BuildNYC
Elevator apt, semi-fireproof with stores
Paseo on Fifth
680 BALTIC STREET · Park Slope · BIN 3423993
💬 Discuss this project
2023Year Built
6Stories
D7Building Class
R6AZoning
265,855 sfGross Floor Area
182Units
Rent Stabilized2 Active Violations ▸FDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: 120 JV Acq · 70,008 sf lot · 3.8 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofWilliam Macklowe Company27p · 3 filings · 20 docs
Floor 6William Macklowe Company13p · 2 filings · 7 docs
Floor 5William Macklowe Company24p · 2 filings · 7 docs
Floor 4William Macklowe Company24p · 2 filings · 7 docs
Floor 3William Macklowe Company24p · 2 filings · 7 docs
Floor 2Supreme Fitness GroupUnder Construction33p · 4 filings · 20 docs
Floor 1Supreme Fitness Group, LidlUnder Construction156p · 13 filings · 20 docs
CellarSupreme Fitness Group, LidlUnder Construction142p · 9 filings · 20 docs
Sub-CellarWilliam Macklowe Company15p · 1 filing · 5 docs
BasementSupreme Fitness GroupUnder Construction1p · 1 filing · 20 docs
Site & exteriorRussian School of Mathematics, Wells FargoUnder Construction18p · 13 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
William Macklowe Company6710/13/2026
FM Construction Group907/08/2026
120 JV Acq LLC C Omacklowe M903/21/2026
120 5Ave9 Owner803/21/2026
120 JV Acq403/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/24/2020$59.4M—120 5AVE9 OWNER, LLC → 120 JV ACQ LLC— not available
03/24/2017$45.7M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Codegreen1103/21/2026
EC Building Consultants1203/21/2026
D R Brown1203/21/2026
SBLM903/21/2026
Louis Striar403/21/2026
Rigid Structural Design203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Schimenti Construction CoGeneral Contractor707/08/2026
N.Y. Sign ArtSign hanger607/08/2026
FM Construction GroupScaffold507/08/2026
Source ConstructionGeneral Contractor507/08/2026
Republic Scaffold & HoistScaffold407/08/2026
Tristate Fire SprinklersFire Protection407/08/2026
GFX Site DevelopmentGeneral Contractor404/09/2026
Headquarters MechanicalPlumbing307/08/2026
Paul SignsSign hanger207/10/2026
Spectrum on Broadway-ElectricElectrical203/22/2026
Ultimate Signs & Designs CoSign hanger207/08/2026
Ultimate Signs & ElectricElectrical103/22/2026
American Standard PlumbingFire Protection108/21/2026
GM RemodelingGeneral Contractor107/29/2026
KSP PlumbingPlumbing108/20/2026
MPS Plumbing & HeatingFire Protection107/08/2026
MPS Plumbing & HeatingPlumbing107/08/2026
Sean Coakley P & HFire Protection107/08/2026
Shaw MechanicalPlumbing107/08/2026
Difazio Electric NYElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Winton Group Architecture4343308/31/2026
Broadway Inspections8735205/29/2026
American Construction Tes9731805/21/2026
Whitestone Associates Engineering81441009/16/2025
Socotec Engineering4983704/25/2025
Langan Engineering, Env, Surveyin1265112/17/2021
Building Lifecycle
All (257)Filed (53)Permit Issued (42)Signed Off (18)Violation (10)Inspection (21)Objection (80)Special Inspection (30)Tax Incentive (3)
08/31/2026
Filed — Alteration
SP HEADS FILED IN CONJUNCTION WITH GC/MH AND PL WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01402699-P1
08/20/2026
Permit issued — Sprinklers
B01402699-S2-EW-SP
08/19/2026
Permit issued — Plumbing
B01402699-S1-PL
08/14/2026
Special inspection requirement — Interior lighting power
Vladimir Kaushansky
08/14/2026
Special inspection requirement — Lighting controls
Vladimir Kaushansky
08/14/2026
Special inspection requirement — Final
