← Back
Multi-story retail building (2+)
7 EAST 57 STREET
MANHATTAN · Midtown-Times Square · BIN 1036053
💬 Discuss this project
1916Year Built
6Stories
K2Building Class
C5-3Zoning
32,959 sfGross Floor Area
1Units
LL97 Covered1 Open Violation ▸
Multi-story retail building (2+) · 5,573 sf lot · 5.91 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof20p · 12 filings · 20 docs
Floor 617p · 13 filings · 20 docs
Floor 514p · 12 filings · 20 docs
Floor 418p · 13 filings · 20 docs
Floor 317p · 12 filings · 20 docs
Floor 218p · 12 filings · 20 docs
Floor 123p · 13 filings · 20 docs
Cellar17p · 10 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
STEADFAST DEVELOPMENT AND CONSTRUCT1503/22/2026
CLASSIC CONSULTING GROUP403/22/2026
STEADFAST DEVELOPMENT203/22/2026
BURBERRY LIMITED303/21/2026
HAMPSTEAD PROPERTIES4603/21/2026
ESCADA403/21/2026
BURBERRY503/21/2026
GUS REALTY703/21/2026
HAMSTEAD INTL REALTY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
OUTSOURCE CONSULTANTS, INC.5603/21/2026
PATUXENT ENGINEERING603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STEADFAST DEVELOPMENT ANDGeneral Contractor3707/08/2026
URBAN INTELLIGENCE, INCGeneral Contractor1203/21/2026
SIRINA FIRE PROT CORPFire Protection307/08/2026
SKINNER PLMNG & HTG CORPFire Protection207/08/2026
CLASSIC CONSULTING GROUPGeneral Contractor203/21/2026
SKINNER PLUMBING & HEATINGPlumbing107/08/2026
DUO PLUMBING & HTG CORP.Plumbing107/08/2026
SRM ELECTRICAL SVC INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
OUTSOURCE SPECIAL INSPECT28272502/26/2025
Building Lifecycle
All (189)Filed (34)Permit Issued (30)Signed Off (18)Violation (51)Inspection (20)Objection (6)Special Inspection (30)
08/19/2025
Signed off — Alteration
STRUCTURAL WORK RELATED TO THE FACADE INCLUDING DEMO AND ALTERATION AND FRAMING WORK, AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY UNDER THIS APPLICATION
M00929438-I1
08/19/2025
Signed off — Alteration
M00869458-I1
08/19/2025
Signed off — Alteration
MECHANICAL WORK FROM CELLAR-ROOF INCLUDING EMERGENCY GENERATOR AND ASSOCATIED PUMP/TANKS, INSTALLATION OF VRF SYSTEMS, OUTDOOR AIR VENTILATION SYSTEMS, TOILET EXHAUST SYSTEMS, POST FIRE SMOKE PURGE SYSTEMS, AND HEATING SYSTEMS.
M00927827-I1
08/19/2025
Signed off — Alteration
HEREWITH FILING OF STRUCTURAL WORK FOR INTERIOR RENOVATIONS IN MERCANTILE SPACE, INCLUDING DUNNAGE WORK, FRAMING WORK, RELATED CONVENIENCE STAIR WORK, AS SHOWN ON PLANS . NO CHANGE IN USE, EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION.
M00929335-I1
05/20/2025
Signed off — Alteration
STANDPIPE WORK AS SHOWN ON PLANS INCLUDING EXTENSION OF SIAMESE CONNECTION TO STREET WITH ASSOCIATED PIPING AS SHOWN ON PLANS FILED HEREWITH
M00869452-S1
04/30/2025
Signed off — Alteration
PLUMBING MODIFICATIONS RELATED TO INTERIOR FIT-OUT FROM CELLAR THROUGH ROOF, ON ASSOCIATED PIPING AS SHOWN ON PLANS FILED HEREWITH.
M00927812-I1
02/26/2025
Filed — Alteration
MECHANICAL WORK FROM CELLAR-ROOF INCLUDING EMERGENCY GENERATOR AND ASSOCATIED PUMP/TANKS, INSTALLATION OF VRF SYSTEMS, OUTDOOR AIR VENTILATION SYSTEMS, TOILET EXHAUST SYSTEMS, POST FIRE SMOKE PURGE SYSTEMS, AND HEATING SYSTEMS.
