| Job | Address | Type | Status | Filed | Latest permit | On the job | Description |
|---|---|---|---|---|---|---|---|
| M01441006 ↗ | 1250 AVENUE OF THE AMER MANHATTAN | — | Permit Issued | — | 09/23/2026 | Contractor WALKER RIDGE CONST NY LLC | STRUCTURAL WORK IN CONJUNCTION WITH INTERIOR RENOVATION OF EXISTING RETAIL SPACE AS SHOWN ON PLANS FILED HEREWITH, RELATING TO REMOVAL OF EX… |
| M01401120 ↗ | 49 EAST 86 STREET MANHATTAN | Alteration | Permit Issued | 06/03/2026 | 09/18/2026 | Contractor JAMES AGRESTA CARPENTRY I | Plumbing work associated with general construction application M01401120-I1. |
| M01167642 ↗ | 3 RIVERSIDE DRIVE MANHATTAN | Alteration CO | Permit Issued | 03/14/2025 | 09/10/2026 | Contractor STEADFAST DEVELOPMENT AND Filer MARY MCKEOWN | The application is being filed for the renovation of a single family residence on the Sub Cellar, Cellar, 1st thru 5th floors and installati… |
| M01430293 ↗ | 1250 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 07/29/2026 | 08/18/2026 | Contractor WALKER RIDGE CONST NY LLC | SPRINKLER MODIFICATIONS AS SHOWN ON PLANS FILED HEREWITH TO INCLUDE REMOVAL OF EXISTING SPRINKLER HEADS ON ASSOCIATED PIPING AND TEMP LOOP I… |
| M01113274 ↗ | 3 RIVERSIDE DRIVE MANHATTAN | Alteration | Permit Issued | 03/13/2025 | 07/28/2026 | Contractor STEADFAST DEVELOPMENT AND | Exterior work on facade, the replacement of windows, entry doors and doorway as per plans filed herewith. No change to occupancy, use or egr… |
| M01319442 ↗ | 211 EAST 62 STREET MANHATTAN | Alteration | Permit Issued | 11/30/2025 | 07/07/2026 | Contractor M.R.S., INC Filer MARY MCKEOWN | Remove/install non load bearing partitions, flooring, ceilings, and finishes per plans filed herewith. No change in egress use or occupancy… |
| Job | Address | Type | Status | Filed | Latest permit | On the job | Description |
|---|---|---|---|---|---|---|---|
| M01441006 ↗ | 1250 AVENUE OF THE AMER MANHATTAN | — | Permit Issued | — | 09/23/2026 | Contractor WALKER RIDGE CONST NY LLC | STRUCTURAL WORK IN CONJUNCTION WITH INTERIOR RENOVATION OF EXISTING RETAIL SPACE AS SHOWN ON PLANS FILED HEREWITH, RELATING TO REMOVAL OF EX… |
| M01401120 ↗ | 49 EAST 86 STREET MANHATTAN | Alteration | Permit Issued | 06/03/2026 | 09/18/2026 | Contractor JAMES AGRESTA CARPENTRY I | Plumbing work associated with general construction application M01401120-I1. |
| M01167642 ↗ | 3 RIVERSIDE DRIVE MANHATTAN | Alteration CO | Permit Issued | 03/14/2025 | 09/10/2026 | Contractor STEADFAST DEVELOPMENT AND Filer MARY MCKEOWN | The application is being filed for the renovation of a single family residence on the Sub Cellar, Cellar, 1st thru 5th floors and installati… |
| M01430293 ↗ | 1250 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 07/29/2026 | 08/18/2026 | Contractor WALKER RIDGE CONST NY LLC | SPRINKLER MODIFICATIONS AS SHOWN ON PLANS FILED HEREWITH TO INCLUDE REMOVAL OF EXISTING SPRINKLER HEADS ON ASSOCIATED PIPING AND TEMP LOOP I… |
| M01113274 ↗ | 3 RIVERSIDE DRIVE MANHATTAN | Alteration | Permit Issued | 03/13/2025 | 07/28/2026 | Contractor STEADFAST DEVELOPMENT AND | Exterior work on facade, the replacement of windows, entry doors and doorway as per plans filed herewith. No change to occupancy, use or egr… |
| M01319442 ↗ | 211 EAST 62 STREET MANHATTAN | Alteration | Permit Issued | 11/30/2025 | 07/07/2026 | Contractor M.R.S., INC Filer MARY MCKEOWN | Remove/install non load bearing partitions, flooring, ceilings, and finishes per plans filed herewith. No change in egress use or occupancy… |
