Locations of Work
PlumbingFire Protection
Floor 22p · 2 filings · 20 docs
Floor 12p · 2 filings · 20 docs
Cellar2p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/11/2019$1.4M—Private party → Private party— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JBA104/18/2024
SHMUEL D. FLAUM, ARCHITECT703/14/2024
ENGINEERING PROFESSIONAL SERVICE P.106/15/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KC EXPEDITING203/21/2026
IMA ENGINEERING403/21/2026
PWF103/21/2026
MEP DESIGNS203/21/2026
DEMOWORKS EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AZCONA, INCGeneral Contractor307/08/2026
ALL-BORO REHAB CONST CORPPlumbing307/08/2026
HIRSCHEL ELECTRICAL INC.Electrical103/22/2026
SAFETY FIRE SPRINKLER CORPFire Protection107/08/2026
J SYNERGY GREEN INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOYUN KIM; RA7415104/18/2024
ANDREW KATZ1030303/14/2024
SHMUEL D. FLAUM, ARCHITEC4278202/21/2024
DAVID KATZ, P.E.6087106/15/2020
Building Lifecycle
All (62)Filed (9)Permit Issued (7)Signed Off (5)Inspection (4)Objection (20)Special Inspection (17)
05/22/2024
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
Q01038336-I1
05/02/2024
Permit issued — Solar
Q01038336-I1-SL
04/18/2024
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
Q01038336-I1
04/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DOYUN KIM
04/18/2024
Special inspection requirement — Air barrier - visual inspection
JEFFREY BELL
04/18/2024
Special inspection requirement — Final
JEFFREY BELL
04/18/2024
Special inspection requirement — Energy Code Compliance Inspections
JEFFREY BELL
04/18/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
DOYUN KIM
04/04/2024
Signed off — Alteration
PLUMBING WORK IN CONJUNCTION WITH NB#421735590
Q00348066-I1
03/27/2024
Special inspection requirement — HVAC insulation and sealing
Shmuel Flaum
03/27/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANDREW KATZ
03/27/2024
Special inspection requirement — HVAC and service water heating equipment
Shmuel Flaum
03/27/2024
Special inspection requirement — Maintenance information
Shmuel Flaum
03/27/2024
Special inspection requirement — HVAC and service water heating system controls
Shmuel Flaum
03/14/2024
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH NB#421735590
Q00348066-P5
03/05/2024
Signed off — Alteration
PLUMBING WORK IN CONJUNCTION WITH NB#421735590
Q00348066-S1
02/28/2024
Signed off — Alteration
Installation of a sprinkler system in conjunction with new building application #421735590.
Q00356668-I1
02/27/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
02/26/2024
Permit issued — Plumbing
Q00348066-S1-PL
02/22/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/21/2024
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH NB#421735590
Q00348066-P4
02/21/2024
Permit issued — Sprinklers
Q00356668-I1-PL
02/21/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Shmuel Flaum
08/15/2023
Signed off — Alteration
temporary construction fence
Q00228786-I1
07/08/2022
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH NB#421735590
Q00348066-P2
01/27/2022
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH NB#421735590
Q00348066-P1
01/25/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANDREW KATZ
01/25/2022
Special inspection requirement — HVAC and service water heating system controls
Shmuel Flaum
01/25/2022
Special inspection requirement — On-Site Private Sewage Disposal Systems Installation
ANDREW KATZ
01/25/2022
Special inspection requirement — HVAC insulation and sealing
Shmuel Flaum
01/25/2022
Special inspection requirement — HVAC and service water heating equipment
Shmuel Flaum
01/25/2022
Special inspection requirement — Maintenance information
Shmuel Flaum
01/11/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/04/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/03/2022
Permit issued — Plumbing
Q00356668-I1-EW-SP
08/18/2021
Permit issued — Construction Fence
Q00228786-I1-FN
04/21/2021
Permit issued — Plumbing
Q00348066-I1-PL
04/09/2021
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH NB#421735590
Q00348066-S1
06/15/2020
Filed — Alteration
Installation of a sprinkler system in conjunction with new building application #421735590.
