| Owner | Filings | Most Recent |
|---|---|---|
| CIM GROUP | 20 | 07/08/2026 |
| 67 IRVING NY | 50 | 07/08/2026 |
| CELTIC SERVICES NYC | 4 | 07/08/2026 |
| 67 IRVING (NY), LLC | 27 | 03/22/2026 |
| HH BUILDING CONSULTING | 4 | 03/22/2026 |
| A R REALTY | 1 | 03/22/2026 |
| 1 R.S CORPORATION | 1 | 03/21/2026 |
| STEEL SYSTEMS | 3 | 03/21/2026 |
| 1 R S | 3 | 03/21/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 10/18/2017 | $34.3M | — | Private party → 67 IRVING (NY), LLC | $699/sf building |
| 10/18/2017 | $9.7M | — | Private party → 67 IRVING (NY), LLC | $197/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| G. BLINN CONSULTING, LLC | 11 | 08/03/2026 |
| GILSANZ MURRAY STEFICEK LLP | 5 | 05/13/2026 |
| LILKER ASSOCIATES CONSULTING ENGINE | 9 | 03/03/2026 |
| MORRIS ADJMI ARCHITECTS | 3 | 12/03/2025 |
| BAZINI ENGINEERING, P.C. | 2 | 04/17/2025 |
| GEODESIGN INC. PC | 2 | 07/22/2024 |
| H & O ENGINEERING, DPC | 1 | 05/23/2024 |
| MSM ENGINEERING SERVICES, PLLC | 1 | 05/22/2024 |
| RYAN SOAMES ENGINEERING | 1 | 07/28/2023 |
| BESPOKE ARCHITECTURE, PLLC | 1 | 11/14/2021 |
| KMB DESIGN GROUP, LLC | 1 | 09/21/2021 |
| LORING CONSULTING ENGINEERS, INC. | 2 | 10/09/2020 |
| A/R ENVIRONETICS ARCHITECTS PC | 2 | 06/18/2020 |
| ASHRAF CORP | 1 | 11/29/2018 |
| Representative | Filings | Most Recent |
|---|---|---|
| A1 EXPEDITING SERVICE | 18 | 03/21/2026 |
| JM ZONING, LLC. | 19 | 03/21/2026 |
| RIZZO GROUP | 4 | 03/21/2026 |
| HH BUILDING CONSULTING & ARCHITECTU | 2 | 03/21/2026 |
| EA DESIGN GROUP | 2 | 03/21/2026 |
| CONSTRUCTION PERMIT SERVICES | 2 | 03/21/2026 |
| ARCHI PRO GROUP | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| S&E BRIDGE & SCAFFOLD LLC. | General Contractor | 10 | 09/17/2026 |
| STEEL SYSTEMS LLC | General Contractor | 6 | 03/21/2026 |
| CAVAN BUILDERS CORP | General Contractor | 5 | 07/08/2026 |
| ANDAMIO SCAFFOLDING LLC | General Contractor | 3 | 03/21/2026 |
| BALATON CONSTRUCTION OF N | General Contractor | 3 | 03/21/2026 |
| SNS ORGNIZATION LTD | General Contractor | 3 | 03/21/2026 |
| FIVE BOROUGH NYC LLC | Fire Protection | 3 | 07/08/2026 |
| SUMMIT INTERIORS, INC | General Contractor | 2 | 03/21/2026 |
| WILLIAM C. GERAKARIS P&H | Plumbing | 1 | 07/08/2026 |
| CEL TECH ELECTRIC INC | General Contractor | 1 | 07/08/2026 |
| CELTIC SERVICES NYC INC | General Contractor | 1 | 07/08/2026 |
| CONCEPT AIR CONDITIONING | General Contractor | 1 | 07/08/2026 |
| GOOD-WILL MECHANICAL CORP. | General Contractor | 1 | 04/09/2026 |
| COD PLUMBING CORP | Plumbing | 1 | 05/27/2026 |
| FRANKIE PLBG & HTG L.L.C | Plumbing | 1 | 05/27/2026 |
| ALBERTO MEDINA | Electrical | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| G. BLINN CONSULTING, LLC | 2894 | 3 | 06/24/2026 |
| SPECIAL TESTING & CONSULT | 1688 | 19 | 05/13/2026 |
| AK ENGINEERING PC | 678 | 1 | 07/28/2023 |
| BESPOKE ARCHITECTURE, PLL | 6403 | 1 | 11/14/2021 |
| KMB DESIGN GROUP, LLC | 513 | 1 | 09/21/2021 |
| ALAN MARGOLIN & ASSOC | 423 | 2 | 10/09/2020 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Construction Fence | Permit Issued | S&E BRIDGE & SCAFFOLD LLC. | 09/16/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | S&E BRIDGE & SCAFFOLD LLC. | 09/16/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | S&E BRIDGE & SCAFFOLD LLC. | 09/16/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | S&E BRIDGE & SCAFFOLD LLC. | 09/16/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | S&E BRIDGE & SCAFFOLD LLC | 02/11/2026 |
| DOB NOW | General Construction | Permit Issued | CAVAN BUILDERS CORP | 02/03/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | S&E BRIDGE & SCAFFOLD LLC | 12/22/2025 |
| DOB NOW | Supported Scaffold | Permit Issued | S&E BRIDGE & SCAFFOLD LLC | 12/01/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | S&E BRIDGE & SCAFFOLD LLC | 11/19/2025 |
| DOB NOW | Standpipe | Permit Issued | FIVE BOROUGH NYC LLC | 11/12/2025 |
| DOB NOW | Standpipe | Permit Issued | FIVE BOROUGH NYC LLC | 11/12/2025 |
