← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
City Point Condominium
7 DEKALB AVENUE · BIN 3396776
💬 Discuss this project
2011Year Built
50Stories
RMBuilding Class
C6-4.5Zoning
1,137,013 sfGross Floor Area
696Units
LL97 CoveredRent Stabilized40 Open Violations 36 unresolved · 4 paperwork only ▸FDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: NYC HOUSING PRESERVATION AND DEVELOPMENT · 113,202 sf lot · 10.04 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Floor 312p · 4 filings · 20 docs
Floor 210p · 5 filings · 20 docs
Floor 114p · 6 filings · 20 docs
Cellar7p · 2 filings · 20 docs
Sub-Basement3p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ACADIA REALTY TRUST6107/08/2026
ALBEE DEVELOPMENT5403/22/2026
HOUSING PRESERVATION & DE103/22/2026
TO THE OWNER OF 1 DEKALB103/22/2026
WASHINGTON MUTUAL BANK SU103/22/2026
TO THE OWNER OF THE PREMI103/22/2026
ACRS 11 LLC203/22/2026
BEDROCK GROUP103/22/2026
ALBEE RETAIL DEVELOPMENT, LLC.5703/21/2026
ALBEE DEVELOPMETN LLC C/O ACRS I803/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WILLIAM VITACCO ASSOCIATES1003/21/2026
BUILDING BROTHERS403/21/2026
DVA Advisors603/21/2026
DIRECT ACCESS EXPEDITING, INC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BALATON CONSULTING LLCScaffold507/08/2026
SWEET GROUP OF NY LLCGeneral Contractor407/08/2026
CITY ELEC'L SIGN ERECTORSElectrical303/22/2026
ADVANCED PLUMBING MECHPlumbing307/08/2026
CITY SIGNSScaffold207/08/2026
ACRS IIGeneral Contractor203/22/2026
KING HOIST & SCAFFOLDINGGeneral Contractor203/21/2026
LORICH CONSTRUCTION MANAGEMENTGeneral Contractor204/09/2026
SCHIMENTI CONSTRUCTION COGeneral Contractor207/08/2026
JOSEPH SPIRELLIElectrical103/21/2026
CMA PLUMBING & HEATING INFire Protection107/08/2026
AARON PLBG AND MECH SYSTPlumbing107/08/2026
ADVANCED PLBG MECH SPRPlumbing103/22/2026
ADVANCED PLBG, MECH & SPRFire Protection107/08/2026
ARTESA LLCGeneral Contractor104/09/2026
J. CAIAZZO PLBG & HTG CORPlumbing107/08/2026
ABCO-PEERLESS SPRKLR CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DESIMONE CONSULTING ENGIN5942110/08/2025
COLE TECHNOLOGIES/CONTROL1290905/13/2024
CATALPA SPECIAL INSPECTIO2004204/26/2022
MEP INSPECTIONS, INC1102104/26/2022
Building Lifecycle
All (143)Filed (25)Permit Issued (23)Signed Off (16)Violation (60)Inspection (19)
06/29/2026
Filed — No Work
B01415710-I1
01/05/2026
Permit issued — Structural
B01283495-I1-ST
10/08/2025
Filed — Alteration
B01283495-I1
09/04/2025
Violation issued (ECB, open)
Unknown
07/31/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/02/2025
Signed off — Alteration
Structural work for tenant space Sephora as shown on plans
B00892038-S1
01/02/2025
Signed off — Alteration
Structural work for tenant space Sephora as shown on plans
B00892038-I1
07/17/2024
Signed off — Alteration
Structural work for tenant space Sephora as shown on plans
B00892038-S2
06/21/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/21/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/14/2024
Inspection — No Access-Final SP - Up to 3 Requested Floors
No Access
View inspection ↗
05/13/2024
Filed — Alteration
Structural work for tenant space Sephora as shown on plans
B00892038-P1
05/08/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/07/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/10/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/09/2024
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
03/15/2024
Permit issued — Structural
B00892038-S3-ST
03/15/2024
Permit issued — General Construction
B00892038-I1-GC
01/03/2024
Permit issued — Plumbing
B00892038-S1-PL
12/13/2023
Permit issued — Sprinklers
B00892038-S2-EW-SP
10/25/2023
Permit issued — Structural
B00892038-S3-ST
10/25/2023
Permit issued — General Construction
B00892038-I1-GC
08/18/2023
Filed — Alteration
Structural work for tenant space Sephora as shown on plans
B00892038-S3
08/04/2023
Filed — Alteration
Structural work for tenant space Sephora as shown on plans
B00892038-S1
08/04/2023
Filed — Alteration
Structural work for tenant space Sephora as shown on plans
B00892038-S2
08/03/2023
Filed — Alteration
Structural work for tenant space Sephora as shown on plans
B00892038-I1
03/02/2023
Signed off — Alteration
Application filed for General Construction work as shown on plans.
