Office only, 7-19 stories
670 PARK AVENUE
MANHATTAN · Upper East Side-Carnegie Hill · BIN 1041224
💬 Discuss this project
1919Year Built
7Stories
O3Building Class
R10Zoning
20,792 sfGross Floor Area
2Units
1 Open Violation ▸
Office only, 7-19 stories · 6,025 sf lot · 3.45 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction23p · 3 filings · 20 docs
Floor 61p · 1 filing · 10 docs
Floor 5
Floor 41p · 1 filing · 10 docs
Floor 3Under Construction11p · 1 filing · 20 docs
Floor 2Under Construction18p · 1 filing · 20 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LEMX2407/08/2026
THE OWNER OF 58 EAST 68TH103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CMTA INC.306/17/2026
GILSANZ MURRAY STEFICEK LLP106/16/2026
OTJ ARCHITECTS106/15/2026
ASHRAF CORP410/14/2025
PAUL PERDEK, PROF. ENG. PLLC207/23/2025
PAUL LANTERI111/29/2022
ENTHINK ENGINEERS LLC207/09/2022
GREEN DESIGN104/30/2020
ROYAL ENGINEERING, P.C307/30/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION403/21/2026
NYCCODE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LEMX CORPGeneral Contractor907/08/2026
PHOENIX SUTTON STR INCGeneral Contractor707/08/2026
PIOTR MISAElectrical503/21/2026
PRESERV BLD RESTOR MGT INGeneral Contractor407/08/2026
WOLF CONSTRUCTION CORP 20General Contractor306/28/2026
ANTHONY LUCIANOElectrical103/21/2026
CAPITOL FIRE SPRINKLER COFire Protection107/29/2026
SERGIO GIANNACHIElectrical103/21/2026
ELPO ELECTRICAL CONTG INCElectrical103/22/2026
LELIS, ARILSONElectrical103/21/2026
NEU, RICHARDElectrical103/21/2026
RICHARD NEUElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENGINEERING BUILDING SERV7303506/17/2026
ATLAS ATC ENGINEERING INC8011111/29/2022
ENTHINK ENGINEERS LLC6247107/09/2022
Building Lifecycle
All (117)Filed (18)Permit Issued (17)Signed Off (7)Violation (43)Inspection (2)Special Inspection (30)
07/28/2026
Permit issued — Sprinklers
M01415569-S3-EW-SP
07/14/2026
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
06/30/2026
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
06/26/2026
Permit issued — General Construction
M01415569-I1-GC
06/23/2026
Permit issued — Mechanical Systems
M01415569-S4-MS
06/23/2026
Permit issued — Structural
M01415569-S2-ST
06/17/2026
Filed — Alteration
Renovation of the 2nd-floor mechanical room, as well as the 3rd-floor setback roof portion where the mechanical equipment is located, is associated with the Mechanical scope. No change is use, egress, or occupancy under this application.
M01415569-S4
06/17/2026
Special inspection requirement — Maintenance information
Tony Cartagine
06/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
Tony Cartagine
06/17/2026
Special inspection requirement — Lighting controls
Tony Cartagine
06/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
Tony Cartagine
06/17/2026
Special inspection requirement — Shutoff dampers
Tony Cartagine
06/17/2026
Special inspection requirement — Ventilation and air distribution system
Tony Cartagine
06/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Tony Cartagine
06/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Tony Cartagine
06/17/2026
Special inspection requirement — Post-installed Anchors
Tony Cartagine
06/17/2026
Special inspection requirement — Mechanical Systems
Tony Cartagine
06/17/2026
Special inspection requirement — Final
Tony Cartagine
06/17/2026
Special inspection requirement — Duct leakage testing, insulation and design
Tony Cartagine
06/17/2026
Special inspection requirement — Interior lighting power
Tony Cartagine
06/16/2026
Filed — Alteration
Renovation of the 2nd-floor mechanical room, as well as the 3rd-floor setback roof portion where the mechanical equipment is located, is associated with the Mechanical scope. No change is use, egress, or occupancy under this application.