| DOB NOW | Plumbing | Permit Issued | VIN-RAY PLUMBING & HEATIN | 11/05/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | S&E BRIDGE & SCAFFOLD LLC | 10/31/2025 |
| DOB NOW | Structural | Permit Issued | CAVAN BUILDERS CORP | 10/28/2025 |
| DOB NOW | Construction Fence | Permit Issued | S&E BRIDGE & SCAFFOLD LLC | 10/17/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | GOODWILL MECHANICAL | 10/15/2025 |
| DOB NOW | Support of Excavation | Permit Issued | CAVAN BUILDERS CORP | 10/14/2025 |
| DOB NOW | Plumbing | Permit Issued | FRANKIE PLBG & HTG L.L.C | 10/03/2025 |
| DOB NOW | Foundation | Signed-off | CAVAN BUILDERS CORP | 09/30/2025 |
| DOB NOW | Standpipe | Permit Issued | FIVE BOROUGH NYC LLC | 09/30/2025 |
| DOB NOW | General Construction | Permit Issued | CAVAN BUILDERS CORP | 09/24/2025 |
| DOB NOW | General Construction | Signed-off | SNS ORGNIZATION LTD | 04/24/2025 |
| DOB NOW | Boiler Equipment | Signed-off | STUART N SCHWARTZ | 04/23/2025 |
| DOB NOW | General Construction | Signed-off | CELTIC SERVICES NYC INC | 05/29/2024 |
| DOB NOW | Sidewalk Shed | Signed-off | ANDAMIO SCAFFOLDING LLC | 05/22/2024 |
| DOB NOW | Mechanical Systems | Signed-off | CONCEPT AIR CONDITIONING | 08/15/2023 |
| DOB NOW | Antenna | Permit Issued | CEL TECH ELECTRIC INC | 01/24/2023 |
| DOB NOW | General Construction | Signed-off | BALATON CONSTRUCTION OF N | 02/14/2022 |
| DOB NOW | Mechanical Systems | Signed-off | SUMMIT INTERIORS, INC | 03/03/2021 |
| DOB NOW | Plumbing | Signed-off | WILLIAM C. GERAKARIS P&H | 06/19/2020 |
| DOB NOW | Supported Scaffold | Signed-off | STEEL SYSTEMS LLC | 04/11/2019 |
| DOB NOW | Supported Scaffold | Signed-off | STEEL SYSTEMS LLC | 11/30/2018 |
| BIS | OT | ISSUED | SUMMIT INTERIORS, INC | 06/11/2020 |
| BIS | EQ | ISSUED | STEEL SYSTEMS LLC | 04/03/2020 |
| BIS | OT | ISSUED | SUMMIT INTERIORS, INC | 03/11/2020 |
| BIS | OT | ISSUED | SUMMIT INTERIORS, INC | 09/30/2019 |
| BIS | EQ | ISSUED | STEEL SYSTEMS LLC | 05/03/2019 |
| BIS | OT | ISSUED | PRESERV BLD RESTOR MGT IN | 04/12/2019 |
| BIS | MH | ISSUED | METROPOLITAN BUILDERS OF | 02/15/2019 |
| BIS | OT | ISSUED | METROPOLITAN BUILDERS OF | 02/15/2019 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 05/13/2026 | Permit Issued | CAVAN BUILDERS CORP | Air Conditioning Systems, Heating Systems | Cooling Lg ARUN060GSS4 60,000 BTU · Vrf Outdoor ×18 ARUN038GSS4 38,000 BTU · Vrf Outdoor ×14 ARUN048GSS4 48,000 BTU · Vrf Outdoor ×14 ARUN096BSS5 96,000 BTU · Vrf Outdoor ×8 ARUB060GSS4 60,000 BTU · Vrf Outdoor ×4 ARUN060GSS4, ARUN060GSS4 60,000 BTU · Vrf Outdoor ×4 ARUM288BTE5 288,000 BTU · Vrf Outdoor ×2 Heating Lg ARUN038GSS4, ARUN038GSS4, ARUN038GSS4 43,000 BTU · Vrf Outdoor ×12 ARUN060GSS4 64,000 BTU · Vrf Outdoor ×12 ARUN048GSS4 54,000 BTU · Vrf Outdoor ×8 ARUN096BSS5, ARUN096BSS5 108,000 BTU · Vrf Outdoor ×8 ARUN048GSS4, ARUN048GSS4, ARUN048GSS4 54,000 BTU · Vrf Outdoor ×6 ARUB060GSS4, ARUB060GSS4 64,000 BTU · Vrf Indoor ×4 ARUM288BTE5 324,000 BTU · Vrf Outdoor ×2 ARUN038GSS4 43,000 BTU · Vrf Outdoor ×2 ARUN060GSS4, ARUN060GSS4, ARUN060GSS4 64,000 BTU · Vrf Outdoor ×2 |
| 07/28/2023 | Signed-off | CONCEPT AIR CONDITIONING | Air Conditioning Systems, Associated Ducts and Piping |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/13/2026 | Permit Issued | FIVE BOROUGH NYC LLC | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/13/2026 | Permit Issued | COD PLUMBING CORP | Gas, Storm, Water/Sanitary |
| 12/30/2019 | — | — | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/16/2026 | Permit Issued | JAM ELECTRICAL CORP | — |
| 11/02/2025 | Permit Issued | 2AC ELECTRIC INC | General Wiring |
| 10/31/2025 | Permit Issued | NASH ELECTRIC SERVICES IN | — |
| 05/29/2024 | Complete | BOROWIDE ELECT'L CONTR'S | — |
| 10/30/2023 | Complete | NORTHEAST ELECTRIC CORP | General Wiring |
| 10/13/2023 | Permit Issued | GILSTON BROTHERS ELECT'L | General Wiring |
| 05/14/2021 | Complete | GUIDING LIGHT ELECTRIC IN | HVAC Wiring |
| 02/03/2020 | Complete | STAR ELEC'L CONTRACTORS C | — |
