← Back
BuildNYC
Walk-up cooperative
Bell Park Gardens
67-56 SPRINGFIELD AVENUE · BIN 4596480
💬 Discuss this project
1949Year Built
2Stories
C6Building Class
R3-2Zoning
554,300 sfGross Floor Area
467Units
LL97 CoveredRent Stabilized3 Active Violations 0 unresolved · 3 paperwork only ▸FDNY Report ↗
Walk-up cooperative · Owner of record: Bell Park Gardens · 902,780 sf lot · 0.61 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Plumbing and gas system installation6p · 2 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
United Veterans Mutual Housing103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Associates307/14/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AM Engineering Services603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Charris ConstructionGeneral Contractor110/04/2026
Amm General ContractingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AM Engineering Services P7975307/14/2021
Building Lifecycle
All (5)Filed (3)Permit Issued (1)Special Inspection (1)
07/14/2021
Filed — Alteration
Application filed to propose a laundry area (washing machine & electrical dryer combo) at the first floor.
Q00510691-P2
07/13/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Albert Munoz
06/08/2021
Permit issued — Plumbing
Q00510691-I1-PL
04/28/2021
Filed — Alteration
Q00510500-I1
04/28/2021
Filed — Alteration
Application filed to propose a laundry area (washing machine & electrical dryer combo) at the first floor.
Q00510691-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAmm General Contracting06/08/2021
BISOTISSUEDAlternate Measures Contracting08/08/2006
1 project · most recent 07/14/2021
Water/Sanitary
FiledStatusContractorScope
07/14/2021Permit IssuedAmm General ContractingWater/Sanitary
1 project · most recent 08/30/2023
General Wiring
FiledStatusContractorScope
08/30/2023CompleteR & T ElectricalGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
07/13/2021Fire-Resistant Penetrations and JointsAlbert Munozspecial
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/27/2026Q00510500-I1Request digital key ↗
08/27/2026Q00510691-I1Request digital key ↗
08/27/2026Q00510691-P2Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/27/2026Q00510500-I1Open ↗
08/27/2026Q00510691-I1Open ↗
08/27/2026Q00510691-P2Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026Q00510691-P2Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/27/2026Q00510500-I1Open ↗
08/27/2026Q00510691-I1Open ↗
08/27/2026Q00510691-P2Open ↗