1899Year Built
2Stories
A1Building Class
R5BZoning
1,560 sfGross Floor Area
1Units
2 Open Violations ▸FDNY Report ↗
Two stories - detached, small or mid-size · 3,200 sf lot · 0.49 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction8p · 2 filings · 20 docs
Floor 1Under Construction11p · 2 filings · 20 docs
CellarUnder Construction4p · 1 filing · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DIESEL CONTRACTING OF N.Y203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARQUITECTURA VARELA808/18/2026
YAO W GUO ARCHITECT, PC302/15/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
L & J DESIGN GROUP1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DIESEL CONTRACTING OF N.YGeneral Contractor1109/23/2026
JUST PLBG & HTG INCPlumbing408/22/2026
P.S.I. MECHANICALPlumbing207/08/2026
AUJLA ELECTRIC CORPElectrical103/22/2026
INNOVATIVE VENTURES TEAMGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SANARK CONSULTING ENGINEE6824608/18/2026
CITY-WIDE TESTING INC416102/13/2024
Building Lifecycle
All (88)Filed (11)Permit Issued (15)Signed Off (1)Violation (5)Inspection (8)Objection (18)Special Inspection (30)
09/22/2026
Permit issued — Structural
B01023758-I1-GC
08/21/2026
Permit issued — Plumbing
B01000956-S1-PL
08/18/2026
Filed — Alteration
PROPOSED 2 STORY REAR EXTENSION OF AN EXISTING 1 FAMILY 2 STORY BUILDING WITH MINOR INTERIOR WORK AS PER PLANS. SEWER CERTIFICATION FILED WITH DEP. NO CHANGE IN OCCUPANCY, USE, OR EGRESS.
B01023758-P2
07/21/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/16/2026
Permit issued — General Construction
B01023758-I1-GC
06/10/2026
Objection resolved — Addressed
06/10/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
ELIAS RASABI
06/10/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
REJEP KOLAR
05/28/2026
Objection raised — Cost
05/21/2026
Filed — Alteration
INSTALL / REPLACE PLUMBING FIXTURES IN CELLAR, 1ST AND 2ND FLOOR AS PER PLANS. ALL GENERAL CONSTRUCTION WORK FILED UNDER DOB NOW JOBS # B00990988 AND B01023758
B01000956-P3
05/21/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
05/21/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
04/28/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/09/2026
Permit issued — General Construction
B01000956-I1-GC
04/09/2026
Permit issued — General Construction
B01000956-I1-GC
03/05/2026
Filed — Alteration
INSTALL / REPLACE PLUMBING FIXTURES IN CELLAR, 1ST AND 2ND FLOOR AS PER PLANS. ALL GENERAL CONSTRUCTION WORK FILED UNDER DOB NOW JOBS # B00990988 AND B01023758
B01000956-P2
02/12/2026
Permit issued — General Construction
B01023758-I1-ST
02/12/2026
Permit issued — Structural
B01023758-I1-GC
01/30/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/20/2026
Objection raised — Admin
01/20/2026
Objection resolved — Addressed
01/15/2026
Objection raised — Cost
01/15/2026
Objection resolved — Addressed
01/14/2026
Filed — Alteration
INSTALL / REPLACE PLUMBING FIXTURES IN CELLAR, 1ST AND 2ND FLOOR AS PER PLANS. ALL GENERAL CONSTRUCTION WORK FILED UNDER DOB NOW JOBS # B00990988 AND B01023758
B01000956-P1
01/12/2026
Special inspection requirement — Subgrade Inspections
REJEP KOLAR
01/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
REJEP KOLAR
01/12/2026
Special inspection requirement — Concrete - Cast-In-Place
REJEP KOLAR
01/12/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
ELIAS RASABI
01/12/2026
Special inspection requirement — Fire-Resistance Rated Construction
Vicente Varela
01/12/2026
Special inspection requirement — Energy Code Compliance Inspections
Vicente Varela
01/12/2026
Special inspection requirement — Final
REJEP KOLAR
01/12/2026
Special inspection requirement — Fenestration air leakage
Vicente Varela
01/12/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Vicente Varela
01/12/2026
Special inspection requirement — Air barrier - visual inspection
Vicente Varela
01/12/2026
Special inspection requirement — Fenestration areas
Vicente Varela
01/12/2026
Special inspection requirement — Interior lighting power
Vicente Varela
01/12/2026
Special inspection requirement — Exterior lighting power
Vicente Varela
01/12/2026
Special inspection requirement — Insulation placement and R values
Vicente Varela
01/12/2026
Special inspection requirement — Structural Cold-Formed Steel
REJEP KOLAR
01/12/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
REJEP KOLAR
01/12/2026
Special inspection requirement — Structural Steel - Details
REJEP KOLAR
01/06/2026
Violation issued (ECB, open)
Construction
01/06/2026
Violation issued (ECB, open)
Unknown
12/29/2025
Objection resolved — Addressed
12/23/2025
Objection raised — Admin
12/18/2025
Filed — Alteration
PROPOSED 2 STORY REAR EXTENSION OF AN EXISTING 1 FAMILY 2 STORY BUILDING WITH MINOR INTERIOR WORK AS PER PLANS. SEWER CERTIFICATION FILED WITH DEP. NO CHANGE IN OCCUPANCY, USE, OR EGRESS.
