Issued Permit Scope
Plumbing · Sprinklers
PROPOSE TO REMOVE EXISTING GAS METER AND RISER AND INSTALL NEW GAS METER AND RISER. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
22 documents · 1 drawing sheet
Propose to perform plumbing and sprinkler work for new cooling tower. No change in use, egress or occupancy.
On file for this project
7 documents · 2 drawing sheets
Propose to install HVAC units and miscellaneous mechanical work in coordination with vertical expansion. No change in use, egress or occupancy.
On file for this project
17 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Bulkhead1p · 1 filing · 20 docs
Structural
Propose to perform plumbing and sprinkler work related to extension on roof. No change in use, egress or occupancy.
On file for this project
52 documents · 1 drawing sheet
Floor 2910p · 7 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructuralOther
Propose to provide structural support for Alger Astronaut Sculpture. No change to use, egress or occupancy.
On file for this project
12 documents · 1 drawing sheet
PROPOSE TO PERFORM PLUMBING AND SPRINKLER WORK. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
9 documents · 1 drawing sheet
PROPOSE TO PERFORM PLUMBING, SPRINKLER AND STANDPIPE WORK. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
11 documents · 3 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 2822p · 12 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
General Construction
PROPOSE TO PERFORM INTERIOR RENOVATIONS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
Subsequent filing for fire pump. No change in use, egress or occupancy.
On file for this project
22 documents · 1 drawing sheet
PROPOSE TO PERFORM PLUMBING, SPRINKLER AND STANDPIPE WORK. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
11 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 2729p · 16 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructuralOther
Issued Permit Scope
Plumbing · Sprinklers
PROPOSE TO REMOVE EXISTING GAS METER AND RISER AND INSTALL NEW GAS METER AND RISER. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
22 documents · 2 drawing sheets
Propose to perform plumbing and sprinkler work for new cooling tower. No change in use, egress or occupancy.
On file for this project
7 documents · 1 drawing sheet
Plumbing and sprinkler work for restrooms and mechanical rooms. No change in use, egress or occupancy.
On file for this project
21 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 2616p · 11 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers
PROPOSE TO REMOVE EXISTING GAS METER AND RISER AND INSTALL NEW GAS METER AND RISER. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
22 documents · 2 drawing sheets
Propose to perform plumbing and sprinkler work for mechanical and restroom renovations. No change in use, egress or occupancy.
On file for this project
4 documents · 3 drawing sheets
Propose to perform structural work for framing and dunnage. No change in use, egress or occupancy.
On file for this project
22 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 2511p · 9 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
PROPOSE TO REMOVE EXISTING GAS METER AND RISER AND INSTALL NEW GAS METER AND RISER. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
22 documents · 2 drawing sheets
Propose to install new plumbing fixtures and piping. Propose to remove existing temporary sprinkler loop and install permanent sprinklers. No change to use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Propose to perform interior renovations. No change in use, egress or occupancy.
On file for this project
22 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 2410p · 8 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
PROPOSE TO REMOVE EXISTING GAS METER AND RISER AND INSTALL NEW GAS METER AND RISER. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
22 documents · 2 drawing sheets
Propose to install new plumbing fixtures and piping. Propose to remove existing temporary sprinkler loop and install permanent sprinklers. No change to use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Propose to perform interior renovations. No change in use, egress or occupancy.
On file for this project
22 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 2312p · 9 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
PROPOSE TO REMOVE EXISTING GAS METER AND RISER AND INSTALL NEW GAS METER AND RISER. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
22 documents · 2 drawing sheets
Propose to install new plumbing fixtures and piping. Propose to remove existing temporary sprinkler loop and install permanent sprinklers. No change to use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Propose to perform interior renovations. No change in use, egress or occupancy.
On file for this project
22 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 2211p · 8 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
PROPOSE TO REMOVE EXISTING GAS METER AND RISER AND INSTALL NEW GAS METER AND RISER. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
22 documents · 2 drawing sheets
Propose to install new plumbing fixtures and piping. Propose to remove existing temporary sprinkler loop and install permanent sprinklers. No change to use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Propose to perform interior renovations. No change in use, egress or occupancy.
On file for this project
22 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 2113p · 10 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
PROPOSE TO REMOVE EXISTING GAS METER AND RISER AND INSTALL NEW GAS METER AND RISER. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
22 documents · 2 drawing sheets
Propose to install new plumbing fixtures and piping. Propose to remove existing temporary sprinkler loop and install permanent sprinklers. No change to use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Propose to perform interior renovations. No change in use, egress or occupancy.
On file for this project
22 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 2022p · 16 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers
Propose to perform plumbing and sprinkler work for mechanical and restroom renovations. No change in use, egress or occupancy.
On file for this project
4 documents · 3 drawing sheets
Propose to perform structural work for framing and dunnage. No change in use, egress or occupancy.
