1987Year Built
3Stories
I5Building Class
R2Zoning
20,510 sfGross Floor Area
1Units
13 Open Violations 10 unresolved · 3 paperwork only ▸FDNY Report ↗
Health center, child center, clinic · 58,800 sf lot · 0.35 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneral
Roof3p · 1 filing · 20 docs
Floor 217p · 1 filing · 20 docs
Floor 13p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RICHMOND UNIVERSITY MEDICAL CENTER1104/09/2026
DEPARTMENT OD EDUCATION403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LIZARDOS ENGINEERING512/08/2025
AK CONSULTING SERVICES, INC108/12/2025
ALEXANDER BADALAMENTI505/13/2025
MARK D. LIPTON ASSOCIATES207/12/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JMV ASSOCIATES2003/21/2026
AK CONSULTING SERVICES203/21/2026
ALEXANDRA CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
H&G CONTRACTING CORPGeneral Contractor307/08/2026
SKY HEIGHTS CONSTRUCTIONGeneral Contractor303/21/2026
CHAMPION INTERNATIONAL COGeneral Contractor207/08/2026
JPI PLUMBING & HEATING INFire Protection107/08/2026
JPI PLUMBING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JSPECS,INC9429912/08/2025
Building Lifecycle
All (110)Filed (13)Permit Issued (8)Signed Off (5)Violation (36)Inspection (6)Objection (12)Special Inspection (30)
01/15/2026
Signed off — Alteration
FILING HEREWITH ALTERATION II APPLICATION FOR SITEWORK FOR NEW ACCESIBLE PARKING AND EXTERIOR RAMP ENTRANCE IN COMPLIANCE WITH ADA REQUIREMENTS FOR THE EXISTING MEDICAL CENTER. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. ALL AS PER PLAN FILED HEREWITH.
S00947787-S1
01/15/2026
Signed off — Alteration
FILING HEREWITH ALTERATION II APPLICATION FOR SITEWORK FOR NEW ACCESIBLE PARKING AND EXTERIOR RAMP ENTRANCE IN COMPLIANCE WITH ADA REQUIREMENTS FOR THE EXISTING MEDICAL CENTER. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. ALL AS PER PLAN FILED HEREWITH.
S00947787-S2
12/08/2025
Filed — Alteration
FILING HEREWITH ALTERATION II APPLICATION FOR SITEWORK FOR NEW ACCESIBLE PARKING AND EXTERIOR RAMP ENTRANCE IN COMPLIANCE WITH ADA REQUIREMENTS FOR THE EXISTING MEDICAL CENTER. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. ALL AS PER PLAN FILED HEREWITH.
S00947787-P8
12/08/2025
Special inspection requirement — Post-installed Anchors
Jeffrey Stones
12/08/2025
Special inspection requirement — Sprinkler Systems
Jeffrey Stones
11/25/2025
Special inspection requirement — Sprinkler Systems
Jeffrey Stones
11/25/2025
Special inspection requirement — Post-installed Anchors
Jeffrey Stones
11/18/2025
Signed off — Alteration
FILING HEREWITH ALTERATION II APPLICATION FOR SITEWORK FOR NEW ACCESIBLE PARKING AND EXTERIOR RAMP ENTRANCE IN COMPLIANCE WITH ADA REQUIREMENTS FOR THE EXISTING MEDICAL CENTER. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. ALL AS PER PLAN FILED HEREWITH.
S00947787-I1
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/12/2025
Signed off — Alteration
FILING HEREWITH ALTERATION II APPLICATION FOR SITEWORK FOR NEW ACCESIBLE PARKING AND EXTERIOR RAMP ENTRANCE IN COMPLIANCE WITH ADA REQUIREMENTS FOR THE EXISTING MEDICAL CENTER. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. ALL AS PER PLAN FILED HEREWITH.
S00947787-S3
10/16/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/16/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/07/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/18/2025
Violation issued (FDNY_NOV, closed)
08/13/2025
Permit issued — Construction Fence
S01266367-I1-FN
08/12/2025
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 669 CASTLETON AVENUE STATEN ISLAND, NY 10301 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
S01266367-I1
07/02/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/02/2025
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
06/17/2025
Permit issued — General Construction
S00947787-S3-GC
06/12/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/27/2025
Permit issued — Plumbing
S00947787-S2-EW-SP
05/23/2025
Permit issued — Plumbing
S00947787-S2-PL
05/13/2025
Filed — Alteration
FILING HEREWITH ALTERATION II APPLICATION FOR SITEWORK FOR NEW ACCESIBLE PARKING AND EXTERIOR RAMP ENTRANCE IN COMPLIANCE WITH ADA REQUIREMENTS FOR THE EXISTING MEDICAL CENTER. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. ALL AS PER PLAN FILED HEREWITH.
