| Owner | Filings | Most Recent |
|---|---|---|
| Dasny | 144 | 10/03/2026 |
| Dormitory Authority of the State | 44 | 03/21/2026 |
| Hunter College | 26 | 03/21/2026 |
| CUNY | 22 | 10/04/2026 |
| CUNY Department of Design Construction MG | 7 | 03/21/2026 |
| DDCM | 4 | 03/21/2026 |
| NYC Department of Design and Construction | 3 | 03/21/2026 |
| Dasny- 695 Park Ave W Building | 2 | 03/21/2026 |
| Keller Eaton Architects | 1 | 03/22/2026 |
| D.P. Consulting | 1 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| Lizardos Engineering | 32 | 09/21/2026 |
| Ysrael A. Seinuk | 8 | 09/11/2026 |
| Superstructures Engineering + Architects | 2 | 08/25/2026 |
| Matiz Architecture and Design | 3 | 07/14/2026 |
| Heritage Architecture | 8 | 05/21/2026 |
| Polise Consulting Engineers | 2 | 04/30/2026 |
| Sgva | 2 | 03/31/2026 |
| Silman | 1 | 12/10/2025 |
| R.G. Vanderweil Engineers | 5 | 11/10/2025 |
| Rigid Structural Design | 2 | 10/27/2025 |
| MG Engineering | 5 | 09/09/2025 |
| Brand Access Solutions | 1 | 04/15/2025 |
| Richard Gonzalez Architect | 2 | 03/21/2025 |
| Urbahn Architects | 1 | 04/17/2024 |
| Severud Associates Consulting Engineering | 1 | 04/02/2024 |
| LL Engineering | 1 | 07/08/2023 |
| Pamela A. Smith | 1 | 12/01/2022 |
| Ashraf | 1 | 12/23/2021 |
| Syed Engineering | 2 | 09/22/2021 |
| Paul Perdek, Prof. Engineering | 1 | 04/15/2021 |
| AK Consulting Services | 1 | 03/25/2021 |
| Dseny Engineering Services | 2 | 12/10/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| Construction Permit Services | 54 | 03/21/2026 |
| Socotec | 14 | 03/21/2026 |
| Heritage Architecture | 8 | 03/21/2026 |
| Outsource Consultants | 8 | 03/21/2026 |
| Rigid Structural Design | 5 | 03/21/2026 |
| Lizardos Engineering Associates | 2 | 03/21/2026 |
| A1 Expediting Service | 4 | 03/21/2026 |
| NYC Department of Housing Preservation and Development | 2 | 03/21/2026 |
| Dseny Engineering Services | 4 | 03/21/2026 |
| Urbahn Architects | 1 | 03/21/2026 |
| AK Consulting Services | 2 | 03/21/2026 |
| Expediting | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| Vanguard Construction and | General Contractor | 22 | 07/08/2026 |
| Eagle 1 Mechanical | Plumbing | 12 | 07/08/2026 |
| Infinity Contracting Service | General Contractor | 10 | 10/07/2026 |
| Tameer | General Contractor | 9 | 07/08/2026 |
| Imperium Construction | Scaffold | 9 | 07/08/2026 |
| C. D. E. Air-Conditioning | General Contractor | 8 | 04/11/2026 |
| Major Systems Mechanical | specialty_contractor | 7 | 07/08/2026 |
| Richards P and H Co | Plumbing | 7 | 10/04/2026 |
| Cauldwell Wingate Co | General Contractor | 5 | 07/08/2026 |
| Richards Plum & Heating Co | General Contractor | 5 | 07/08/2026 |
| Fidelis Contracting | General Contractor | 4 | 10/03/2026 |
| Par Plumbing Co | Plumbing | 4 | 07/08/2026 |
| Carlitos Contracting | Scaffold | 4 | 04/09/2026 |
| Grinnell | Fire Protection | 3 | 07/08/2026 |
| Safway Atlantic | Scaffold | 3 | 09/19/2026 |
| M.S.T. General Contracting | Scaffold | 3 | 07/08/2026 |
| Intersystem Installation | Scaffold | 3 | 03/21/2026 |
| Everlast Scaffolding | Scaffold | 3 | 07/08/2026 |
| Sirina Fire Protection | Fire Protection | 3 | 07/08/2026 |
| Stat Electric | Electrical | 3 | 03/21/2026 |
| Tristate Plumbing Services | Plumbing | 2 | 07/08/2026 |
| Ashlar Mechanical | Fire Protection | 2 | 07/08/2026 |
| Eastern Plumbing & Mechanical Contracting | Plumbing | 2 | 07/08/2026 |
| Pro Con Group | General Contractor | 1 | 04/09/2026 |
| Tappan Lic. Electric Contracting | Electrical | 1 | 03/21/2026 |
| R.C.M. Electric | Electrical | 1 | 03/22/2026 |
| KND Licensed Electrical Cont' | Electrical | 1 | 03/21/2026 |
| Johnson Brothers | Electrical | 1 | 03/21/2026 |
| High Volt Electric Corp of | Electrical | 1 | 03/21/2026 |
| Commercial Electric Cont | Electrical | 1 | 03/22/2026 |
