← Back
Office with commercial, 7-19 stories
70 WEST 40 STREET
MANHATTAN · BIN 1016059
💬 Discuss this project
1922Year Built
16Stories
O6Building Class
C6-4.5Zoning
68,081 sfGross Floor Area
21Units
LL97 Covered4 Open Violations 3 unresolved · 1 paperwork only ▸FISP: SAFE
Office with commercial, 7-19 stories · Owner of record: MILLTEX DISTRIBUTORS LLC · 5,036 sf lot · 13.52 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneralOther
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 7 docs
Floor 164p · 2 filings · 20 docs
Floor 15
Floor 147p · 2 filings · 9 docs
Floor 13
Floor 12
Floor 1112p · 2 filings · 9 docs
Floor 10
Floor 9
Floor 8Under Construction6p · 2 filings · 10 docs
Floor 7
Floor 6
Floor 513p · 2 filings · 13 docs
Floor 4
Floor 3
Floor 2
Floor 111p · 1 filing · 3 docs
Mezzanine12p · 4 filings · 19 docs
Cellar14p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VANGUARD DEVELOPMENT USA407/08/2026
MILLTEX DISTRIBUTORS LLC C O W7803/22/2026
WIDGEION MGMT. CORP5103/22/2026
283-285 EAST 4 ST HOUS103/22/2026
RESOURCE CONSTRUCTION103/22/2026
WIDGEON MGT CORP MILLTEX DIST5703/21/2026
MILLTEX DIST LLC C/O WIDGEON403/21/2026
58 TO 64 40TH ST CORP1003/21/2026
MILLTEX DST LLC WIDGEON MGT403/21/2026
WIDGEON MGT CORP MILL DISTR COMP403/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS2003/21/2026
OEF CONSULTANTS LLC1203/21/2026
LMS-ACE SERVICES303/21/2026
HS DESIGN STUDIO203/21/2026
RETHY ASSOCIATES403/21/2026
AE DESIGN SOLUTION403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
W.J. REGAN & COMPANY LLCGeneral Contractor807/08/2026
EVEREST SCAFFOLDING INCGeneral Contractor803/21/2026
BRENNAN OPERATING INCGeneral Contractor707/10/2026
PJM AND SONS, INCGeneral Contractor507/08/2026
E.J. YORK INCGeneral Contractor407/11/2026
GIOVANNI MARTINI CONTRACTGeneral Contractor407/08/2026
BURDG DUNHAM & ASSOCIATESGeneral Contractor403/21/2026
PREMIER SANITATION LLCGeneral Contractor303/21/2026
CONSTRUCTION MANAGEMENT &General Contractor303/21/2026
CMA PLUMBING & HEATING INFire Protection307/08/2026
ROBINSON, PHILIPElectrical103/21/2026
SM METRO P & H CORPElectrical103/21/2026
WALTON, MARCElectrical103/21/2026
ADVANCED PLBG, MECH & SPRFire Protection106/28/2026
BEDROCK PLBG. & HTG., INCPlumbing106/28/2026
CN PLUMBING INCPlumbing107/01/2026
ORBIT PLBG & HTG INCPlumbing107/08/2026
ALEXANDER MERZLYAKElectrical103/21/2026
PARAMOUNT PLBG & HTG CORPPlumbing107/08/2026
CITYWIDE ELEC'L WIRING INElectrical103/22/2026
DUNCAN, JAMESElectrical103/21/2026
FRIEDMAN, STANLEYElectrical103/21/2026
GUDERSKI, STANLEYElectrical103/21/2026
HARTENSVELD JR, THOMASElectrical103/21/2026
HEMNAUTH, SUDESHElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EDG2578806/24/2026
JACK GREEN ASSOCIATES422605/14/2026
AMARACON TESTING & INSPEC58421108/28/2025
OEF CONSULTANTS LLC3735604/09/2025
DAVID A. LEVY & ASSOC.4854311/20/2023
Building Lifecycle
All (222)Filed (46)Permit Issued (36)Signed Off (16)Facade (FISP) (15)Violation (50)Inspection (8)Objection (21)Special Inspection (30)
08/12/2026
Objection resolved — Resolved
08/11/2026
Objection raised — Scope
07/30/2026
Filed — Alteration
Plumbing work for restroom renovations in office space.
