BuildNYC
Elevator apt, fireproof without stores
Throggs Neck Addition (NYCHA)
680 BALCOM AVENUE · BIN 2091488
💬 Discuss this project
1971Year Built
7Stories
D3Building Class
R4Zoning
321,300 sfGross Floor Area
220Units
LL97 CoveredRent Stabilized7 Active Violations 4 unresolved · 3 paperwork only 6 old, status unconfirmed ▸FISP: SWARMP
Elevator apt, fireproof without stores · Owner of record: NYC Housing Authority · 503,000 sf lot · 0.64 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofRoofing Replacement and Rooftop Structure RenovationUnder Construction32p · 3 filings · 20 docs
BulkheadRoofing Replacement and Rooftop Structure RenovationUnder Construction6p · 1 filing · 18 docs
Floor 1NYC Housing Authority13p · 2 filings · 20 docs
CellarNYC Housing Authority1p · 1 filing · 3 docs
Site & exteriorTemporary sidewalk shed installation for NYCHA Throggs Neck Under Construction14p · 3 filings · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority4210/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STV309/09/2026
HD Group506/03/2026
Superstructures Engineering + Architects104/04/2022
New York & Company301/14/2021
Arup111/01/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
New York & Company603/21/2026
Superstructures Engineering + Architects103/21/2026
Aristar Group603/21/2026
AK Consulting Services203/21/2026
Dennis Kim203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Bhaghiana General ConstructionScaffold207/08/2026
L.L.G. Plumbing & HeatingPlumbing207/08/2026
Gemini ElevatorElectrical103/21/2026
Bhaghiana General ConstructionGeneral Contractor104/09/2026
WDFGeneral Contractor107/08/2026
MNK EnterprisesScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Bureau Veritas Na6902309/09/2026
AK Consulting Services, I6198111/26/2023
New York Engineering Associates851301/14/2021
Universal Testing and Ins400111/01/2019
Building Lifecycle
All (105)Filed (15)Permit Issued (14)Signed Off (1)Facade (FISP) (13)Violation (29)Inspection (1)Objection (2)Special Inspection (30)
09/09/2026
Filed — Alteration
FILING FOR ROOF REPLACEMENT WORK AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY OR USE.
X01085425-P2
09/02/2026
Special inspection requirement — Insulation placement and R values
IBRAHIM MOURAD
09/02/2026
Special inspection requirement — Tenant Protection Plan Compliance
09/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
09/02/2026
Special inspection requirement — Masonry
IBRAHIM MOURAD
09/02/2026
Special inspection requirement — Post-installed Anchors
IBRAHIM MOURAD
09/02/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
IBRAHIM MOURAD
09/02/2026
Special inspection requirement — Energy Code Compliance Inspections
IBRAHIM MOURAD
09/02/2026
Special inspection requirement — Final
IBRAHIM MOURAD
09/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
IBRAHIM MOURAD
09/02/2026
Special inspection requirement — Fenestration air leakage
IBRAHIM MOURAD
09/02/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
IBRAHIM MOURAD
06/03/2026
Filed — Alteration
NYCHA THROGGS NECK ADDITION, BLD. #30 - INSTALLATION OF +/-25 FEET HIGH X +/- 163 FEET LONG TEMPORARY SUPPORTED SCAFFOLDING ON THE ROOF LEVEL, AS PER PLANS, FOR BULKHEAD ROOF REPLACEMENT WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01351134-P1
05/27/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/06/2026
Filed — Alteration
NYCHA THROGGS NECK ADDITION, BLD. #30 - INSTALLATION OF APPROXIMATELY +/- 427 LF TEMPORARY HEAVY DUTY SIDEWALK SHED, AS PER PLANS, FOR ROOFING REPLACEMENT PROJECT. THERE WILL BE NO CHANGE TO BUILDING USE, EGRESS OR OCCUPANCY.
X01299348-P1
03/11/2026
Filed — Alteration
FILING FOR ROOF REPLACEMENT WORK AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY OR USE.
