DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
DOB10/04/2023FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB03/06/2023PARTIAL VACATE ORDER NOTE:OBSERVED EXP#3 NORTH ELEVATION,CRACK,SPALLIN CONCRETE SLAB FROM ALL FIRE TOWER/LANDING PLATFORMS AT THE TIME OF INSPECTION,AS PER QEWI FISP 3 UNSAFE NOTIFICATION #902205.REMEDY VACATE ALL BALCONIES VACATE COURTYARD LOCATED AT NORTH ELEVATION EXP#3
DOB03/02/2023EMERGENCY WORK ORDER DUE TO UNSAFE FIRE TOWER/LANGING PLATFORMS AT ALL FLOORS.NOTE:@THE TIME OF INSPECTION OBSERVED AT EXPO#3 NORTH ELEVATION SPALLLING CONCRETE FROM ALL FIRE TOWER/LANDING PLATFORMS.REMEDY:IMMED MAKE AREA SAFE CORRECT UNDER DIRECTION OF REISTERED PROFESSIONAL ALL UNSAFE CONDITIONS SUBMIT PHOTOS CONDITIONS FACADES@BUILDINGS.NYC.GOV
DOB02/16/2023CYCLE 9B FAILURE TO CORRECT SWARMP CONDITIONS
DOB02/16/2023CYCLE 9B UNSAFE REPORT FILED
DOB12/01/2021FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
DOB04/29/2021FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
DOB07/31/2018FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018
DOB07/01/2013V-DOB VIOLATION - ACTIVE
DOB07/01/2013V-DOB VIOLATION - ACTIVE
DOB07/01/2013V-DOB VIOLATION - ACTIVE
DOB07/13/2007V-DOB VIOLATION - ACTIVE
DOB10/22/2002V-DOB VIOLATION - ACTIVE
DOB10/22/2002V-DOB VIOLATION - ACTIVE
DOB10/22/2002V-DOB VIOLATION - ACTIVE
DOB01/14/1992VP-VIOLATION UNSERVED ECB-ACTIVE
DOB01/14/1992VP-VIOLATION UNSERVED ECB-ACTIVE
DOB01/14/1992VP-VIOLATION UNSERVED ECB-ACTIVE
ECB04/20/2026FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 8B AND 9B REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #902205. REMEDY: FILE ACCEPTABLE REPORT.Hearing held — result not yet published$1K proposed
ECB05/19/2023FAILURE TO MAINTAIBN BUILDING WALL(S)OR APPURTENANCES.NOTE:AT THE TIMEOF INSPECTION OBSERVED AT EXPO#1 SOUTH ELEVATION SPALLING DECORATIVE STONE CRACK AT CHIMNEY.REM:MAINTAIN EXTERIOR BUILDING WALL OR APPURTENANothing owed — awaiting certificate of correction
ECB03/02/2023FAILURE TO MAINTAIN BUILDING WALL(S)OR APPURTENANCES.NOTE:AT THE TIME OF INSPECTION OBSERVED AT EXPOSURE#3 NORTH ELEVATION SPALLING CONCRETEFROM ALL FIRE TOWER/LANGING PLATE FORMS AND NO SAFETY MEASURES TO SECUNothing owed — awaiting certificate of correction