← Back
Two family frame
6650 69 STREET
QUEENS · BIN 4062589
💬 Discuss this project
1940Year Built
2.5Stories
B2Building Class
R5Zoning
3,327 sfGross Floor Area
2Units
Two family frame · Owner of record: 66-50 69TH STREET LLC · 4,608 sf lot · 0.72 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof1p · 1 filing · 8 docs
Floor 26p · 3 filings · 20 docs
Floor 14p · 2 filings · 20 docs
Cellar5p · 3 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/08/2022$1.0M—Private party → 66-50 69TH STREET LLC$313/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HAMANN ENGINEERING, PLLC803/05/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BIG ORANGE EXPEDITING1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROCK FACE CONSTR INCGeneral Contractor907/08/2026
BIG ORANGE SAFETY FIRSTGeneral Contractor603/21/2026
ORBIT PLBG & HTG INCPlumbing307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HAMANN ENGINEERING, PLLC4949703/05/2026
Building Lifecycle
All (72)Filed (8)Permit Issued (10)Signed Off (2)Inspection (5)Objection (17)Special Inspection (30)
04/20/2026
Signed off — Alteration
JOB FILED TO SHOW THE GUT RENOVATION OF 2 FAMILY HOUSE ON CEL, 001-002 TO ATTIC AS PER PLANS FILED HEREWITH. NO CHANGE TO LAYOUTS AND NO REMOVAL OF THE EXISTING FLOOR PROPOSED. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00750436-I1
04/06/2026
Signed off — Alteration
JOB FILED TO SHOW THE GUT RENOVATION OF 2 FAMILY HOUSE ON CEL, 001-002 TO ATTIC AS PER PLANS FILED HEREWITH. NO CHANGE TO LAYOUTS AND NO REMOVAL OF THE EXISTING FLOOR PROPOSED. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00750436-S1
04/03/2026
Permit issued — Mechanical Systems
Q00750436-I1-GC-CX
03/23/2026
Permit issued — General Construction
Q00750436-I1-GC-CX
03/05/2026
Filed — Alteration
JOB FILED TO SHOW THE GUT RENOVATION OF 2 FAMILY HOUSE ON CEL, 001-002 TO ATTIC AS PER PLANS FILED HEREWITH. NO CHANGE TO LAYOUTS AND NO REMOVAL OF THE EXISTING FLOOR PROPOSED. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00750436-P4
03/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
CARL HAMANN
03/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
CARL HAMANN
03/04/2026
Special inspection requirement — HVAC-R and service water heating system controls
CARL HAMANN
03/04/2026
Special inspection requirement — Maintenance information
CARL HAMANN
03/04/2026
Special inspection requirement — HVAC-R and service water heating equipment
CARL HAMANN
02/17/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/02/2026
Filed — Alteration
JOB FILED TO SHOW THE GUT RENOVATION OF 2 FAMILY HOUSE ON CEL, 001-002 TO ATTIC AS PER PLANS FILED HEREWITH. NO CHANGE TO LAYOUTS AND NO REMOVAL OF THE EXISTING FLOOR PROPOSED. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00750436-P3
01/30/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
CARL HAMANN
01/30/2026
Special inspection requirement — Interior lighting power
CARL HAMANN
01/30/2026
Special inspection requirement — Fire-Resistance Rated Construction
CARL HAMANN
01/30/2026
Special inspection requirement — Final
CARL HAMANN
01/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
CARL HAMANN
01/30/2026
Special inspection requirement — Mechanical Systems
CARL HAMANN
01/30/2026
Special inspection requirement — Air barrier - visual inspection
CARL HAMANN
01/30/2026
Special inspection requirement — Fenestration areas
CARL HAMANN
01/30/2026
Special inspection requirement — Fenestration air leakage
CARL HAMANN
01/30/2026
Special inspection requirement — Insulation placement and R values
CARL HAMANN
01/28/2026
Filed — Alteration
JOB FILED TO SHOW THE GUT RENOVATION OF 2 FAMILY HOUSE ON CEL, 001-002 TO ATTIC AS PER PLANS FILED HEREWITH. NO CHANGE TO LAYOUTS AND NO REMOVAL OF THE EXISTING FLOOR PROPOSED. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00750436-P2
01/28/2026
Special inspection requirement — HVAC-R and service water heating system controls
CARL HAMANN
01/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
CARL HAMANN
01/28/2026
Special inspection requirement — Mechanical Systems
CARL HAMANN
01/28/2026
Special inspection requirement — Final
CARL HAMANN
01/28/2026
Special inspection requirement — Fire-Resistance Rated Construction
CARL HAMANN
01/28/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
CARL HAMANN
01/28/2026
Special inspection requirement — Fenestration areas
CARL HAMANN
01/28/2026
Special inspection requirement — Fenestration air leakage
CARL HAMANN
01/28/2026
Special inspection requirement — Interior lighting power
CARL HAMANN
01/28/2026
Special inspection requirement — Insulation placement and R values
CARL HAMANN
01/28/2026
Special inspection requirement — Air barrier - visual inspection
CARL HAMANN
01/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
CARL HAMANN
01/28/2026
Special inspection requirement — HVAC-R and service water heating equipment
CARL HAMANN
01/28/2026
Special inspection requirement — Maintenance information
CARL HAMANN
01/28/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
CARL HAMANN
06/11/2025
Permit issued — Plumbing
Q00750436-S1-PL
03/28/2025
Permit issued — Mechanical Systems
Q00750436-I1-GC-CX
12/20/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/20/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/20/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/18/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/29/2024