Vladimir Kaushansky
08/14/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/14/2026
Special inspection requirement — Mechanical Systems
Vladimir Kaushansky
08/03/2026
Objection resolved — Addressed
08/03/2026
Objection resolved — Addressed
08/03/2026
Objection resolved — Addressed
08/03/2026
Objection resolved — Addressed
07/28/2026
Permit issued — General Construction
B01402699-I1-GC-CX
07/15/2026
421-a(16) construction completed
07/08/2026
Permit issued — Sign
B01415839-I1-SG
07/08/2026
Permit issued — Sign
B01415865-I1-SG
07/02/2026
Filed — Alteration
INSTALL EXTERIOR ILLUMINATED WALL SIGN ( RUSSIAN SCHOOL OF MATH)
B01415865-I1
07/02/2026
Filed — Alteration
INSTALL EXTERIOR ILLUMINATED WALL SIGN ( RUSSIAN SCHOOL OF MATH)
B01415839-I1
06/29/2026
Objection resolved — Resolved
06/29/2026
Objection resolved — Resolved
06/29/2026
Objection resolved — Resolved
06/29/2026
Objection resolved — Resolved
06/17/2026
Objection raised — Other
06/17/2026
Objection resolved — Resolved
06/17/2026
Objection resolved — Addressed
06/17/2026
Objection resolved — Addressed
06/17/2026
Objection resolved — Addressed
06/17/2026
Objection resolved — Resolved
06/17/2026
Objection resolved — Addressed
06/17/2026
Objection resolved — Addressed
06/12/2026
Objection raised — Other
06/12/2026
Objection raised — Cost
06/12/2026
Objection raised — Other
06/12/2026
Objection raised — Other
06/12/2026
Objection raised — Structural
06/12/2026
Objection raised — Other
06/12/2026
Objection raised — Other
06/12/2026
Objection raised — Other
06/12/2026
Objection raised — Other
06/12/2026
Objection raised — Other
06/12/2026
Objection raised — Other
06/12/2026
Objection raised — Other
06/12/2026
Objection raised — Cost
06/12/2026
Objection raised — Other
06/11/2026
Special inspection requirement — Final
LEON SKVIRSKY
06/11/2026
Special inspection requirement — Final
LEON SKVIRSKY
06/05/2026
Special inspection requirement — Fire-Resistance Rated Construction
EDWIN HOPKINS
06/05/2026
Special inspection requirement — Interior lighting power
EDWIN HOPKINS
06/05/2026
Special inspection requirement — Final
EDWIN HOPKINS
06/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWIN HOPKINS
06/05/2026
Special inspection requirement — Lighting controls
EDWIN HOPKINS
06/05/2026
Special inspection requirement — Energy Code Compliance Inspections
EDWIN HOPKINS
05/29/2026
Filed — Alteration
SP HEADS FILED IN CONJUNCTION WITH GC/MH AND PL WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01402699-I1
05/29/2026
Filed — Alteration
SP HEADS FILED IN CONJUNCTION WITH GC/MH AND PL WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01402699-S1
05/29/2026
Filed — Alteration
SP HEADS FILED IN CONJUNCTION WITH GC/MH AND PL WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01402699-S2
05/29/2026
Special inspection requirement — Tenant Protection Plan Compliance
Salvatore Chiarelli
05/29/2026
Special inspection requirement — Sprinkler Systems
EDWIN HOPKINS
05/29/2026
Special inspection requirement — HVAC-R and service water heating system controls
EDWIN HOPKINS
05/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWIN HOPKINS
05/29/2026
Special inspection requirement — HVAC-R and service water heating equipment
EDWIN HOPKINS
Latest 60 of 257 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedAmerican Standard Plumbing08/20/2026
DOB NOWPlumbingPermit IssuedKSP Plumbing08/19/2026
DOB NOWGeneral ConstructionPermit IssuedGM Remodeling07/28/2026
DOB NOWSignPermit IssuedPaul Signs07/08/2026
