← Back
Two family converted from one family
68-22 61 ROAD
QUEENS · BIN 4062571
💬 Discuss this project
1960Year Built
2Stories
B3Building Class
R4Zoning
2,070 sfGross Floor Area
2Units
Two family converted from one family · 2,063 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingFire ProtectionGeneral
Floor 27p · 2 filings · 20 docs
Floor 17p · 3 filings · 20 docs
Basement6p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/02/2021$775K—— → —$374/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HAMANN ENGINEERING, PLLC1404/11/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BIG ORANGE EXPEDITING2803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MK CONTRACTING GROUP INCGeneral Contractor907/08/2026
COOLQUEST MECHANICAL INCGeneral Contractor507/08/2026
ORBIT PLBG & HTG INCPlumbing207/08/2026
ORBIT SPRINKLER CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HAMANN ENGINEERING, PLLC49491404/11/2024
STRUCT. ENGINEERING INTEG4174105/20/2022
Building Lifecycle
All (82)Filed (14)Permit Issued (11)Signed Off (5)Inspection (10)Objection (12)Special Inspection (30)
11/18/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CARL HAMANN
04/22/2024
Special inspection requirement — Permanent certificate
CARL HAMANN
04/22/2024
Special inspection requirement — Fenestration areas
CARL HAMANN
04/22/2024
Special inspection requirement — Fenestration air leakage
CARL HAMANN
04/22/2024
Special inspection requirement — Air barrier - visual inspection
CARL HAMANN
04/22/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
CARL HAMANN
04/22/2024
Special inspection requirement — Interior lighting power
CARL HAMANN
04/22/2024
Special inspection requirement — Energy Code Compliance Inspections
CARL HAMANN
04/22/2024
Special inspection requirement — Concrete - Cast-In-Place
CARL HAMANN
04/11/2024
Filed — Alteration CO
Mechanical job as per plans filled herewith. No change in use egress and occupancy under thisapplication.
Q00655352-P4
03/08/2024
Signed off — Alteration
JOB FILED FOR INTERIOR RENOVATION OF ONE FAMILY HOUSE, CHANGE TO THE LAYOUTS AND PARTITIONS FILED UNDER THIS APPLICATION, CONSTRUCTION OF PORCH IN THE REAR OF THE BUILDING. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00631750-I1
03/06/2024
Signed off — Alteration CO
Mechanical job as per plans filled herewith. No change in use egress and occupancy under thisapplication.
Q00655352-S1
03/01/2024
Special inspection requirement — HVAC-R and service water heating equipment
CARL HAMANN
03/01/2024
Special inspection requirement — Maintenance information
CARL HAMANN
03/01/2024
Special inspection requirement — Mechanical Systems
CARL HAMANN
03/01/2024
Special inspection requirement — Final
CARL HAMANN
03/01/2024
Special inspection requirement — Energy Code Compliance Inspections
CARL HAMANN
03/01/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
CARL HAMANN
03/01/2024
Special inspection requirement — HVAC-R and service water heating system controls
CARL HAMANN
02/28/2024
Filed — Alteration CO
Mechanical job as per plans filled herewith. No change in use egress and occupancy under thisapplication.
Q00655352-P3
02/19/2024
Special inspection requirement — HVAC-R and service water heating equipment
CARL HAMANN
02/19/2024
Special inspection requirement — Mechanical Systems
CARL HAMANN
02/19/2024
Special inspection requirement — Energy Code Compliance Inspections
CARL HAMANN
02/19/2024
Special inspection requirement — Final
CARL HAMANN
02/19/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
CARL HAMANN
02/19/2024
Special inspection requirement — Maintenance information
CARL HAMANN
02/19/2024
Special inspection requirement — HVAC-R and service water heating system controls
CARL HAMANN
02/09/2024
Signed off — Alteration
Plumbing work filed herewith on the basement, 1st and 2nd floor. No change in use, egress and occupancy.
Q00631765-I1
01/31/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/29/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/04/2024
Objection resolved — Addressed
12/15/2023
Objection raised — Energy
11/30/2023
Filed — Alteration CO
Mechanical job as per plans filled herewith. No change in use egress and occupancy under thisapplication.