B00706849-I1
02/09/2023
Filed — Alteration
Application filed for General Construction work as shown on plans.
B00706849-P1
01/23/2023
Signed off — Alteration
Modification of plumbing and sprinkler systems as shown on plans
B00708113-I1
01/17/2023
Signed off — Alteration
Modification of plumbing system as shown on plans
B00599211-I1
01/13/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/12/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/10/2023
Signed off — Alteration
Erect illuminated accessory business wall sign; copy reading "PRIMARK"
B00778573-I1
01/10/2023
Signed off — Alteration
B00778571-I1
01/10/2023
Signed off — Alteration
B00778568-I1
01/10/2023
Signed off — Alteration
B00778551-I1
01/10/2023
Signed off — Alteration
Erect illuminated accessory business wall sign; copy reading "Primark"
B00778569-I1
01/09/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/20/2022
Signed off — Alteration
Application filed for general construction and non-structural demolition. Egress capacity of Phase 1 stairs and occupancy egress out those stairs remain unchanged.
B00599293-I1
12/16/2022
Filed — Alteration
Modification of plumbing system as shown on plans
B00599211-P1
12/06/2022
Signed off — Alteration
Mechanical work as reflected on submitted plans.
B00706851-I1
12/01/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/28/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/22/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/22/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/21/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/14/2022
Signed off — Alteration
B00599219-I1
10/14/2022
Permit issued — Sign
B00778551-I1-SG
10/14/2022
Permit issued — Sign
B00778568-I1-SG
10/14/2022
Permit issued — Sign
B00778569-I1-SG
10/14/2022
Permit issued — Sign
B00778571-I1-SG
10/14/2022
Permit issued — Sign
B00778573-I1-SG
10/13/2022
Filed — Alteration
Erect illuminated accessory business wall sign; copy reading "PRIMARK"
B00778573-I1
10/13/2022
Filed — Alteration
B00778571-I1
10/13/2022
Filed — Alteration
B00778568-I1
10/13/2022
Filed — Alteration
B00778551-I1
10/13/2022
Filed — Alteration
Erect illuminated accessory business wall sign; copy reading "Primark"
B00778569-I1
10/04/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/08/2022
Permit issued — Supported Scaffold
B07995509-I1-SF
09/07/2022
Filed — Alteration
B07995509-I1
Latest 60 of 143 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offARTESA LLC01/05/2026
DOB NOWStructuralSigned-offSWEET GROUP OF NY LLC03/15/2024
DOB NOWGeneral ConstructionSigned-offSWEET GROUP OF NY LLC03/15/2024
DOB NOWPlumbingSigned-offADVANCED PLUMBING MECH01/03/2024
DOB NOWSprinklersSigned-offADVANCED PLBG, MECH & SPR12/13/2023
DOB NOWStructuralSigned-offSWEET GROUP OF NY LLC10/25/2023
DOB NOWGeneral ConstructionSigned-offSWEET GROUP OF NY LLC10/25/2023
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO10/14/2022
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO10/14/2022
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO10/14/2022
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO10/14/2022
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO10/14/2022
DOB NOWSupported ScaffoldPermit IssuedKING HOIST & SCAFFOLDING09/08/2022
DOB NOWPlumbingSigned-offAARON PLBG AND MECH SYST08/11/2022
DOB NOWPlumbingSigned-offABCO-PEERLESS SPRKLR CORP05/13/2022
DOB NOWMechanical SystemsPermit IssuedSCHIMENTI CONSTRUCTION CO05/03/2022
DOB NOWGeneral ConstructionSigned-offSCHIMENTI CONSTRUCTION CO05/03/2022
DOB NOWSprinklersSigned-offCMA PLUMBING & HEATING IN01/13/2022
DOB NOWPlumbingSigned-offJ. CAIAZZO PLBG & HTG COR01/04/2022
DOB NOWGeneral ConstructionSigned-offLORICH CONSTRUCTION MANAGEMENT12/23/2021
DOB NOWMechanical SystemsPermit IssuedLORICH CONSTRUCTION MANAGEMENT12/09/2021
DOB NOWSignSigned-offELMER DAWSON12/29/2017