Q00356668-I1
05/13/2020
Objection raised — Scope
05/13/2020
Objection resolved — Addressed
05/13/2020
Objection raised — Mechanical
05/13/2020
Objection resolved — Addressed
05/13/2020
Objection raised — Inspections
05/13/2020
Objection resolved — Addressed
05/13/2020
Objection raised — Other
05/13/2020
Objection resolved — Addressed
05/13/2020
Objection raised — Inspections
05/13/2020
Objection resolved — Addressed
05/13/2020
Objection raised — Other
05/13/2020
Objection resolved — Addressed
05/13/2020
Objection raised — Inspections
05/13/2020
Objection resolved — Addressed
05/10/2020
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH NB#421735590
Q00348066-I1
11/13/2019
Permit issued — Construction Fence
Q00228786-I1-FN
10/10/2019
Objection raised — 2014-AN AC 28-104.7-Building C
10/10/2019
Objection resolved — Addressed
10/10/2019
Objection raised — Scope
10/10/2019
Objection resolved — Addressed
10/10/2019
Objection raised — Inspections
Latest 60 of 62 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offJ SYNERGY GREEN05/02/2024
DOB NOWPlumbingSigned-offALL-BORO REHAB CONST CORP02/26/2024
DOB NOWSprinklersSigned-offALL-BORO REHAB CONST CORP02/21/2024
DOB NOWPlumbingSigned-offSAFETY FIRE SPRINKLER CORP01/03/2022
DOB NOWConstruction FenceSigned-offAZCONA, INC08/18/2021
DOB NOWPlumbingSigned-offALL-BORO REHAB CONST CORP04/21/2021
DOB NOWConstruction FenceSigned-offAZCONA, INC11/13/2019
BIS—ISSUEDALL-BORO REHAB CONSTRCT C01/02/2022
BIS—ISSUEDALL-BORO REHAB CONSTRCT C03/24/2021
BIS—ISSUEDALL-BORO REHAB CONSTRCT C03/24/2021
BIS—ISSUEDALL-BORO REHAB CONSTRCT C08/16/2020
BIS—ISSUEDALL-BORO REHAB CONSTRCT C08/05/2020
BIS—ISSUEDAZCONA, INC11/15/2019
2 projects · most recent 04/18/2024
General Wiring
FiledStatusContractorScope
04/18/2024CompleteGREEN LIGHT ELECL & MECH—
11/29/2022CompleteHIRSCHEL ELECTRICAL INC.General Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/27/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
02/22/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/11/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/04/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
04/18/2024Fire-Resistant Penetrations and JointsDOYUN KIMspecial
04/18/2024Air barrier - visual inspectionJEFFREY BELLenergy_progress
04/18/2024FinalJEFFREY BELLprogress
04/18/2024Energy Code Compliance InspectionsJEFFREY BELLprogress
04/18/2024Structural Stability – Alterations of existing buildingsDOYUN KIMspecial
03/27/2024HVAC insulation and sealing Shmuel Flaumenergy_progress
03/27/2024Fire-Resistant Penetrations and JointsANDREW KATZspecial
03/27/2024HVAC and service water heating equipment Shmuel Flaumenergy_progress
03/27/2024Maintenance informationShmuel Flaumenergy_progress
03/27/2024HVAC and service water heating system controls Shmuel Flaumenergy_progress
02/21/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationShmuel Flaumspecial
01/25/2022Fire-Resistant Penetrations and JointsANDREW KATZspecial
01/25/2022HVAC and service water heating system controls Shmuel Flaumenergy_progress
01/25/2022On-Site Private Sewage Disposal Systems InstallationANDREW KATZspecial
01/25/2022HVAC insulation and sealing Shmuel Flaumenergy_progress
01/25/2022HVAC and service water heating equipment Shmuel Flaumenergy_progress
01/25/2022Maintenance informationShmuel Flaumenergy_progress
▾Documents — 153 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch4
08/27/2026Q00348066-P2Request digital key ↗
08/27/2026Q00348066-S1Request digital key ↗
08/27/2026Q00348066-P4Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
08/28/2026Q00356668-I1Request digital key ↗
08/27/2026Q00348066-P1Request digital key ↗
08/27/2026Q00348066-P5Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/14/2026Q00228786-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
08/28/2026Q00356668-I1Request digital key ↗
▸Applications & Permits16
▸BISPLAN / WORK APPROVAL APPLICATION10
04/18/2025421735590Open ↗
03/11/2024421735590Open ↗
04/28/2021421735590Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION4
10/15/2020421735590Open ↗
10/15/2020421735590Open ↗
08/16/2020421735590Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
02/23/2022440590638Open ↗
05/26/2020440590638Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISVERIFY TAX LOT1
02/15/2024421735590Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
01/22/2024421735590Open ↗
▸BISZONING DIAGRAM1
06/24/2020421735590Open ↗
▸Seals & Professional Certifications26
▸DOB NOWProgress Inspector Seal & Signature10
08/28/2026Q01038336-I1Open ↗
08/28/2026Q01038336-I1Open ↗
08/27/2026Q00348066-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/28/2026Q00228786-I1Open ↗
