| Owner | Filings | Most Recent |
|---|---|---|
| 7311 67 DR | 4 | 03/21/2026 |
| 7311 67 DRIVE CORP | 2 | 03/21/2026 |
| 79-56 METROPOLITAN AVE | 1 | 03/21/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 12/28/2018 | $1.7M | — | — → — | — not available |
| Firm | Filings | Most Recent |
|---|---|---|
| MADRIAGA ENGINEERING P.C. | 2 | 06/28/2021 |
| J SQUARE ARCHITECTURE DPC | 2 | 05/12/2021 |
| Representative | Filings | Most Recent |
|---|---|---|
| Manetta architecture design pllc | 8 | 03/21/2026 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/28/2021 | — | — | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/28/2021 | — | — | Gas, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/18/2019 | Permit Issued | BOROWIDE ELECT'L CONTR'S | 3 meters, 1 new_meters |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/28/2021 | — | — | Steel |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 04/28/2021 | Maintenance information | — | energy_progress |
| 04/28/2021 | Air barrier - visual inspection | — | energy_progress |
| 04/28/2021 | Fenestration and door U-factor and product ratings | — | energy_progress |
| 04/28/2021 | Fenestration areas | — | energy_progress |
| 04/28/2021 | Fenestration air leakage | — | energy_progress |
| 04/28/2021 | Interior lighting power | — | energy_progress |
| 04/28/2021 | Permanent certificate | — | energy_progress |
| 04/28/2021 | Insulation placement and R values | — | energy_progress |
| 04/22/2021 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | — | special |
| 04/14/2021 | Structural Steel - High Strength Bolting | — | special |
| 04/14/2021 | Subgrade Inspections | — | special |
| 04/14/2021 | Structural Stability – Alterations of existing buildings | — | special |
| 04/14/2021 | Footing and Foundation | — | progress |
| 04/14/2021 | Energy Code Compliance Inspections | — | progress |
| 04/14/2021 | Fire-Resistance Rated Construction | — | progress |
| 04/14/2021 | Structural Wood Frame | — | progress |
| 04/14/2021 | Final | — | progress |
| 04/14/2021 | Structural Steel - Details | — | special |
| 04/14/2021 | Wood – Prefabricated I-Joists | — | special |
| 04/14/2021 | Subsurface Investigations (Borings/Test Pits) | — | special |
| 04/14/2021 | Chimneys and vents | — | special |
| 04/14/2021 | Concrete - Cast-In-Place | — | special |
| 04/14/2021 | Excavations - Sheeting, Shoring, and Bracing | — | special |
| 04/14/2021 | Fire-Resistant Penetrations and Joints | — | special |
| 04/14/2021 | Masonry | — | special |