M01397352-S2
07/30/2026
Special inspection requirement — Energy Code Compliance Inspections
07/30/2026
Special inspection requirement — HVAC-R and service water heating equipment
07/30/2026
Special inspection requirement — HVAC-R and service water heating system controls
07/30/2026
Special inspection requirement — Electrical motors and elevators
07/30/2026
Special inspection requirement — Shutoff dampers
07/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
07/30/2026
Special inspection requirement — Maintenance information
07/23/2026
Special inspection requirement — Final
07/23/2026
Special inspection requirement — Mechanical Systems
07/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/22/2026
Signed off — Alteration
Modification of the sprinkler system as shown on the drawings filed herewith. No change in use, egress, or occupancy.
M01213263-I1
07/10/2026
Permit issued — General Construction
M01397352-I1-GC
07/10/2026
Permit issued — General Construction
M01387847-I1-GC
07/08/2026
Signed off — Alteration
Masonry opening and installation of roll down door between separate tax and zoning lots 85 and 81. Easement agreement not required as opening does not affect egress, light & air or party wall. 3-hour fire rated roll down door separation for fire and smoke
M01211054-I1
07/08/2026
Permit issued — General Construction
M01211054-I1-GC
06/29/2026
Permit issued — Plumbing
M01397352-S1-PL
06/24/2026
Filed — Alteration
Modification of the plumbing system as shown on the drawings filed herewith. No change in use, egress, or occupancy.
M01213249-P2
06/12/2026
Filed — Alteration
Plumbing work for restroom renovations in office space.
M01397352-S1
06/12/2026
Filed — Alteration
ROOF REPAIRS
M01388769-I1
06/12/2026
Special inspection requirement — Insulation placement and R values
Roy Sokoloski
06/12/2026
Special inspection requirement — Air barrier - visual inspection
Roy Sokoloski
06/03/2026
Signed off — Alteration
Modification of the mechanical system to install ductwork and supply register/diffusers and returns as shown on the drawings filed herewith, No change in use, egress, or occupancy.
M01213267-I1
05/20/2026
Filed — Alteration
Plumbing work for restroom renovations in office space.
M01397352-I1
05/14/2026
Filed — Alteration
Modification of the sprinkler system as shown on the drawings filed herewith. No change in use, egress, or occupancy.
M01213263-P2
05/14/2026
Filed — Alteration
Modification of the plumbing system as shown on the drawings filed herewith. No change in use, egress, or occupancy.
M01213249-P1
05/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anthony Stasio
05/14/2026
Special inspection requirement — Sprinkler Systems
LAWRENCE GREEN
05/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anthony Stasio
05/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anthony Stasio
05/06/2026
Special inspection requirement — Post-installed Anchors
Anthony Stasio
05/06/2026
Special inspection requirement — Sprinkler Systems
LAWRENCE GREEN
05/04/2026
Filed — Alteration
Demolition of partitions, floors and ceilings of office on the 8th floor. The tenant will construct the space under a separate application.
M01387847-I1
04/28/2026
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
04/24/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/22/2026
Special inspection requirement — Final
Roy Sokoloski
04/15/2026
Special inspection requirement — Final
Bradford Leibin
04/02/2026
Filed — Alteration
Modification of the sprinkler system as shown on the drawings filed herewith. No change in use, egress, or occupancy.