On file for this project
22 documents · 2 drawing sheets
Propose to perform selective mechanical removals and install new water cooled self contained AC units. Also propose to install exhaust ductwork for restrooms. No change in use, egress or occupancy.
On file for this project
13 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 198p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
PROPOSE TO REMOVE EXISTING GAS METER AND RISER AND INSTALL NEW GAS METER AND RISER. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
22 documents · 2 drawing sheets
Plumbing amendment work to remove hot water heaters and sprinkler amendment work to show small changes in sprinkler layout. No change in use, egress or occupancy.
On file for this project
37 documents · 1 drawing sheet
Propose to perform plumbing and sprinkler work for mechanical and restroom renovations. No change in use, egress or occupancy.
On file for this project
4 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 1845p · 10 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Propose to perform interior renovation of non-load bearing partitions. No change in use, egress or occupancy.
On file for this project
6 documents
Project M01334248Signed-off · 02/09/2026
Propose mechanical work as per drawings filed herewith. No change in use, egress or occupancy.
On file for this project
3 drawing sheets
Propose plumbing and sprinkler modifications as per drawings filed herewith. No change in use, egress or occupancy.
On file for this project
4 documents · 4 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 1713p · 10 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
PROPOSE TO REMOVE EXISTING GAS METER AND RISER AND INSTALL NEW GAS METER AND RISER. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
22 documents · 2 drawing sheets
Mechanical on floors 2, 3, 5, 15-17 as indicated on attached plans. There is no change in egress use or occupancy.
On file for this project
14 documents · 1 drawing sheet
Plumbing/sprinkler modifications as per attached plans.
On file for this project
10 documents · 4 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 1612p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
PROPOSE TO REMOVE EXISTING GAS METER AND RISER AND INSTALL NEW GAS METER AND RISER. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
22 documents · 2 drawing sheets
Mechanical on floors 2, 3, 5, 15-17 as indicated on attached plans. There is no change in egress use or occupancy.
On file for this project
14 documents · 1 drawing sheet
Plumbing/sprinkler modifications as per attached plans.
On file for this project
10 documents · 4 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 1515p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Removal of existing beams and columns reinforcement, approx. 180 LF of new steel. Interior structural modifications as per plans filed herewith. No change in use, egress, or occupancy under this application.
On file for this project
3 documents · 1 drawing sheet
PROPOSE TO REMOVE EXISTING GAS METER AND RISER AND INSTALL NEW GAS METER AND RISER. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
22 documents · 2 drawing sheets
Mechanical on floors 2, 3, 5, 15-17 as indicated on attached plans. There is no change in egress use or occupancy.
On file for this project
14 documents · 2 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 1425p · 12 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
PROPOSE TO REMOVE EXISTING GAS METER AND RISER AND INSTALL NEW GAS METER AND RISER. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
22 documents · 2 drawing sheets
Propose to remove plumbing and sprinkler fixtures and piping. No change in use, egress or occupancy.
On file for this project
10 documents · 2 drawing sheets
Propose to perform re-routing of plumbing piping and new sprinkler piping/heads. No change in use, egress or occupancy.
On file for this project
10 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 13
Floor 1219p · 7 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
PROPOSE TO REMOVE EXISTING GAS METER AND RISER AND INSTALL NEW GAS METER AND RISER. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
22 documents · 2 drawing sheets
Sprinkler & plumbing modifications as per attached plans. There is no change in egress, use or occupancy.
On file for this project
14 documents · 10 drawing sheets
Propose to remove plumbing and sprinkler fixtures and piping. No change in use, egress or occupancy.
On file for this project
10 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 1120p · 7 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Filing herewith for four floor buildout for full floor tenant , interior partitions, mechanical and plumbing modifications.
On file for this project
10 documents · 3 drawing sheets
PROPOSE TO REMOVE EXISTING GAS METER AND RISER AND INSTALL NEW GAS METER AND RISER. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
22 documents · 1 drawing sheet
Sprinkler & plumbing modifications as per attached plans. There is no change in egress, use or occupancy.
On file for this project
14 documents · 9 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 1016p · 7 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
PROPOSE TO REMOVE EXISTING GAS METER AND RISER AND INSTALL NEW GAS METER AND RISER. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
22 documents · 1 drawing sheet
Sprinkler & plumbing modifications as per attached plans. There is no change in egress, use or occupancy.
On file for this project
14 documents · 9 drawing sheets
Propose to perform structural work for framing and dunnage. No change in use, egress or occupancy.
On file for this project
22 documents · 2 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 920p · 6 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
PROPOSE TO REMOVE EXISTING GAS METER AND RISER AND INSTALL NEW GAS METER AND RISER. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
22 documents · 1 drawing sheet
Sprinkler & plumbing modifications as per attached plans. There is no change in egress, use or occupancy.