| M01225997 ↗ | 3 RIVERSIDE DRIVE MANHATTAN | Alteration | Permit Issued | 05/15/2025 | 06/08/2026 | Contractor STEADFAST DEVELOPMENT AND Filer MARY MCKEOWN | Minor selective interior removal of partitions, floorings, guardrails, fixtures per plans filed herewith. No change in egress, use or occup… |
| M01403486 ↗ | 1177 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 05/21/2026 | 05/27/2026 | Owner CUSHMAN & WAKEFIELD Contractor SCHIMENTI CONSTRUCTION CO | THIS PROJECT IS AN INTERIOR TENANT FIT-OUT FOR CHARLES TYRWHITT OF APPROXIMATELY 1,259 SF. WORKINCLUDES BUT IS NOT LIMITED TO: CONSTRUCTION … |
| M01296898 ↗ | 131 PRINCE STREET MANHATTAN | Alteration | Signed-off | 10/20/2025 | 03/13/2026 | Owner ACADIA REALTY TRUST Contractor JAMES AGRESTA CARPENTRY I | Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or oc… |
| M01327913 ↗ | 120 WEST 18 STREET MANHATTAN | Alteration | Permit Issued | 01/13/2026 | 02/19/2026 | Owner DOUBLE STAR REAL ESTATE Contractor TMG CONSTRUCTION CORP | Modifications to the existing sprinkler systems per plans filed herewith. No change in use, egress or occupancy. |
| M01327901 ↗ | 120 WEST 18 STREET MANHATTAN | Alteration | Signed-off | 12/12/2025 | 12/30/2025 | Owner DOUBLE STAR REAL ESTATE Contractor TMG CONSTRUCTION CORP | Plumbing work as shown on plans. |
| M08031822 ↗ | 86 RIVERSIDE DRIVE MANHATTAN | Alteration | Permit Issued | 11/04/2022 | 10/22/2025 | Contractor ADS CONSTRUCTION CORP | Work consists of exterior work to include removal/install of windows, doors, railing and iron gates. No change in egress, use or occupancy. |
| M00839763 ↗ | 86 RIVERSIDE DRIVE MANHATTAN | Alteration | Permit Issued | 03/07/2024 | 10/21/2025 | Owner GMEN ACQUISITON LLC Contractor ADS CONSTRUCTION CORP Filer MARY MCKEOWN | BUILD OUT OF SINGLE FAMILY RESIDENCE TO INCLUDE REMOVAL/INSTALLALATION OF NON LOAD BEARING PARTITIONS, FLOORING, CEILING, FIXTURES AND FINI… |
| M01238959 ↗ | 154 SPRING STREET MANHATTAN | Alteration | Signed-off | 09/23/2025 | 10/16/2025 | Owner ACADIA REALTY TRUST Contractor FOLOR INC Filer MARY MCKEOWN | Minor modification to existing storefront of retail space to be occupied by Watchfinder & Co as per plans filed herewith. No change in egre… |
| M01222656 ↗ | 29 9 AVENUE MANHATTAN | Alteration | Filed — no permit on record | 09/03/2025 | — | Owner MIDTOWN EQUITIES Filer MARY MCKEOWN | — |
| M01212183 ↗ | 477 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 05/22/2025 | 08/07/2025 | Owner RFR REALTY, LLC Contractor SCHIMENTI CONSTRUCTION CO Filer METROPOLIS GROUP INC | REMOVAL AND INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01229689 ↗ | 154 SPRING STREET MANHATTAN | Alteration | Signed-off | 07/08/2025 | 07/14/2025 | Owner ACADIA REALTY TRUST Contractor FOLOR INC Filer MARY MCKEOWN | Tenant Build out for Watchfinder & Co. in existing commercial space. Remove/install non load bearing partitions, flooring, ceilings, finish… |
| M01222052 ↗ | 29 9 AVENUE MANHATTAN | Alteration | Signed-off | 05/14/2025 | 07/07/2025 | Contractor MICHILLI INC | Baccarat Minor selective demo of interior partitions, flooring, ceilings, finishes and fixtures per plans filed herewith. No change in egre… |
| M01234559 ↗ | 29 9 AVENUE MANHATTAN | Alteration | Signed-off | 06/23/2025 | 07/07/2025 | Owner MIDTOWN EQUITIES Contractor MICHILLI INC Filer MARY MCKEOWN | Baccarat Install non load bearing partition, flooring, ceilings, finishes, ADA ramp and fixtures per plans filed herewith. No change in egr… |
| M01215180 ↗ | 1151 BROADWAY MANHATTAN | Alteration | Signed-off | 06/12/2025 | 06/26/2025 | Owner PREMIER EQUITIES Contractor ATLAS SUPREME SERVICE INC Filer PEROTTO CONSULTING MGT | #8955 - NEW INTERIOR PARTITIONS, FINISHES, CABINETS AND COUNTERS, INSTALLATION OF SERVICE EQUIPMENT, NEW REFLECTED CEILING PLAN FOR SWEETGRE… |