M01415569-S2
06/15/2026
Filed — Alteration
Renovation of the 2nd-floor mechanical room, as well as the 3rd-floor setback roof portion where the mechanical equipment is located, is associated with the Mechanical scope. No change is use, egress, or occupancy under this application.
M01415569-S1
06/15/2026
Filed — Alteration
Renovation of the 2nd-floor mechanical room, as well as the 3rd-floor setback roof portion where the mechanical equipment is located, is associated with the Mechanical scope. No change is use, egress, or occupancy under this application.
M01415569-I1
06/15/2026
Filed — Alteration
Renovation of the 2nd-floor mechanical room, as well as the 3rd-floor setback roof portion where the mechanical equipment is located, is associated with the Mechanical scope. No change is use, egress, or occupancy under this application.
M01415569-S3
06/11/2026
Special inspection requirement — HVAC-R and service water heating system controls
Tony Cartagine
06/11/2026
Special inspection requirement — Ventilation and air distribution system
Tony Cartagine
06/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Tony Cartagine
06/11/2026
Special inspection requirement — Sprinkler Systems
Tony Cartagine
06/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Tony Cartagine
06/11/2026
Special inspection requirement — Sprayed fire-resistant materials
Tony Cartagine
06/11/2026
Special inspection requirement — Final
Tony Cartagine
06/11/2026
Special inspection requirement — Shutoff dampers
Tony Cartagine
06/11/2026
Special inspection requirement — Post-installed Anchors
Tony Cartagine
06/11/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Tony Cartagine
06/11/2026
Special inspection requirement — Lighting controls
Tony Cartagine
06/11/2026
Special inspection requirement — Mechanical Systems
Tony Cartagine
06/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Tony Cartagine
06/11/2026
Special inspection requirement — Post-installed Anchors
Tony Cartagine
06/11/2026
Special inspection requirement — Final
Tony Cartagine
06/11/2026
Special inspection requirement — Duct leakage testing, insulation and design
Tony Cartagine
06/11/2026
Special inspection requirement — HVAC-R and service water heating equipment
Tony Cartagine
01/20/2026
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01301658-I1
10/15/2025
Permit issued — Supported Scaffold
M01301658-I1-SF
10/14/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01301658-I1
09/19/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M01223019-I1
08/08/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M01223019-P2
07/24/2025
Permit issued — Protection and Mechanical Methods
M01258956-I1-PMM
07/23/2025
Filed — Alteration
INSTALLATION OF TEMPORARY STORAGE OF MATERIALS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01258956-I1
07/16/2025
Permit issued — Protection and Mechanical Methods
M01251757-I1-PMM
07/15/2025
Filed — Alteration
INSTALLATION OF TEMPORARY BETAMAX HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01251757-I1
07/03/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M01223019-P1
06/17/2025
Permit issued — Supported Scaffold
M01223019-I1-SH
06/17/2025
Permit issued — Supported Scaffold
M01223019-I1-SF
06/16/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M01223019-I1
04/05/2023
Signed off — Alteration
M00527011-I1
02/28/2023
Permit issued — General Construction
M00527011-I1-GC-CX
11/29/2022
Filed — Alteration
M00527011-I1
11/03/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY BETA MAX HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
M00770575-I1
11/03/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00770599-I1
07/09/2022
Filed — Alteration
INSTALLATION OF TEMPORARY BETA MAX HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
