| Owner | Filings | Most Recent |
|---|---|---|
| DOUGLAS ELLIMAN PROPERTY MANAGEMENT | 22 | 09/13/2026 |
| CPW TERRACE TRUST | 10 | 07/08/2026 |
| SOLSTICE RESIDENTIAL GROUP | 39 | 07/08/2026 |
| 888 PARK | 5 | 04/09/2026 |
| ANDAMIO SCAFFOLDING LLC | 9 | 03/22/2026 |
| BERESFORD APT INC SOLSTIC | 4 | 03/22/2026 |
| AKAM ASSOCIATES | 9 | 03/22/2026 |
| DNA CONSTRACTING LLC | 1 | 03/22/2026 |
| OWNER OF 211 CENTRAL PARK | 1 | 03/22/2026 |
| AKAM ASSOC. AGENT | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| NEW AGE ENGINEERING PLLC | 3 | 08/05/2026 |
| BARLISWEDLICK ARCHITECTS, LLC | 7 | 07/13/2026 |
| CES ENGINEERING LLC | 28 | 05/20/2026 |
| GUSTAVSON DUNDES | 3 | 05/20/2026 |
| JESEFA TEMPLO ARCHITECTURE LLC | 2 | 05/18/2026 |
| COLLECTIF ENGINEERING PLLC | 2 | 04/13/2026 |
| CHRISTIAN MARTOS | 2 | 04/09/2026 |
| TYLIN | 3 | 03/13/2026 |
| MCALPINE ASSOCIATES ARCHITECTS PC | 1 | 03/12/2026 |
| CHARLES G. MICHEL ENGINEERING, PC. | 7 | 03/11/2026 |
| HANINGTON ENGINEERING CONSULTANTS | 5 | 03/11/2026 |
| RESTRUCTURE ENGINEERING, PLLC | 4 | 03/09/2026 |
| LUBRANO CIAVARRA ARCHITECTS, PLLC | 2 | 02/04/2026 |
| RJD ENGINEERING LLC | 12 | 12/01/2025 |
| ALL CITY ENGINEERING P.C. | 2 | 11/14/2025 |
| REBECCA RASMUSSEN ARCHITECT | 4 | 10/27/2025 |
| RIGID STRUCTURAL DESIGN, LLC | 3 | 10/03/2025 |
| RODRIGO ZAMORA ARCHITECT PLLC | 2 | 09/26/2025 |
| KUSHNER STUDIOS | 3 | 09/24/2025 |
| KAY LEONG AKERLOF ARCHITECTURE | 6 | 08/20/2025 |
| OLD STRUCTURES ENGINEERING | 2 | 08/12/2025 |
| A2 ARCHITECT, PC | 2 | 07/31/2025 |
| LAWLESS & MANGIONE | 2 | 07/25/2025 |
| TEMPLE SIMPSON STUDIO | 2 | 07/03/2025 |
| MG ENGINEERING D.P.C. | 3 | 06/23/2025 |
| Representative | Filings | Most Recent |
|---|---|---|
| WILLIAM VITACCO ASSOCIATES | 26 | 03/21/2026 |
| J CALLAHAN CONSULTING | 46 | 03/21/2026 |
| JAM CONSULTANTS, INC. | 12 | 03/21/2026 |
| DVA Advisors | 6 | 03/21/2026 |
| OUTSOURCE CONSULTANTS, INC. | 4 | 03/21/2026 |
| AGOUTI CONSTRUCTION CONSULTING | 22 | 03/21/2026 |
| CODE | 12 | 03/21/2026 |
| IOAD | 12 | 03/21/2026 |
| RESOLUTION EXPEDITING | 12 | 03/21/2026 |
| ANDRA CONSTANTIN EXPEDITER | 10 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| DYNAMIC INSTALLATION CORP. | General Contractor | 29 | 07/08/2026 |
| AM&G WATERPROOFING LLC | General Contractor | 17 | 07/08/2026 |
| UBERTO, LTD | General Contractor | 13 | 04/09/2026 |
| ANDAMIO SCAFFOLDING LLC | General Contractor | 9 | 03/21/2026 |
| RUSK APARTMENT, LLC | General Contractor | 8 | 07/08/2026 |
| BAR CONSTRUCTION SERVICES | General Contractor | 8 | 07/08/2026 |
| DYNAMIX SCAFFOLD GROUP LL | General Contractor | 8 | 07/08/2026 |
| SILVERLINING INTERIORS | General Contractor | 7 | 07/08/2026 |
| FANUKA INC | General Contractor | 7 | 07/08/2026 |
| V. DISALVO CONTRACTING CO | General Contractor | 6 | 04/09/2026 |
| DONATO PLUMBING, INC | Plumbing | 6 | 07/08/2026 |
| S. DONADIC INC | General Contractor | 6 | 07/08/2026 |
| SUPERIOR HVAC INC | General Contractor | 6 | 07/08/2026 |
| RUSK RENOVATIONS, INC | General Contractor | 6 | 07/08/2026 |
| KILLOWEN CONSTRUCTION IN | General Contractor | 5 | 07/31/2026 |