B01023758-P1
12/12/2025
Special inspection requirement — Exterior lighting power
Vicente Varela
12/12/2025
Special inspection requirement — Final
REJEP KOLAR
12/12/2025
Special inspection requirement — Fire-Resistance Rated Construction
Vicente Varela
12/12/2025
Special inspection requirement — Air barrier - visual inspection
Vicente Varela
12/12/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Vicente Varela
12/12/2025
Special inspection requirement — Fenestration areas
Vicente Varela
12/12/2025
Special inspection requirement — Fenestration air leakage
Vicente Varela
12/12/2025
Special inspection requirement — Insulation placement and R values
Vicente Varela
12/12/2025
Special inspection requirement — Interior lighting power
Vicente Varela
10/23/2025
Permit issued — Structural
B01023758-I1-GC
10/02/2025
Permit issued — General Construction
B01000956-I1-GC
07/25/2025
Permit issued — Plumbing
B01000956-S1-PL
07/17/2025
Permit issued — General Construction
B01000956-I1-GC
Latest 60 of 88 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedDIESEL CONTRACTING OF N.Y09/22/2026
DOB NOWPlumbingPermit IssuedJUST PLBG & HTG INC08/21/2026
DOB NOWGeneral ConstructionPermit IssuedDIESEL CONTRACTING OF N.Y06/16/2026
DOB NOWGeneral ConstructionPermit IssuedCENTRAL CONSTRUCTION MAN*04/09/2026
DOB NOWGeneral ConstructionPermit IssuedDIESEL CONTRACTING OF N.Y04/09/2026
DOB NOWGeneral ConstructionPermit IssuedCENTRAL CONSTRUCTION MAN*02/12/2026
DOB NOWStructuralPermit IssuedCENTRAL CONSTRUCTION MAN*02/12/2026
DOB NOWStructuralPermit IssuedCENTRAL CONSTRUCTION MAN*10/23/2025
DOB NOWGeneral ConstructionPermit IssuedCENTRAL CONSTRUCTION MAN*10/02/2025
DOB NOWPlumbingPermit IssuedMOHAMED ABDELRAZEK07/25/2025
DOB NOWGeneral ConstructionPermit IssuedCENTRAL CONSTRUCTION MAN*07/17/2025
DOB NOWGeneral ConstructionPermit IssuedCENTRAL CONSTRUCTION MAN*07/16/2025
DOB NOWGeneral ConstructionPermit IssuedCENTRAL CONSTRUCTION MAN*07/16/2025
DOB NOWGeneral ConstructionPermit IssuedINNOVATIVE VENTURES TEAM02/14/2024
DOB NOWPlumbingSigned-offP.S.I. MECHANICAL06/28/2021
BISOTISSUEDGLOBAL DESIGN CONCEPT COR10/13/2022
BISOTISSUEDGLOBAL DESIGN CONCEPT COR08/23/2022
1 project · most recent 05/21/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/21/2026Permit IssuedJUST PLBG & HTG INCGas, Storm, Water/Sanitary
1 project · most recent 05/17/2019
General Wiring
FiledStatusContractorScope
05/17/2019CompleteAUJLA ELECTRIC CORPGeneral Wiring
1 project · most recent 08/18/2026
Steel Concrete
FiledStatusContractorScope
08/18/2026Permit IssuedDIESEL CONTRACTING OF N.YSteel, Concrete
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
07/21/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/28/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/30/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/23/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/23/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/29/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/05/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/05/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
06/10/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesELIAS RASABIspecial
06/10/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationREJEP KOLARspecial
05/21/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
05/21/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities—special
01/12/2026Subgrade InspectionsREJEP KOLARspecial
01/12/2026Fire-Resistant Penetrations and JointsREJEP KOLARspecial
01/12/2026Concrete - Cast-In-PlaceREJEP KOLARspecial
01/12/2026Subsurface Investigations (Borings/Test Pits)ELIAS RASABIspecial
01/12/2026Fire-Resistance Rated ConstructionVicente Varelaprogress
01/12/2026Energy Code Compliance InspectionsVicente Varelaprogress
01/12/2026FinalREJEP KOLARprogress
01/12/2026Fenestration air leakageVicente Varelaenergy_progress