M00770575-I1
Latest 60 of 117 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedCAPITOL FIRE SPRINKLER CO07/28/2026
DOB NOWGeneral ConstructionPermit IssuedWOLF CONSTRUCTION CORP 2006/26/2026
DOB NOWMechanical SystemsPermit IssuedWOLF CONSTRUCTION CORP 2006/23/2026
DOB NOWStructuralPermit IssuedWOLF CONSTRUCTION CORP 2006/23/2026
DOB NOWSupported ScaffoldSigned-offLEMX CORP10/15/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedPRESERV BLD RESTOR MGT IN07/24/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedPRESERV BLD RESTOR MGT IN07/16/2025
DOB NOWSupported ScaffoldSigned-offLEMX CORP06/17/2025
DOB NOWSupported ScaffoldSigned-offLEMX CORP06/17/2025
DOB NOWGeneral ConstructionSigned-offPRESERV BLD RESTOR MGT IN02/28/2023
DOB NOWProtection and Mechanical MethodsSigned-offPRESERV BLD RESTOR MGT IN07/09/2022
DOB NOWSidewalk ShedSigned-offLEMX CORP07/08/2022
DOB NOWSidewalk ShedSigned-offLEMX CORP07/08/2022
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC06/01/2020
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC05/01/2020
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC04/19/2019
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC04/19/2019
BISOTISSUEDPRESERV BLD RESTOR MGT IN09/15/2020
BISOTISSUEDPRESERV BLD RESTOR MGT IN10/09/2019
BISOTISSUEDPRESERV BLD RESTOR MGT IN05/29/2019
BISOTISSUEDPRESERV BLD RESTOR MGT IN10/04/2017
BISOTISSUEDPRESERV BLD RESTOR MGT IN06/26/2017
BISOTISSUEDPRESERV BLD RESTOR MGT IN10/03/2016
BISOTISSUEDPRESERV BLD RESTOR MGT IN05/10/2016
BIS—ISSUEDCOUNCIL ON FOREIGN RELAT04/22/2016
BISPLISSUEDDEEM PLUMBING INC06/01/2015
BISPLISSUEDDEEM PLUMBING INC01/21/2015
BIS—ISSUEDE.W. HOWELL CO, LLC12/15/2014
BISSPISSUEDCODE FIRE PROTECTION CORP10/17/2014
BIS—ISSUEDE.W. HOWELL CO, LLC06/26/2014
BISPLISSUEDA STEINMAN PLG & HTG CORP06/03/2014
BISPLISSUEDA STEINMAN PLG & HTG CORP05/05/2014
BIS—ISSUEDE.W. HOWELL CO, LLC05/13/2013
BISEQISSUEDROCKLEDGE SCAFFOLD CORP08/01/2011
BISSPISSUEDCODE FIRE PROTECTION CORP05/31/2011
BISFBISSUEDEMPIRE STATE FUEL OIL CORP01/08/2001
BISOTISSUEDYORK HUNTER SERVS.INC01/12/2000
BISFBISSUEDH. LIEBLICH &CO., INC07/14/1999
BISOTISSUEDYORK HUNTER SERVICES INC08/13/1998
BISSPISSUEDTRISTATE PLBG SVCS CORP08/06/1998
+ 16 more permits on file
1 project · most recent 06/17/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/17/2026Permit IssuedWOLF CONSTRUCTION CORP 20Heating and Air Conditioning Systems
Heat / Cool
Trane WSK120B3S0P**G4C0A1B1A004 117,750 BTU · Rooftop Unit ×4
1 project · most recent 06/17/2026
FiledStatusContractorScope
06/17/2026Permit IssuedCAPITOL FIRE SPRINKLER CO—
7 projects · most recent 07/08/2026
General Wiring
FiledStatusContractorScope
07/08/2026Permit IssuedM&T ELECTRICAL LLCGeneral Wiring
09/28/2025CompleteJAM ELECTRICAL CORP—
08/04/2025CompleteP & Z ELECTRIC CORPGeneral Wiring
06/18/2025CompleteRICHARD NEU—
06/30/2022CompleteELPO ELECTRICAL CONTG INC—
06/12/2020CompleteELPO ELECTRICAL CONTG INC—
04/16/2019CompleteELPO ELECTRICAL CONTG INC—
1 project · most recent 06/17/2026
Steel
FiledStatusContractorScope
06/17/2026Permit IssuedCAPITOL FIRE SPRINKLER COSteel
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/14/2026Pass-Final PL - More than 10 Requested FloorsPassView ↗
06/30/2026Pass-Final PL - More than 10 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
06/17/2026Maintenance informationTony Cartagineenergy_progress
06/17/2026HVAC-R and service water heating equipmentTony Cartagineenergy_progress
06/17/2026Lighting controlsTony Cartagineenergy_progress
06/17/2026HVAC-R and service water heating system controlsTony Cartagineenergy_progress
06/17/2026Shutoff dampersTony Cartagineenergy_progress