| CEPRINE CONSTRUCTION INC | General Contractor | 5 | 04/09/2026 |
| DEBONO BROS. BUILDERS & D | General Contractor | 4 | 07/08/2026 |
| ORBIT PLBG & HTG INC | Plumbing | 4 | 08/25/2026 |
| KLDNY INC | General Contractor | 3 | 07/08/2026 |
| ARK-POL PLUMBING CORP | Plumbing | 3 | 07/08/2026 |
| LANE REFRIGERATION CO.,IN | General Contractor | 3 | 07/08/2026 |
| INS DYNAMICS INC | General Contractor | 3 | 04/09/2026 |
| VELLA INTERIORS INC | General Contractor | 3 | 07/08/2026 |
| EINSTEIN ELEC'L CORP | Electrical | 3 | 03/22/2026 |
| ARI GROUP, INC | General Contractor | 3 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| NEW AGE ENGINEERING PLLC | 7746 | 4 | 08/05/2026 |
| MICHAEL PATINO ARCHITECTU | 8170 | 14 | 07/13/2026 |
| A DEGREE OF FREEDOM STRUC | 925 | 3 | 05/18/2026 |
| CHRISTIAN L. MARTOS ENGIN | 5965 | 8 | 04/13/2026 |
| MCALPINE ARCHITECTURE PC | 5694 | 3 | 04/13/2026 |
| SPECIAL TESTING & CONSULT | 1688 | 6 | 03/09/2026 |
| DOMANI INSPECTION SERVICE | 843 | 10 | 02/04/2026 |
| HOTTENROTH & JOSEPH ARCHI | 1160 | 12 | 12/01/2025 |
| SD TESTING & INSPECTION S | 7010 | 4 | 11/14/2025 |
| ARCO ENGINEERING PC | 3769 | 3 | 10/27/2025 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Structural | Permit Issued | UBERTO, LTD | 09/30/2026 |
| DOB NOW | Plumbing | Permit Issued | FIVE STAR P&H CO,INC | 09/28/2026 |
| DOB NOW | Plumbing | Permit Issued | ORBIT PLBG & HTG INC | 08/24/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | KILLOWEN CONSTRUCTION IN | 07/30/2026 |
| DOB NOW | Structural | Permit Issued | KILLOWEN CONSTRUCTION IN | 07/23/2026 |
| DOB NOW | General Construction | Permit Issued | KILLOWEN CONSTRUCTION IN | 07/14/2026 |
| DOB NOW | Structural | Signed-off | HAMILTON AIR COMPANY, INC. | 07/08/2026 |
| DOB NOW | Structural | Signed-off | HAMILTON AIR COMPANY, INC. | 06/17/2026 |
| DOB NOW | General Construction | Permit Issued | SILVERLINING INTERIORS | 06/15/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | KILLOWEN CONSTRUCTION IN | 06/08/2026 |
| DOB NOW | Plumbing | Permit Issued | R.J.C. MECHANICAL CORP | 05/18/2026 |
| DOB NOW | Mechanical Systems | Signed-off | FLUE TECH INC | 04/30/2026 |
| DOB NOW | Structural | Permit Issued | SILVERLINING INTERIORS | 04/28/2026 |
| DOB NOW | Plumbing | Signed-off | ZATOS PLBG AND HTG INC | 04/27/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | SILVERLINING INTERIORS | 04/27/2026 |
| DOB NOW | Plumbing | Permit Issued | FORTE EXPRESS P & H INC | 04/27/2026 |
| DOB NOW | Plumbing | Permit Issued | SMART PLBG & HTG CORP | 04/23/2026 |
| DOB NOW | General Construction | Permit Issued | KILLOWEN CONSTRUCTION IN | 04/22/2026 |
| DOB NOW | General Construction | Signed-off | PRODIGY CONSTRUCTION INC | 04/20/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | BHD GROUP LLC | 03/27/2026 |
| DOB NOW | Plumbing | Signed-off | DEMAR MECHANICAL INC | 03/27/2026 |
| DOB NOW | General Construction | Permit Issued | BHD GROUP LLC | 03/26/2026 |
| DOB NOW | General Construction | Permit Issued | UBERTO, LTD | 02/27/2026 |
| DOB NOW | Structural | Signed-off | LEEDING BUILDERS GROUP LC | 02/10/2026 |