S00947787-P7
05/13/2025
Permit issued — Mechanical Systems
S00947787-S1-MS
05/13/2025
Permit issued — General Construction
S00947787-I1-GC
05/13/2025
Special inspection requirement — Fire-Resistance Rated Construction
Jeffrey Stones
05/13/2025
Special inspection requirement — Final
Jeffrey Stones
05/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Stones
05/12/2025
Filed — Alteration
FILING HEREWITH ALTERATION II APPLICATION FOR SITEWORK FOR NEW ACCESIBLE PARKING AND EXTERIOR RAMP ENTRANCE IN COMPLIANCE WITH ADA REQUIREMENTS FOR THE EXISTING MEDICAL CENTER. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. ALL AS PER PLAN FILED HEREWITH.
S00947787-P4
05/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Jeffrey Stones
05/09/2025
Special inspection requirement — Heating Systems
Jeffrey Stones
05/09/2025
Special inspection requirement — Mechanical Systems
Jeffrey Stones
05/09/2025
Special inspection requirement — Final
Jeffrey Stones
05/09/2025
Special inspection requirement — Ventilation and air distribution system
Jeffrey Stones
05/09/2025
Special inspection requirement — Shutoff dampers
Jeffrey Stones
05/09/2025
Special inspection requirement — HVAC-R and service water heating system controls
Jeffrey Stones
05/08/2025
Filed — Alteration
FILING HEREWITH ALTERATION II APPLICATION FOR SITEWORK FOR NEW ACCESIBLE PARKING AND EXTERIOR RAMP ENTRANCE IN COMPLIANCE WITH ADA REQUIREMENTS FOR THE EXISTING MEDICAL CENTER. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. ALL AS PER PLAN FILED HEREWITH.
S00947787-P5
05/08/2025
Filed — Alteration
FILING HEREWITH ALTERATION II APPLICATION FOR SITEWORK FOR NEW ACCESIBLE PARKING AND EXTERIOR RAMP ENTRANCE IN COMPLIANCE WITH ADA REQUIREMENTS FOR THE EXISTING MEDICAL CENTER. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. ALL AS PER PLAN FILED HEREWITH.
S00947787-P6
05/08/2025
Special inspection requirement — Heating Systems
Jeffrey Stones
05/08/2025
Special inspection requirement — Post-installed Anchors
Jeffrey Stones
05/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Stones
05/08/2025
Special inspection requirement — Final
Jeffrey Stones
05/08/2025
Special inspection requirement — Fire-Resistance Rated Construction
Jeffrey Stones
05/08/2025
Special inspection requirement — HVAC-R and service water heating system controls
Jeffrey Stones
05/08/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Jeffrey Stones
05/08/2025
Special inspection requirement — Concrete - Cast-In-Place
Jeffrey Stones
05/08/2025
Special inspection requirement — Subgrade Inspections
Jeffrey Stones
05/08/2025
Special inspection requirement — Final
Jeffrey Stones
05/08/2025
Special inspection requirement — Shutoff dampers
Jeffrey Stones
05/08/2025
Special inspection requirement — Ventilation and air distribution system
Jeffrey Stones
05/08/2025
Special inspection requirement — Final
Jeffrey Stones
05/08/2025
Special inspection requirement — Mechanical Systems
Jeffrey Stones
05/08/2025
Special inspection requirement — Sprinkler Systems
Jeffrey Stones
03/06/2025
Objection resolved — Addressed
03/06/2025
Objection resolved — Addressed
03/06/2025
Objection resolved — Addressed
03/06/2025
Objection resolved — Addressed
02/07/2025
Filed — Alteration
FILING HEREWITH ALTERATION II APPLICATION FOR SITEWORK FOR NEW ACCESIBLE PARKING AND EXTERIOR RAMP ENTRANCE IN COMPLIANCE WITH ADA REQUIREMENTS FOR THE EXISTING MEDICAL CENTER. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. ALL AS PER PLAN FILED HEREWITH.