Q00655352-P2
07/05/2023
Signed off — Alteration
INSTALLATION OF SPRINKLERS SYSTEM ON THE BASEMENT FLOOR IN COMPLIANCE WITH THE FIRE APARATUS ACCESS REQUIREMENT IN CONJUNCTION WITH CONVERSION TO 2 FAMILY HOUSE, NO CHANGE IN USE, EGRESS AND OCCUPANCY PROPOSED UNDER THIS APPLICAITON.
Q00692793-I1
02/27/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/23/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CARL HAMANN
02/22/2023
Special inspection requirement — Sprinkler Systems
CARL HAMANN
02/20/2023
Filed — Alteration
Plumbing work filed herewith on the basement, 1st and 2nd floor. No change in use, egress and occupancy.
Q00631765-P2
02/16/2023
Filed — Alteration
INSTALLATION OF SPRINKLERS SYSTEM ON THE BASEMENT FLOOR IN COMPLIANCE WITH THE FIRE APARATUS ACCESS REQUIREMENT IN CONJUNCTION WITH CONVERSION TO 2 FAMILY HOUSE, NO CHANGE IN USE, EGRESS AND OCCUPANCY PROPOSED UNDER THIS APPLICAITON.
Q00692793-P1
01/23/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CARL HAMANN
01/23/2023
Special inspection requirement — Sprinkler Systems
CARL HAMANN
12/30/2022
Permit issued — General Construction
Q00655352-I1-GC
12/30/2022
Permit issued — General Construction
Q00631750-I1-GC
12/29/2022
Permit issued — Mechanical Systems
Q00655352-S1-MS
12/23/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/23/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/07/2022
Permit issued — Sprinklers
Q00692793-I1-EW-SP
12/06/2022
Permit issued — Plumbing
Q00631765-I1-PL
11/15/2022
Signed off — Alteration
APPLICATION FILED TO SHOW THE UNDERPINNING WORK AS PER PLANS, NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00718952-I1
10/28/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/28/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/04/2022
Permit issued — Foundation
Q00718952-I1-GC-CX
07/25/2022
Permit issued — Mechanical Systems
Q00655352-S1-MS
07/13/2022
Objection raised — Other
07/13/2022
Objection resolved — Addressed
07/06/2022
Filed — Alteration
INSTALLATION OF SPRINKLERS SYSTEM ON THE BASEMENT FLOOR IN COMPLIANCE WITH THE FIRE APARATUS ACCESS REQUIREMENT IN CONJUNCTION WITH CONVERSION TO 2 FAMILY HOUSE, NO CHANGE IN USE, EGRESS AND OCCUPANCY PROPOSED UNDER THIS APPLICAITON.
Q00692793-I1
06/08/2022
Filed — Alteration CO
Mechanical job as per plans filled herewith. No change in use egress and occupancy under thisapplication.
Q00655352-P1
05/20/2022
Filed — Alteration
APPLICATION FILED TO SHOW THE UNDERPINNING WORK AS PER PLANS, NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00718952-I1
Latest 60 of 82 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMK CONTRACTING GROUP INC12/30/2022
DOB NOWGeneral ConstructionSigned-offMK CONTRACTING GROUP INC12/30/2022
DOB NOWMechanical SystemsSigned-offCOOLQUEST MECHANICAL INC12/29/2022
DOB NOWSprinklersSigned-offORBIT SPRINKLER CORP12/07/2022
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC12/06/2022
DOB NOWFoundationSigned-offMK CONTRACTING GROUP INC08/04/2022
DOB NOWMechanical SystemsSigned-offCOOLQUEST MECHANICAL INC07/25/2022
DOB NOWMechanical SystemsSigned-offCOOLQUEST MECHANICAL INC04/08/2022
DOB NOWGeneral ConstructionPermit IssuedMK CONTRACTING GROUP INC03/31/2022
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC12/03/2021
DOB NOWGeneral ConstructionSigned-offMK CONTRACTING GROUP INC11/26/2021
1 project · most recent 04/11/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/11/2024Permit IssuedMK CONTRACTING GROUP INCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MUZ-FS18NAH 18,000 BTU OUTDOOR CONDENSING UNIT 21,000 BTU · Condensing Unit ×1
MXZ-2C20NAHZ 20,000 BTU OUTDOOR CONDENSING UNIT 20,000 BTU · Vrf Outdoor ×1