M00927827-P4
02/05/2025
Signed off — Alteration
STANDPIPE WORK ON ASSOCIATED PIPING, RELATED TO INSTALLATION OF NEW STANDPIPE IN EGRESS STAIR, INCLUDING REMOVAL OF FIRE HOSE VALVE RELOCATE AS SHOWN ON PLANS FILED HEREWITH
M00927507-I1
02/04/2025
Special inspection requirement — Maintenance information
JONAR MADRIAGA
02/04/2025
Special inspection requirement — Mechanical Systems
JONAR MADRIAGA
02/04/2025
Special inspection requirement — Duct leakage testing, insulation and design
JONAR MADRIAGA
02/04/2025
Special inspection requirement — Heating Systems
JONAR MADRIAGA
02/04/2025
Special inspection requirement — Ventilation and air distribution system
JONAR MADRIAGA
02/04/2025
Special inspection requirement — HVAC-R and service water heating equipment
JONAR MADRIAGA
02/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JONAR MADRIAGA
02/04/2025
Special inspection requirement — Energy Code Compliance Inspections
JONAR MADRIAGA
02/04/2025
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
JONAR MADRIAGA
02/04/2025
Special inspection requirement — Post-installed Anchors
JONAR MADRIAGA
02/04/2025
Special inspection requirement — Final
JONAR MADRIAGA
02/04/2025
Special inspection requirement — HVAC-R and service water heating system controls
JONAR MADRIAGA
02/04/2025
Special inspection requirement — Shutoff dampers
JONAR MADRIAGA
02/04/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JONAR MADRIAGA
12/18/2024
Signed off — Alteration
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00939239-I1
12/04/2024
Filed — Alteration
PLUMBING MODIFICATIONS RELATED TO INTERIOR FIT-OUT FROM CELLAR THROUGH ROOF, ON ASSOCIATED PIPING AS SHOWN ON PLANS FILED HEREWITH.
M00927812-P3
12/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JONAR MADRIAGA
12/04/2024
Special inspection requirement — Post-installed Anchors
JONAR MADRIAGA
11/26/2024
Signed off — Alteration
STANDPIPE WORK ON ASSOCIATED PIPING, RELATED TO INSTALLATION OF NEW STANDPIPE IN EGRESS STAIR, INCLUDING REMOVAL OF FIRE HOSE VALVE RELOCATE AS SHOWN ON PLANS FILED HEREWITH
M00927507-S1
11/15/2024
Signed off — Alteration
EXTERIOR FACADE WORK INCLUDING DEMOLITION AND INSTALLATION. FIRST FLOOR STOREFRONT & ENTRANCE VESTIBULE DEMOLITION & INSTALLATION. MARQUEE ROOF DEMOLITION AND INSTALLATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
M00929427-I1
11/15/2024
Signed off — Alteration
STANDPIPE WORK AS SHOWN ON PLANS INCLUDING EXTENSION OF SIAMESE CONNECTION TO STREET WITH ASSOCIATED PIPING AS SHOWN ON PLANS FILED HEREWITH
M00869452-I1
11/15/2024
Signed off — Alteration
INTERIOR FIT-OUT WORK INCLUDING DEMO OF EXISTING & CONSTRUCTION OF NEW PARTITIONS, CEILING, DOOR, FINISHES, CONVENIENCE STAIR INSTALL FLOORS 1-3, EXIST. ELEVATOR MODERNIZATION IN COMMERCIAL SPACE AS SHOWN ON PLANS FILED . NO CHANGE IN USE EGRESS OCCOUPANC
M00927832-I1
11/12/2024
Signed off — Alteration
NEW FUEL OIL TANK, FUEL OIL PUMPS, AND ASSOCIATED FUEL OIL PIPING TO SUPPLY FUEL OIL TO THE NEW ROOF MOUNTED EMERGENCY GENERATOR. THE NEW FUEL OIL TANK, AND FUEL OIL PUMPS ARE LOCATED IN THE CELLAR. GENERATOR JOB# M00927827-I1
M00929240-I1
10/16/2024
Signed off — Alteration
REMOVAL OF EXISTING SPRINKLER HEADS ON ASSOCIATED PIPING AS SHOWN ON PLANS FILED HEREWITH. TEMPORARY CORE SPRINKLER LOOP TO BE ADDED TO EACH FLOOR
M00866704-I1
10/11/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/08/2024
Filed — No Work
M01119493-I1
10/08/2024
Objection raised — Other
10/08/2024
Objection resolved — Addressed
10/04/2024
Filed — Alteration
MECHANICAL WORK FROM CELLAR-ROOF INCLUDING EMERGENCY GENERATOR AND ASSOCATIED PUMP/TANKS, INSTALLATION OF VRF SYSTEMS, OUTDOOR AIR VENTILATION SYSTEMS, TOILET EXHAUST SYSTEMS, POST FIRE SMOKE PURGE SYSTEMS, AND HEATING SYSTEMS.