01/12/2026Fenestration and door U-factor and product ratingsVicente Varelaenergy_progress
01/12/2026Air barrier - visual inspectionVicente Varelaenergy_progress
01/12/2026Fenestration areasVicente Varelaenergy_progress
01/12/2026Interior lighting powerVicente Varelaenergy_progress
01/12/2026Exterior lighting powerVicente Varelaenergy_progress
01/12/2026Insulation placement and R valuesVicente Varelaenergy_progress
01/12/2026Structural Cold-Formed SteelREJEP KOLARspecial
01/12/2026Structural Stability – Alterations of existing buildingsREJEP KOLARspecial
01/12/2026Structural Steel - DetailsREJEP KOLARspecial
12/12/2025Exterior lighting powerVicente Varelaenergy_progress
12/12/2025FinalREJEP KOLARprogress
12/12/2025Fire-Resistance Rated ConstructionVicente Varelaprogress
12/12/2025Air barrier - visual inspectionVicente Varelaenergy_progress
Latest 25 of 46.
▾Documents — 98 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
09/01/2026B00481534-P2Request digital key ↗
09/01/2026B00481534-I1Request digital key ↗
09/01/2026B00481534-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
03/17/2021322059721Open ↗
02/03/2021322059721Open ↗
11/21/2018322059721Open ↗
▸BISWORK PERMIT APPLICATION2
08/24/2022322059721Open ↗
12/11/2018322059721Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram3
08/19/2026B01023758-P2Open ↗
08/13/2026B01023758-P1Open ↗
08/13/2026B01023758-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/19/2026B01023758-P2Open ↗
08/13/2026B01023758-P1Open ↗
08/13/2026B01023758-I1Open ↗
▸Seals & Professional Certifications34
▸DOB NOWProgress Inspector Seal & Signature14
09/02/2026B01023758-P1Open ↗
09/02/2026B01023758-P1Open ↗
09/02/2026B01023758-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/01/2026B00481534-I1Open ↗
09/01/2026B00481534-P2Open ↗
09/01/2026B00481534-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026B01023758-P1Open ↗
09/02/2026B01023758-P1Open ↗
08/30/2026B01023758-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/21/2018322059721Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
11/21/2018322059721Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
11/21/2018322059721Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/19/2026B01023758-P2Open ↗
08/13/2026B01023758-P1Open ↗
08/13/2026B01023758-I1Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
11/21/2018322059721Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
09/01/2026B00481534-P1Open ↗
09/01/2026B00481534-P2Open ↗
09/01/2026B00481534-I1Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/21/2018322059721Open ↗
▸Energy Compliance3
▸BISAS-BUILT ENERGY ANALYSIS1
10/20/2022322059721Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
11/21/2018322059721Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/01/2026B00481534-I1Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY3
10/20/2022322059721Open ↗
10/20/2022322059721Open ↗
02/03/2021322059721Open ↗
▸DOB NOWSOIL REPORT3
08/19/2026B01023758-P2Open ↗
08/13/2026B01023758-I1Open ↗
08/13/2026B01023758-P1Open ↗
▸BISTECHNICAL REPORT: PHOTOLUMINESCENCE1
10/20/2022322059721Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B01023758-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/21/2022322059721Open ↗
▸BISSUPERSEDING LETTER1
08/24/2022322059721Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
10/20/2022322059721Open ↗
11/21/2018322059721Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
11/21/2018322059721Open ↗
▸BISADDITIONAL INFORMATION1
03/17/2021322059721Open ↗
▸Other Documents9
▸DOB NOWSite Survey: Initial3
08/19/2026B01023758-P2Open ↗
08/13/2026B01023758-I1Open ↗
08/13/2026B01023758-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/19/2026B01023758-P2Open ↗
08/13/2026B01023758-P1Open ↗
08/13/2026B01023758-I1Open ↗
▸DOB NOWPlot Diagram3
08/19/2026B01023758-P2Open ↗
08/13/2026B01023758-P1Open ↗
08/13/2026B01023758-I1Open ↗