| J.H. Electric of New York | Electrical | 1 | 03/21/2026 |
| Eagle Mechanical | Fire Protection | 1 | 07/08/2026 |
| Solar Electric Systems | Electrical | 1 | 03/21/2026 |
| G-Squared Electric | Electrical | 1 | 03/21/2026 |
| G.S.H. Electric | Electrical | 1 | 03/22/2026 |
| Gomez Armando | Electrical | 1 | 03/21/2026 |
| Turchiano JR Joseph | General Contractor | 1 | 03/21/2026 |
| Richards P H | General Contractor | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Tectonic Engineering Cons | 106 | 27 | 09/11/2026 |
| KS Engineers | 7715 | 6 | 07/16/2026 |
| Future Tech Consultants O | 589 | 17 | 11/10/2025 |
| LL Engineering | 1618 | 1 | 07/08/2023 |
| Socotec Engineering | 4983 | 1 | 01/27/2023 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Structural | Permit Issued | Infinity Contracting Service | 10/06/2026 |
| DOB NOW | General Construction | Permit Issued | Infinity Contracting Service | 10/06/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Infinity Contracting Service | 10/06/2026 |
| DOB NOW | General Construction | Permit Issued | Fidelis Contracting | 10/02/2026 |
| DOB NOW | Construction Fence | Permit Issued | Safway Atlantic | 09/18/2026 |
| DOB NOW | Plumbing | Signed-off | Par Plumbing Co | 04/30/2026 |
| DOB NOW | Sprinklers | Permit Issued | Ashlar Mechanical | 04/13/2026 |
| DOB NOW | Plumbing | Permit Issued | Eagle 1 Mechanical | 04/13/2026 |
| DOB NOW | General Construction | Permit Issued | C. D. E. Air-Conditioning | 04/09/2026 |
| DOB NOW | General Construction | Permit Issued | Pro Con Group | 04/07/2026 |
| DOB NOW | General Construction | Permit Issued | Cauldwell Wingate Co | 01/13/2026 |
| DOB NOW | Mechanical Systems | Signed-off | Cauldwell Wingate Co | 01/08/2026 |
| DOB NOW | General Construction | Permit Issued | Vanguard Construction and | 12/30/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Vanguard Construction and | 12/30/2025 |
| DOB NOW | General Construction | Permit Issued | Vanguard Construction and | 12/30/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | Richards Plum & Heating Co | 12/16/2025 |
| DOB NOW | Plumbing | Signed-off | Richards P and H Co | 11/24/2025 |
| DOB NOW | Structural | Signed-off | Cauldwell Wingate Co | 11/20/2025 |
| DOB NOW | Structural | Permit Issued | Infinity Contracting Service | 11/03/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | Infinity Contracting Service | 11/03/2025 |
| DOB NOW | General Construction | Permit Issued | Infinity Contracting Service | 11/03/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Cauldwell Wingate Co | 10/30/2025 |
| DOB NOW | Plumbing | Signed-off | Tristate Plumbing Services | 10/30/2025 |
| DOB NOW | General Construction | Permit Issued | Cauldwell Wingate Co | 10/29/2025 |
| DOB NOW | Construction Fence | Permit Issued | Carlitos Contracting | 10/27/2025 |
| DOB NOW | Construction Fence | Permit Issued | Safway Atlantic | 09/29/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | C&C Daley's Construction | 08/12/2025 |
| DOB NOW | Sprinklers | Signed-off | Sirina Fire Protection | 07/28/2025 |
| DOB NOW | General Construction | Permit Issued | Fidelis Contracting | 07/07/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Vanguard Construction and | 06/26/2025 |
| DOB NOW | Structural | Signed-off | Vanguard Construction and | 06/26/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | C. D. E. Air-Conditioning | 05/05/2025 |
| DOB NOW | Structural | Permit Issued | C. D. E. Air-Conditioning | 05/05/2025 |
| DOB NOW | Plumbing | Signed-off | Par Plumbing Co | 05/01/2025 |
| DOB NOW | Construction Fence | Permit Issued | Safway Atlantic | 04/16/2025 |
| DOB NOW | Plumbing | Permit Issued | Eagle 1 Mechanical | 04/03/2025 |
| DOB NOW | Sprinklers | Permit Issued | Ashlar Mechanical | 03/11/2025 |
| DOB NOW | Structural | Permit Issued | Infinity Contracting Service | 03/10/2025 |