M00927827-P2
10/02/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/02/2024
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
10/01/2024
Special inspection requirement — HVAC-R and service water heating equipment
JONAR MADRIAGA
10/01/2024
Special inspection requirement — HVAC-R and service water heating system controls
JONAR MADRIAGA
10/01/2024
Special inspection requirement — Maintenance information
JONAR MADRIAGA
10/01/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JONAR MADRIAGA
10/01/2024
Special inspection requirement — Post-installed Anchors
JONAR MADRIAGA
10/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JONAR MADRIAGA
10/01/2024
Special inspection requirement — High-Pressure Steam Piping (Welding)
JONAR MADRIAGA
10/01/2024
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
JONAR MADRIAGA
09/30/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/30/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/30/2024
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
09/30/2024
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
09/27/2024
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED AND CONSTRUCTION FENCE IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M00894369-I1
09/27/2024
Filed — Alteration
NEW FUEL OIL TANK, FUEL OIL PUMPS, AND ASSOCIATED FUEL OIL PIPING TO SUPPLY FUEL OIL TO THE NEW ROOF MOUNTED EMERGENCY GENERATOR. THE NEW FUEL OIL TANK, AND FUEL OIL PUMPS ARE LOCATED IN THE CELLAR. GENERATOR JOB# M00927827-I1
M00929240-P3
09/25/2024
Special inspection requirement — Maintenance information
JONAR MADRIAGA
09/25/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
09/25/2024
Special inspection requirement — HVAC-R and service water heating system controls
JONAR MADRIAGA
09/25/2024
Special inspection requirement — HVAC-R and service water heating equipment
JONAR MADRIAGA
09/25/2024
Special inspection requirement — Post-installed Anchors
JONAR MADRIAGA
09/25/2024
Special inspection requirement — High-Pressure Steam Piping (Welding)
09/18/2024
Filed — Alteration
PLUMBING MODIFICATIONS RELATED TO INTERIOR FIT-OUT FROM CELLAR THROUGH ROOF, ON ASSOCIATED PIPING AS SHOWN ON PLANS FILED HEREWITH.
M00927812-P2
Latest 60 of 189 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offSTEADFAST DEVELOPMENT AND09/09/2024
DOB NOWGeneral ConstructionSigned-offSTEADFAST DEVELOPMENT AND09/09/2024
DOB NOWGeneral ConstructionSigned-offSTEADFAST DEVELOPMENT AND09/09/2024
DOB NOWStructuralSigned-offSTEADFAST DEVELOPMENT AND09/09/2024
DOB NOWMechanical SystemsSigned-offSTEADFAST DEVELOPMENT AND09/09/2024
DOB NOWGeneral ConstructionSigned-offSTEADFAST DEVELOPMENT AND09/09/2024
DOB NOWStandpipeSigned-offSIRINA FIRE PROT CORP07/26/2024
DOB NOWBoiler EquipmentSigned-offPACIFIC ENERGY CORP06/07/2024
DOB NOWGeneral ConstructionSigned-offSTEADFAST DEVELOPMENT AND05/28/2024
DOB NOWSprinklersSigned-offSKINNER PLMNG & HTG CORP03/01/2024
DOB NOWGeneral ConstructionSigned-offSTEADFAST DEVELOPMENT AND02/26/2024
DOB NOWStandpipeSigned-offSKINNER PLMNG & HTG CORP02/21/2024
DOB NOWSidewalk ShedSigned-offURBAN INTELLIGENCE, INC01/09/2024
DOB NOWConstruction FenceSigned-offURBAN INTELLIGENCE, INC01/09/2024
DOB NOWPlumbingSigned-offSKINNER PLUMBING & HEATIN01/04/2024
DOB NOWMechanical SystemsSigned-offSTEADFAST DEVELOPMENT AND12/28/2023
DOB NOWGeneral ConstructionSigned-offSTEADFAST DEVELOPMENT AND10/20/2023
DOB NOWStructuralSigned-offSTEADFAST DEVELOPMENT AND10/19/2023
DOB NOWGeneral ConstructionSigned-offSTEADFAST DEVELOPMENT AND10/19/2023
DOB NOWStructuralSigned-offSTEADFAST DEVELOPMENT AND10/19/2023
DOB NOWSupported ScaffoldSigned-offCLASSIC CONSULTING GROUP09/26/2023
DOB NOWStandpipeSigned-offSIRINA FIRE PROT CORP08/04/2023
DOB NOWSprinklersSigned-offSIRINA FIRE PROT CORP07/26/2023
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.07/14/2023
DOB NOWStructuralSigned-offSTEADFAST DEVELOPMENT AND06/28/2023
DOB NOWSidewalk ShedSigned-offURBAN INTELLIGENCE, INC06/27/2023
