| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 03/26/2025 | Signed-off | STRUCTURE TONE, LLC | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Mitsubishi Electric PUHY- EP144TNU-A1 960,000 BTU · Vrf Outdoor ×3 PUHY-EP-144TNU-A1 960,000 BTU · Vrf Outdoor ×1 Ventilation Mainstream MLR-72X50-2.0-HD 6,750 CFM · Kitchen Exhaust ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/24/2026 | Permit Issued | TF ELECTRICAL CORP | General Wiring |
| 01/12/2026 | Permit Issued | P.E. STONE INC | General Wiring |
| 01/12/2026 | Complete | KLEINKNECHT ELEC. CO.,INC | General Wiring |
| 11/25/2025 | Complete | H. & L. ELECTRIC INC | General Wiring |
| 09/16/2025 | Permit Issued | CORPORATE ELEC. GROUP INC | — |
| 07/14/2025 | Complete | H. & L. ELECTRIC INC | — |
| 07/10/2025 | Permit Issued | WARREN OSTROFF ELEC., INC | General Wiring |
| 04/01/2025 | Complete | BOROWIDE ELECT'L CONTR'S | — |
| 02/06/2025 | Complete | H. & L. ELECTRIC INC | General Wiring |
| 11/01/2022 | Permit Issued | DIFALZO ELECTRIC NY, INC | General Wiring |
| 10/24/2022 | Permit Issued | DIFALZO ELECTRIC NY, INC | General Wiring |
| 10/24/2022 | Complete | DIFALZO ELECTRIC NY, INC | General Wiring |
| 03/09/2021 | Complete | LOWY & DONNATH INC. | General Wiring |
| 02/19/2019 | Permit Issued | DIFAZIO ELECTRIC NY, INC | General Wiring |
| 04/25/2018 | Complete | INTER CONNECTION ELEC INC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/06/2025 | Permit Issued | B&B CONTRACTING GRP LLC | Steel, Concrete, Masonry |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/23/2026 | Signed-off | SAFWAY ATLANTIC, LLC | Fence, Scaffold |
| — | — | — | Fence |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/13/2026 | Permit Issued | STRUCTURE TONE, LLC | Tenant Protection Plan 72 Hour |
| Owner | Filings | Most Recent |
|---|---|---|
| ST REGIS HOTEL | 79 | 07/08/2026 |
| SWATCH GROUP U S | 3 | 07/08/2026 |
| XINOS CONSTRUCTION | 12 | 07/08/2026 |
| VORNADO REALTY TRUST | 5 | 04/09/2026 |
| OMEGA INDUSTRIES INC. | 2 | 03/22/2026 |
| FIFTH AND FIFTHY FIFTH CO | 3 | 03/22/2026 |
| ST REGIS HOTEL JOINT VENTURE | 3 | 03/22/2026 |
| WATTS RESTORATION INC | 5 | 03/22/2026 |
| AT&T WIRELESS SERVICES | 1 | 03/21/2026 |
| VORNADO OFFICE MANAGEMENT LLC | 33 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| BAZINI ENGINEERING, P.C. | 1 | 05/05/2026 |
| BRAND ACCESS SOLUTIONS | 7 | 02/23/2026 |
| MLG ARCHITECTS | 9 | 02/12/2026 |
| VINCENT J. LIOTTA P.E. | 1 | 01/07/2026 |
| RAND ENGINEERING & ARCHITECTURE DPC | 1 | 05/06/2025 |
| A DEGREE OF FREEDOM STRUCTURAL ENGI | 2 | 04/29/2025 |
| ASHRAF CORP | 1 | 03/29/2025 |
| SOUTHPORT ENGINEERING ASSOCIATES PC | 7 | 03/26/2025 |
| TSF ENGINEERING, PC | 1 | 11/15/2024 |
| FZAD | 1 | 11/13/2024 |
| POLISE CONSULTING ENGINEER | 2 | 12/12/2023 |
| FISKAA ENGINEERING | 1 | 09/19/2022 |
| SAGHARI ARCHITECTURAL SERVICES, PC | 1 | 08/31/2022 |
| RENANT ANTREN CORP. | 1 | 07/29/2022 |
| NY RESTORATION TECHNOLOGY CORP | 1 | 01/13/2021 |
| KMB DESIGN GROUP, LLC | 1 | 06/12/2020 |
| ELI MARGALIT | 1 | 11/01/2019 |
| ASIF JAMIL, RA | 1 | 03/13/2019 |
| CPENGINEERING PC | 1 | — |
| Representative | Filings | Most Recent |
|---|---|---|
| A1 EXPEDITING SERVICE | 14 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 38 | 03/21/2026 |
| SMEP DESIGN & CONSULTATION LLC | 4 | 03/21/2026 |
| FZAD ARCHITECTURE + DESIGN | 1 | 03/21/2026 |
| CASA GROUP | 2 | 03/21/2026 |
| JULIAN A. GOMEZ | 2 | 03/21/2026 |
| CCM CONSULTING GROUP, INC. | 1 | 03/21/2026 |
| METROPOLIS GROUP INC | 2 | 03/21/2026 |
| GM ZONING FILING | 2 | 03/21/2026 |
| STRELING ENGINEERING SERVICES P C | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| STRUCTURE TONE, LLC | General Contractor | 19 | 09/03/2026 |