08/28/2026Q00356668-I1Open ↗
08/27/2026Q00348066-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/28/2026Q01038336-I1Open ↗
08/27/2026Q00348066-I1Open ↗
08/23/2026Q00348066-P1Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
02/24/2022440590638Open ↗
05/26/2020440590638Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
03/04/2020421735590Open ↗
▸Trade Schedules & Equipment4
▸BISGAS CUT-OFF1
11/21/2019421937408Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
03/05/2024421735590Open ↗
▸BISSEWER CUT-OFF1
11/21/2019421937408Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
03/05/2024421735590Open ↗
▸Safety & Tenant Protection9
▸BISSTREET TREE CHECKLIST3
02/23/2022440590638Open ↗
06/24/2020421735590Open ↗
03/04/2020421735590Open ↗
▸BISSTREET TREES SITE PLAN2
04/04/2024421735590Open ↗
03/25/2022440590638Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
11/21/2019421937408Open ↗
11/21/2019421937408Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
01/12/2024421735590Open ↗
▸BISSTREET TREE SIGNOFF1
06/05/2024421735590Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
02/12/2024421735590Open ↗
01/22/2024421735590Open ↗
07/25/2022421735590Open ↗
Showing 3 of 5 on file for this type
▸BISAIR SEALING AND INSULATION - VISUAL1
03/05/2024421735590Open ↗
▸BISINTERIOR LIGHTING POWER1
03/05/2024421735590Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
03/05/2024421735590Open ↗
▸BISFENESTRATION AREAS1
03/05/2024421735590Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
03/05/2024421735590Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
03/05/2024421735590Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/05/2024421735590Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/07/2024421735590Open ↗
▸BIS* HVAC INSULATION AND SEALING1
03/05/2024421735590Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/04/2020421735590Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00348066-I1Open ↗
▸Inspections & Test Reports20
▸BISTECHNICAL REPORT: RESPONSIBILITY6
02/12/2024421735590Open ↗
02/08/2024421735590Open ↗
07/25/2022421735590Open ↗
Showing 3 of 6 on file for this type
▸BISDEMOLITION (DM) JOB SIGNOFF2
04/04/2024421735590Open ↗
01/22/2024421735590Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
06/04/2024421735590Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
01/18/2024421735590Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
07/27/2020421735590Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
03/05/2024421735590Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
03/05/2024421735590Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
03/05/2024421735590Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
03/05/2024421735590Open ↗
▸BISMASONRY1
03/05/2024421735590Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
03/05/2024421735590Open ↗
▸BISDEMOLITION1
03/05/2024421735590Open ↗
▸BISSOIL REPORT1
06/22/2020421735590Open ↗
▸BISSOIL PERC. TEST-PVT ON-SITE STORM WATER DRAINAGE DISPOSAL SYS & DET. FACL.1
01/22/2024421735590Open ↗
▸Approvals, Objections & Sign-offs13
▸BISLETTERS - SUPPORTING DOCUMENTATION5
06/06/2024421735590Open ↗
06/03/2024421735590Open ↗
04/05/2024421735590Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
03/11/2024421735590Open ↗
05/15/2020421735590Open ↗
04/20/2020421735590Open ↗
Showing 3 of 4 on file for this type
▸BISTAP LETTER - DOM SVC : DEP-DOM1
11/21/2019421937408Open ↗
▸BISLANDMARKS APPROVAL1
11/21/2019421937408Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
06/22/2020421735590Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01038336-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
11/21/2019421937408Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
11/21/2019421937408Open ↗
▸Filing & Intake Forms11
▸BISADDITIONAL INFORMATION6
06/03/2024421735590Open ↗
03/28/2024421735590Open ↗
03/25/2022440590638Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET2
03/04/2020421735590Open ↗
09/17/2019421937408Open ↗
▸BISBOROUGH INTAKE FORM2
10/15/2020421735590Open ↗
04/20/2020421735590Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
02/24/2022440590638Open ↗
▸Other Documents8
▸BISBPP - SUPPORTING DOCUMENTATION2
02/24/2022440590638Open ↗
05/26/2020440590638Open ↗
▸BISSHUTOFF DAMPERS1
03/05/2024421735590Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
06/22/2020421735590Open ↗
▸BISLOWEST FLOOR ELEVATION1
08/03/2020421735590Open ↗
▸BISMAINTENANCE INFORMATION1
03/05/2024421735590Open ↗
▸BISPERMANENT CERTIFICATE1
03/05/2024421735590Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
03/05/2024421735590Open ↗