DOB NOWConstruction FenceSigned-offURBAN INTELLIGENCE, INC06/27/2023
DOB NOWGeneral ConstructionSigned-offSTEADFAST DEVELOPMENT AND06/20/2023
DOB NOWGeneral ConstructionSigned-offSTEADFAST DEVELOPMENT AND05/25/2023
DOB NOWMechanical SystemsSigned-offSTEADFAST DEVELOPMENT AND05/24/2023
BISMHISSUEDSHAWMUT WOODWORKING & SUPPLY09/25/2015
BISOTISSUEDSHAWMUT WOODWORKING & SUPPLY08/24/2011
BISOTISSUEDSHAWMUT WOODWORKING & SUPPLY01/22/2010
BISOTISSUEDSHAWMUT WOODWORKING & SUPPLY08/13/2009
BISOTISSUEDSHAWMUT WOODWORKING & SUPPLY07/12/2006
BISOTISSUEDSHAWMUT WOODWORKING & SUPPLY07/12/2006
BISPLISSUEDPAR PLUMBING CO., INC05/19/2006
BISOTISSUEDRICHTER & RATNER CONTRACTING06/25/2004
BISPLISSUEDPACE PLG CORP09/12/2002
BISPLISSUEDPACE PLUMBING CORP.08/16/2002
+ 40 more permits on file
5 projects · most recent 04/11/2026
General Wiring Lighting
FiledStatusContractorScope
04/11/2026CompleteSRM ELECTRICAL SVC INCGeneral Wiring, Lighting
12/18/2023CompleteSRM ELECTRICAL SVC INC2 meters, 2 new_meters
11/13/2023CompleteCENTURY ELECTRIC LLCGeneral Wiring
07/01/2023CompleteSRM ELECTRICAL SVC INC—
06/21/2023Complete5 J'S ELECTL CONTS CORP—
▾Field Inspections (DOB CAP) — 20
DateTypeResultReport
10/11/2024Pass-Final Boiler Equipment InspectionPassView ↗
10/02/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/02/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
09/30/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/30/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/30/2024Certified Sprinkler - SP - RoughingCertifiedView ↗
09/30/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
07/18/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
07/01/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/19/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/19/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
06/14/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/12/2024Fail-Final PL - Up to 9 Requested FloorsFailView ↗
05/31/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/29/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/17/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/25/2024Pass-Final PL - UndergroundPassView ↗
02/12/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/30/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/30/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 78
DateRequirementInspectorRole
02/04/2025Duct leakage testing, insulation and designJONAR MADRIAGAenergy_progress
02/04/2025FinalJONAR MADRIAGAprogress
02/04/2025Energy Code Compliance InspectionsJONAR MADRIAGAprogress
02/04/2025Post-installed AnchorsJONAR MADRIAGAspecial
02/04/2025Mechanical SystemsJONAR MADRIAGAspecial
02/04/2025Heating SystemsJONAR MADRIAGAspecial
02/04/2025Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
02/04/2025Exhaust and Vent Systems in Plenums and DuctsJONAR MADRIAGAspecial
02/04/2025HVAC-R and service water heating equipmentJONAR MADRIAGAenergy_progress
02/04/2025Shutoff dampersJONAR MADRIAGAenergy_progress
02/04/2025HVAC-R and service water heating system controlsJONAR MADRIAGAenergy_progress
02/04/2025Maintenance informationJONAR MADRIAGAenergy_progress
02/04/2025Ventilation and air distribution systemJONAR MADRIAGAenergy_progress
02/04/2025HVAC-R and service water piping design and insulationJONAR MADRIAGAenergy_progress
12/04/2024Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
12/04/2024Post-installed AnchorsJONAR MADRIAGAspecial
10/01/2024High-Pressure Steam Piping (Welding)JONAR MADRIAGAspecial
10/01/2024Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
10/01/2024Post-installed AnchorsJONAR MADRIAGAspecial
10/01/2024HVAC-R and service water piping design and insulationJONAR MADRIAGAenergy_progress
10/01/2024Maintenance informationJONAR MADRIAGAenergy_progress
10/01/2024HVAC-R and service water heating equipmentJONAR MADRIAGAenergy_progress
10/01/2024HVAC-R and service water heating system controlsJONAR MADRIAGAenergy_progress