| M01180600 ↗ | 870 BROADWAY MANHATTAN | Alteration | Signed-off | 06/18/2025 | 06/25/2025 | Contractor DGC CAPITAL CONTRACTING CORP Filer PEROTTO CONSULTING MGT | #8927 - Interior renovations of existing Use Group 6 space for Sweetgreen. No change in egress, use, or occupancy. |
| M01221531 ↗ | 154 SPRING STREET MANHATTAN | Alteration | Signed-off | 05/19/2025 | 06/17/2025 | Owner ACADIA REALTY TRUST Contractor FOLOR INC Filer MARY MCKEOWN | Minor selective interior demo in retail space to be occupied by Watchfinder & Co. Remove non load bearing partitions, flooring, ceilings a… |
| B01217770 ↗ | 108 NORTH 6 STREET BROOKLYN | Alteration | Signed-off | 05/22/2025 | 06/04/2025 | Owner L3 CAPITAL LLC Contractor PAUL M MAINTENANCE INC Filer MARY MCKEOWN | New Tenant build for Rothy's Remove/install non load bearing partitions, flooring, ceilings, finishes and fixtures as per plans filed herew… |
| M01159378 ↗ | 380 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 05/07/2025 | 05/12/2025 | Contractor STEADFAST DEVELOPMENT AND | Filing herewith interior renovation at existing first floor, MEZ and Sub-Cellar #3, 3B Level, space, Issey Miyake, 45 Madison Avenue. No cha… |
| M01159376 ↗ | 380 PARK AVENUE SOUTH MANHATTAN | Alteration | Permit Issued | 04/10/2025 | 04/29/2025 | Contractor STEADFAST DEVELOPMENT AND | Filing herewith soft removal at existing first floor, MEZ and Sub-Cellar #3, 3B Level, space, Issey Miyake 45 Madison Avenue. No change in u… |
| M01191361 ↗ | 167 ORCHARD STREET MANHATTAN | Alteration | Signed-off | 03/11/2025 | 04/03/2025 | Owner SHERR EQUITIES, LLC Contractor CGT TRIPLE STAR CONSTRUCT Filer PEROTTO CONSULTING MGT | #8934 - Interior renovation of existing restaurant for Sweetgreen including lighting modifications. No change in egress, use, or occupancy. |
| M01116254 ↗ | 1 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 11/14/2024 | 01/07/2025 | Contractor ATLAS SUPREME SERVICE INC | Tenant interior alterations to an existing building. Modifications to include new partition walls, drop ceilings, and finishes as needed for… |
| B07995586 ↗ | 76 ST MARKS AVENUE BROOKLYN | Alteration | Signed-off | 12/01/2022 | 12/17/2024 | Contractor DGC CAPITAL CONTRACTING CORP Filer BURNHAM NATIONWIDE INC | Filing herewith application for interior renovations as per plans submitted. |
| Q01063085 ↗ | 106-24 71 AVENUE QUEENS | Alteration | Permit Issued | 06/26/2024 | 12/16/2024 | Contractor DGC CAPITAL CONTRACTING CORP | OT-GC Cosmetic Work as per plans filed herewith. No change in use, Egress or Occupancy under this ALT2 application. |
| M01100214 ↗ | 128 WOOSTER STREET MANHATTAN | Alteration | Signed-off | 10/29/2024 | 11/22/2024 | Owner TYLAWSKY REALTY Contractor MGI DESIGNED INTERIORS Filer MARY MCKEOWN | Minor work to existing storefront to accommodate new tenant Issey Miyake per plans filed herewith. Repaint window frames, restore existing … |
| M01100313 ↗ | 128 WOOSTER STREET MANHATTAN | Alteration | Signed-off | 10/29/2024 | 11/22/2024 | Owner TYLAWSKY REALTY Contractor MGI DESIGNED INTERIORS Filer MARY MCKEOWN | Renovation to existing commercial space to be occupied by Issey Miyake. Remove/install non load bearing partitions, flooring, ceilings, fin… |
| M01118934 ↗ | 67 WALL STREET MANHATTAN | Alteration | Signed-off | 10/11/2024 | 10/28/2024 | Contractor DGC CAPITAL CONTRACTING CORP | #8903 - INTERIOR FITOUT FOR SWEETGREEN AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01117376 ↗ | 131 PRINCE STREET MANHATTAN | Alteration | Signed-off | 10/15/2024 | 10/22/2024 | Owner ACADIA REALTY TRUST Contractor JAMES AGRESTA CARPENTRY I Filer METROPOLIS GROUP INC | INTERIOR RENOVATION FOR AN EXISTING RETAIL STORE ON THE 1ST FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY |
