← Back
BuildNYC
Elevator apt, semi-fireproof without stores
Pomonok (NYCHA)
70-25 KISSENA BOULEVARD · BIN 4451584
💬 Discuss this project
1952Year Built
7Stories
D1Building Class
R6Zoning
652,327 sfGross Floor Area
701Units
LL97 Covered18 Active Violations ▸FISP: No Report FiledFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: NYC Housing Authority · 589,949 sf lot · 1.11 FAR built · Flood zone X
Locations of Work
StructuralPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 7NYC Housing Authority9p · 1 filing · 9 docs
Floor 6NYC Housing Authority9p · 1 filing · 9 docs
Floor 5NYC Housing Authority9p · 1 filing · 9 docs
Floor 4NYC Housing Authority9p · 1 filing · 9 docs
Floor 3NYC Housing Authority9p · 1 filing · 9 docs
Floor 2NYC Housing Authority9p · 1 filing · 9 docs
Floor 1NYC Housing Authority9p · 1 filing · 9 docs
CellarNYC Housing Authority11p · 2 filings · 12 docs
Site & exteriorTimber trench box shoring for drainage structures3p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority1707/08/2026
NYC Housing803/21/2026
NYC Department of Parks and Recreation503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Srikanth Puttagunta108/25/2026
D.P. Consulting203/07/2023
Becker Engineering108/19/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
D.P. Consulting403/21/2026
KM Associates of New York103/21/2026
K & M Associates103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Prestige Pavers of NYCGeneral Contractor303/21/2026
D.D.S. Mechanical PBG & HeatingPlumbing207/08/2026
Drummond RucklinElectrical103/21/2026
Mike Lewkovicz Electric CompanyElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Alan Margolin & Associates423203/07/2023
Becker Engineering633108/19/2021
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
10/29/2026
Elevator Category 1 inspection report filed
10/27/2026
Elevator Category 1 inspection report filed
08/25/2026
Filed — Alteration
Q01448091-I1
08/24/2026
Special inspection requirement — Tenant Protection Plan Compliance
87 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offD.D.S. Mechanical PBG & Heating01/04/2023
DOB NOWPlumbingSigned-offD.D.S. Mechanical PBG & Heating07/28/2022
DOB NOWSupport of ExcavationSigned-offPrestige Pavers of NYC10/21/2021
BISEQISSUEDArc Electrical & Mechanical Con04/08/2016
BISEQISSUEDArc Electrical & Mechanical Con03/18/2016
BISOTISSUEDArc Electrical & Mechanical Con12/31/2015
BISOTISSUEDArc Electrical & Mechanical Con11/09/2015
BISEQISSUEDSMJ Construction Management08/28/2015
BISEQISSUEDSMJ Construction Management08/19/2015
BISEQISSUEDNavtech Construction04/08/2009
BISEQISSUEDNavtech Construction03/10/2009
BISOTISSUEDV.c.vitanza Sons04/14/1999
BISPLISSUEDV. C. Vitanza Sons04/14/1999
BISPLISSUEDV. C. Vitanza Sons04/14/1999
BISOTISSUEDV.c.vitanza Sons04/14/1999
BISOTISSUEDV.c.vitanza Sons03/04/1998
BISPLISSUEDV. C. Vitanza Sons03/04/1998
BISPLISSUEDV. C. Vitanza Sons03/04/1998
BISOTISSUEDV.c.vitanza Sons03/04/1998
BISPLISSUEDV. C. Vitanza Sons02/22/1990
5 projects · most recent 12/18/2025
General Wiring
FiledStatusContractorScope
12/18/2025Permit IssuedAccord Power Electric—
01/02/2021Permit IssuedN.Y.C. Housing AuthorityGeneral Wiring
01/02/2021Permit IssuedN.Y.C. Housing AuthorityGeneral Wiring
01/02/2021Permit IssuedN.Y.C. Housing AuthorityGeneral Wiring
03/13/2019Permit IssuedEia ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
03/16/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
08/24/2026Tenant Protection Plan Compliance—special
08/19/2026Metering—energy_progress
08/19/2026Electrical motors and elevators—energy_progress
08/19/2026Permanent certificate—energy_progress
08/19/2026Maintenance information—energy_progress
08/19/2026Fire-Resistant Penetrations and Joints—special
08/19/2026Energy Code Compliance Inspections—progress
08/19/2026HVAC-R and service water piping design and insulation—energy_progress
08/19/2026HVAC-R and service water heating system controls—energy_progress
08/19/2026HVAC-R and service water heating equipment—energy_progress
03/08/2023Fire-Resistant Penetrations and JointsYoung Suhspecial
08/12/2021FinalJohn Beckerprogress
08/12/2021Excavations - Sheeting, Shoring, and BracingJohn Beckerspecial
94 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account