← Back
Primarily 4 family with 1 store or office
681 BROADWAY
BROOKLYN · BIN 3071599
💬 Discuss this project
1931Year Built
3Stories
S4Building Class
C4-3Zoning
8,130 sfGross Floor Area
5Units
Rent Stabilized102 Open Violations ▸FDNY Report ↗
Primarily 4 family with 1 store or office · Owner of record: 8 COOK CORP. · 2,574 sf lot · 3.16 FAR built · Flood zone X500
Locations of Work
Architecture
Floor 11p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
9612 LIBERTY CORP703/22/2026
J G CONSTRUCTION SRVCS503/22/2026
8 COOK CORP.303/22/2026
8 COOK CORP MARK KOPLOWIT203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOHAMMAD AHEAD, PE103/22/2022
DOYUN KIM; RA202/23/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KC EXPEDITING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EMPIRE GROUP NYC LLCGeneral Contractor303/21/2026
J & G CONSTRUCTION SVCSGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOYUN KIM; RA7415202/23/2022
Building Lifecycle
All (75)Filed (3)Permit Issued (2)Signed Off (2)Violation (60)Special Inspection (8)
05/01/2026
Violation issued (HPD, closed)
A
04/06/2026
Violation issued (HPD, open)
A
04/06/2026
Violation issued (HPD, open)
A
04/06/2026
Violation issued (HPD, open)
A
04/06/2026
Violation issued (HPD, open)
C
04/06/2026
Violation issued (HPD, open)
A
04/06/2026
Violation issued (HPD, open)
A
04/06/2026
Violation issued (HPD, open)
A
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/06/2025
Violation issued (HPD, closed)
A
11/25/2024
Violation issued (HPD, closed)
I
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/09/2024
Violation issued (HPD, closed)
A
11/17/2023
Violation issued (HPD, closed)
I
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/05/2023
Violation issued (ECB, open)
Construction
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/21/2023
Violation issued (HPD, closed)
A
11/04/2022
Violation issued (HPD, closed)
I
07/26/2022
Signed off — Alteration
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
B00695717-I1
05/24/2022
Signed off — Alteration
FILING TO REPAIR FIRE DAMAGE THROUGHOUT THE PREMISES AND RENOVATE THE INTERIOR AS PER PLANS. NO CHANGE TO USE, EGRESS, AND/OR OCCUPANCY
B00685705-I1
03/23/2022
Permit issued — Sidewalk Shed
B00695717-I1-SH
03/22/2022
Filed — Alteration
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
B00695717-I1
03/10/2022
Special inspection requirement — Final
MOHAMMAD AHEAD
03/03/2022
Violation issued (ECB, closed)
Construction
03/02/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/24/2022
Permit issued — Mechanical Systems
B00685705-I1-GC-CX
02/23/2022
Filed — Alteration
FILING TO REPAIR FIRE DAMAGE THROUGHOUT THE PREMISES AND RENOVATE THE INTERIOR AS PER PLANS. NO CHANGE TO USE, EGRESS, AND/OR OCCUPANCY
B00685705-I1
02/23/2022
Filed — Alteration
FILING TO DO INTERIOR RENOVATIONS AS PER PLANS AND TO REPAIR FIRE DAMAGE
B00685707-I1
02/23/2022
Violation issued (HPD, closed)
I
02/23/2022
Violation issued (HPD, closed)
A
02/23/2022
Special inspection requirement — Mechanical Systems
DOYUN KIM
02/23/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
DOYUN KIM
02/23/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
DOYUN KIM
02/23/2022
Special inspection requirement — Structural Wood Frame
DOYUN KIM
02/23/2022
Special inspection requirement — Energy Code Compliance Inspections
DOYUN KIM
02/23/2022
Special inspection requirement — Fire-Resistance Rated Construction
DOYUN KIM
02/23/2022
Special inspection requirement — Final
DOYUN KIM
11/29/2021
Violation issued (ECB, open)
Construction
11/29/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/29/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/29/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/07/2021
Violation issued (HPD, closed)
I
04/07/2021
Violation issued (HPD, closed)
A
01/25/2021
Violation issued (HPD, open)
C
01/25/2021
Violation issued (HPD, open)
C
01/25/2021
Violation issued (HPD, open)
B
01/25/2021
Violation issued (HPD, open)
B
01/25/2021
Violation issued (HPD, open)
B
01/25/2021
Violation issued (HPD, open)
B
01/25/2021
Violation issued (HPD, open)
B
01/25/2021
Violation issued (HPD, open)
B
01/25/2021
Violation issued (HPD, closed)
C
01/25/2021
Violation issued (HPD, closed)
A
01/25/2021
Violation issued (HPD, open)
B
01/25/2021
Violation issued (HPD, closed)
C
01/25/2021
Violation issued (HPD, open)
B
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offJ & G CONSTRUCTION SVCS03/23/2022
DOB NOWMechanical SystemsSigned-offEMPIRE GROUP NYC LLC02/24/2022
BISFBISSUEDTHOMAS E GATTO11/14/2000
BISEQISSUEDSAFWAY STEEL PRODUCTS10/29/1998
1 project · most recent 02/23/2022
Gas Water/Sanitary
FiledStatusContractorScope
02/23/2022——Gas, Water/Sanitary
3 projects · most recent 06/11/2025
FiledStatusContractorScope
06/11/2025Permit IssuedLINTECH ELECTRIC, INC6 meters, 4 new_meters
11/09/2022Permit IssuedILLUMINATIONS UNLMTD ELEC4 meters, 4 new_meters
04/01/2019CompleteACCURATE ELEC'L CORP.—
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
03/10/2022FinalMOHAMMAD AHEADprogress
02/23/2022Mechanical SystemsDOYUN KIMspecial
02/23/2022Fire-Resistant Penetrations and JointsDOYUN KIMspecial
02/23/2022Structural Stability – Alterations of existing buildingsDOYUN KIMspecial
02/23/2022Structural Wood FrameDOYUN KIMprogress
02/23/2022Energy Code Compliance InspectionsDOYUN KIMprogress
02/23/2022Fire-Resistance Rated ConstructionDOYUN KIMprogress
02/23/2022FinalDOYUN KIMprogress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/31/2026B00685705-I1Request digital key ↗
08/31/2026B00685707-I1Request digital key ↗
08/30/2026B00695717-I1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/31/2026B00685705-I1Open ↗
08/13/2026B00685707-I1Open ↗
08/13/2026B00695717-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026B00695717-I1Open ↗
08/23/2026B00685705-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026B00685705-I1Open ↗
08/23/2026B00685705-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/31/2026B00685705-I1Open ↗
08/13/2026B00685707-I1Open ↗