DOB NOWSignPermit IssuedPaul Signs07/08/2026
DOB NOWSprinklersPermit IssuedMPS Plumbing & Heating03/03/2026
DOB NOWGeneral ConstructionPermit IssuedGFX Site Development02/27/2026
DOB NOWMechanical SystemsPermit IssuedGFX Site Development02/27/2026
DOB NOWPlumbingPermit IssuedMPS Plumbing & Heating02/24/2026
DOB NOWStructuralPermit IssuedGFX Site Development02/10/2026
DOB NOWGeneral ConstructionPermit IssuedGFX Site Development02/03/2026
DOB NOWSignSigned-offUltimate Signs & Designs Co08/14/2025
DOB NOWSignSigned-offUltimate Signs & Designs Co08/14/2025
DOB NOWSignSigned-offSkanska Building06/27/2025
DOB NOWSignSigned-offSkanska Building06/27/2025
DOB NOWSignSigned-offSkanska Building06/27/2025
DOB NOWSignSigned-offSkanska Building06/26/2025
DOB NOWSignSigned-offSkanska Building06/26/2025
DOB NOWSignSigned-offSkanska Building06/26/2025
DOB NOWStructuralSigned-offSchimenti Construction Co06/20/2025
DOB NOWGeneral ConstructionSigned-offSchimenti Construction Co06/20/2025
DOB NOWMechanical SystemsSigned-offSchimenti Construction Co06/20/2025
DOB NOWStandpipeSigned-offTristate Fire Sprinkler06/09/2025
DOB NOWSprinklersSigned-offTristate Fire Sprinkler06/09/2025
DOB NOWConstruction FencePermit IssuedRepublic Scaffold & Hoist04/21/2025
DOB NOWMechanical SystemsSigned-offSchimenti Construction Co04/17/2025
DOB NOWPlumbingSigned-offJames Cruz04/16/2025
DOB NOWSprinklersSigned-offSean Coakley P & H04/04/2025
DOB NOWGeneral ConstructionSigned-offSchimenti Construction Co04/02/2025
DOB NOWStructuralSigned-offSchimenti Construction Co04/02/2025
DOB NOWBoiler EquipmentSigned-offHeadquarters Mechanical03/28/2025
DOB NOWBoiler EquipmentSigned-offHeadquarters Mechanical10/28/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedRepublic Scaffold & Hoist05/24/2024
DOB NOWStandpipeSigned-offTristate Fire Sprinkler05/07/2024
DOB NOWSprinklersSigned-offTristate Fire Sprinkler05/07/2024
DOB NOWSupported ScaffoldSigned-offFM Construction Group04/16/2024
DOB NOWSupported ScaffoldSigned-offFM Construction Group02/07/2024
DOB NOWSupported ScaffoldSigned-offFM Construction Group10/17/2023
DOB NOWPlumbingSigned-offHeadquarters Mechanical04/05/2023
DOB NOWFoundationSigned-offSource Construction08/23/2022
+ 13 more permits on file
2 projects · most recent 08/31/2026
Others Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
08/31/2026Permit IssuedGM RemodelingOthers
Other
Daikin RWEQ144TBTJA 15,600 BTU · Vrf Outdoor ×1
05/21/2026Permit IssuedGFX Site DevelopmentAir Conditioning Systems, Heating Systems
Cooling
Carrier 50HQP096NVE5C1TP 8 tons · Rooftop Unit ×10
50WDA060HE1D3EBA 5 tons · Chiller ×6
50WDA009HEEBFEBA 250 CFM · Makeup Air ×2
50WDA024HE1D3EBA 2 tons · Rooftop Unit ×2
50WDA048HE1D3EBA 4 tons · Wshp ×2
Heating
Qmark CDF-RESESSED 2X2 300 CFM · Electric Heater ×2
3 projects · most recent 08/31/2026
Sprinkler System
FiledStatusContractorScope
08/31/2026Permit IssuedAmerican Standard PlumbingSprinkler System
05/21/2026Permit IssuedMPS Plumbing & HeatingSprinkler System
04/25/2025Signed-offTristate Fire Sprinkler1,268 heads, 3 outlets
2 projects · most recent 08/31/2026
Water/Sanitary
FiledStatusContractorScope
08/31/2026Permit IssuedKSP PlumbingWater/Sanitary
05/21/2026Permit IssuedMPS Plumbing & HeatingWater/Sanitary
25 projects · most recent 10/17/2026
General Wiring
FiledStatusContractorScope
10/17/2026Permit IssuedLens Electric—
10/17/2026Permit IssuedLens Electric—
08/24/2026Permit IssuedAccurate ElectricalGeneral Wiring
07/19/2026Permit IssuedLens ElectricGeneral Wiring