10/01/2024Fuel-Oil Storage and Fuel-Oil Piping SystemsJONAR MADRIAGAspecial
09/25/2024Post-installed AnchorsJONAR MADRIAGAspecial
Latest 25 of 78.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
BurberryRetailCellar, Floors 1–6, Roof
Project M01119493 No Work · TA Certificate of Operation Issued · 10/08/2024
Project M00927812 Alteration · LOC Issued · 01/03/2024
Project M00927827 Alteration · LOC Issued · 12/20/2023
Project M00929240 Alteration · LOC Issued · 12/20/2023
Project M00927832 Alteration · LOC Issued · 10/16/2023
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 240 on file (BIS + DOB NOW)
▸Plans & Drawings34
▸DOB NOWPlans/Sketch33
08/31/2026M00866704-I1Request digital key ↗
08/31/2026M00866704-P2Request digital key ↗
08/31/2026M00865897-I1Request digital key ↗
Showing 3 of 33 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly1
08/15/2026M01119493-I1Request digital key ↗
▸Applications & Permits13
▸BISPLAN / WORK APPROVAL APPLICATION9
10/17/2014122153052Open ↗
09/06/2011120803611Open ↗
07/26/2010120129976Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION4
10/12/2015122153052Open ↗
09/06/2011120803611Open ↗
01/25/2010120241292Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications128
▸DOB NOWSpecial Inspector Seal & Signature50
09/23/2026M00929240-I1Open ↗
09/23/2026M00929240-I1Open ↗
09/23/2026M00929240-I1Open ↗
Showing 3 of 50 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature34
08/31/2026M00865897-I1Open ↗
08/31/2026M00865895-I1Open ↗
08/31/2026M00860814-I1Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWProgress Inspector Seal & Signature27
09/23/2026M00929335-I1Open ↗
09/23/2026M00929240-I1Open ↗
09/23/2026M00929240-I1Open ↗
Showing 3 of 27 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
05/10/2016122153052Open ↗
10/12/2015122153052Open ↗
10/17/2014122153052Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
09/06/2011120803611Open ↗
08/03/2009120121279Open ↗
08/03/2009120121279Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
10/17/2014122153052Open ↗
09/06/2011120803611Open ↗
08/03/2009120121279Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/17/2014122153052Open ↗
▸Trade Schedules & Equipment2
▸BISEQUIPMENT USE PERMITS1
11/06/2015122153052Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
11/06/2015122153052Open ↗
▸Safety & Tenant Protection1
▸BISST-1 Street Tree Checklist1
05/29/2009120047403Open ↗
▸Environmental & Asbestos33
▸DOB NOWDEP ACP-5: Asbestos Assessment Report28
08/31/2026M00865897-I1Open ↗
08/31/2026M00865895-I1Open ↗
08/31/2026M00860814-I1Open ↗
Showing 3 of 28 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
09/06/2011120803611Open ↗
01/08/2010120241292Open ↗
08/03/2009120121279Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
08/17/2009120129976Open ↗
05/29/2009120047403Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
05/10/2016122153052Open ↗
10/12/2015122153052Open ↗
10/17/2014122153052Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
05/10/2016122153052Open ↗
▸BISTECHNICAL REPORT: ENERGY1
09/06/2011120803611Open ↗
▸Approvals, Objections & Sign-offs7
▸BISADMINISTRATIVE OBJECTIONS5
09/06/2011120803611Open ↗
01/08/2010120241292Open ↗
08/17/2009120129976Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
05/29/2009120047403Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
05/10/2016122153052Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
05/10/2016122153052Open ↗
10/17/2014122153052Open ↗
09/06/2011120803611Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET6
10/17/2014122153052Open ↗
09/06/2011120803611Open ↗
01/08/2010120241292Open ↗
Showing 3 of 6 on file for this type
▸Other Documents5
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
08/17/2009120129976Open ↗
07/30/2009120047403Open ↗
▸BISPlot Diagram2
05/29/2009120047403Open ↗
08/17/2009120129976Open ↗
▸BISSupporting Document: Fee Exempt1
05/29/2009120047403Open ↗