| DOB NOW | General Construction | Permit Issued | Infinity Contracting Service | 03/07/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | Infinity Contracting Service | 03/07/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 09/21/2026 | Permit Issued | Infinity Contracting Service | Air Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems | |
| 09/11/2026 | Signed-off | Vanguard Construction and | Heating Systems | Heating Vts VTS AVS030 2,700 CFM ×2 |
| 04/30/2026 | — | — | Others | Other — (2) MULTIAQUA MHQWW-24-H-3 600 CFM ×2 |
| 04/15/2026 | Permit Issued | C. D. E. Air-Conditioning | Air Conditioning Systems, Associated Ducts and Piping | Cooling Multistack Model Number: ASP030KCHB 27 tons · Chiller ×4 Mitsubishi Electric NTXMSH36A142BA 42,000 BTU · Condensing Unit ×1 TUHYE0723AN41AN <H> 80,000 BTU · Vrf Outdoor ×1 |
| 12/10/2025 | — | — | Air Conditioning Systems | Cooling |
| 11/10/2025 | Permit Issued | Cauldwell Wingate Co | Air Conditioning Systems, Associated Ducts and Piping | Cooling Trane CSAA006 2,200 CFM · Chiller ×2 CSAA0006 2,200 CFM · Split System ×1 TTA15043DAA 13 tons · Split System ×1 |
| 07/30/2021 | — | — | Air Conditioning Systems | Cooling |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/21/2026 | Permit Issued | Ashlar Mechanical | 920 heads, 14 outlets |
| 09/11/2026 | Signed-off | Sirina Fire Protection | — |
| 11/10/2025 | Permit Issued | Eagle Mechanical | 26 heads |
| 07/08/2023 | Signed-off | Grinnell | 34 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/21/2026 | Permit Issued | Eagle 1 Mechanical | Gas, Water/Sanitary |
| 09/11/2026 | Signed-off | Par Plumbing Co | Water/Sanitary |
| 04/30/2026 | — | — | Water/Sanitary |
| 11/10/2025 | Signed-off | Tristate Plumbing Services | Gas, Water/Sanitary |
| 11/10/2025 | Permit Issued | Eastern Plumbing & Mechanical Contracting | Gas, Water/Sanitary |
| 08/15/2023 | Signed-off | Richards P and H Co | Water/Sanitary |
| 07/30/2021 | — | — | Gas, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/28/2026 | Permit Issued | KND Licensed Electrical Cont' | General Wiring, Lighting |
| 12/15/2025 | Complete | G-Squared Electric | General Wiring |
| 12/11/2025 | Complete | G.S.H. Electric | General Wiring |
| 08/19/2025 | Complete | G.S.H. Electric | General Wiring |
| 02/17/2025 | Permit Issued | Ark Systems Electric | General Wiring, Lighting |
| 09/25/2024 | Complete | Maraj Electric | General Wiring |
| 08/16/2024 | Complete | Gottlieb Electric | General Wiring |
| 08/15/2024 | Permit Issued | Milad Contracting | General Wiring, Lighting |
| 05/01/2024 | Complete | Nunez Electric | General Wiring |
| 11/30/2023 | Complete | Hatzel and Buehler | General Wiring |
| 07/17/2023 | Complete | Redd Electrical Services | General Wiring |
| 02/22/2023 | Complete | Commercial Electric Cont | General Wiring |
| 09/06/2022 | Complete | Meco Electric Co | General Wiring |
| 07/26/2021 | Permit Issued | Abilene Electric | — |
| 03/08/2021 | Permit Issued | Stanco System Electrical Cont | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/21/2026 | Permit Issued | Infinity Contracting Service | Steel |
| 09/11/2026 | Signed-off | Par Plumbing Co | Steel, Concrete |
| 08/25/2026 | — | — | Steel, Concrete |
| 03/24/2026 | Permit Issued | Pro Con Group | 2 scope_items |
| 12/10/2025 | — | — | Steel, Concrete |
| 11/10/2025 | Permit Issued | Cauldwell Wingate Co | Steel, Concrete |
| 02/28/2025 | Permit Issued | C. D. E. Air-Conditioning | 2 scope_items |
| 07/30/2021 | — | — | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/15/2025 | Permit Issued | Safway Atlantic | Fence |
| 12/23/2021 | Permit Issued | Intersystem Installation | Scaffold |