07/10/2026Permit IssuedLimitless Electric Resources—
07/10/2026Permit IssuedLimitless Electric Resources—
04/03/2026CompleteTF ElectricalGeneral Wiring
04/03/2026CompleteTF ElectricalGeneral Wiring
04/02/2026CompleteTF ElectricalGeneral Wiring
04/02/2026CompleteTF ElectricalGeneral Wiring
12/09/2025CompleteDaven ElectricGeneral Wiring
10/23/2025CompleteAxcel Electric Co—
09/16/2025Permit IssuedDifazio Electric NYGeneral Wiring
09/16/2025CancelledDifazio Electric NYGeneral Wiring
09/12/2025CompleteUltimate Signs & Electric—
1 project · most recent 05/21/2026
Steel Concrete
FiledStatusContractorScope
05/21/2026Permit IssuedMPS Plumbing & HeatingSteel, Concrete
1 project · most recent 04/21/2025
Fence
FiledStatusContractorScope
04/21/2025Permit IssuedRepublic Scaffold & HoistFence
▾Field Inspections (DOB CAP) — 21
DateTypeResultReport
03/13/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/04/2026Pass-Final PL - UndergroundPassView ↗
09/19/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/17/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/14/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/27/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/18/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/17/2025Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
06/17/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/17/2025Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
06/17/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
06/13/2025Pass-Final Boiler Equipment InspectionPassView ↗
06/09/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/09/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
05/23/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/08/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/08/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/09/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/11/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/11/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 114
DateRequirementInspectorRole
08/14/2026Interior lighting powerVladimir Kaushanskyenergy_progress
08/14/2026Lighting controlsVladimir Kaushanskyenergy_progress
08/14/2026FinalVladimir Kaushanskyprogress
08/14/2026Mechanical SystemsVladimir Kaushanskyspecial
08/14/2026Tenant Protection Plan Compliance—special
06/11/2026FinalLEON SKVIRSKYprogress
06/11/2026FinalLEON SKVIRSKYprogress
06/05/2026FinalEDWIN HOPKINSprogress
06/05/2026Fire-Resistant Penetrations and JointsEDWIN HOPKINSspecial
06/05/2026Fire-Resistance Rated ConstructionEDWIN HOPKINSprogress
06/05/2026Interior lighting powerEDWIN HOPKINSenergy_progress
06/05/2026Lighting controlsEDWIN HOPKINSenergy_progress
06/05/2026Energy Code Compliance InspectionsEDWIN HOPKINSprogress
05/29/2026Tenant Protection Plan ComplianceSalvatore Chiarellispecial
05/29/2026HVAC-R and service water piping design and insulationEDWIN HOPKINSenergy_progress
05/29/2026HVAC-R and service water heating system controlsEDWIN HOPKINSenergy_progress
05/29/2026Mechanical SystemsEDWIN HOPKINSspecial
05/29/2026FinalEDWIN HOPKINSprogress
05/29/2026HVAC-R and service water heating equipmentEDWIN HOPKINSenergy_progress
05/29/2026Fire-Resistant Penetrations and JointsEDWIN HOPKINSspecial
05/29/2026Sprinkler SystemsEDWIN HOPKINSspecial
05/29/2026Post-installed AnchorsEDWIN HOPKINSspecial
05/28/2026Tenant Protection Plan ComplianceSalvatore Chiarellispecial
05/26/2026Lighting controlsMINKUK KIMenergy_progress
05/26/2026Interior lighting powerMINKUK KIMenergy_progress
