrf Indoor ×8
FXMQ24TBVJU 25,100 BTU · Vrf Indoor ×3
Trane GEHK090 92,000 BTU · Wshp ×3
GEHK120 129,400 BTU · Wshp ×3
GEHK150 164,100 BTU · Wshp ×3
GEHK048 51,750 BTU · Wshp ×2
GEHK072 79,200 BTU · Wshp ×1
Ventilation
Greenheck SQ-100-VG 1,000 CFM · Exhaust Fan ×2
CSP-A510-VG 100 CFM · Exhaust Fan ×1
CSP-A700-VG 465 CFM · Exhaust Fan ×1
SQ-20-M2-VG 7,200 CFM · Exhaust Fan ×1
09/05/2023Permit IssuedCOCOZZA GROUP LLCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Trane GEHE1203 124,500 BTU · Wshp ×1
Ventilation
Greenheck BSQ-140-HP 1,550 CFM · Exhaust Fan ×1
SQ-140-VG 1,950 CFM · Exhaust Fan ×1
SQ-97-VG 300 CFM · Exhaust Fan ×1
21 jobs · most recent 08/19/2026
FiledStatusContractorScope
08/19/2026Permit IssuedNYC FIRE SPRINKLER CORP499 heads
07/13/2026Signed-offNYC FIRE SPRINKLER CORP502 heads
07/06/2026Permit IssuedSIRINA FIRE PROT CORP—
06/29/2026Permit IssuedPAR FIRE PROTECTION LLC—
06/29/2026Permit IssuedPAR FIRE PROTECTION LLC778 heads
06/29/2026Permit IssuedPAR FIRE PROTECTION LLC473 heads, 1 outlets
06/02/2026Permit IssuedBEDROCK MECHANICAL INC32 heads
05/26/2026Signed-offNYC FIRE SPRINKLER CORP—
05/18/2026Signed-offAGGRESSIVE FIRE PROT LLC140 heads
04/02/2026Permit IssuedBEDROCK MECHANICAL INC164 heads
02/06/2026Signed-offAGGRESSIVE FIRE PROT LLC536 heads
11/05/2025Signed-offREAL PLUMBING CORP3 heads
09/15/2025Signed-offAGGRESSIVE FIRE PROT LLC1,207 heads
09/15/2025Signed-offAGGRESSIVE FIRE PROT LLC1,183 heads
09/15/2025Signed-offNYC FIRE SPRINKLER CORP1,804 heads
20 jobs · most recent 08/19/2026
Water/Sanitary Storm
FiledStatusContractorScope
08/19/2026———
07/13/2026Signed-offPAR PLUMBING CO., INCStorm, Water/Sanitary
06/29/2026Permit IssuedLAB PLBG & HTG CO INCWater/Sanitary
06/29/2026Permit IssuedLAB PLBG & HTG CO INCWater/Sanitary
06/29/2026Permit IssuedLAB PLBG & HTG CO INCWater/Sanitary
06/02/2026Permit IssuedBEDROCK PLBG. & HTG., INCWater/Sanitary
05/26/2026Signed-offPAR PLUMBING CO., INCWater/Sanitary
05/19/2026Permit IssuedTRISTATE PLBG SVCS CORPStorm, Water/Sanitary
05/18/2026Signed-offMAC FELDER INCWater/Sanitary
04/02/2026Permit IssuedDONATO PLUMBING, INCWater/Sanitary
03/20/2026Permit IssuedPAR PLUMBING CO., INCWater/Sanitary
02/06/2026Signed-offLAB PLBG & HTG CO INCWater/Sanitary
11/05/2025Signed-offREAL PLUMBING CORPWater/Sanitary
09/15/2025Signed-offMAC FELDER INCWater/Sanitary
09/15/2025Signed-offLAB PLBG & HTG CO INCWater/Sanitary
25 jobs · most recent 08/21/2026
General Wiring
FiledStatusContractorScope
08/21/2026Permit IssuedTUXEDO ELEC'L CONTR'G INCGeneral Wiring
08/12/2026Permit IssuedNEAD ELECTRIC INC.General Wiring
08/12/2026Permit IssuedNEAD ELECTRIC INC.General Wiring
08/12/2026Permit IssuedNEAD ELECTRIC INC.General Wiring
08/12/2026Permit IssuedNEAD ELECTRIC INC.General Wiring
07/17/2026Permit IssuedTUXEDO ELEC'L CONTR'G INCGeneral Wiring
07/06/2026Permit IssuedATLAS-ACON ELEC. SERVICEGeneral Wiring
06/01/2026Permit IssuedSOLAS ELECTRICAL CORP—
05/28/2026Permit IssuedK & R ELECTRIC CO., INC.General Wiring
05/21/2026Permit IssuedNEAD ELECTRIC INC.—
05/18/2026CompleteNEAD ELECTRIC INC.General Wiring
05/18/2026CompleteNEAD ELECTRIC INC.General Wiring
05/18/2026CompleteNEAD ELECTRIC INC.General Wiring
05/18/2026CompleteNEAD ELECTRIC INC.General Wiring
02/12/2026Permit IssuedFREEDOM ELECTRIC & DATAGeneral Wiring
7 jobs · most recent 07/06/2026
Steel Concrete
FiledStatusContractorScope
07/06/2026Permit IssuedSTRUCTURE TONE, LLCSteel, Concrete
06/03/2026Signed-offJRM CONSTRUCTION MGMT LLC1 scope_items
05/20/2026Permit IssuedSTRUCTURE TONE, LLCSteel, Concrete
03/31/2026Permit IssuedSCHIMENTI CONSTRUCTION COSteel, Concrete