| 03/25/2021 | Permit Issued | M.S.T. General Contracting | Fence |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/28/2025 | Permit Issued | C&C Daley's Construction | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/14/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/14/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/29/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/19/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 11/26/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 11/07/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/09/2025 | Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test | Certified | View ↗ |
| 06/09/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 10/04/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/23/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/23/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/19/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/25/2023 | Pass-Final PL - More than 10 Requested Floors | Pass | View ↗ |
| 09/22/2023 | Pass-Final PL - More than 10 Requested Floors | Pass | View ↗ |
| 09/19/2023 | Fail-Final PL - More than 10 Requested Floors | Fail | View ↗ |
| 09/06/2023 | Fail-Final PL - More than 10 Requested Floors | Fail | View ↗ |
| 02/03/2023 | Pass-Final PL - More than 10 Requested Floors | Pass | View ↗ |
| 10/07/2022 | Pass-Final PL - More than 10 Requested Floors | Pass | View ↗ |
| 09/07/2022 | Pass-Final PL - More than 10 Requested Floors | Pass | View ↗ |
| 08/31/2022 | Fail-Final PL - More than 10 Requested Floors | Fail | View ↗ |
| 01/05/2022 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 12/15/2021 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/27/2026 | Sprinkler Systems | Mohamed Shahid | special |
| 07/27/2026 | Fire-Resistant Penetrations and Joints | Mohamed Shahid | special |
| 07/27/2026 | Post-installed Anchors | Mohamed Shahid | special |
| 07/27/2026 | Standpipe Systems | Mohamed Shahid | special |
| 07/01/2026 | Public Assembly Emergency Lighting | GEORGE GHEBRYAL | progress |
| 05/01/2026 | Public Assembly Emergency Lighting | GEORGE GHEBRYAL | progress |
| 04/22/2026 | Concrete - Cast-In-Place | — | special |
| 04/22/2026 | Structural Steel - Details | — | special |
| 04/22/2026 | Post-installed Anchors | — | special |
| 04/22/2026 | Sprayed fire-resistant materials | — | special |
| 04/22/2026 | Final | Paul Millman | progress |
| 04/22/2026 | Structural Steel - Welding | — | special |
| 04/17/2026 | Standpipe Systems | Mohamed Shahid | special |
| 04/17/2026 | Sprinkler Systems | Mohamed Shahid | special |
| 04/17/2026 | Fire-Resistant Penetrations and Joints | Mohamed Shahid | special |
| 04/17/2026 | Post-installed Anchors | Mohamed Shahid | special |
| 03/25/2026 | Structural Steel - High Strength Bolting | GEORGE GHEBRYAL | special |
| 03/25/2026 | Final | George Ozga | progress |
| 03/25/2026 | Structural Stability – Alterations of existing buildings | GEORGE GHEBRYAL | special |
| 03/25/2026 | Structural Steel - Details | GEORGE GHEBRYAL | special |
| 03/25/2026 | Structural Steel - Welding | GEORGE GHEBRYAL | special |
| 02/11/2026 | Final | Paul Millman | progress |
| 02/11/2026 | Structural Steel - Welding | GEORGE GHEBRYAL | special |
| 02/11/2026 | Structural Steel - High Strength Bolting | GEORGE GHEBRYAL | special |
| 02/11/2026 | Structural Steel - Details | GEORGE GHEBRYAL | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Hunter College North Building | Education | Sub-basement, Floors 1, 5–9, 12–14, Roof | Project M01391367 Project M01329672 Project M01091743 Project M00759340 |
| Hunter College City University of New York | Education | Sub-cellar, Cellar, Sub-basement, Floors 1–5, 7, 12–16, Mezzanine, Roof | Project M01323081 Project M01249919 Project M01358636 Project M01303357 Project M01259079 Project M01210345 Project M01089047 Project M01021367 Project M01023340 Project M00906402 Project M00849821 Project M00880549 |