Latest 25 of 114.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Russian School of MathematicsEducationFloor 1
Project B01415839 Alteration · Permit Entire · 07/02/2026
Project B01415865 Alteration · Permit Entire · 07/02/2026
Supreme Fitness GroupFitness / RecreationCellar, Floors 1, 2
Project B01351207 Alteration · Permit Entire · 01/27/2026
Project B01327192 Alteration · Permit Entire · 12/23/2025
Wells FargoBank / Financial branch—
Project B01258054 Alteration · LOC Issued · 08/07/2025
Project B01258055 Alteration · LOC Issued · 08/07/2025
LidlRetailCellar, Floor 1
Project B01191160 Alteration · LOC Issued · 03/25/2025
Project B01189768 Alteration · LOC Issued · 03/24/2025
Project B01191168 Alteration · LOC Issued · 03/22/2025
Project B01191174 Alteration · LOC Issued · 03/22/2025
Project B01191180 Alteration · LOC Issued · 03/22/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 358 on file (BIS + DOB NOW)
▸Plans & Drawings44
▸DOB NOWPlans/Sketch43
09/03/2026B00054978-I1Request digital key ↗
09/03/2026B00054959-I1Request digital key ↗
09/03/2026B00054970-I1Request digital key ↗
Showing 3 of 43 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/21/2026B01109229-I1Request digital key ↗
▸Applications & Permits55
▸BISPLAN / WORK APPROVAL APPLICATION44
12/15/2025321696358Open ↗
12/12/2025321191410Open ↗
09/19/2025321191410Open ↗
Showing 3 of 44 on file for this type
▸BISWORK PERMIT APPLICATION10
06/26/2025321191410Open ↗
05/20/2025321191410Open ↗
05/12/2025321191410Open ↗
Showing 3 of 10 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
05/29/2025321191410Open ↗
▸Zoning, Tax Lot & Property Records6
▸BISZONING DIAGRAM2
07/05/2023321191410Open ↗
08/15/2018321191410Open ↗
▸BISAMENDED ZONING DIAGRAM1
10/09/2018321191410Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
01/17/2018321191410Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
08/01/2018321191410Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
01/17/2018321191410Open ↗
▸Seals & Professional Certifications108
▸DOB NOWDPL-1: Design Professional Seal & Signature45
10/14/2026B01402699-P1Open ↗
09/03/2026B00054978-I1Open ↗
09/03/2026B00054959-I1Open ↗
Showing 3 of 45 on file for this type
▸DOB NOWProgress Inspector Seal & Signature36
10/14/2026B01402699-P1Open ↗
10/14/2026B01402699-P1Open ↗
10/14/2026B01402699-P1Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature25
10/14/2026B01402699-P1Open ↗
10/03/2026B01327192-I1Open ↗
09/23/2026B01000296-I1Open ↗
Showing 3 of 25 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
05/16/2018340568326Open ↗
01/08/2018340568326Open ↗
▸Trade Schedules & Equipment14
▸BISSCHEDULE B - PLUMBING6
06/24/2025321191410Open ↗
06/20/2025321191410Open ↗
03/11/2025321191410Open ↗
Showing 3 of 6 on file for this type
▸BISHEATING SYSTEMS2
07/17/2025321191410Open ↗
07/17/2025321191410Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
07/03/2025321191410Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
07/03/2025321191410Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
08/07/2025321191410Open ↗
▸BIS* BOILER (BL) SIGNOFF1
09/09/2025321191410Open ↗
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
08/01/2018321191410Open ↗
▸BISEQUIPMENT USE PERMITS1
07/30/2025321191410Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST2
08/01/2018321191410Open ↗
01/17/2018321191410Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
04/28/2022321191410Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
08/27/2024321191410Open ↗