| TRYSTATE MECHANICAL, INC | General Contractor | 10 | 07/08/2026 |
| SAFWAY ATLANTIC, LLC | General Contractor | 9 | 07/08/2026 |
| XINOS CONSTRUCTION CORP | General Contractor | 8 | 07/08/2026 |
| B&B CONTRACTING GRP LLC | General Contractor | 4 | 04/09/2026 |
| CJS INDUSTRIES INC | General Contractor | 3 | 04/09/2026 |
| SCOTT BIGMAN | Electrical | 2 | 03/21/2026 |
| ROBERT CHAIKIN | Electrical | 2 | 03/21/2026 |
| DYNAIRE LLC | General Contractor | 2 | 07/08/2026 |
| MANENGEERING BUREAU INC | Fire Protection | 2 | 07/08/2026 |
| SERRANO, JAVIER | Electrical | 1 | 03/21/2026 |
| LAWRENCE J. LEVINE | Fire Protection | 1 | 03/21/2026 |
| PHOENIX PLMBG & MECH CORP | Fire Protection | 1 | 07/08/2026 |
| ANDAMIO SCAFFOLDING LLC | General Contractor | 1 | 04/09/2026 |
| DPC NEW YORK, INC | General Contractor | 1 | 07/08/2026 |
| LANE REFRIGERATION CO.,IN | General Contractor | 1 | 04/09/2026 |
| LG TECH LLC | General Contractor | 1 | 04/09/2026 |
| ARROYO, RAFAEL | Electrical | 1 | 03/21/2026 |
| PAR PLUMBING CO., INC | Plumbing | 1 | 07/08/2026 |
| BEHNAMBAKHSH, SHAYAN | Electrical | 1 | 03/21/2026 |
| DIFALZO ELECTRIC NY, INC | Electrical | 1 | 03/22/2026 |
| GREGORY SZWAJA | Electrical | 1 | 03/21/2026 |
| IANNACONE, FERDINAND | Electrical | 1 | 03/21/2026 |
| JAMES GIORGIO, JR | Electrical | 1 | 03/21/2026 |
| KLEINKNECHT ELEC. CO.,INC | Electrical | 1 | 03/22/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| BAZINI ENGINEERING, P.C. | 1808 | 1 | 05/05/2026 |
| G. BLINN CONSULTING, LLC | 2894 | 5 | 02/23/2026 |
| SHAHRISH SHUVO ENGINEERIN | 8524 | 5 | 02/12/2026 |
| VINCENT J. LIOTTA P. E. | 1974 | 1 | 01/07/2026 |
| RAND ENGINEERING & ARCHIT | 266 | 1 | 05/06/2025 |
| PSI AGENCY INC. | 254 | 15 | 03/26/2025 |
| TSF ENGINEERING, PC | 1274 | 1 | 11/15/2024 |
| FZAD ARCHITECTURE + DESIG | 2041 | 1 | 11/13/2024 |
| W. ALLEN ENGINEERING PLLC | 664 | 1 | 09/19/2022 |
| AMKA & ASSOCIATES LLC | 8239 | 2 | 08/31/2022 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 09/02/2026 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 09/02/2026 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 05/29/2026 |
| DOB NOW | General Construction | Signed-off | DYNAIRE LLC | 05/11/2026 |
| DOB NOW | Mechanical Systems | Signed-off | DYNAIRE LLC | 05/08/2026 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 02/26/2026 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 02/02/2026 |
| DOB NOW | Mechanical Systems | Signed-off | LANE REFRIGERATION CO.,IN | 01/12/2026 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 12/19/2025 |
| DOB NOW | Structural | Permit Issued | B&B CONTRACTING GRP LLC | 12/11/2025 |
| DOB NOW | Supported Scaffold | Signed-off | SAFWAY ATLANTIC, LLC | 10/14/2025 |
| DOB NOW | Construction Fence | Signed-off | SAFWAY ATLANTIC, LLC | 09/29/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | SAFWAY ATLANTIC, LLC | 09/29/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | SAFWAY ATLANTIC, LLC | 09/29/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | SAFWAY ATLANTIC, LLC | 09/16/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | SAFWAY ATLANTIC, LLC | 08/25/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | SAFWAY ATLANTIC, LLC | 08/25/2025 |
| DOB NOW | Construction Fence | Signed-off | SAFWAY ATLANTIC, LLC | 08/25/2025 |
| DOB NOW | Structural | Permit Issued | B&B CONTRACTING GRP LLC | 07/31/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | STRUCTUAL PRESV SYSTEM | 07/02/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | STRUCTUAL PRESV SYSTEM | 07/02/2025 |
| DOB NOW | Structural | Signed-off | STRUCTURE TONE, LLC | 05/15/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | ANDAMIO SCAFFOLDING LLC | 03/31/2025 |
