← Back
Primarily 1 family with 1 store or office
6806 20 AVENUE
BROOKLYN · Bensonhurst · BIN 3135041
💬 Discuss this project
1931Year Built
2Stories
S1Building Class
R5Zoning
2,560 sfGross Floor Area
2Units
Primarily 1 family with 1 store or office · 2,000 sf lot · 1.28 FAR built · Flood zone X
Locations of Work
Plumbing
Cellar1p · 1 filing · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
6812 20TH AVE1307/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SEBASTIAN M D'ALESSANDRO509/26/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FOUNTAIN OF TREVI, INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SEBASTIAN M. D'ALESSANDRO1127509/26/2022
Building Lifecycle
All (45)Filed (5)Permit Issued (2)Signed Off (2)Inspection (6)Special Inspection (30)
12/01/2022
Signed off — Alteration
INSTALL THREE (3) NEW GAS BOILERS AT CELLAR, AND REGISTER WITH BOILER DIVISION. FILED IN CONJUNCTION WITH PLUMBING JOB # B00787621. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B00787796-I1
12/01/2022
Signed off — Alteration
REPLACE TWO (2) GAS H. W. HEATERS WITH NEW AT CEL. REPLACE EXIST GAS LINES WITH NEW AT CEL AND FROM CEL TO 2ND FL. INSTALL (3) NEW GAS BOILERS AT CEL & REGISTER W/ BOILER DIVISION (FILED UNDER B00787796). NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B00787621-I1
10/06/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/05/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/03/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Sebastian D'Alessandro
10/03/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Sebastian D'Alessandro
10/03/2022
Special inspection requirement — HVAC-R and service water heating equipment
Sebastian D'Alessandro
10/03/2022
Special inspection requirement — HVAC-R and service water heating system controls
Sebastian D'Alessandro
10/03/2022
Special inspection requirement — Maintenance information
Sebastian D'Alessandro
10/03/2022
Special inspection requirement — Heating Systems
Sebastian D'Alessandro
09/30/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/26/2022
Filed — Alteration
REPLACE TWO (2) GAS H. W. HEATERS WITH NEW AT CEL. REPLACE EXIST GAS LINES WITH NEW AT CEL AND FROM CEL TO 2ND FL. INSTALL (3) NEW GAS BOILERS AT CEL & REGISTER W/ BOILER DIVISION (FILED UNDER B00787796). NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B00787621-P2
09/26/2022
Filed — Alteration
INSTALL THREE (3) NEW GAS BOILERS AT CELLAR, AND REGISTER WITH BOILER DIVISION. FILED IN CONJUNCTION WITH PLUMBING JOB # B00787621. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B00787796-P1
09/26/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Sebastian D'Alessandro
09/26/2022
Special inspection requirement — HVAC-R and service water heating equipment
Sebastian D'Alessandro
09/26/2022
Special inspection requirement — Maintenance information
Sebastian D'Alessandro
09/26/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Sebastian D'Alessandro
09/26/2022
Special inspection requirement — HVAC-R and service water heating system controls
Sebastian D'Alessandro
09/26/2022
Special inspection requirement — Energy Code Compliance Inspections
Sebastian D'Alessandro
09/23/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/23/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Sebastian D'Alessandro
09/23/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Sebastian D'Alessandro
09/23/2022
Special inspection requirement — Energy Code Compliance Inspections
Sebastian D'Alessandro
09/23/2022
Special inspection requirement — HVAC-R and service water heating system controls
Sebastian D'Alessandro
09/23/2022
Special inspection requirement — HVAC-R and service water heating equipment
Sebastian D'Alessandro
09/23/2022
Special inspection requirement — Maintenance information
Sebastian D'Alessandro
09/23/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Sebastian D'Alessandro
09/23/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Sebastian D'Alessandro
09/23/2022
Special inspection requirement — Heating Systems
Sebastian D'Alessandro
09/23/2022
Special inspection requirement — HVAC-R and service water heating equipment
Sebastian D'Alessandro
09/23/2022
Special inspection requirement — Maintenance information
Sebastian D'Alessandro
09/23/2022
Special inspection requirement — HVAC-R and service water heating system controls
Sebastian D'Alessandro
09/19/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/09/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/01/2022
Filed — Alteration
REPLACE TWO (2) GAS H. W. HEATERS WITH NEW AT CEL. REPLACE EXIST GAS LINES WITH NEW AT CEL AND FROM CEL TO 2ND FL. INSTALL (3) NEW GAS BOILERS AT CEL & REGISTER W/ BOILER DIVISION (FILED UNDER B00787796). NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B00787621-P1
09/01/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Sebastian D'Alessandro
09/01/2022
Special inspection requirement — HVAC-R and service water heating system controls
