ECB07/03/2024A. C. 27-929.1, FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL IN AN OFFICE BUILDING 100 FEET OR MOR$-30 due
DOB02/22/2022FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
DOB11/30/2021V-DOB VIOLATION - ACTIVE
DOB11/30/2021V-DOB VIOLATION - ACTIVE
DOB11/30/2021V-DOB VIOLATION - ACTIVE
DOB11/30/2021V-DOB VIOLATION - ACTIVE
DOB11/19/2020V-DOB VIOLATION - ACTIVE
DOB11/26/2019V-DOB VIOLATION - ACTIVE
DOB11/26/2019V-DOB VIOLATION - ACTIVE
DOB11/26/2019V-DOB VIOLATION - ACTIVE
DOB11/26/2019V-DOB VIOLATION - ACTIVE
DOB09/03/2019FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
DOB01/15/2019V-DOB VIOLATION - ACTIVE
DOB05/31/2018FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
DOB01/13/1997V-DOB VIOLATION - ACTIVE
ECB12/22/2022FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE9A REPORT OF CRITICAL EXAM DOCUMENTING CONDITION OF EXTERIOR WALL&APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL904291.SUBMIT ACCEPTABLE REQUIRED TECHNICAL REPORTNothing owed — awaiting certificate of correction
ECB05/23/2022FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE/WALLS AND APPURTENANCES. NOTE OBSERVED AT EXP1 SOUTH ELEVATION:BROKEN/SPALLED STONE AT 4TH FLOOR.ROOF LEVE STEP CRACKS AT PARAPET WALLS AT MULTIPLE LOCATIONS AND SPANothing owed — awaiting certificate of correction
ECB04/12/2022FAILURE TO MAINTAIN EXTERIOR BLDG FACADE & APPURTENANCES.NOTED:AT TIMEOF INSPECTION SOUTH ELEVATION EXP.#1.CHIPPED & BROKEN MASONRY STONE ON3RD FL WATER TABLE TOWARDS TI-E LEFT HAND SIDE OF THE MAIN ENTRANCE DONothing owed — awaiting certificate of correction
ECB04/20/202127-929.1 AC27-929.1,FAILURE TO COMPLETE INSTALLATION OF FULL SYSTEM OFAUTOMATIC SPRINKLERS&FILE FINAL SPRINKLER REPORT PREPARED BY REGISTERED DESIGN PROFESSIONAL IN OFFICE BLDG 100' OR MORE IN HT IN EXISTENCE ONothing owed — awaiting certificate of correction
ECB04/21/2020SEC. 27-929.1 AC 27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS & FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL BY 7/1/19,IN AN OFFICE BLDGNothing owed — awaiting certificate of correction
ECB12/16/201927-929.1 A.C. 27-929.1,FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL BY 7/1/19,IN AN OFFICE BUILDINNothing owed — awaiting certificate of correction
ECB09/04/2018FAILURE TO SUBMIT ACCEPTABLE 8TH ROUND REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALLS AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#804291. REMEDY: SUBMIT REQUIRED TECHNICAL REPORTNothing owed — awaiting certificate of correction