X01085425-P1
03/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
03/11/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
IBRAHIM MOURAD
03/11/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/11/2026
Special inspection requirement — Masonry
IBRAHIM MOURAD
03/11/2026
Special inspection requirement — Post-installed Anchors
IBRAHIM MOURAD
03/11/2026
Special inspection requirement — Fire-Resistance Rated Construction
IBRAHIM MOURAD
03/11/2026
Special inspection requirement — Final
IBRAHIM MOURAD
03/11/2026
Special inspection requirement — Energy Code Compliance Inspections
IBRAHIM MOURAD
03/11/2026
Special inspection requirement — Insulation placement and R values
IBRAHIM MOURAD
03/11/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
IBRAHIM MOURAD
03/11/2026
Special inspection requirement — Fenestration air leakage
IBRAHIM MOURAD
03/09/2026
Special inspection requirement — Insulation placement and R values
IBRAHIM MOURAD
03/09/2026
Special inspection requirement — Masonry
IBRAHIM MOURAD
03/09/2026
Special inspection requirement — Post-installed Anchors
IBRAHIM MOURAD
03/09/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
IBRAHIM MOURAD
03/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
03/09/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/09/2026
Special inspection requirement — Energy Code Compliance Inspections
IBRAHIM MOURAD
03/09/2026
Special inspection requirement — Final
IBRAHIM MOURAD
03/04/2026
Permit issued — General Construction
X01085425-I1-GC-CX
01/27/2026
Filed — Alteration
NYCHA THROGGS NECK ADDITION, BLD. #30 - INSTALLATION OF +/-25 FEET HIGH X +/- 163 FEET LONG TEMPORARY SUPPORTED SCAFFOLDING ON THE ROOF LEVEL, AS PER PLANS, FOR BULKHEAD ROOF REPLACEMENT WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01351134-I1
01/27/2026
Permit issued — Supported Scaffold
X01351134-I1-SF
01/27/2026
Permit issued — Sidewalk Shed
X01299348-I1-SH
01/27/2026
Permit issued — Construction Fence
X01299357-I1-FN
01/26/2026
Filed — Alteration
NYCHA THROGGS NECK ADDITION, BLD. #30 - INSTALLATION OF APPROXIMATELY +/- 427 LF TEMPORARY HEAVY DUTY SIDEWALK SHED, AS PER PLANS, FOR ROOFING REPLACEMENT PROJECT. THERE WILL BE NO CHANGE TO BUILDING USE, EGRESS OR OCCUPANCY.
X01299348-I1
01/26/2026
Filed — Alteration
NYCHA THROGGS NECK ADDITION, BLD. #30 - INSTALLATION OF +/-1489 LF OF 8'-0"H TEMPORARY CHAIN LINK CONSTRUCTION FENCE, AS PER PLANS, FOR ROOFING REPLACEMENT PROJECT. THERE WILL BE NO CHANGE IN BUILDINGG USE, EGRESS OR OCCUPANCY.
X01299357-I1
12/24/2025
Permit issued — Suspended Scaffold
X01334437-I1-SC
12/16/2025
Filed — Alteration
INSTALLATION OF MATERIAL SWING HOIST.
X01334437-I1
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/20/2025
Cycle 10 facade report submitted
10/16/2025
Cycle 10 facade report signed — UNSAFE
10/01/2025
Cycle 10 facade inspection completed
11/26/2024
Cycle 9 facade report signed — SWARMP
11/20/2024
Cycle 9 facade report submitted
11/07/2024
Cycle 9 facade inspection completed
10/22/2024
Permit issued — Suspended Scaffold
X00967357-I1-SC
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/14/2024
Filed — Alteration
FILING FOR ROOF REPLACEMENT WORK AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY OR USE.