| M00869452 ↗ | 7 EAST 57 STREET MANHATTAN | Alteration | Signed-off | 05/31/2023 | 09/09/2024 | Owner Burberry Limited Contractor STEADFAST DEVELOPMENT AND | STANDPIPE WORK AS SHOWN ON PLANS INCLUDING EXTENSION OF SIAMESE CONNECTION TO STREET WITH ASSOCIATED PIPING AS SHOWN ON PLANS FILED HEREWIT… |
| M00927832 ↗ | 7 EAST 57 STREET MANHATTAN | Alteration | Signed-off | 10/16/2023 | 09/09/2024 | Owner Burberry Limited Contractor STEADFAST DEVELOPMENT AND | INTERIOR FIT-OUT WORK INCLUDING DEMO OF EXISTING & CONSTRUCTION OF NEW PARTITIONS, CEILING, DOOR, FINISHES, CONVENIENCE STAIR INSTALL FLOORS… |
| M00929427 ↗ | 7 EAST 57 STREET MANHATTAN | Alteration | Signed-off | 10/16/2023 | 09/09/2024 | Owner Burberry Limited Contractor STEADFAST DEVELOPMENT AND | EXTERIOR FACADE WORK INCLUDING DEMOLITION AND INSTALLATION. FIRST FLOOR STOREFRONT & ENTRANCE VESTIBULE DEMOLITION & INSTALLATION. MARQUEE R… |
| M01046819 ↗ | 152 ELIZABETH STREET MANHATTAN | Alteration | Signed-off | 06/25/2024 | 07/10/2024 | Contractor ADS CONSTRUCTION CORP | New tenant build out for Pleats Please in existing commerical space. Remove/install non load bearing partitions, flooring, ceilings, finish… |
| M01047144 ↗ | 134 5 AVENUE MANHATTAN | Alteration | Signed-off | 06/25/2024 | 06/27/2024 | Owner 134 5TH AVE LLC Contractor PAUL M MAINTENANCE INC Filer MARY MCKEOWN | MINOR STOREFRONT WORK TO ACCOMODATE FOR NEW TENANT ROTHY'S REPLACE EXISITNG ENTRY WITH NEW IN SAME LOCATION AND REPLACE TRIM WORK WITH SAME… |
| M01048176 ↗ | 370 7 AVENUE MANHATTAN | Alteration | Signed-off | 05/16/2024 | 06/04/2024 | Contractor DGC CAPITAL CONTRACTING CORP | OT-GC work as per plans filed herewith. No change in use, egress or occupancy. |
| M00860814 ↗ | 7 EAST 57 STREET MANHATTAN | Alteration | Signed-off | 05/22/2023 | 05/28/2024 | Owner Burberry Limited Contractor STEADFAST DEVELOPMENT AND | APPLICATION FILED HEREWITH FOR NON-STRUCTURAL INTERIOR DEMOLITION WORK AS SHOWN ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS A… |
| B01033446 ↗ | 992 MANHATTAN AVENUE BROOKLYN | Alteration | Signed-off | 05/03/2024 | 05/15/2024 | Contractor DGC CAPITAL CONTRACTING CORP | Interior Cosmetic work as per plans filed herewith. No change in use, egress or occupancy under our application |
| M01030478 ↗ | 134 5 AVENUE MANHATTAN | Alteration | Signed-off | 04/16/2024 | 05/10/2024 | Owner 134 5TH AVE LLC Contractor PAUL M MAINTENANCE INC Filer MARY MCKEOWN | Renovation to existing retail space to be occupied by Rothys. Remove/install non load bearing partitions, flooring, ceilings, finishes and … |
| B00963485 ↗ | 7 DEKALB AVENUE BROOKLYN | Alteration | Signed-off | 02/06/2024 | 02/15/2024 | Owner ACADIA REALTY TRUST Contractor STEADFAST DEVELOPMENT AND | Removal of non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this applica… |
| M00816214 ↗ | 126 WEST 126 STREET MANHATTAN | Alteration | Signed-off | 02/14/2023 | 02/08/2024 | Contractor STEADFAST DEVELOPMENT AND | STRUCTURAL PLANS FILED HEREWITH FOR INTERIOR TENANT FIT-OUT FOR SEPHORA AT FIRST FLOOR. |
| M00968592 ↗ | 26 WEST 20 STREET MANHATTAN | Alteration | Signed-off | 01/26/2024 | 02/02/2024 | Contractor JKT CONSTRUCTION INC Filer METROPOLIS GROUP INC | REMOVAL OF INTERIOR PARTITIONS, DOORS AND CEILINGS. INSTALLATION OF NEW PARTITIONS, DOORS AND CEILINGS, AS PER PLANS FILED HEREWITH. NO CHAN… |