| DOB NOW | General Construction | Permit Issued | FANUKA | 02/02/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | FANUKA | 02/02/2026 |
| DOB NOW | Structural | Permit Issued | FANUKA | 02/02/2026 |
| DOB NOW | Mechanical Systems | Signed-off | V. DISALVO CONTRACTING CO | 01/05/2026 |
| DOB NOW | Structural | Signed-off | V. DISALVO CONTRACTING CO | 01/05/2026 |
| DOB NOW | General Construction | Signed-off | V. DISALVO CONTRACTING CO | 12/30/2025 |
| DOB NOW | Plumbing | Signed-off | SUPER PLUMBERS CORP | 12/24/2025 |
| DOB NOW | General Construction | Permit Issued | UBERTO, LTD | 11/21/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | ALL MAKES HTG & A/C CORP | 11/07/2025 |
| DOB NOW | General Construction | Permit Issued | RG DECORATING & PAINTING | 11/06/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | CEPRINE CONSTRUCTION INC | 11/03/2025 |
| DOB NOW | Plumbing | Permit Issued | FIVE STAR P&H CO,INC | 10/27/2025 |
| DOB NOW | Supported Scaffold | Signed-off | CEPRINE CONSTRUCTION INC | 10/15/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | UBERTO, LTD | 10/09/2025 |
| DOB NOW | General Construction | Signed-off | RUSK RENOVATIONS, INC | 10/03/2025 |
| DOB NOW | Mechanical Systems | Signed-off | RUSK RENOVATIONS, INC | 10/02/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/05/2026 | Signed-off | FLUE TECH INC | Others | Other Lifetime Chimney Supply FURAN FLEX RWV 1 BTU · Chimney ×1 Heatshield CHAMBER COAT 1 BTU ×1 |
| 05/26/2026 | Permit Issued | SILVERLINING INTERIORS | Heating and Air Conditioning Systems | Heat / Cool Daikin REYA168AATJA 156,000 BTU · Vrf Outdoor ×2 |
| 05/20/2026 | — | — | Air Conditioning Systems | Cooling Task MODEL# TYC021-30K 29,900 BTU · Condensing Unit ×1 |
| 04/13/2026 | Permit Issued | KILLOWEN CONSTRUCTION IN | Air Conditioning Systems | Cooling Ephoca AIO Ceiling Ducted with ERV
ADP10R4H1 14,000 BTU · Ductwork ×4 |
| 03/11/2026 | Permit Issued | UBERTO, LTD | Heating and Air Conditioning Systems | Heat / Cool Mitsubishi Electric PURY-EP120TNU-A1 135,000 BTU · Vrf Outdoor ×4 |
| 11/14/2025 | Permit Issued | BHD GROUP LLC | Air Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems | Cooling Task Applied Products TYC021TW-30K 29,900 BTU · Condensing Unit ×6 Heat / Cool Ephoca APK10R3H2 8,900 BTU · Erv ×4 Heating Berko CUH935 6,824 BTU · Electric Heater ×2 |
| 10/27/2025 | Permit Issued | HUDSON GREEN CRAFT LLC | Air Conditioning Systems | Cooling Above Air VCU-H-0024-1-X 2 tons · Condensing Unit ×1 VCU-H-0024-1-X,, MCA 13.7 2 tons · Condensing Unit ×1 |
| 09/26/2025 | Signed-off | RUSK RENOVATIONS, INC | Air Conditioning Systems, Ventilation Systems | |
| 08/07/2025 | Permit Issued | FLUE TECH INC | Others | Other Lifetime Chimney Supply FURAN FLEX RWV 1 BTU · Chimney ×1 U.S. Draft Co. CBX13 7,900 CFM · Exhaust Fan ×1 |
| 07/31/2025 | Permit Issued | ALL MAKES HTG & A/C CORP | Air Conditioning Systems | |
| 06/06/2025 | Signed-off | ARI GROUP, INC | Air Conditioning Systems | Cooling |
| 08/28/2024 | Permit Issued | PAM AIR CONDITIONING INC | Air Conditioning Systems | Cooling |
| 05/16/2022 | — | — | Air Conditioning Systems | Cooling |
