← Back
One family attached or semi-detached
68 ST JAMES PLACE
BROOKLYN · BIN 3055523
💬 Discuss this project
1869Year Built
3Stories
A5Building Class
R6BZoning
2,240 sfGross Floor Area
1Units
One family attached or semi-detached · 980 sf lot · 2.29 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof5p · 1 filing · 20 docs
Floor 33p · 1 filing · 20 docs
Floor 22p · 1 filing · 20 docs
Floor 13p · 1 filing · 20 docs
Cellar10p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/12/2022$1.8M—Private party → Private party$792/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ANAT SOUDRY ARCHITECT507/17/2023
BARRY STRUCTURAL ENGINEERING, PLLC207/05/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JOSEPH FELLNER703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BNH CONSTRUCTION NY INCGeneral Contractor507/08/2026
CATMAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
O'ROURKE ENGINEERING, LLC5873207/17/2023
RYAN SPECIAL ENGINEERING2018207/17/2023
BARRY STRUCTURAL ENGINEER749307/05/2023
Building Lifecycle
All (56)Filed (7)Permit Issued (4)Signed Off (3)Inspection (4)Objection (8)Special Inspection (30)
07/29/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/17/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
10/03/2023
Signed off — Alteration
NEW HVAC SPLIT SYSTEM AND BATHROOM EXHAUSTS.
B00711743-S3
08/29/2023
Signed off — Alteration
NEW HVAC SPLIT SYSTEM AND BATHROOM EXHAUSTS.
B00711743-S1
07/26/2023
Objection resolved — Addressed
07/26/2023
Special inspection requirement — Structural Steel - High Strength Bolting
MICHAEL BARRY
07/26/2023
Special inspection requirement — Final
MICHAEL BARRY
07/26/2023
Special inspection requirement — Structural Steel - Details
MICHAEL BARRY
07/26/2023
Special inspection requirement — Structural Steel - Welding
MICHAEL BARRY
07/26/2023
Special inspection requirement — Concrete - Cast-In-Place
MICHAEL BARRY
07/24/2023
Special inspection requirement — Final
William Ryan
07/24/2023
Special inspection requirement — Energy Code Compliance Inspections
Anat Soudry
07/24/2023
Special inspection requirement — Mechanical Systems
William Ryan
07/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN O'ROURKE
07/24/2023
Special inspection requirement — Post-installed Anchors
BRIAN O'ROURKE
07/24/2023
Special inspection requirement — Maintenance information
Anat Soudry
07/24/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Anat Soudry
07/24/2023
Special inspection requirement — HVAC-R and service water heating equipment
Anat Soudry
07/24/2023
Special inspection requirement — HVAC-R and service water heating system controls
Anat Soudry
07/17/2023
Filed — Alteration
NEW HVAC SPLIT SYSTEM AND BATHROOM EXHAUSTS.
B00711743-P3
07/10/2023
Signed off — Alteration
NEW HVAC SPLIT SYSTEM AND BATHROOM EXHAUSTS.
B00711743-S4
07/07/2023
Special inspection requirement — Post-installed Anchors
BRIAN O'ROURKE
07/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN O'ROURKE
07/07/2023
Special inspection requirement — Mechanical Systems
William Ryan
07/07/2023
Special inspection requirement — Energy Code Compliance Inspections
Anat Soudry
07/07/2023
Special inspection requirement — Final
William Ryan
07/07/2023
Special inspection requirement — HVAC-R and service water heating system controls
Anat Soudry
07/07/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Anat Soudry
07/07/2023
Special inspection requirement — HVAC-R and service water heating equipment
Anat Soudry
07/07/2023
Special inspection requirement — Maintenance information
Anat Soudry
07/06/2023
Objection raised — Structural
07/05/2023
Filed — Alteration
NEW HVAC SPLIT SYSTEM AND BATHROOM EXHAUSTS.
B00711743-P2
06/09/2023
Special inspection requirement — Concrete - Cast-In-Place
MICHAEL BARRY
06/09/2023
Special inspection requirement — Final
MICHAEL BARRY
06/09/2023
Special inspection requirement — Structural Steel - Welding
MICHAEL BARRY
06/09/2023
Special inspection requirement — Structural Steel - High Strength Bolting
MICHAEL BARRY
06/09/2023
Special inspection requirement — Structural Steel - Details
MICHAEL BARRY
04/20/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Anat Soudry
04/20/2023
Special inspection requirement — HVAC-R and service water heating equipment
Anat Soudry
04/19/2023
Filed — Alteration
NEW HVAC SPLIT SYSTEM AND BATHROOM EXHAUSTS.
B00711743-P1
01/11/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/11/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/08/2022
Permit issued — Plumbing
B00711743-S4-PL
12/06/2022
Filed — Alteration
NEW HVAC SPLIT SYSTEM AND BATHROOM EXHAUSTS.