06/17/2026Ventilation and air distribution systemTony Cartagineenergy_progress
06/17/2026HVAC-R and service water piping design and insulationTony Cartagineenergy_progress
06/17/2026Fire-Resistant Penetrations and JointsTony Cartaginespecial
06/17/2026Post-installed AnchorsTony Cartaginespecial
06/17/2026Mechanical SystemsTony Cartaginespecial
06/17/2026FinalTony Cartagineprogress
06/17/2026Duct leakage testing, insulation and designTony Cartagineenergy_progress
06/17/2026Interior lighting powerTony Cartagineenergy_progress
06/11/2026HVAC-R and service water heating system controlsTony Cartagineenergy_progress
06/11/2026Ventilation and air distribution systemTony Cartagineenergy_progress
06/11/2026Fire-Resistant Penetrations and JointsTony Cartaginespecial
06/11/2026Sprinkler SystemsTony Cartaginespecial
06/11/2026Fire-Resistant Penetrations and JointsTony Cartaginespecial
06/11/2026Sprayed fire-resistant materialsTony Cartaginespecial
06/11/2026FinalTony Cartagineprogress
06/11/2026Shutoff dampersTony Cartagineenergy_progress
06/11/2026Post-installed AnchorsTony Cartaginespecial
06/11/2026HVAC-R and service water piping design and insulationTony Cartagineenergy_progress
06/11/2026Lighting controlsTony Cartagineenergy_progress
06/11/2026Mechanical SystemsTony Cartaginespecial
Latest 25 of 40.
▾Documents — 365 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch14
09/02/2026M00770599-I1Request digital key ↗
09/02/2026M00770575-I1Request digital key ↗
09/01/2026M00527011-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold4
09/05/2026M00156658-I1Request digital key ↗
09/05/2026M00345500-I1Request digital key ↗
08/15/2026M00156658-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed4
09/05/2026M00156658-I1Request digital key ↗
09/05/2026M00345500-I1Request digital key ↗
08/15/2026M00156658-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits57
▸BISPLAN / WORK APPROVAL APPLICATION26
06/19/2020123808120Open ↗
04/17/2020123808120Open ↗
03/26/2020123808120Open ↗
Showing 3 of 26 on file for this type
▸BISWORK PERMIT APPLICATION13
10/09/2019123808120Open ↗
05/30/2019123808120Open ↗
10/03/2017123083322Open ↗
Showing 3 of 13 on file for this type
▸BISPLACE OF ASSEMBLY12
03/06/2020121682535Open ↗
01/24/2020121682535Open ↗
07/18/2017121682562Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWLPC Approval/Permit5
08/16/2026M01415569-S1Open ↗
08/16/2026M01415569-S2Open ↗
08/16/2026M01415569-S4Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
10/06/2015120585679Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISZONING RESOLUTION DETERMINATION2
02/18/2014121682535Open ↗
02/18/2014121682562Open ↗
▸BISZONING EXHIBIT I- CERTIFICATION1
03/13/2012120585679Open ↗
▸Seals & Professional Certifications113
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION41
05/28/2019123808120Open ↗
05/04/2018123083322Open ↗
05/04/2018123083322Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWProgress Inspector Seal & Signature25
09/01/2026M00770599-I1Open ↗
08/28/2026M00770575-I1Open ↗
08/26/2026M00527011-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
09/05/2026M00156658-I1Open ↗
09/05/2026M00345500-I1Open ↗
09/02/2026M00770575-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
08/28/2026M00770575-I1Open ↗
08/26/2026M00527011-I1Open ↗
08/26/2026M00527011-I1Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
05/28/2019123808120Open ↗
06/30/2017123083322Open ↗
05/02/2016122726050Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
08/08/2011120783018Open ↗
06/06/2011120710025Open ↗
Showing 2 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
05/28/2019123808120Open ↗
06/30/2017123083322Open ↗
05/02/2016122726050Open ↗
▸Trade Schedules & Equipment11
▸BISSELF-CERT PLUMBING NOTICE4
03/06/2015122076047Open ↗