| M00943594 ↗ | 1165 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 11/14/2023 | 11/17/2023 | Owner NAFTALI GROUP Contractor MGI DESIGNED INTERIORS Filer MARY MCKEOWN | Minor interior renovation to existing commercial space to be occupied by MALIN+GOETZ. Install non load bearing partitions, flooring, ceilin… |
| M00845312 ↗ | 114 5 AVENUE MANHATTAN | Alteration | Signed-off | 06/22/2023 | 06/28/2023 | Contractor STEADFAST DEVELOPMENT AND | General Construction modifications to take place on the basement and first floor as per drawings filed herewith. No change in use, egress, o… |
| M00816545 ↗ | 235 WEST 75 STREET MANHATTAN | Alteration | Signed-off | 02/09/2023 | 06/05/2023 | Owner EIB Austell LLC Contractor F.L. PINTO COMPANIES LLC Filer MARY MCKEOWN | Replace existing awning with new in kind. New Awning labelled #4 as per plans filed herewith. No change in egress, use or occupancy. |
| M00813652 ↗ | 235 WEST 75 STREET MANHATTAN | Alteration | Signed-off | 02/09/2023 | 06/01/2023 | Contractor F.L. PINTO COMPANIES LLC | Replace existing awning with new in kind. New Awning (#1) with wording EVER/BODY as per plans filed herewith. No change in egress use or o… |
| M00814972 ↗ | 235 WEST 75 STREET MANHATTAN | Alteration | Signed-off | 02/09/2023 | 06/01/2023 | Owner EIB Austell LLC Contractor F.L. PINTO COMPANIES LLC Filer MARY MCKEOWN | Replace existing awning with new in kind. New Awning (#2) with wording EVER/BODY as per plans filed herewith. No change in egress, use or… |
| M00816544 ↗ | 235 WEST 75 STREET MANHATTAN | Alteration | Signed-off | 02/09/2023 | 06/01/2023 | Owner EIB Austell LLC Contractor F.L. PINTO COMPANIES LLC Filer MARY MCKEOWN | Replace existing awning with as kind. New Awning labelled (#3) as per plans filed herewith. No change in egress, use or occupancy. |
| M00816546 ↗ | 235 WEST 75 STREET MANHATTAN | Alteration | Signed-off | 02/09/2023 | 06/01/2023 | Contractor F.L. PINTO COMPANIES LLC | Replace existing awning with same kind with wording EVERBODY. New Awning labelled # 5 as per plans filed herewith. No change in egress, us… |
| M00816547 ↗ | 235 WEST 75 STREET MANHATTAN | Alteration | Signed-off | 02/09/2023 | 06/01/2023 | Owner EIB Austell LLC Contractor F.L. PINTO COMPANIES LLC Filer MARY MCKEOWN | Replace existing awning with new in same kind with wording EVERBODY. New Awning labelled #6 as per plans filed herewith. No change in eg… |
| B00837794 ↗ | 134 N 6 STREET BROOKLYN | Alteration | Signed-off | 03/28/2023 | 04/13/2023 | Owner L3 CAPITAL LLC Contractor STEADFAST DEVELOPMENT AND Filer MARY MCKEOWN | New tenant build out in existg com space to be occupied by BYREDO Remove/install non load bearing partitions, flooring, ceilings, finish and… |
| B00837784 ↗ | 134 N 6 STREET BROOKLYN | Alteration | Signed-off | 03/28/2023 | 04/11/2023 | Owner L3 CAPITAL LLC Contractor STEADFAST DEVELOPMENT AND Filer MARY MCKEOWN | Install temporary plywood fence in conjunction with new tenant build out for BYREDO in existing commercial space. No change in egress, use … |
| M00767835 ↗ | 77 WEST 68 STREET MANHATTAN | Alteration | Permit Issued | 07/13/2022 | 04/03/2023 | Owner HUBB NYC PROPERTIES LLC Contractor PAUL M MAINTENANCE INC Filer MARY MCKEOWN | New tenant build out for Rothys. Remove/install non load bearing partitions, flooring, ceilings, finishes and fixtures as per plans filed he… |
| M08048320 ↗ | 655 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 02/01/2023 | 03/10/2023 | Contractor F.L. PINTO COMPANIES LLC Filer JM ZONING, LLC. | FILING FOR INTERIOR RENOVATION ON THE FIRST FLOOR. NO CHANGE TO USE, EGRESS, OCCUPANCY OR BUILDING STRUCTURE. |