B00711743-S4
10/18/2022
Permit issued — Mechanical Systems
B00711743-S3-MS
10/12/2022
Permit issued — General Construction
B00711743-I1-GC
10/04/2022
Permit issued — Structural
B00711743-S1-ST
06/22/2022
Filed — Alteration
NEW HVAC SPLIT SYSTEM AND BATHROOM EXHAUSTS.
B00711743-S3
05/23/2022
Objection raised — Admin
05/23/2022
Objection resolved — Addressed
05/23/2022
Objection raised — Structural
05/23/2022
Objection resolved — Addressed
05/23/2022
Objection raised — Structural
05/23/2022
Objection resolved — Addressed
05/13/2022
Filed — Alteration
NEW HVAC SPLIT SYSTEM AND BATHROOM EXHAUSTS.
B00711743-S1
05/03/2022
Filed — Alteration
NEW HVAC SPLIT SYSTEM AND BATHROOM EXHAUSTS.
B00711743-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC12/08/2022
DOB NOWMechanical SystemsSigned-offBNH CONSTRUCTION NY INC10/18/2022
DOB NOWGeneral ConstructionPermit IssuedBNH CONSTRUCTION NY INC10/12/2022
DOB NOWStructuralSigned-offBNH CONSTRUCTION NY INC10/04/2022
1 project · most recent 07/17/2023
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/17/2023Signed-offBNH CONSTRUCTION NY INCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM48NAMHZ 4 tons · Heat Pump Outdoor ×1
1 project · most recent 07/17/2023
Gas Water/Sanitary
FiledStatusContractorScope
07/17/2023Signed-offCATMAN PLUMBING INCGas, Water/Sanitary
1 project · most recent 11/29/2022
General Wiring
FiledStatusContractorScope
11/29/2022CompleteERIC & NG ELEC'L, INC.General Wiring
1 project · most recent 07/17/2023
Steel Concrete
FiledStatusContractorScope
07/17/2023Signed-offCATMAN PLUMBING INCSteel, Concrete
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/29/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/17/2024Fail-Final CND-Occupancy InspectionFailView ↗
01/11/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/11/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
07/26/2023Structural Steel - High Strength BoltingMICHAEL BARRYspecial
07/26/2023FinalMICHAEL BARRYprogress
07/26/2023Structural Steel - DetailsMICHAEL BARRYspecial
07/26/2023Structural Steel - WeldingMICHAEL BARRYspecial
07/26/2023Concrete - Cast-In-PlaceMICHAEL BARRYspecial
07/24/2023FinalWilliam Ryanprogress
07/24/2023Energy Code Compliance InspectionsAnat Soudryprogress
07/24/2023Mechanical SystemsWilliam Ryanspecial
07/24/2023Fire-Resistant Penetrations and JointsBRIAN O'ROURKEspecial
07/24/2023Post-installed AnchorsBRIAN O'ROURKEspecial
07/24/2023Maintenance informationAnat Soudryenergy_progress
07/24/2023HVAC-R and service water piping design and insulationAnat Soudryenergy_progress
07/24/2023HVAC-R and service water heating equipmentAnat Soudryenergy_progress
07/24/2023HVAC-R and service water heating system controlsAnat Soudryenergy_progress
07/07/2023Post-installed AnchorsBRIAN O'ROURKEspecial
07/07/2023Fire-Resistant Penetrations and JointsBRIAN O'ROURKEspecial
07/07/2023Mechanical SystemsWilliam Ryanspecial
07/07/2023Energy Code Compliance InspectionsAnat Soudryprogress
07/07/2023FinalWilliam Ryanprogress
07/07/2023HVAC-R and service water heating system controlsAnat Soudryenergy_progress
07/07/2023HVAC-R and service water piping design and insulationAnat Soudryenergy_progress
07/07/2023HVAC-R and service water heating equipmentAnat Soudryenergy_progress
07/07/2023Maintenance informationAnat Soudryenergy_progress
06/09/2023Concrete - Cast-In-PlaceMICHAEL BARRYspecial
06/09/2023FinalMICHAEL BARRYprogress
Latest 25 of 42.
▾Documents — 64 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/28/2026B00711743-S4Request digital key ↗
08/28/2026B00711743-P1Request digital key ↗
08/28/2026B00711743-P3Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits7
▸DOB NOWLPC Approval/Permit7
08/28/2026B00711743-S4Open ↗
08/28/2026B00711743-S3Open ↗
08/15/2026B00711743-S1Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications42
▸DOB NOWProgress Inspector Seal & Signature20
09/01/2026B00711743-P3Open ↗
09/01/2026B00711743-P3Open ↗
09/01/2026B00711743-P3Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/01/2026B00711743-P3Open ↗
09/01/2026B00711743-P3Open ↗
09/01/2026B00711743-P3Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/28/2026B00711743-S4Open ↗
08/28/2026B00711743-S3Open ↗
08/28/2026B00711743-S1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/28/2026B00711743-S4Open ↗
08/28/2026B00711743-S3Open ↗
08/15/2026B00711743-S1Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00711743-S3Open ↗