DOB NOWSignSigned-offELMER DAWSON12/29/2017
BISMHISSUEDLORICH CONSTRUCTION MANAGEMENT10/18/2019
BISOTISSUEDLORICH CONSTRUCTION MANAGEMENT10/18/2019
BISOTISSUEDLORICH CONSTRUCTION MANAGEMENT10/18/2019
BISOTISSUEDASG CONSTRUCTION GROUP IN09/04/2019
BISSPISSUEDCAPITOL FIRE SPRINKLER CO06/14/2019
BISOTISSUEDDGC CAPITAL CONTRACTING CORP03/27/2019
BISPLISSUEDA & M WARSHAW PLBG & HTG12/22/2017
BISOTISSUEDALL-RITE CONSTRUCTION CO12/04/2017
BISOTISSUEDALL-RITE CONSTRUCTION CO12/04/2017
BISMHISSUEDALL-RITE CONSTRUCTION CO12/04/2017
BISEQISSUEDADVANCED SCAFFOLD SERVICE09/16/2016
BIS—ISSUEDAMERICAN SIGN & ELECL CON07/26/2016
BIS—ISSUEDAMERICAN SIGN & ELECL CON07/26/2016
BIS—ISSUEDAMERICAN SIGN & ELECL CON07/26/2016
BIS—ISSUEDAMERICAN SIGN & ELECL CON07/26/2016
BIS—ISSUEDAMERICAN SIGN & ELECL CON07/26/2016
BIS—ISSUEDAMERICAN SIGN & ELECL CON07/25/2016
+ 33 more permits on file
1 project · most recent 05/13/2024
Sprinkler System
FiledStatusContractorScope
05/13/2024Signed-offADVANCED PLBG, MECH & SPRSprinkler System
1 project · most recent 05/13/2024
Water/Sanitary
FiledStatusContractorScope
05/13/2024Signed-offADVANCED PLUMBING MECHWater/Sanitary
10 projects · most recent 11/23/2022
General Wiring
FiledStatusContractorScope
11/23/2022CompleteCITY ELEC'L SIGN ERECTORS—
11/23/2022CompleteCITY ELEC'L SIGN ERECTORS—
11/23/2022CompleteCITY ELEC'L SIGN ERECTORS—
11/23/2022CompleteCITY ELEC'L SIGN ERECTORS—
11/23/2022CompleteCITY ELEC'L SIGN ERECTORS—
07/11/2019CompleteJAM ELECTRICAL CORP—
04/24/2019CancelledSPIRELLI ELECTRIC INCGeneral Wiring
04/17/2019CompleteSPIRELLI ELECTRIC INCGeneral Wiring
11/26/2018CompleteSPIRELLI ELECTRIC INCGeneral Wiring
02/12/2018Permit IssuedBOROWIDE ELECT'L CONTR'SGeneral Wiring
1 project · most recent 05/13/2024
Steel Concrete
FiledStatusContractorScope
05/13/2024Signed-offSWEET GROUP OF NY LLCSteel, Concrete
▾Field Inspections (DOB CAP) — 19
DateTypeResultReport
06/21/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/21/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/14/2024No Access-Final SP - Up to 3 Requested FloorsNo AccessView ↗
05/08/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/07/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/10/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/09/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
01/13/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/12/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/09/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/01/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/28/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/22/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/22/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/21/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/04/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/27/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/17/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/17/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
05/13/2024FinalGEORGE ANDERSENprogress
05/13/2024Fire-Resistant Penetrations and JointsGEORGE ANDERSENspecial
05/08/2024Fire-Resistant Penetrations and JointsGEORGE ANDERSENspecial
05/08/2024FinalGEORGE ANDERSENprogress
08/02/2023Structural Steel - High Strength BoltingGEORGE ANDERSENspecial
08/02/2023Structural Stability – Alterations of existing buildingsGEORGE ANDERSENspecial
08/02/2023Concrete - Cast-In-PlaceGEORGE ANDERSENspecial
08/02/2023Structural Steel - DetailsGEORGE ANDERSENspecial
08/02/2023Structural Steel - WeldingGEORGE ANDERSENspecial
07/10/2023FinalGEORGE ANDERSENprogress
02/10/2023FinalERIC BERLENTprogress
02/10/2023Fire-Resistance Rated ConstructionERIC BERLENTprogress
10/13/2022FinalAHMED SHAABANprogress
10/13/2022FinalAHMED SHAABANprogress
10/12/2022FinalAHMED SHAABANprogress
09/28/2022FinalERIC BERLENTprogress