| B00757624 ↗ | 141 NORTH 4 STREET BROOKLYN | Alteration | Signed-off | 06/23/2022 | 02/02/2023 | Contractor HUDSON BLACK INC Filer MARY MCKEOWN | Remove/install non load bearing partitions, ceilings, flooring, finishes, and fixtures for tenant build out for Diplyque per plans filed her… |
| Q08042710 ↗ | 40-24 COLLEGE POINT BOULEVARD | Alteration | Signed-off | 12/06/2022 | 01/26/2023 | Owner Acadia Realty Trust Contractor STEADFAST DEVELOPMENT AND | removal and installation of non bearing partitions and related finishes as per plans filed herewith, no change in use, egress or occupancy u… |
| Q08043996 ↗ | 90-15 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 12/20/2022 | 01/25/2023 | Owner MACERICH Contractor E. C. PROVINI CO., INC | Space # 2033 (Victoria's Secret) Renovation to an existing retail space. Work includes demolition, architectural, mechanical, electrical, pl… |
| M00783701 ↗ | 233 ELIZABETH STREET MANHATTAN | Alteration | Permit Issued | 10/11/2022 | 01/09/2023 | Owner DALAN MANAGEMENT Contractor TMG CONSTRUCTION CORP Filer MARY MCKEOWN | Minor interior renovation to existing floor lay in retail space occupied by Le Labo. Remove floor infill to create opening for new elevato… |
| M08039309 ↗ | 218 5 AVENUE MANHATTAN | Alteration CO | Permit Issued | 12/05/2022 | 01/04/2023 | Owner STELLAR MANAGEMENT Contractor F.L. PINTO COMPANIES LLC Filer JM ZONING, LLC. | ALT-CO FILED FOR INTERIOR RENOVATIONS AND CHANGE OF USE AT CELLAR LEVEL FROM STORAGE TO BUSSINESS OCCUPANCY AS PER PLANS FILED. |
| B08033138 ↗ | 210 JORALEMON STREET BROOKLYN | Alteration | Signed-off | 12/05/2022 | 12/12/2022 | Contractor F.L. PINTO COMPANIES LLC Filer JM ZONING, LLC. | FILING FOR INTERIOR IMPROVEMENTS TO AN EXISTING FITNESS ESTABLISHMENT. THE PROJECT INCLUDES WORK ON THEGROUND FLOOR AND CELLAR FLOOR. NO CHA… |
| M08039431 ↗ | 72 SPRING STREET MANHATTAN | Alteration | Signed-off | 12/01/2022 | 12/06/2022 | Contractor MCCORMACK CONTRACTING INC | Replace Door Hardware on Retail Store Entry Doors, Paint Retail Store Exterior Storefront Metal Trim & Install One Louver Within Existing Wi… |
| M00677962 ↗ | 1277 3 AVENUE MANHATTAN | Alteration CO | Permit Issued | 05/13/2022 | 09/12/2022 | Contractor FRANCO BLDNG MAINT Filer DOMANI CONSULTING | SCOPE OF WORK: THIS IS A PERMIT APPLICATION FOR INTERIOR IMPROVEMENTS FOR NEW RETAIL STORE THE PROJECT INCLUDES WORK ON THE 1st Floor. WOR… |
| B00770493 ↗ | 161 WYTHE AVENUE BROOKLYN | Alteration | Signed-off | 07/31/2022 | 09/07/2022 | Contractor STEADFAST DEVELOPMENT AND | New tenant build out for Glossier in existing retail space. Remove/install non load bearing partitions, flooring, ceilings, finishes and fi… |
| M00789221 ↗ | 235 WEST 75 STREET MANHATTAN | Alteration | Signed-off | 08/15/2022 | 09/07/2022 | Owner EIB Austell LLC Contractor F.L. PINTO COMPANIES LLC Filer MARY MCKEOWN | Renovation to existing store for new tenant build out for Everboby. Remove/install non load bearing partitions, flooring, ceilings, finishe… |
| M00783211 ↗ | 72 SPRING STREET MANHATTAN | Alteration | Signed-off | 08/10/2022 | 08/12/2022 | Owner HELLER PROPERTIES Contractor MCCORMACK CONTRACTING INC Filer RETHY ASSOCIATES, INC. | Demo.Partitions, Doors, Millwork, Store Fixtures, Wall&Floor Finish on Part Cellar & 1st Fl. Prep.Floors for New Flooring, Install Partition… |
| M00770746 ↗ | 15 WEST 61ST STREET MANHATTAN | Alteration | Signed-off | 07/26/2022 | 08/10/2022 | Contractor STEADFAST DEVELOPMENT AND Filer GILLMAN CONSULTING INC | CONSTRUCTION OF INTERIOR WALLS / PARTITIONS, WALL FIXTURES, FLOORING AND CEILING AS SHOWNON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRES… |