X01085425-I1
04/11/2024
Violation issued (ECB, closed)
Local Law
12/08/2023
Permit issued — Suspended Scaffold
X00967357-I1-SC
12/07/2023
Objection raised — Other
12/07/2023
Objection resolved — Addressed
Latest 60 of 105 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBhaghiana General Construction03/04/2026
DOB NOWSupported ScaffoldPermit IssuedBhaghiana General Construction01/27/2026
DOB NOWSidewalk ShedPermit IssuedMNK Enterprises01/27/2026
DOB NOWConstruction FencePermit IssuedBhaghiana General Construction01/27/2026
DOB NOWSuspended ScaffoldPermit IssuedBlue Tech Construction NY12/24/2025
DOB NOWSuspended ScaffoldPermit IssuedWall Contractor10/22/2024
DOB NOWSuspended ScaffoldPermit IssuedWall Contractor12/08/2023
DOB NOWGeneral ConstructionPermit IssuedWDF04/20/2022
DOB NOWPlumbingSigned-offL.L.G. Plumbing & Heating03/25/2021
DOB NOWBoiler EquipmentSigned-offNational Grid Energy Management02/08/2021
DOB NOWBoiler EquipmentSigned-offNational Grid Energy Management12/23/2020
DOB NOWBoiler EquipmentSigned-offNational Grid Energy Management06/11/2020
DOB NOWPlumbingSigned-offL.L.G. Plumbing & Heating03/11/2020
DOB NOWBoiler EquipmentSigned-offNational Grid Energy Management01/30/2020
BISEQISSUEDRoma Scaffolding04/10/2015
BISOTISSUEDRoma Scaffolding02/11/2015
BISOTISSUEDRoma Scaffolding01/29/2015
BISEQISSUEDRoma Scaffolding01/12/2015
BISEQISSUEDRoma Scaffolding12/26/2014
BISEQISSUEDAMC United07/16/2012
BISEQISSUEDZoria Housing11/17/2011
BISOTISSUEDZoria Housing11/09/2011
BISEQISSUEDZoria Housing11/09/2011
BISOTISSUEDZoria Housing09/14/2011
BISEQISSUEDZoria Housing08/03/2011
BISEQISSUEDZoria Housing08/03/2011
BISEQISSUEDZoria Housing04/19/2011
BISEQISSUEDZoria Housing11/08/2010
BISOTISSUEDNap Construction Co11/01/2000
BISPLRE-ISSUEDCape Plumbing09/06/2000
1 project · most recent 11/01/2019
Storm
FiledStatusContractorScope
11/01/2019Signed-offLLG P, H, Triumph ConstructionStorm
1 project · most recent 10/01/2025
FiledStatusContractorScope
10/01/2025Permit IssuedAujla Electric—
1 project · most recent 09/09/2026
Concrete Masonry
FiledStatusContractorScope
09/09/2026Permit IssuedBhaghiana General ConstructionConcrete, Masonry
3 projects · most recent 06/03/2026
Scaffold Sidewalk Shed Fence
FiledStatusContractorScope
06/03/2026Permit IssuedBhaghiana General ConstructionScaffold
05/06/2026Permit IssuedMNK EnterprisesSidewalk Shed
01/26/2026Permit IssuedBhaghiana General ConstructionFence
2 projects · most recent 12/16/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
12/16/2025Permit IssuedBlue Tech Construction NYSuspended Scaffold (SC)
11/26/2023Permit IssuedWall ContractorSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
05/27/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
09/02/2026Insulation placement and R valuesIBRAHIM MOURADenergy_progress
09/02/2026Tenant Protection Plan Compliance—special
09/02/2026Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
09/02/2026MasonryIBRAHIM MOURADspecial
09/02/2026Post-installed AnchorsIBRAHIM MOURADspecial
09/02/2026Structural Stability – Alterations of existing buildingsIBRAHIM MOURADspecial
09/02/2026Energy Code Compliance InspectionsIBRAHIM MOURADprogress
09/02/2026FinalIBRAHIM MOURADprogress
09/02/2026Fire-Resistance Rated ConstructionIBRAHIM MOURADprogress
09/02/2026Fenestration air leakageIBRAHIM MOURADenergy_progress
09/02/2026Fenestration and door U-factor and product ratingsIBRAHIM MOURADenergy_progress
03/11/2026Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
03/11/2026Structural Stability – Alterations of existing buildingsIBRAHIM MOURADspecial
03/11/2026Tenant Protection Plan Compliance—special
03/11/2026MasonryIBRAHIM MOURADspecial
03/11/2026Post-installed AnchorsIBRAHIM MOURADspecial
03/11/2026Fire-Resistance Rated ConstructionIBRAHIM MOURADprogress
03/11/2026FinalIBRAHIM MOURADprogress
03/11/2026Energy Code Compliance InspectionsIBRAHIM MOURADprogress
03/11/2026Insulation placement and R valuesIBRAHIM MOURADenergy_progress
03/11/2026Fenestration and door U-factor and product ratingsIBRAHIM MOURADenergy_progress
03/11/2026Fenestration air leakageIBRAHIM MOURADenergy_progress
03/09/2026Insulation placement and R valuesIBRAHIM MOURADenergy_progress
03/09/2026MasonryIBRAHIM MOURADspecial
03/09/2026Post-installed AnchorsIBRAHIM MOURADspecial
Latest 25 of 50.