10/30/2025Signed-offJRM CONSTRUCTION MGMT LLCSteel, Concrete
01/15/2025Signed-offJRM CONSTRUCTION MGMT LLCSteel, Concrete
08/22/2022Permit IssuedCONNOR CONSTRUCTION LLCSteel
3 jobs · most recent 06/22/2026
Sidewalk Shed Scaffold Fence
FiledStatusContractorScope
06/22/2026Permit IssuedPLATFORM SOLUTIONS, INCSidewalk Shed
08/11/2025——Scaffold
05/29/2025Signed-offSAFWAY ATLANTIC, LLCFence
▾Field Inspections (DOB CAP) — 172
DateTypeResultReport
08/17/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/13/2026Pass-Final General Construction Non-Directive 14PassView ↗
08/07/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/30/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/24/2026Fail-Final General Construction Non-Directive 14FailView ↗
07/21/2026Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
07/21/2026Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
07/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/16/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/15/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/08/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/10/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/04/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/04/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/04/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/01/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/20/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/15/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/12/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/12/2026Fail-Final General Construction Non-Directive 14FailView ↗
04/28/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/24/2026Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
04/24/2026Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
04/23/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
Latest 25 of 172.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/20/2026Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
08/20/2026FinalStephanie Lanprogress
08/20/2026Fire-Resistance Rated ConstructionRICHARD GREENWALDprogress
08/20/2026Sprayed fire-resistant materialsRICHARD GREENWALDspecial
08/20/2026Mastic and Intumescent Fire-resistant CoatingsRICHARD GREENWALDspecial
08/13/2026FinalTed Moudisprogress
08/13/2026Fire-Resistance Rated ConstructionNicolas Crosettoprogress
08/13/2026Sprayed fire-resistant materialsNicolas Crosettospecial
08/13/2026Fire-Resistant Penetrations and JointsNicolas Crosettospecial
08/13/2026Mastic and Intumescent Fire-resistant CoatingsNicolas Crosettospecial
07/29/2026Post-installed AnchorsNicolas Crosettospecial
07/29/2026Fire-Resistant Penetrations and JointsNicolas Crosettospecial
07/22/2026Maintenance informationRICHARD GREENWALDenergy_progress
07/22/2026Lighting controlsRICHARD GREENWALDenergy_progress
07/22/2026HVAC-R and service water piping design and insulationRICHARD GREENWALDenergy_progress
07/22/2026Energy Code Compliance InspectionsRICHARD GREENWALDprogress
07/22/2026HVAC-R and service water heating equipmentRICHARD GREENWALDenergy_progress
07/22/2026HVAC-R and service water heating system controlsRICHARD GREENWALDenergy_progress
07/22/2026FinalRICHARD GREENWALDprogress
07/22/2026Interior lighting powerRICHARD GREENWALDenergy_progress
07/22/2026Mechanical SystemsRICHARD GREENWALDspecial
07/21/2026HVAC-R and service water heating equipmentRICHARD GREENWALDenergy_progress
07/21/2026HVAC-R and service water piping design and insulationRICHARD GREENWALDenergy_progress
07/21/2026FinalRICHARD GREENWALDprogress
07/21/2026MeteringRICHARD GREENWALDenergy_progress
Latest 25 of 150.