M01213263-P1
03/31/2026
Objection resolved — Resolved
03/25/2026
Signed off — Alteration
EXISTING RESTROOMS FINISHES AND PARTIAL WALL REMOVAL AT LEVEL 5. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M01203790-I1
03/09/2026
Violation issued (ECB, open)
Construction
03/09/2026
Special inspection requirement — Sprinkler Systems
LAWRENCE GREEN
03/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anthony Stasio
02/27/2026
Objection resolved — Addressed
11/07/2025
Objection raised — Admin
10/30/2025
Objection resolved — Addressed
10/30/2025
Objection resolved — Addressed
10/28/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/28/2025
Objection raised — Scope
10/28/2025
Objection raised — Scope
10/03/2025
Permit issued — Mechanical Systems
M01256910-I1-MS
08/28/2025
Filed — Alteration
Mechanical work for landlord HVAC prep & floor heat electrification only. Replace Water Cooled DX AC w/ new Water Source Heat Pump, Plate-Frame Heat Exchange & secondary loop circulator pump Add Perimeter Fan Powered Boxes & ERV. (R) all steam radiator
M01256910-I1
08/27/2025
Special inspection requirement — Electrical motors and elevators
Philip Friedman
08/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CONNIE PISANI
08/27/2025
Special inspection requirement — HVAC-R and service water heating system controls
Philip Friedman
08/27/2025
Special inspection requirement — HVAC-R and service water heating equipment
Philip Friedman
08/27/2025
Special inspection requirement — Maintenance information
Philip Friedman
08/27/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Philip Friedman
Latest 60 of 222 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedE.J. YORK INC07/10/2026
DOB NOWGeneral ConstructionPermit IssuedE.J. YORK INC07/10/2026
DOB NOWGeneral ConstructionSigned-offBRENNAN OPERATING INC07/08/2026
DOB NOWPlumbingPermit IssuedCN PLUMBING INC06/29/2026
DOB NOWMechanical SystemsPermit IssuedPJM AND SONS, INC10/03/2025
DOB NOWGeneral ConstructionSigned-offBRENNAN OPERATING07/10/2025
DOB NOWMechanical SystemsSigned-offBRENNAN OPERATING07/10/2025
DOB NOWMechanical SystemsPermit IssuedBARTOSZ WINSKO07/02/2025
DOB NOWSprinklersSigned-offADVANCED PLBG, MECH & SPR06/27/2025
DOB NOWPlumbingSigned-offBEDROCK PLBG. & HTG., INC06/23/2025
DOB NOWGeneral ConstructionSigned-offBRENNAN OPERATING06/05/2025
DOB NOWMechanical SystemsSigned-offBRENNAN OPERATING06/05/2025
DOB NOWMechanical SystemsPermit IssuedBARTOSZ WINSKO02/12/2025
DOB NOWMechanical SystemsPermit IssuedBARTOSZ WINSKO01/13/2025
DOB NOWSuspended ScaffoldPermit IssuedCENTRAL CONSTRUCTION MGMT02/07/2024
DOB NOWSprinklersSigned-offCMA PLUMBING & HEATING IN11/06/2023
DOB NOWMechanical SystemsPermit IssuedPJM AND SONS, INC10/30/2023
DOB NOWGeneral ConstructionSigned-offCONSTRUCTION MANAGEMENT &10/25/2023
DOB NOWSprinklersSigned-offCMA PLUMBING & HEATING IN09/29/2023
DOB NOWGeneral ConstructionPermit IssuedEJ YORK INC09/21/2023
DOB NOWSprinklersSigned-offCMA PLUMBING & HEATING IN08/30/2023
DOB NOWPlumbingSigned-offPARAMOUNT PLBG & HTG CORP08/16/2023
DOB NOWMechanical SystemsSigned-offBURDG DUNHAM ASSOCIATES08/09/2023
DOB NOWGeneral ConstructionSigned-offBURDG DUNHAM ASSOCIATES08/09/2023
DOB NOWMechanical SystemsPermit IssuedPJM AND SONS, INC05/18/2022
DOB NOWMechanical SystemsSigned-offPJM AND SONS, INC03/29/2022
DOB NOWGeneral ConstructionSigned-offW.J. REGAN & COMPANY LLC01/07/2022
DOB NOWGeneral ConstructionSigned-offW.J. REGAN & COMPANY LLC12/29/2021
DOB NOWGeneral ConstructionSigned-offPREMIER SANITATION LLC05/14/2021
DOB NOWGeneral ConstructionSigned-offW.J. REGAN & COMPANY LLC04/01/2021
DOB NOWGeneral ConstructionSigned-offW.J. REGAN & COMPANY LLC02/26/2021
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC03/30/2020
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC12/20/2019
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC11/04/2019
DOB NOWSupported ScaffoldSigned-offEVEREST SCAFFOLDING INC07/17/2019
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC01/02/2019
BISOTISSUEDONE TEN GROUP INC10/20/2021