09/28/2022Fire-Resistance Rated ConstructionERIC BERLENTprogress
09/14/2022Fire-Resistant Penetrations and JointsGEORGE ANDERSENspecial
09/14/2022FinalGEORGE ANDERSENprogress
09/14/2022Sprayed fire-resistant materialsGEORGE ANDERSENspecial
06/29/2022FinalGEORGE ANDERSENprogress
06/29/2022Sprayed fire-resistant materialsGEORGE ANDERSENspecial
06/29/2022Fire-Resistant Penetrations and JointsGEORGE ANDERSENspecial
04/14/2022Fire-Resistant Penetrations and JointsERIC BERLENTspecial
03/29/2022Sprinkler SystemsNicolas Crosettospecial
Latest 25 of 29.
▾Documents — 1,617 on file (BIS + DOB NOW)
▸Plans & Drawings25
▸DOB NOWPlans/Sketch24
09/03/2026B00004178-I1Request digital key ↗
09/03/2026B00004172-I1Request digital key ↗
08/31/2026B00599219-I1Request digital key ↗
Showing 3 of 24 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly1
08/16/2026B01415710-I1Request digital key ↗
▸Applications & Permits308
▸BISPLAN / WORK APPROVAL APPLICATION178
01/29/2024310229295Open ↗
05/15/2023310229295Open ↗
04/12/2023310229295Open ↗
Showing 3 of 178 on file for this type
▸BISWORK PERMIT APPLICATION116
10/21/2019321952954Open ↗
10/21/2019321952954Open ↗
10/21/2019321952954Open ↗
Showing 3 of 116 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION10
09/19/2019321952954Open ↗
Showing 1 of 10 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Zoning, Tax Lot & Property Records2
▸BISZONING EXHIBIT I- CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications384
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION208
03/27/2020321990315Open ↗
03/27/2020321990315Open ↗
01/30/2020321983485Open ↗
Showing 3 of 208 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST48
09/09/2019321983485Open ↗
08/01/2019321981487Open ↗
06/13/2019321990315Open ↗
Showing 3 of 48 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT37
09/09/2019321983485Open ↗
08/01/2019321981487Open ↗
06/13/2019321990315Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature25
09/03/2026B00004178-I1Open ↗
09/03/2026B00004172-I1Open ↗
08/31/2026B00599219-I1Open ↗
Showing 3 of 25 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/22/2026B00599293-I1Open ↗
09/22/2026B00599293-I1Open ↗
08/28/2026B00599293-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/22/2026B00599293-I1Open ↗
09/02/2026B00004178-I1Open ↗
09/01/2026B00778551-I1Open ↗
Showing 3 of 13 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISPC FULL REPORT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISProfessional and Owner Certification (POC3)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment119
▸BISSELF-CERT PLUMBING NOTICE35
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 35 on file for this type
▸BISSCHEDULE B - PLUMBING31
10/14/2020321963693Open ↗
08/18/2020321963693Open ↗
05/04/2020321963693Open ↗
Showing 3 of 31 on file for this type
▸BISEQUIPMENT USE PERMITS12
01/19/2021321952954Open ↗
01/19/2021321952954Open ↗
01/19/2021321952954Open ↗
Showing 3 of 12 on file for this type
▸BISWATER METER PERMIT : DEP-METER10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA8
03/23/2020321952945Open ↗
02/15/2019320943501Open ↗
Showing 2 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
06/11/2019321963693Open ↗
05/31/2019321952954Open ↗
05/31/2019321952954Open ↗
Showing 3 of 8 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT5
01/19/2021321952954Open ↗
Showing 1 of 5 on file for this type
▸BISSPRINKLER INSP REPORT : FP-854
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISRPZ/DDCV TEST REPORT : GEN215B3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0213
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Safety & Tenant Protection8
▸BISST-1 Street Tree Checklist5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTenant Protection Plan and Notes3
06/13/2019321990315Open ↗
02/25/2019321789819Open ↗
Showing 2 of 3 on file for this type