| 11/13/2019 | Permit Issued | AEGIS ENERGY SERVICES LLC | Generators | Generators __Junk__ POWERVERTER 4,000 BTU · Generator ×1 |
| 09/03/2019 | Signed-off | SUPERIOR HVAC INC | Air Conditioning Systems | Cooling Above Air VCU-C-030-1 30,000 BTU · Condensing Unit ×2 Carrier FPMBNC030 30,000 BTU · Fan Coil Indoor ×1 First Company 30HXC 30,000 BTU · Fan Coil Indoor ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/26/2026 | Permit Issued | FORTE EXPRESS P & H INC | Gas, Water/Sanitary |
| 05/20/2026 | — | — | Gas, Water/Sanitary |
| 04/13/2026 | Permit Issued | R.J.C. MECHANICAL CORP | Water/Sanitary |
| 03/11/2026 | Permit Issued | ORBIT PLBG & HTG INC | Gas, Water/Sanitary |
| 12/01/2025 | Signed-off | DYNAMIC BLUE WATER MECH | Gas, Water/Sanitary |
| 11/14/2025 | Permit Issued | SMART PLBG & HTG CORP | Gas, Water/Sanitary |
| 10/27/2025 | Permit Issued | DONATO PLUMBING, INC | Gas, Water/Sanitary |
| 09/26/2025 | Signed-off | ZATOS PLBG AND HTG INC | Water/Sanitary |
| 07/31/2025 | Permit Issued | FIVE STAR P&H CO,INC | Gas, Water/Sanitary |
| 06/23/2025 | Signed-off | DEMAR MECHANICAL INC | Gas, Water/Sanitary |
| 11/13/2019 | Permit Issued | EH PLUMBING & HEATING COR | Gas |
| 10/24/2019 | — | — | Gas, Water/Sanitary |
| 08/26/2019 | Signed-off | BRANCH PLUMBING LLC | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/24/2026 | Complete | VERTEX ELECTRIC CORP. | — |
| 07/14/2026 | Permit Issued | A.DAVINO ELEC'L CONT'G CO | General Wiring |
| 06/17/2026 | Complete | T. MCCAFFREY-T. MCGOVERN | 1 meters |
| 04/27/2026 | Permit Issued | TOP NOTCH ELECTRIC INC | General Wiring |
| 04/13/2026 | Complete | AMSTERDAM ELECTRIC CORP | General Wiring |
| 03/10/2026 | Permit Issued | CRESCO ELECTRICAL CORP | General Wiring |
| 02/19/2026 | Permit Issued | ZIP ELECTRIC INC | General Wiring |
| 11/03/2025 | Permit Issued | HIGH QUALITY ELEC.OF NYC | — |
| 10/20/2025 | Complete | APOLLO ELECTRIC INC. | General Wiring |
| 10/16/2025 | Permit Issued | LENS ELECTRIC, INC | General Wiring |
| 09/17/2025 | Permit Issued | BELMONT ELECTRICAL, INC | General Wiring |
| 09/15/2025 | Permit Issued | EINSTEIN ELEC'L CORP | — |
| 09/15/2025 | Permit Issued | EINSTEIN ELEC'L CORP | General Wiring |
| 09/11/2025 | Permit Issued | ALBA ELECTRIC CORP | General Wiring |
| 04/03/2025 | Complete | EINSTEIN ELEC'L CORP | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/26/2026 | Permit Issued | SILVERLINING INTERIORS | Steel, Concrete |
| 05/18/2026 | Signed-off | HAMILTON AIR COMPANY, INC | Masonry |
| 04/13/2026 | Permit Issued | KILLOWEN CONSTRUCTION IN | Steel, Concrete |
| 03/11/2026 | Permit Issued | UBERTO, LTD | Steel, Concrete |
| 11/14/2025 | Permit Issued | SMART PLBG & HTG CORP | Steel |
| 09/26/2025 | Signed-off | RUSK RENOVATIONS, INC | 1 scope_items |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/15/2024 | Permit Issued | DYNAMIX SCAFFOLD GROUP LL | Scaffold |
| 01/02/2019 | Permit Issued | DYNAMIC INSTALLATION CORP | Sidewalk Shed |