MXZ-3C24NAHZ 23,600 BTU OUTDOOR CONDENSING UNIT 23,600 BTU · Condensing Unit ×1
MXZ-3C24NAHZ2 24,000 BTU · Condensing Unit ×10
NTXSPB18A112AA 18,000 BTU · Condensing Unit ×5
1 project · most recent 04/01/2022
General Wiring
FiledStatusContractorScope
04/01/2022CompleteDENMAR ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
11/18/2024Pass-Final CND-Occupancy InspectionPassView ↗
01/31/2024Pass-Final CND-Occupancy InspectionPassView ↗
01/29/2024Pass-Final CND-Occupancy InspectionPassView ↗
02/27/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/23/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/23/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/23/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/28/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/28/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/20/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
04/22/2024Fire-Resistant Penetrations and JointsCARL HAMANNspecial
04/22/2024Permanent certificateCARL HAMANNenergy_progress
04/22/2024Fenestration areasCARL HAMANNenergy_progress
04/22/2024Fenestration air leakageCARL HAMANNenergy_progress
04/22/2024Air barrier - visual inspectionCARL HAMANNenergy_progress
04/22/2024Fenestration and door U-factor and product ratingsCARL HAMANNenergy_progress
04/22/2024Interior lighting powerCARL HAMANNenergy_progress
04/22/2024Energy Code Compliance InspectionsCARL HAMANNprogress
04/22/2024Concrete - Cast-In-PlaceCARL HAMANNspecial
03/01/2024HVAC-R and service water heating equipmentCARL HAMANNenergy_progress
03/01/2024Maintenance informationCARL HAMANNenergy_progress
03/01/2024Mechanical SystemsCARL HAMANNspecial
03/01/2024FinalCARL HAMANNprogress
03/01/2024Energy Code Compliance InspectionsCARL HAMANNprogress
03/01/2024HVAC-R and service water piping design and insulationCARL HAMANNenergy_progress
03/01/2024HVAC-R and service water heating system controlsCARL HAMANNenergy_progress
02/19/2024HVAC-R and service water heating equipmentCARL HAMANNenergy_progress
02/19/2024Mechanical SystemsCARL HAMANNspecial
02/19/2024Energy Code Compliance InspectionsCARL HAMANNprogress
02/19/2024FinalCARL HAMANNprogress
02/19/2024HVAC-R and service water piping design and insulationCARL HAMANNenergy_progress
02/19/2024Maintenance informationCARL HAMANNenergy_progress
02/19/2024HVAC-R and service water heating system controlsCARL HAMANNenergy_progress
02/22/2023Fire-Resistant Penetrations and JointsCARL HAMANNspecial
02/22/2023Sprinkler SystemsCARL HAMANNspecial
Latest 25 of 43.
▾Documents — 81 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/27/2026Q00631750-P1Request digital key ↗
08/27/2026Q00631750-I1Request digital key ↗
08/26/2026Q00718952-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00655352-I1Open ↗
▸Seals & Professional Certifications45
▸DOB NOWProgress Inspector Seal & Signature19
09/06/2026Q00655352-P3Open ↗
09/06/2026Q00655352-P3Open ↗
08/31/2026Q00631750-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/27/2026Q00631750-I1Open ↗
08/26/2026Q00718952-I1Open ↗
08/23/2026Q00655352-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/26/2026Q00631765-I1Open ↗
09/06/2026Q00655352-P3Open ↗
09/01/2026Q00631765-P2Open ↗
Showing 3 of 12 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/23/2026Q00655352-P4Open ↗
08/15/2026Q00655352-I1Open ↗
08/15/2026Q00655352-P2Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
08/27/2026Q00631750-I1Open ↗
08/26/2026Q00718952-I1Open ↗
08/23/2026Q00655352-P4Open ↗
Showing 3 of 14 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026Q00655352-I1Open ↗
08/13/2026Q00631750-I1Open ↗
▸Other Documents2
▸DOB NOWFinal Survey1
08/13/2026Q00655352-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00718952-I1Open ↗