12/10/2014122076047Open ↗
11/07/2011120710025Open ↗
Showing 3 of 4 on file for this type
▸BISSPRINKLER INSP REPORT : FP-852
12/10/2014122076047Open ↗
09/12/2011120710025Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE B - PLUMBING1
06/06/2011120710025Open ↗
▸BISEQUIPMENT USE PERMITS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
07/22/2016120631799Open ↗
▸Safety & Tenant Protection5
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
03/15/2012120585679Open ↗
03/13/2012120585679Open ↗
▸DOB NOWTenant Protection Plan2
09/05/2026M00345500-I1Open ↗
08/13/2026M00156658-P1Open ↗
▸BISSTREET TREE CHECKLIST1
04/25/2013120585679Open ↗
▸Environmental & Asbestos21
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
06/02/2020123808120Open ↗
05/30/2019123738795Open ↗
05/28/2019123808120Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
06/19/2013121682562Open ↗
06/19/2013121682535Open ↗
Showing 2 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
06/06/2011120710025Open ↗
Showing 1 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/16/2026M01415569-S1Open ↗
08/16/2026M01415569-S4Open ↗
08/16/2026M01415569-S2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M00527011-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
03/16/2021123808120Open ↗
▸Approvals, Objections & Sign-offs70
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter18
09/05/2026M00156658-I1Open ↗
09/05/2026M00345500-I1Open ↗
09/02/2026M00770575-I1Open ↗
Showing 3 of 18 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST16
03/16/2021123808120Open ↗
05/04/2018123083322Open ↗
09/29/2017120585679Open ↗
Showing 3 of 16 on file for this type
▸BISLANDMARKS APPROVAL9
05/28/2019123808120Open ↗
06/30/2017123083322Open ↗
04/07/2017122726050Open ↗
Showing 3 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS9
06/19/2013121682562Open ↗
06/19/2013121682535Open ↗
08/08/2011120783018Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
05/30/2019123738795Open ↗
06/28/2017120585679Open ↗
05/18/2017121682535Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
07/03/2014120585679Open ↗
04/22/2013120585679Open ↗
03/23/2012120585679Open ↗
Showing 3 of 5 on file for this type
▸BISSUPERSEDING LETTER3
05/19/2016120585679Open ↗
12/30/2014120585679Open ↗
07/10/2014120585679Open ↗
▸BISCCD1-Construction Code Determination2
02/18/2014121682562Open ↗
01/30/2014120585679Open ↗
▸BISLANDMARKS SIGNOFF1
03/16/2021123808120Open ↗
▸Cost, Insurance & Ownership20
▸BISCOST AFFIDAVIT19
06/02/2020123808120Open ↗
05/30/2019123738795Open ↗
05/28/2019123808120Open ↗
Showing 3 of 19 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
03/16/2021123808120Open ↗
▸Filing & Intake Forms25
▸BISADDITIONAL INFORMATION13
06/19/2020123808120Open ↗
06/02/2020123808120Open ↗
02/21/2017122726050Open ↗
Showing 3 of 13 on file for this type
▸BISEFILING COVER SHEET7
05/30/2019123738795Open ↗
06/30/2017123083322Open ↗
05/02/2016122726050Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM5
04/17/2020123808120Open ↗
01/31/2020121682535Open ↗
01/24/2020121682535Open ↗
Showing 3 of 5 on file for this type
▸Other Documents17
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION8
05/28/2019123808120Open ↗
05/06/2019123808120Open ↗
09/29/2017120585679Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWBSA Meeting Minutes/BSA Resolution3
09/05/2026M00156658-I1Open ↗
08/13/2026M00156658-P1Open ↗
08/13/2026M00156658-P2Open ↗
▸BISRESTRICTION: DEED2
12/04/2013121682562Open ↗
03/15/2012120585679Open ↗
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSupporting Document: Fee Deferment1
04/15/2016122726050Open ↗
▸BISLAA - Supporting Documentation1
05/04/2018123083322Open ↗
▸DOB NOWProof of Historic Building1
08/13/2026M00527011-I1Open ↗