| 01/25/2019 | Complete | ARMOR ELECTRICAL CORP | General Wiring |
| 01/02/2018 | Permit Issued | M & J ELEC'L CONTR'S CORP | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/13/2026 | Permit Issued | CAVAN BUILDERS CORP | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/03/2026 | Permit Issued | S&E BRIDGE & SCAFFOLD LLC | Scaffold, Sidewalk Shed |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/03/2026 | Permit Issued | S&E BRIDGE & SCAFFOLD LLC | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/18/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/17/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/29/2026 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 05/29/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 05/12/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/30/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/30/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 01/27/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 11/13/2025 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 11/13/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 10/20/2025 | Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet) | Certified | View ↗ |
| 05/23/2025 | Pass-Final Boiler Equipment Inspection | Pass | View ↗ |
| 01/25/2024 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 01/09/2024 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 11/13/2023 | Pass-Final Antenna Withdrawal | Pass | View ↗ |
| 11/02/2023 | Fail-Final Antenna Withdrawal | Fail | View ↗ |
| 06/14/2023 | Pass-Final PL - Up to 9 Requested Floors | Pass | View ↗ |
| 11/07/2022 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 06/26/2026 | Post-installed Anchors | GREG BLINN | special |
| 06/24/2026 | Post-installed Anchors | GREG BLINN | special |
| 06/01/2026 | Concrete - Cast-In-Place | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 06/01/2026 | Final | SEBASTIAN SETTEDUCATE JR., P.E | progress |
| 06/01/2026 | Footing and Foundation | SEBASTIAN SETTEDUCATE JR., P.E | progress |
| 06/01/2026 | Subgrade Inspections | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 06/01/2026 | Structural Stability – Alterations of existing buildings | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 05/25/2026 | HVAC-R and service water heating system controls | SEBASTIAN SETTEDUCATE JR., P.E | energy_progress |
| 05/25/2026 | Fire-Resistant Penetrations and Joints | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 05/25/2026 | Post-installed Anchors | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 05/25/2026 | HVAC-R and service water piping design and insulation | SEBASTIAN SETTEDUCATE JR., P.E | energy_progress |
| 05/25/2026 | HVAC-R and service water heating equipment | SEBASTIAN SETTEDUCATE JR., P.E | energy_progress |
| 05/12/2026 | Masonry | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 05/05/2026 | Concrete - Cast-In-Place | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 05/05/2026 | Final | SEBASTIAN SETTEDUCATE JR., P.E | progress |
| 05/05/2026 | Subgrade Inspections | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 05/05/2026 | Structural Steel - Welding | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 05/05/2026 | Structural Steel - High Strength Bolting | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 05/05/2026 | Structural Steel - Details | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 05/05/2026 | Structural Stability – Alterations of existing buildings | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 05/05/2026 | Sprayed fire-resistant materials | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 05/05/2026 | Post-installed Anchors | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 05/05/2026 | Concrete - Cast-In-Place | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 05/05/2026 | Footing and Foundation | SEBASTIAN SETTEDUCATE JR., P.E | progress |
| 05/05/2026 | Final | SEBASTIAN SETTEDUCATE JR., P.E | progress |