▸Energy Compliance18
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
06/16/2025321191410Open ↗
06/16/2025321191410Open ↗
03/30/2022321191410Open ↗
Showing 3 of 6 on file for this type
▸BISINTERIOR LIGHTING POWER1
07/03/2025321191410Open ↗
▸BIS* DUCT LEAKAGE TESTING1
07/03/2025321191410Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
07/03/2025321191410Open ↗
▸BISFENESTRATION AREAS1
07/03/2025321191410Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
07/03/2025321191410Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/03/2025321191410Open ↗
▸BISLIGHTING CONTROLS1
07/03/2025321191410Open ↗
▸BIS* HVAC INSULATION AND SEALING1
07/03/2025321191410Open ↗
▸BISLIGHTING IN DWELLING UNITS1
07/03/2025321191410Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
07/03/2025321191410Open ↗
▸BISEXTERIOR LIGHTING POWER1
07/03/2025321191410Open ↗
▸BISFENESTRATION AIR LEAKAGE1
07/03/2025321191410Open ↗
▸Inspections & Test Reports35
▸BISTECHNICAL REPORT: RESPONSIBILITY19
07/17/2025321191410Open ↗
07/10/2025321191410Open ↗
07/07/2025321191410Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX4
10/24/2024321191410Open ↗
03/26/2024321191410Open ↗
06/02/2022321191410Open ↗
Showing 3 of 4 on file for this type
▸BISSPRAYED FIRE-RESISTANT MATERIALS2
07/23/2025321191410Open ↗
07/23/2025321191410Open ↗
▸BISMECHANICAL SYSTEMS2
10/01/2025321191410Open ↗
07/17/2025321191410Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
03/17/2023321191410Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
08/27/2024321191410Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
08/27/2024321191410Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
08/27/2024321191410Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
08/27/2024321191410Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
03/31/2022321191410Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
08/01/2018321191410Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
06/01/2022321191410Open ↗
▸Approvals, Objections & Sign-offs19
▸BISSCHEDULE A - OCCUPANCY / USE13
12/12/2025321191410Open ↗
09/19/2025321191410Open ↗
09/17/2025321191410Open ↗
Showing 3 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
05/12/2025321191410Open ↗
05/08/2024321191410Open ↗
11/25/2022321191410Open ↗
Showing 3 of 6 on file for this type
▸Cost, Insurance & Ownership9
▸BISPROJECT-SPECIFIC GL INSURANCE4
05/14/2024321191410Open ↗
10/13/2022321191410Open ↗
06/11/2022321191410Open ↗
Showing 3 of 4 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)3
05/20/2025321191410Open ↗
05/12/2025321191410Open ↗
05/14/2024321191410Open ↗
▸BISCOST AFFIDAVIT2
05/16/2018340568326Open ↗
Showing 1 of 2 on file for this type
▸Filing & Intake Forms29
▸BISADDITIONAL INFORMATION24
09/26/2025321191410Open ↗
09/26/2025321191410Open ↗
09/26/2025321191410Open ↗
Showing 3 of 24 on file for this type
▸BISEFILING COVER SHEET4
01/25/2018321191410Open ↗
Showing 1 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
01/08/2018340568326Open ↗
▸Other Documents9
▸BISCHIMNEYS AND VENTS2
07/17/2025321191410Open ↗
07/17/2025321191410Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
05/12/2025321191410Open ↗
05/02/2025321191410Open ↗
▸BISUNDERPINNING (2014)1
08/27/2024321191410Open ↗
▸BISVESTIBULES1
07/03/2025321191410Open ↗
▸BISMAINTENANCE INFORMATION1
07/03/2025321191410Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
07/03/2025321191410Open ↗
▸BISPVT ON-SITE STORM WATER DISPOSAL SYSTEMS & DETENTION FACL., INSTALLATION1
09/18/2024321191410Open ↗