On file for this project
14 documents · 12 drawing sheets
Plumbing and sprinkler work for restrooms and mechanical rooms. No change in use, egress or occupancy.
On file for this project
21 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 820p · 6 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
PROPOSE TO REMOVE EXISTING GAS METER AND RISER AND INSTALL NEW GAS METER AND RISER. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
22 documents · 1 drawing sheet
Sprinkler & plumbing modifications as per attached plans. There is no change in egress, use or occupancy.
On file for this project
14 documents · 13 drawing sheets
Propose to perform structural work for framing and dunnage. No change in use, egress or occupancy.
On file for this project
22 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 712p · 7 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
PROPOSE TO REMOVE EXISTING GAS METER AND RISER AND INSTALL NEW GAS METER AND RISER. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
22 documents · 2 drawing sheets
Sprinkler & plumbing modifications as per attached plans. There is no change in egress, use or occupancy.
On file for this project
14 documents · 1 drawing sheet
Sprinkler & plumbing modifications on part of the 4th floor & throughout floors 6 & 7 as indicated on attached plans. there is no change in egress, use or occupancy
On file for this project
18 documents · 4 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 613p · 8 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Propose to remove interior renovations. No change to use, egress or occupancy.
On file for this project
4 documents
PROPOSE TO REMOVE EXISTING GAS METER AND RISER AND INSTALL NEW GAS METER AND RISER. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
22 documents · 2 drawing sheets
Propose to construct loading dock for SEC use. No change to use, egress or occupancy.
On file for this project
8 documents
Latest 3 of 8 filings on this floor.
Floor 513p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
PROPOSE TO REMOVE EXISTING GAS METER AND RISER AND INSTALL NEW GAS METER AND RISER. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
22 documents · 2 drawing sheets
Mechanical on floors 2, 3, 5, 15-17 as indicated on attached plans. There is no change in egress use or occupancy.
On file for this project
14 documents · 2 drawing sheets
Plumbing and sprinkler work for restrooms and mechanical rooms. No change in use, egress or occupancy.
On file for this project
21 documents · 3 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 412p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
PROPOSE TO REMOVE EXISTING GAS METER AND RISER AND INSTALL NEW GAS METER AND RISER. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
22 documents · 2 drawing sheets
Plumbing and sprinkler work for restrooms and mechanical rooms. No change in use, egress or occupancy.
On file for this project
21 documents · 3 drawing sheets
Sprinkler & plumbing modifications on part of the 4th floor & throughout floors 6 & 7 as indicated on attached plans. there is no change in egress, use or occupancy
On file for this project
18 documents · 4 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 312p · 8 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
PROPOSE TO REMOVE EXISTING GAS METER AND RISER AND INSTALL NEW GAS METER AND RISER. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
22 documents · 2 drawing sheets
Mechanical on floors 2, 3, 5, 15-17 as indicated on attached plans. There is no change in egress use or occupancy.
On file for this project
14 documents · 1 drawing sheet
Propose to perform re-routing of plumbing piping and new sprinkler piping/heads. No change in use, egress or occupancy.
On file for this project
10 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 212p · 10 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
PROPOSE TO REMOVE EXISTING GAS METER AND RISER AND INSTALL NEW GAS METER AND RISER. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
22 documents · 2 drawing sheets
Mechanical on floors 2, 3, 5, 15-17 as indicated on attached plans. There is no change in egress use or occupancy.
On file for this project
14 documents · 1 drawing sheet
Propose to perform re-routing of plumbing piping and new sprinkler piping/heads. No change in use, egress or occupancy.
On file for this project
10 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 121p · 18 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment
Propose to remove plumbing and sprinkler fixtures and piping. No change in use, egress or occupancy.
On file for this project
5 documents · 2 drawing sheets
Propose to perform selective ductwork removal. No change in use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Filing for new plumbing piping and sprinkler heads. No change to use, egress or occupancy.
On file for this project
11 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Mezzanine14p · 11 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment
PROPOSE TO REMOVE EXISTING GAS METER AND RISER AND INSTALL NEW GAS METER AND RISER. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
22 documents · 3 drawing sheets
Propose to install HVAC units and miscellaneous mechanical work in coordination with vertical expansion. No change in use, egress or occupancy.
On file for this project
17 documents · 1 drawing sheet
Propose to perform structural work for framing and dunnage. No change in use, egress or occupancy.
On file for this project
22 documents · 3 drawing sheets
Latest 3 of 8 filings on this floor.
Cellar24p · 15 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment
Subsequent filing for fire pump. No change in use, egress or occupancy.
On file for this project
22 documents · 1 drawing sheet
PROPOSE TO REMOVE EXISTING GAS METER AND RISER AND INSTALL NEW GAS METER AND RISER. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
22 documents · 2 drawing sheets
Propose to remove plumbing and sprinkler fixtures and piping. No change in use, egress or occupancy.
On file for this project
5 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.