▸Environmental & Asbestos75
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER28
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 28 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED16
09/10/2019321983485Open ↗
09/03/2019321981487Open ↗
07/30/2019321990315Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWOER: Notice of Satisfaction13
09/03/2026B00004178-I1Open ↗
09/03/2026B00004172-I1Open ↗
08/31/2026B00599293-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWOER: Notice to Proceed13
09/03/2026B00004178-I1Open ↗
09/03/2026B00004172-I1Open ↗
08/31/2026B00599293-I1Open ↗
Showing 3 of 13 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION3
12/22/2020321952954Open ↗
Showing 1 of 3 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance74
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS38
01/30/2020321983485Open ↗
01/30/2020321983485Open ↗
09/09/2019321983485Open ↗
Showing 3 of 38 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS15
01/30/2020321983485Open ↗
07/18/2019321789819Open ↗
03/11/2019320943501Open ↗
Showing 3 of 15 on file for this type
▸BISTR8: Energy Code Progress Inspections11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
12/06/2022321662553Open ↗
02/10/2021321990315Open ↗
12/31/2020321952954Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
01/07/2021321990315Open ↗
12/31/2020321952954Open ↗
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Inspections & Test Reports28
▸BISTECHNICAL REPORT: RESPONSIBILITY18
07/23/2021321662553Open ↗
07/23/2021321662553Open ↗
01/07/2021321990315Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Approvals, Objections & Sign-offs253
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST94
02/22/2021310229295Open ↗
02/10/2021321990315Open ↗
12/31/2020321952954Open ↗
Showing 3 of 94 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION55
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 55 on file for this type
▸BISADMINISTRATIVE OBJECTIONS52
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 52 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE27
01/29/2024310229295Open ↗
05/15/2023310229295Open ↗
04/12/2023310229295Open ↗
Showing 3 of 27 on file for this type
▸BISTAP LETTER - FIRE SVC : DEP-FIRE9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)8
08/29/2026B00706849-I1Open ↗
08/29/2026B00708113-I1Open ↗
08/13/2026B00778551-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)5
08/13/2026B00778551-I1Open ↗
08/13/2026B00778573-I1Open ↗
08/13/2026B00778571-I1Open ↗
Showing 3 of 5 on file for this type
▸BISSHED LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Cost, Insurance & Ownership89
▸BISCOST AFFIDAVIT85
01/30/2020321983485Open ↗
09/09/2019321983485Open ↗
08/01/2019321981487Open ↗
Showing 3 of 85 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
01/07/2021321990315Open ↗
12/22/2020321952954Open ↗
12/09/2020321952945Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms171
▸BISEFILING COVER SHEET76
09/11/2019321983485Open ↗
08/06/2019321981487Open ↗
06/19/2019321990315Open ↗
Showing 3 of 76 on file for this type
▸BISADDITIONAL INFORMATION65
03/08/2024310229295Open ↗
06/13/2023310229295Open ↗
08/26/2020321963693Open ↗
Showing 3 of 65 on file for this type
▸BISBOROUGH INTAKE FORM22
01/30/2020321983485Open ↗
01/03/2020310229295Open ↗
10/16/2019321662553Open ↗
Showing 3 of 22 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸Other Documents34
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION14
06/13/2023310229295Open ↗
Showing 1 of 14 on file for this type
▸BISENVIRONMENTAL(E) DEP NOTICE TO PROCEED9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISENVIRONMENTAL -E- DEP NOTICE OF SATIS7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISENVIRONMENTAL "E" DEP NOTICE OF SATISFACTION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type