| M00769627 ↗ | 77 WEST 68 STREET MANHATTAN | Alteration | Signed-off | 07/13/2022 | 08/01/2022 | Contractor PAUL M MAINTENANCE INC | Minor modification to existing storefront per plans filed herewith. No change in egress use or occupancy. Signage to be filed under separa… |
| B00655991 ↗ | 160-166 NORTH 4TH STREET BROOKLYN | Alteration | Signed-off | 05/09/2022 | 07/08/2022 | Owner ACADIA REALTY TRUST Contractor DGC CAPITAL CONTRACTING CORP Filer BURNHAM NATIONWIDE INC | Filing application for interior renovations as per plan submitted herewith. No change in use, egress or occupancy. |
| B00674459 ↗ | 5120 AVENUE U BROOKLYN | Alteration | Signed-off | 02/28/2022 | 06/28/2022 | Contractor SCHIMENTI CONSTRUCTION CO | Retail Space Sephora space # 0151. Remove/install non load bearing partitions, flooring, ceilings, finishes and fixtures. Modify storefront… |
| M00746617 ↗ | 77 WEST 68 STREET MANHATTAN | Alteration | Signed-off | 05/31/2022 | 06/22/2022 | Owner HUBB NYC PROPERTIES LLC Contractor PAUL M MAINTENANCE INC Filer MARY MCKEOWN | INSTALL TEMPORARY PLYWOOD FENCE PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY |
| M00708549 ↗ | 24 PRINCE STREET MANHATTAN | No Work | Filed — no permit on record | 04/05/2022 | — | — | — |
| M00671692 ↗ | 250 VESEY STREET MANHATTAN | Alteration | Signed-off | 02/16/2022 | 03/01/2022 | Contractor STEADFAST DEVELOPMENT AND | General construction work as shown on plans. Space 109 and 110 (Lululemon) |
| M00563918 ↗ | 9 MERCER STREET MANHATTAN | Alteration | Permit Issued | 02/04/2022 | 02/20/2022 | Contractor SHAWMUT WOODWORKING & SUPPLY Filer METROPOLIS GROUP INC | Exterior renovation of commercial space, remove and install walls, doors, floor finishes, ceilings as per plans herewith, no change in use |
| Q00567220 ↗ | 4325 HUNTER STREET QUEENS | Alteration | Signed-off | 10/28/2021 | 11/09/2021 | Owner ROCKROSE DEVELOPMENT Contractor SOUTH EAST CONSTRUCTION G Filer BURNHAM NATIONWIDE INC | Filing herewith application for interior buildout and storefront minor work. No change in sue, egress or occupancy. |
| Q00584438 ↗ | 136-32 ROOSEVELT AVENUE QUEENS | Alteration | Permit Issued | 09/20/2021 | 10/06/2021 | Owner MACY'S INC. Contractor CREATIVE INSTALLATIONS IN Filer Integrated Companies | Interior renovation on part of first floor (renutriv) as indicated on attached plans. There is no change in egress, use or occupancy. |
| M00548471 ↗ | 31 PRINCE STREET MANHATTAN | Alteration | Signed-off | 07/07/2021 | 09/13/2021 | Owner VERACITY DEVELOPMENT Contractor HANDY MEN OF NYC INC Filer MARY MCKEOWN | Minor remodel of existing retail space. Removal/installation of partitions, flooring, ceilings, finishes and tile at storefront. No change… |
| M00563788 ↗ | 9 MERCER STREET MANHATTAN | Alteration | Permit Issued | 09/02/2021 | 09/10/2021 | Contractor SHAWMUT WOODWORKING & SUPPLY Filer METROPOLIS GROUP INC | Interior renovation of commercial space, remove and install walls, doors, floor finishes, ceilings as per plans. |
| M00569865 ↗ | 24 PRINCE STREET MANHATTAN | Alteration | Signed-off | 08/06/2021 | 09/10/2021 | Owner STITCHT Contractor PAUL M MAINTENANCE INC Filer MARY MCKEOWN | install temp plywood fence. No change in egress, use or occupancy. |
| M00416153 ↗ | 44 EAST 14 STREET MANHATTAN | Alteration | Signed-off | 10/29/2020 | 03/31/2021 | Contractor STEADFAST DEVELOPMENT AND | Installation of plywood fence as per plans filed herewith. No change in egress, use or occupancy under this application. Application filed… |
| M00265849 ↗ | 667 MADISON AVENUE MANHATTAN | No Work | Filed — no permit on record | 11/26/2019 | — | — | — |