▾Documents — 8,115 on file (BIS + DOB NOW)
▸Plans & Drawings352
▸DOB NOWPlans/Sketch292
09/04/2026M00483937-I1Request digital key ↗
09/04/2026M00485360-I1Request digital key ↗
09/03/2026M00498807-I1Request digital key ↗
Showing 3 of 292 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly13
09/02/2026M00741232-I1Request digital key ↗
Showing 1 of 13 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold9
09/04/2026M00375709-I1Request digital key ↗
09/04/2026M00375709-P3Request digital key ↗
09/03/2026M00397787-P2Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler8
09/04/2026M00351480-I1Request digital key ↗
09/03/2026M00465002-I1Request digital key ↗
09/03/2026M00195057-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems5
09/04/2026M00351473-I1Request digital key ↗
09/04/2026M00351473-P2Request digital key ↗
09/04/2026M00351473-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - General Construction4
09/04/2026M00451914-P1Request digital key ↗
09/04/2026M00451914-I1Request digital key ↗
09/03/2026M00475854-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Standpipe4
09/03/2026M00195057-P2Request digital key ↗
09/03/2026M00195057-P3Request digital key ↗
Showing 2 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/04/2026M00222544-I1Request digital key ↗
Showing 1 of 3 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence3
09/05/2026M00222533-I1Request digital key ↗
09/04/2026M00385298-I1Request digital key ↗
Showing 2 of 3 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00351478-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign1
09/04/2026M00435833-I1Request digital key ↗
▸Applications & Permits1,378
▸BISPLAN / WORK APPROVAL APPLICATION856
02/04/2026120405891Open ↗
02/03/2026120405891Open ↗
01/29/2026123880005Open ↗
Showing 3 of 856 on file for this type
▸BISWORK PERMIT APPLICATION518
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 518 on file for this type
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Seals & Professional Certifications2,417
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION901
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 901 on file for this type
▸DOB NOWProgress Inspector Seal & Signature362
09/29/2026M00862782-P1Open ↗
09/29/2026M07994828-P1Open ↗
09/29/2026M07994828-P1Open ↗
Showing 3 of 362 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature350
09/10/2026M01392261-S2Open ↗
09/04/2026M00351478-I1Open ↗
09/04/2026M00351473-P1Open ↗
Showing 3 of 350 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature287
09/29/2026M00351473-P2Open ↗
09/29/2026M07994828-P1Open ↗
09/29/2026M00862782-P1Open ↗
Showing 3 of 287 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST193
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 193 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM140
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 140 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT133
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 133 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISPC FULL REPORT17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸Trade Schedules & Equipment728
▸BISSELF-CERT PLUMBING NOTICE218
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 218 on file for this type
▸BISSCHEDULE B - PLUMBING169
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 169 on file for this type
▸BISEQUIPMENT USE PERMITS93
11/30/2023123782040Open ↗
11/30/2023123782040Open ↗
11/30/2023123782040Open ↗
Showing 3 of 93 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA82
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 82 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE79
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 79 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8539
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 39 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT34
11/30/2023123782040Open ↗
11/30/2023123782040Open ↗
11/30/2023123782040Open ↗
Showing 3 of 34 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWFDNY: Letter of No Objection4
09/03/2026M00195057-P2Open ↗
09/03/2026M00195057-P1Open ↗
Showing 2 of 4 on file for this type
▸Safety & Tenant Protection7
▸BISSTREET TREE CHECKLIST7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸Environmental & Asbestos617
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'193
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 193 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report169
09/10/2026M01392261-S2Open ↗
09/04/2026M00351478-I1Open ↗
09/04/2026M00351473-P2Open ↗
Showing 3 of 169 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)165
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 165 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form70