| 12/28/2018 | Permit Issued | DYNAMIC INSTALLATION CORP | Scaffold |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/01/2024 | — | — | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 07/21/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 06/29/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/09/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/30/2026 | Fail-Final Boiler Equipment Inspection | Fail | View ↗ |
| 04/29/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/06/2026 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 03/20/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/06/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/06/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/05/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/02/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 02/27/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/18/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/17/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 02/11/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 02/06/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/02/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/30/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/15/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 01/13/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/08/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/07/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 01/06/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/12/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 12/04/2025 | Certified Storm Drainage-ST-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/06/2026 | Tenant Protection Plan Compliance | Stephen Shishko | special |
| 08/06/2026 | Final | Stephen Shishko | progress |
| 08/06/2026 | Mechanical Systems | Stephen Shishko | special |
| 08/06/2026 | Chimneys and vents | Stephen Shishko | special |
| 07/28/2026 | Final | Stephen Shishko | progress |
| 07/28/2026 | Mechanical Systems | Stephen Shishko | special |
| 07/28/2026 | Chimneys and vents | Stephen Shishko | special |
| 07/28/2026 | Tenant Protection Plan Compliance | Stephen Shishko | special |
| 06/01/2026 | Final | Dominic Cullen | progress |
| 06/01/2026 | Structural Stability – Alterations of existing buildings | Dominic Cullen | special |
| 06/01/2026 | Tenant Protection Plan Compliance | LAWRENCE GREEN | special |
| 06/01/2026 | Masonry | Dominic Cullen | special |
| 05/13/2026 | Structural Stability – Alterations of existing buildings | Dominic Cullen | special |
| 05/13/2026 | Masonry | Dominic Cullen | special |
| 05/13/2026 | Final | Dominic Cullen | progress |
| 05/13/2026 | Tenant Protection Plan Compliance | — | special |
| 05/05/2026 | Post-installed Anchors | — | special |
| 04/09/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 04/09/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 04/03/2026 | Final | — | progress |
| 04/03/2026 | Mechanical Systems | — | special |
| 03/30/2026 | Structural Steel - Details | Michael Patino | special |
| 03/30/2026 | Final | Michael Patino | progress |
| 03/30/2026 | Structural Steel - High Strength Bolting | Michael Patino | special |
| 03/30/2026 | Concrete - Cast-In-Place | Michael Patino | special |