Sebastian D'Alessandro
09/01/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Sebastian D'Alessandro
09/01/2022
Special inspection requirement — HVAC-R and service water heating equipment
Sebastian D'Alessandro
09/01/2022
Special inspection requirement — Maintenance information
Sebastian D'Alessandro
09/01/2022
Special inspection requirement — Energy Code Compliance Inspections
Sebastian D'Alessandro
08/12/2022
Permit issued — Boiler Equipment
B00787796-I1-BE
08/12/2022
Permit issued — Plumbing
B00787621-I1-PL
08/09/2022
Filed — Alteration
INSTALL THREE (3) NEW GAS BOILERS AT CELLAR, AND REGISTER WITH BOILER DIVISION. FILED IN CONJUNCTION WITH PLUMBING JOB # B00787621. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B00787796-I1
08/09/2022
Filed — Alteration
REPLACE TWO (2) GAS H. W. HEATERS WITH NEW AT CEL. REPLACE EXIST GAS LINES WITH NEW AT CEL AND FROM CEL TO 2ND FL. INSTALL (3) NEW GAS BOILERS AT CEL & REGISTER W/ BOILER DIVISION (FILED UNDER B00787796). NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B00787621-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offTREVI PLUMBING INC08/12/2022
DOB NOWPlumbingSigned-offTREVI PLUMBING INC08/12/2022
BIS—ISSUEDPAUL SIGNS, INC11/23/2011
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
10/06/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/05/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/30/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/23/2022Pass-Final Boiler Equipment InspectionPassView ↗
09/19/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/09/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
10/03/2022Fire-Resistant Penetrations and JointsSebastian D'Alessandrospecial
10/03/2022HVAC-R and service water piping design and insulationSebastian D'Alessandroenergy_progress
10/03/2022HVAC-R and service water heating equipmentSebastian D'Alessandroenergy_progress
10/03/2022HVAC-R and service water heating system controlsSebastian D'Alessandroenergy_progress
10/03/2022Maintenance informationSebastian D'Alessandroenergy_progress
10/03/2022Heating SystemsSebastian D'Alessandrospecial
09/26/2022Fire-Resistant Penetrations and JointsSebastian D'Alessandrospecial
09/26/2022HVAC-R and service water heating equipmentSebastian D'Alessandroenergy_progress
09/26/2022Maintenance informationSebastian D'Alessandroenergy_progress
09/26/2022HVAC-R and service water piping design and insulationSebastian D'Alessandroenergy_progress
09/26/2022HVAC-R and service water heating system controlsSebastian D'Alessandroenergy_progress
09/26/2022Energy Code Compliance InspectionsSebastian D'Alessandroprogress
09/23/2022HVAC-R and service water piping design and insulationSebastian D'Alessandroenergy_progress
09/23/2022Fire-Resistant Penetrations and JointsSebastian D'Alessandrospecial
09/23/2022Energy Code Compliance InspectionsSebastian D'Alessandroprogress
09/23/2022HVAC-R and service water heating system controlsSebastian D'Alessandroenergy_progress
09/23/2022HVAC-R and service water heating equipmentSebastian D'Alessandroenergy_progress
09/23/2022Maintenance informationSebastian D'Alessandroenergy_progress
09/23/2022HVAC-R and service water piping design and insulationSebastian D'Alessandroenergy_progress
09/23/2022Fire-Resistant Penetrations and JointsSebastian D'Alessandrospecial
09/23/2022Heating SystemsSebastian D'Alessandrospecial
09/23/2022HVAC-R and service water heating equipmentSebastian D'Alessandroenergy_progress
09/23/2022Maintenance informationSebastian D'Alessandroenergy_progress
09/23/2022HVAC-R and service water heating system controlsSebastian D'Alessandroenergy_progress
09/01/2022Fire-Resistant Penetrations and JointsSebastian D'Alessandrospecial
Latest 25 of 30.
▾Documents — 54 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/28/2026B00787621-P2Request digital key ↗
08/28/2026B00787621-I1Request digital key ↗
08/28/2026B00787621-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION2
10/25/2011320257814Open ↗
01/06/2011320257814Open ↗
▸Seals & Professional Certifications35
▸DOB NOWProgress Inspector Seal & Signature23
09/23/2026B00787796-I1Open ↗
09/23/2026B00787796-I1Open ↗
09/23/2026B00787796-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026B00787796-I1Open ↗
09/23/2026B00787796-I1Open ↗
09/20/2026B00787621-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/28/2026B00787621-P2Open ↗
08/28/2026B00787621-I1Open ↗
08/28/2026B00787621-P1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/28/2026B00787621-P2Open ↗
08/28/2026B00787621-I1Open ↗
08/28/2026B00787621-P1Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
01/06/2011320257814Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026B00787621-I1Open ↗
08/13/2026B00787796-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
01/06/2011320257814Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
10/25/2011320257814Open ↗
01/06/2011320257814Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
01/06/2011320257814Open ↗