09/03/2026M00488458-I1Open ↗
09/02/2026M00746542-I1Open ↗
Showing 2 of 70 on file for this type
▸BISASBESTOS INSPECTION REPORT9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Energy Compliance294
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS142
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 142 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS48
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 48 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY26
12/04/2023123346003Open ↗
11/01/2023123782040Open ↗
10/31/2023123346003Open ↗
Showing 3 of 26 on file for this type
▸BISTR8: Energy Code Progress Inspections22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸BISTECHNICAL REPORT: ENERGY21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸DOB NOWEN2: As Built Energy Analysis10
09/04/2026M00451914-I1Open ↗
09/03/2026M00617124-I1Open ↗
Showing 2 of 10 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)8
11/14/2023140898161Open ↗
10/27/2023123346003Open ↗
09/15/2023123782040Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸Inspections & Test Reports123
▸BISTECHNICAL REPORT: RESPONSIBILITY61
12/04/2023123346003Open ↗
11/06/2023123346003Open ↗
11/01/2023123346003Open ↗
Showing 3 of 61 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS42
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 42 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER5
11/28/2023123782040Open ↗
Showing 1 of 5 on file for this type
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS5
08/04/2023123346003Open ↗
08/03/2023123782040Open ↗
Showing 2 of 5 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)4
10/31/2023123346003Open ↗
08/03/2023123782040Open ↗
Showing 2 of 4 on file for this type
▸Approvals, Objections & Sign-offs617
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST293
09/25/2024122163318Open ↗
12/04/2023140898161Open ↗
12/04/2023123346003Open ↗
Showing 3 of 293 on file for this type
▸BISADMINISTRATIVE OBJECTIONS183
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 183 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION64
05/29/2024122286409Open ↗
05/29/2024122159555Open ↗
05/29/2024122164022Open ↗
Showing 3 of 64 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE56
02/04/2026120405891Open ↗
09/26/2025123880005Open ↗
09/24/2025123880005Open ↗
Showing 3 of 56 on file for this type
▸BISFINAL8
11/14/2023140898161Open ↗
08/03/2023123782040Open ↗
06/22/2023140953519Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION4
09/05/2023123880005Open ↗
Showing 1 of 4 on file for this type
▸DOB NOWDEP Variance (V5) letter1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership657
▸BISCOST AFFIDAVIT640
11/27/2023123782040Open ↗
11/22/2023123782040Open ↗
Showing 2 of 640 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW311
12/04/2023140898161Open ↗
11/22/2023123782040Open ↗
11/10/2023123346003Open ↗
Showing 3 of 11 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸Filing & Intake Forms724
▸BISEFILING COVER SHEET344
08/12/2024124041027Open ↗
Showing 1 of 344 on file for this type
▸BISADDITIONAL INFORMATION196
02/02/2026123880005Open ↗
12/08/2025123880005Open ↗
04/24/2025123880005Open ↗
Showing 3 of 196 on file for this type
▸BISBOROUGH INTAKE FORM151
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 151 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 31 on file for this type
▸DOB NOWAI1 Form (from plan PDF)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents90
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION36
09/24/2024124041027Open ↗
09/24/2024124041027Open ↗
09/24/2024124041027Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWPro Cert Restriction Exception (LL158/17)14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸DOB NOWAlternate Plan 35
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWAlternate Plan 25
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWAlternate Plan 45
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWAlternate Plan 15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWAlternate Plan 54
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWAlternate Plan 64
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWAlternate Plan 73
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWManufacturer's Specifications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWWind Tunnel Test Report2
09/02/2026M00746542-I1Open ↗
09/02/2026M00746542-P1Open ↗
▸DOB NOWCalculations2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 101
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 91
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 81
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type