| M00195274 ↗ | 667 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 07/24/2019 | 10/23/2019 | Contractor SHAWMUT WOODWORKING & SUPPLY Filer BURNHAM NATIONWIDE INC | application for construction fence related to minor storefront work. no change in use, egress or occupancy. |
| Person | Filings | Most recent |
|---|---|---|
| Steven O'Neil | 40 | 05/18/2026 |
| Mary Langan | 39 | 08/04/2026 |
| Name | Jobs together | Most recent |
|---|---|---|
| MEYERS+ ENGINEERS | 8 | 07/30/2026 |
| CHRISTIE ENGINEERING, PC | 1 | — |
| KPFF CONSULTING ENGINEERS | 1 | 05/28/2025 |
| M-ENGINEERING NEW YORK, LLC | 1 | 04/19/2024 |
| Z.S. ENGINEERING, D.P.C. | 1 | 04/19/2024 |
| Name | Jobs together | Most recent |
|---|---|---|
| STEADFAST DEVELOPMENT AND | 19 | 02/18/2026 |
| F.L. PINTO COMPANIES LLC | 10 | 11/03/2023 |
| DGC CAPITAL CONTRACTING C | 7 | 06/18/2025 |
| PAUL M MAINTENANCE INC | 7 | 07/22/2025 |
| ADS CONSTRUCTION CORP | 3 | 02/25/2026 |
| FOLOR INC | 3 | 09/23/2025 |
| JAMES AGRESTA CARPENTRY I | 3 | 06/03/2026 |
| MGI DESIGNED INTERIORS | 3 | 10/29/2024 |
| SCHIMENTI CONSTRUCTION CO | 3 | 05/21/2026 |
| SHAWMUT WOODWORKING & SUP | 3 | 02/04/2022 |
| TMG CONSTRUCTION CORP | 3 | 07/30/2026 |
| ATLAS SUPREME SERVICE INC | 2 | 04/27/2026 |
| CERTIFIED OF N.Y. INC | 2 | 02/25/2026 |
| MCCORMACK CONTRACTING INC | 2 | 12/01/2022 |
| MICHILLI INC | 2 | 06/23/2025 |
| P.H. WORKS INC | 2 | 06/03/2026 |
| WALKER RIDGE CONST NY LLC | 2 | 07/29/2026 |
| ALAN J BRUTOSKY PLBR CONT | 1 | 12/15/2025 |
| ALLSTATE SPRINKLER LLC | 1 | 07/30/2026 |
| AMN PLUMBING CORP | 1 | 07/30/2026 |
| ANESIS SERVICES CORP | 1 | 07/29/2026 |
| BEDROCK MECHANICAL INC | 1 | 05/28/2025 |
| BEDROCK PLBG. & HTG., INC | 1 | 05/28/2025 |
| BUCKMILLER AUTO.SPKLR.COR | 1 | 10/22/2025 |
| CGT TRIPLE STAR CONSTRUCT | 1 | 06/26/2025 |
| Name | Jobs together | Most recent |
|---|---|---|
| ACADIA REALTY TRUST | 8 | 10/22/2025 |
| EIB Austell LLC | 5 | 02/09/2023 |
| Burberry Limited | 4 | 07/30/2024 |
| L3 CAPITAL LLC | 3 | 07/22/2025 |
| 134 5TH AVE LLC | 2 | 06/25/2024 |
| DOUBLE STAR REAL ESTATE | 2 | 07/30/2026 |
| HUBB NYC PROPERTIES LLC | 2 | 07/13/2022 |
| MIDTOWN EQUITIES | 2 | 09/03/2025 |
| TYLAWSKY REALTY | 2 | 10/29/2024 |
| AVALON BAY COMMUNITIES INC. | 1 | 10/21/2022 |
| CUSHMAN & WAKEFIELD | 1 | 05/21/2026 |
| DALAN MANAGEMENT | 1 | 10/11/2022 |
| DAVID TURNER ARCHITECT, P.C | 1 | 06/18/2025 |
| FRANCOBUILDING MAINTENANCE INC. | 1 | 04/30/2026 |
| GMEN ACQUISITON LLC | 1 | 02/25/2026 |
| HELLER PROPERTIES | 1 | 10/11/2022 |
| MACERICH | 1 | 06/27/2023 |
| MACY'S INC. | 1 | 09/20/2021 |
| NAFTALI GROUP | 1 | 11/14/2023 |
| PREMIER EQUITIES | 1 | 04/27/2026 |
| RFR REALTY LLC | 1 | 05/28/2025 |
| ROCKROSE DEVELOPMENT | 1 | 10/28/2021 |
| SHERR EQUITIES, LLC | 1 | 06/26/2025 |
| STELLAR MANAGEMENT | 1 | 11/03/2023 |
| STITCHT | 1 | 08/06/2021 |
| Name | Jobs together | Most recent |
|---|---|---|
| MARY MCKEOWN | 29 | 07/01/2026 |
| OUTSOURCE CONSULTANTS, INC. | 6 | 07/29/2026 |
| METROPOLIS GROUP INC | 5 | 05/28/2025 |
| WILLIAM VITACCO ASSOCIATES | 5 | 07/30/2026 |
| A1 EXPEDITING SERVICE CORP. | 3 | 05/21/2026 |
| BURNHAM NATIONWIDE INC | 3 | 10/30/2024 |
| JM ZONING, LLC. | 3 | 11/03/2023 |
| PEROTTO CONSULTING MGT | 3 | 04/27/2026 |
| EMPIRE CITY CONSULTANTS, INC. | 2 | 02/18/2026 |
| DOMANI CONSULTING | 1 | 04/30/2026 |
| GILLMAN CONSULTING INC | 1 | 10/21/2022 |
| GREEN LIGHT EXPEDITING LLC | 1 | 06/27/2023 |
| Integrated Companies | 1 | 09/20/2021 |
| J. CALLAHAN CONSULTING, INC. | 1 | 03/13/2025 |
| RETHY ASSOCIATES, INC. | 1 | 10/11/2022 |