Permit issued — Plumbing
Q00750436-S1-PL
04/15/2024
Permit issued — Mechanical Systems
Q00750436-I1-GC-CX
04/12/2024
Filed — Alteration
JOB FILED TO SHOW THE GUT RENOVATION OF 2 FAMILY HOUSE ON CEL, 001-002 TO ATTIC AS PER PLANS FILED HEREWITH. NO CHANGE TO LAYOUTS AND NO REMOVAL OF THE EXISTING FLOOR PROPOSED. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00750436-S1
03/29/2024
Filed — Alteration
JOB FILED TO SHOW THE GUT RENOVATION OF 2 FAMILY HOUSE ON CEL, 001-002 TO ATTIC AS PER PLANS FILED HEREWITH. NO CHANGE TO LAYOUTS AND NO REMOVAL OF THE EXISTING FLOOR PROPOSED. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00750436-P1
11/03/2023
Objection resolved — Resolved
11/03/2023
Objection resolved — Resolved
10/10/2023
Permit issued — Mechanical Systems
Q00750436-I1-GC-CX
10/06/2023
Objection resolved — Addressed
10/03/2023
Objection resolved — Addressed
09/21/2023
Objection resolved — Resolved
09/21/2023
Objection resolved — Addressed
09/20/2023
Objection resolved — Addressed
08/09/2023
Objection raised — Inspections
08/09/2023
Objection raised — Fire_Protection
08/09/2023
Objection raised — Fire_Protection
08/09/2023
Objection raised — Zoning
Latest 60 of 72 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offROCK FACE CONSTR INC04/03/2026
DOB NOWGeneral ConstructionSigned-offROCK FACE CONSTR INC03/23/2026
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC06/11/2025
DOB NOWMechanical SystemsSigned-offROCK FACE CONSTR INC03/28/2025
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC04/29/2024
DOB NOWMechanical SystemsSigned-offROCK FACE CONSTR INC04/15/2024
DOB NOWMechanical SystemsSigned-offROCK FACE CONSTR INC10/10/2023
DOB NOWGeneral ConstructionSigned-offBIG ORANGE SAFETY FIRST11/21/2022
DOB NOWPlumbingPermit IssuedORBIT PLBG & HTG INC08/17/2022
DOB NOWGeneral ConstructionSigned-offBIG ORANGE SAFETY FIRST07/05/2022
1 project · most recent 07/27/2023
Ventilation Systems
FiledStatusContractorScope
07/27/2023——Ventilation Systems
1 project · most recent 07/06/2022
Gas Water/Sanitary
FiledStatusContractorScope
07/06/2022Permit IssuedORBIT PLBG & HTG INCGas, Water/Sanitary
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
02/17/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/20/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/20/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/20/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/18/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 60
DateRequirementInspectorRole
03/04/2026Fire-Resistant Penetrations and JointsCARL HAMANNspecial
03/04/2026HVAC-R and service water piping design and insulationCARL HAMANNenergy_progress
03/04/2026HVAC-R and service water heating system controlsCARL HAMANNenergy_progress
03/04/2026Maintenance informationCARL HAMANNenergy_progress
03/04/2026HVAC-R and service water heating equipmentCARL HAMANNenergy_progress
01/30/2026Fenestration and door U-factor and product ratingsCARL HAMANNenergy_progress
01/30/2026Interior lighting powerCARL HAMANNenergy_progress
01/30/2026Fire-Resistance Rated ConstructionCARL HAMANNprogress
01/30/2026FinalCARL HAMANNprogress
01/30/2026Fire-Resistant Penetrations and JointsCARL HAMANNspecial
01/30/2026Mechanical SystemsCARL HAMANNspecial
01/30/2026Air barrier - visual inspectionCARL HAMANNenergy_progress
01/30/2026Fenestration areasCARL HAMANNenergy_progress
01/30/2026Fenestration air leakageCARL HAMANNenergy_progress
01/30/2026Insulation placement and R valuesCARL HAMANNenergy_progress
01/28/2026HVAC-R and service water heating system controlsCARL HAMANNenergy_progress
01/28/2026Fire-Resistant Penetrations and JointsCARL HAMANNspecial
01/28/2026Mechanical SystemsCARL HAMANNspecial
01/28/2026FinalCARL HAMANNprogress
01/28/2026Fire-Resistance Rated ConstructionCARL HAMANNprogress
01/28/2026Fenestration and door U-factor and product ratingsCARL HAMANNenergy_progress
01/28/2026Fenestration areasCARL HAMANNenergy_progress
01/28/2026Fenestration air leakageCARL HAMANNenergy_progress
01/28/2026Interior lighting powerCARL HAMANNenergy_progress
01/28/2026Insulation placement and R valuesCARL HAMANNenergy_progress
Latest 25 of 60.
▾Documents — 51 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/26/2026Q00751742-I1Request digital key ↗
08/17/2026Q00750436-P4Request digital key ↗
08/17/2026Q00750436-P3Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q00897740-I1Open ↗
▸Seals & Professional Certifications29
▸DOB NOWProgress Inspector Seal & Signature15
09/01/2026Q00750436-P1Open ↗
09/01/2026Q00750436-P1Open ↗
08/29/2026Q00750436-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/17/2026Q00750436-P3Open ↗
08/17/2026Q00750436-P2Open ↗
08/17/2026Q00750436-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026Q00750436-P1Open ↗
08/29/2026Q00750436-I1Open ↗
08/29/2026Q00750436-P3Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026Q00897740-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/17/2026Q00750436-P3Open ↗
08/17/2026Q00750436-P2Open ↗
08/17/2026Q00750436-S1Open ↗
Showing 3 of 8 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/17/2026Q00750436-I1Open ↗
▸Other Documents3
▸DOB NOWSite Survey: Initial1
08/13/2026Q00897740-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q00897740-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026Q00897740-I1Open ↗