S00947787-P3
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 110 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedSKY HEIGHTS CONSTRUCTION08/13/2025
DOB NOWGeneral ConstructionSigned-offH&G CONTRACTING CORP06/17/2025
DOB NOWPlumbingSigned-offJPI PLUMBING & HEATING IN05/27/2025
DOB NOWPlumbingSigned-offJPI PLUMBING & HEATING IN05/23/2025
DOB NOWMechanical SystemsSigned-offH&G CONTRACTING CORP05/13/2025
DOB NOWGeneral ConstructionSigned-offH&G CONTRACTING CORP05/13/2025
DOB NOWGeneral ConstructionSigned-offCHAMPION INTERNATIONAL CO08/03/2021
DOB NOWGeneral ConstructionSigned-offCHAMPION INTERNATIONAL CO04/15/2021
BIS—ISSUEDJRCRUZ CORP05/08/2020
BISOTISSUEDBLUE STAR GROUP LLC05/22/2009
BISOTISSUEDSCRAN PLUMBING INC06/01/2007
BISOTISSUEDVICTOR J PEROSI & SONS08/29/2006
BISMHISSUEDSCARAN PLUMBING INC06/22/2006
1 project · most recent 08/12/2025
Fence
FiledStatusContractorScope
08/12/2025Permit IssuedSKY HEIGHTS CONSTRUCTIONFence
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
10/16/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/16/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/16/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/07/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/02/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/02/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
06/12/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
12/08/2025Post-installed AnchorsJeffrey Stonesspecial
12/08/2025Sprinkler SystemsJeffrey Stonesspecial
11/25/2025Sprinkler SystemsJeffrey Stonesspecial
11/25/2025Post-installed AnchorsJeffrey Stonesspecial
05/13/2025Fire-Resistance Rated ConstructionJeffrey Stonesprogress
05/13/2025FinalJeffrey Stonesprogress
05/13/2025Fire-Resistant Penetrations and JointsJeffrey Stonesspecial
05/09/2025HVAC-R and service water piping design and insulationJeffrey Stonesenergy_progress
05/09/2025Heating SystemsJeffrey Stonesspecial
05/09/2025Mechanical SystemsJeffrey Stonesspecial
05/09/2025FinalJeffrey Stonesprogress
05/09/2025Ventilation and air distribution systemJeffrey Stonesenergy_progress
05/09/2025Shutoff dampersJeffrey Stonesenergy_progress
05/09/2025HVAC-R and service water heating system controlsJeffrey Stonesenergy_progress
05/08/2025Heating SystemsJeffrey Stonesspecial
05/08/2025Post-installed AnchorsJeffrey Stonesspecial
05/08/2025Fire-Resistant Penetrations and JointsJeffrey Stonesspecial
05/08/2025FinalJeffrey Stonesprogress
05/08/2025Fire-Resistance Rated ConstructionJeffrey Stonesprogress
05/08/2025HVAC-R and service water heating system controlsJeffrey Stonesenergy_progress
05/08/2025HVAC-R and service water piping design and insulationJeffrey Stonesenergy_progress
05/08/2025Concrete - Cast-In-PlaceJeffrey Stonesspecial
05/08/2025Subgrade InspectionsJeffrey Stonesspecial
05/08/2025FinalJeffrey Stonesprogress
05/08/2025Shutoff dampersJeffrey Stonesenergy_progress
Latest 25 of 31.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Visiting Nurse AssocOfficeFloor 1
Project S00487997 Alteration · LOC Issued · 03/30/2021
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 81 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/25/2026S00487997-P1Request digital key ↗
08/25/2026S00487997-I1Request digital key ↗
08/18/2026S01266367-I1Request digital key ↗
▸Applications & Permits12
▸BISPLAN / WORK APPROVAL APPLICATION8
05/07/2020520317648Open ↗
01/30/2020520317648Open ↗
01/30/2020520317648Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION4
05/08/2020520317648Open ↗
05/22/2009520002862Open ↗
07/31/2007510004736Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications33
▸DOB NOWProgress Inspector Seal & Signature9
09/02/2026S00487997-I1Open ↗
09/01/2026S00947787-P4Open ↗
08/26/2026S00947787-P7Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026S00947787-P4Open ↗
08/27/2026S00947787-P6Open ↗
08/27/2026S00947787-S2Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
05/08/2020520317648Open ↗
05/08/2020520317648Open ↗
05/08/2020520317648Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/25/2026S00487997-I1Open ↗
08/13/2026S00487997-P1Open ↗
08/13/2026S01266367-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
04/30/2009520002862Open ↗
06/01/2007510004736Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
04/30/2009520002862Open ↗
06/01/2007510004736Open ↗
▸BISTECHNICAL REPORT: STATEMENT OF RESPONSIBILITY2
06/12/2007510004736Open ↗
06/01/2007510004736Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
08/07/2018520317648Open ↗
11/28/2017520317648Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
06/01/2007510004736Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
08/07/2018520317648Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/25/2026S00487997-I1Open ↗
08/13/2026S00487997-P1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
06/01/2007510004736Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
04/30/2009520002862Open ↗
▸Inspections & Test Reports1
▸BISBORINGS / TEST PITS (TR-4) 27-7201
08/24/2018520317648Open ↗
▸Approvals, Objections & Sign-offs8
▸BISLETTERS - SUPPORTING DOCUMENTATION2
05/08/2020520317648Open ↗
09/13/2018520317648Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
08/07/2018520317648Open ↗
11/28/2017520317648Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
04/30/2009520002862Open ↗
06/01/2007510004736Open ↗
▸BISNYS DEC FRESHWATER WETLANDS APPROVAL1
08/24/2018520317648Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026S01266367-I1Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
11/28/2017520317648Open ↗
04/30/2009520002862Open ↗
06/12/2007510004736Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms7
▸DOB NOWAI1 Form3
08/13/2026S00947787-P4Open ↗
08/13/2026S00947787-P3Open ↗
08/13/2026S00947787-I1Open ↗
▸BISBOROUGH INTAKE FORM2
05/08/2020520317648Open ↗
01/30/2020520317648Open ↗
▸BISADDITIONAL INFORMATION1
09/05/2018520317648Open ↗
▸BISEFILING COVER SHEET1
11/28/2017520317648Open ↗
▸Other Documents4
▸BISSITE CONNECTION:DEP1
08/24/2018520317648Open ↗
▸BISH.V.A.C INSTALLTION ROOF TOP UNIT1
06/12/2007510004736Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
08/24/2018520317648Open ↗
▸BISPLOT DIAGRAM1
09/05/2018520317648Open ↗