| DOB NOW | Mechanical Systems | Signed-off | STRUCTURE TONE, LLC | 02/26/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | STRUCTUAL PRESV SYSTEM | 02/25/2025 |
| DOB NOW | General Construction | Signed-off | CJS INDUSTRIES INC | 12/23/2024 |
| DOB NOW | Mechanical Systems | Signed-off | CJS INDUSTRIES INC | 12/23/2024 |
| DOB NOW | Suspended Scaffold | Signed-off | STRUCTUAL PRESV SYSTEM | 06/14/2024 |
| DOB NOW | Sprinklers | Signed-off | MANENGEERING BUREAU INC | 01/22/2024 |
| DOB NOW | Sprinklers | Signed-off | MANENGEERING BUREAU INC | 01/22/2024 |
| DOB NOW | Plumbing | Signed-off | PAR PLUMBING CO., INC | 01/22/2024 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 12/28/2023 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 12/27/2023 |
| DOB NOW | Structural | Signed-off | STRUCTURE TONE, LLC | 12/27/2023 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 12/27/2023 |
| DOB NOW | Mechanical Systems | Signed-off | STRUCTURE TONE, LLC | 12/27/2023 |
| DOB NOW | Mechanical Systems | Signed-off | STRUCTURE TONE, LLC | 12/27/2023 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 12/27/2023 |
| DOB NOW | Structural | Signed-off | XINOS CONSTRUCTION CORP | 08/16/2023 |
| DOB NOW | Supported Scaffold | Signed-off | XINOS CONSTRUCTION CORP | 07/31/2023 |
| Date | Type | Result | Report |
|---|---|---|---|
| 06/11/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 12/12/2025 | Pass-Final PL - Underground | Pass | View ↗ |
| 10/03/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/11/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/06/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/04/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/06/2024 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 06/27/2024 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 06/21/2024 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 09/21/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/20/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 01/11/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 04/23/2026 | Final | Joseph Bazini | progress |
| 04/23/2026 | Heating Systems | Joseph Bazini | special |
| 04/23/2026 | Tenant Protection Plan Compliance | Joseph Bazini | special |
| 04/23/2026 | Mechanical Systems | Joseph Bazini | special |
| 02/03/2026 | Post-installed Anchors | GREG BLINN | special |
| 02/03/2026 | Post-installed Anchors | GREG BLINN | special |
| 01/07/2026 | HVAC-R and service water heating equipment | Vincent Liotta | energy_progress |
| 01/07/2026 | Maintenance information | Vincent Liotta | energy_progress |
| 01/07/2026 | HVAC-R and service water piping design and insulation | Vincent Liotta | energy_progress |
| 01/07/2026 | HVAC-R and service water heating system controls | Vincent Liotta | energy_progress |
| 12/19/2025 | Tenant Protection Plan Compliance | Shahrish Shuvo | special |
| 12/19/2025 | Tenant Protection Plan Compliance | Shahrish Shuvo | special |
| 12/19/2025 | Final | Kevin Brown | progress |
| 12/19/2025 | Final | Kevin Brown | progress |
| 10/09/2025 | Post-installed Anchors | GREG BLINN | special |
| 10/07/2025 | Tenant Protection Plan Compliance | Shahrish Shuvo | special |
| 10/02/2025 | Final | Kevin Brown | progress |
| 02/24/2025 | Energy Code Compliance Inspections | MAURICIO ANDRADE | progress |
| 02/24/2025 | Fire-Resistant Penetrations and Joints | MAURICIO ANDRADE | special |
| 02/24/2025 | Tenant Protection Plan Compliance | — | special |
| 02/24/2025 | Sprayed fire-resistant materials | James Vignola | special |
| 02/24/2025 | Final | MAURICIO ANDRADE | progress |
| 02/24/2025 | Mechanical Systems | MAURICIO ANDRADE | special |
| 11/05/2024 | Mechanical Systems | Nicholas Tucci | special |
| 11/05/2024 | Fire-Resistant Penetrations and Joints | Nicholas Tucci | special |