▾Documents — 221 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch10
08/24/2026X00701716-I1Request digital key ↗
08/22/2026X00967357-I1Request digital key ↗
08/17/2026X01334437-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment3
08/26/2026X00346705-I1Request digital key ↗
08/15/2026X00346705-P1Request digital key ↗
08/15/2026X00226172-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/15/2026X00256981-I1Request digital key ↗
▸Applications & Permits26
▸BISPLAN / WORK APPROVAL APPLICATION13
04/08/2015240095106Open ↗
03/03/2015240085448Open ↗
03/02/2015240085448Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION13
04/08/2015240095106Open ↗
02/24/2015240086116Open ↗
01/29/2015240086116Open ↗
Showing 3 of 13 on file for this type
▸Seals & Professional Certifications87
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION23
12/23/2015240086116Open ↗
12/23/2015240086116Open ↗
12/23/2015240086116Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
10/14/2026X01085425-P2Open ↗
10/14/2026X01085425-P2Open ↗
09/23/2026X00346705-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
10/14/2026X01085425-P2Open ↗
08/26/2026X00226172-I1Open ↗
08/26/2026X00256981-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
10/14/2026X01085425-P2Open ↗
09/23/2026X00346705-I1Open ↗
09/23/2026X00346705-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
09/13/2012220040818Open ↗
07/12/2012220196918Open ↗
05/25/2012220091479Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
09/13/2012220040818Open ↗
07/12/2012220196918Open ↗
05/25/2012220091479Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
04/08/2015240095106Open ↗
01/15/2015240086116Open ↗
01/04/2015240086349Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
04/08/2015240095106Open ↗
01/15/2015240086116Open ↗
01/04/2015240086349Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
04/08/2015240095106Open ↗
01/15/2015240086116Open ↗
01/04/2015240086349Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos9
▸BISDEP ASBESTOS PROJECT COMPLETION FORM3
05/14/2012220040818Open ↗
05/14/2012220040818Open ↗
05/14/2012220040818Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
04/08/2015240095106Open ↗
01/15/2015240086116Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
11/08/2010220091479Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)1
09/16/2011220040818Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
04/20/2011220115211Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/24/2026X00701716-I1Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
12/31/2015240086116Open ↗
12/24/2015240086116Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
01/29/2015240086116Open ↗
01/15/2015240086116Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
12/24/2014240085448Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/23/2015240086116Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
01/15/2015240086116Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X00226172-I1Open ↗
▸Inspections & Test Reports7
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)4
04/08/2015240095106Open ↗
01/15/2015240086116Open ↗
01/04/2015240086349Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY3
01/29/2015240086116Open ↗
01/15/2015240086116Open ↗
12/24/2014240085448Open ↗
▸Approvals, Objections & Sign-offs47
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter14
10/14/2026X01085425-P2Open ↗
08/17/2026X01085425-I1Open ↗
08/16/2026X01299348-P1Open ↗
Showing 3 of 14 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
12/31/2015240086116Open ↗
12/23/2015240086116Open ↗
11/10/2015240086349Open ↗
Showing 3 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
12/23/2015240086116Open ↗
11/10/2015240086349Open ↗
11/10/2015240085448Open ↗
Showing 3 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
07/12/2012220196918Open ↗
04/20/2011220115211Open ↗
11/08/2010220091479Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)3
08/13/2026X00346705-P1Open ↗
08/13/2026X00226172-I1Open ↗
08/13/2026X00346705-I1Open ↗
▸BISSUPERSEDING LETTER2
05/25/2012220091479Open ↗
05/25/2012220115211Open ↗
▸BISBSA-CPC APPROVAL2
04/26/2011220115211Open ↗
11/08/2010220091479Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026X01085425-I1Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
12/23/2015240086116Open ↗
01/15/2015240086116Open ↗
09/13/2012220040818Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms13
▸BISADDITIONAL INFORMATION5
03/03/2015240085448Open ↗
03/02/2015240085448Open ↗
09/13/2012220040818Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
04/08/2015240095106Open ↗
01/15/2015240086116Open ↗
01/04/2015240086349Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET4
07/12/2012220196918Open ↗
04/20/2011220115211Open ↗
11/08/2010220091479Open ↗
Showing 3 of 4 on file for this type
▸Other Documents5
▸DOB NOWManufacturer's Specifications2
08/13/2026X01334437-I1Open ↗
08/13/2026X00967357-I1Open ↗
▸DOB NOWCalculations2
08/13/2026X01334437-I1Open ↗
08/13/2026X00967357-I1Open ↗
▸BISFEE EXEMPTION DOCUMENTATION1
01/15/2015240086116Open ↗