BISSPISSUEDDNA PLUMBING CONTR. INC10/09/2020
BISSPISSUEDCN PLUMBING INC09/14/2020
BISPLISSUEDDNA PLUMBING CONTR. INC06/24/2020
+ 46 more permits on file
4 projects · most recent 07/30/2026
Heating and Air Conditioning Systems Ventilation Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
07/30/2026Permit IssuedE.J. YORK INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Trane Axiom Water Source Heat Pump GEHV12031 137,190 BTU · Heat Pump Outdoor ×1
Ventilation
Mitsubishi Electric LGH-F470RVX2-E 470 CFM · Erv ×1
08/28/2025Permit IssuedPJM AND SONS, INCHeating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Heat / Cool
Trane Axiom Standard Water Source Heat Pump GEHV 12031 10 tons · Heat Pump Outdoor ×1
Heating
Titus DTFS 1,150 CFM · Fan Powered Box ×2
Ventilation
Mitsubishi Electric LGH-F600RVX2-E 600 CFM · Erv ×1
09/11/2023Permit IssuedPJM AND SONS, INCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric TPEFYP024MA143A 24,000 BTU · Vrf Indoor ×4
PEFYP24NMAU-E4 24,000 BTU · Vrf Indoor ×1
PMFY-P06NBMU-E 6,000 BTU · Vrf Indoor ×1
PQRY-P120THMU-A1 12,000 BTU · Vrf Outdoor ×1
TPEFY012MA143A 12,000 BTU · Vrf Indoor ×1
— BP430-96 126,600 BTU · Heat Exchanger ×1
08/22/2023——Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric TPVFYP048AM141A 102,000 BTU · Vrf Indoor ×2
PKFY-P06NLMU-ETH 12,700 BTU · Vrf Indoor ×1
TPEFYP024MA144A 51,000 BTU · Fan Coil Indoor ×1
TQRYP1203AL41AN 255,000 BTU · Vrf Outdoor ×1
— BP430-96 126,600 BTU · Heat Exchanger ×1
2 projects · most recent 05/14/2026
FiledStatusContractorScope
05/14/2026Signed-offADVANCED PLBG, MECH & SPR312 heads
01/11/2023——33 heads
4 projects · most recent 07/30/2026
Water/Sanitary
FiledStatusContractorScope
07/30/2026Permit IssuedCN PLUMBING INCWater/Sanitary
06/24/2026Signed-offBEDROCK PLBG. & HTG., INCWater/Sanitary
05/14/2026———
08/01/2023Signed-offPARAMOUNT PLBG & HTG CORPWater/Sanitary
16 projects · most recent 02/19/2026
General Wiring
FiledStatusContractorScope
02/19/2026CompleteNEW CENTURY ELEC'L CONTRGeneral Wiring
07/10/2025CompleteL&B ELEC'L INTERNATIONALGeneral Wiring
05/14/2025CompleteNEW CENTURY ELEC'L CONTRGeneral Wiring
04/24/2025Permit IssuedPRECISION ELECL CONT CORPGeneral Wiring
10/23/2023CompletePATRIOT ELECTRIC CORP—
10/23/2023CompletePATRIOT ELECTRIC CORPGeneral Wiring
10/17/2023Permit IssuedEXECUTIVE ELECTL SER INCGeneral Wiring
01/31/2022Permit IssuedNEW CENTURY ELEC'L CONTR—
01/31/2022Permit IssuedNEW CENTURY ELEC'L CONTRGeneral Wiring
04/03/2021Permit IssuedNEW CENTURY ELEC'L CONTRGeneral Wiring
11/08/2019CompleteAP ELECTL SER & MAIN INCGeneral Wiring
09/09/2019Permit IssuedAGIR ELECTL SOLUTION INCGeneral Wiring
08/26/2019Permit IssuedLEBO ELECTRIC LLCGeneral Wiring
01/02/2019CompleteBOROWIDE ELECT'L CONTR'S—
10/23/2018CompleteSALZMAN ELECTRIC CO., INCGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/28/2026Pass-Final SP - Up to 3 Requested FloorsPassView ↗
04/24/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/28/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/13/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/08/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/07/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/07/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/01/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 99
DateRequirementInspectorRole
07/30/2026Shutoff dampers—energy_progress
07/30/2026Maintenance information—energy_progress
07/30/2026HVAC-R and service water piping design and insulation—energy_progress
07/30/2026Electrical motors and elevators—energy_progress
07/30/2026HVAC-R and service water heating equipment—energy_progress
07/30/2026HVAC-R and service water heating system controls—energy_progress
07/30/2026Energy Code Compliance Inspections—progress
07/23/2026Fire-Resistant Penetrations and Joints—special
07/23/2026Final—progress
07/23/2026Mechanical Systems—special
06/12/2026Air barrier - visual inspectionRoy Sokoloskienergy_progress
06/12/2026Insulation placement and R valuesRoy Sokoloskienergy_progress
05/14/2026Fire-Resistant Penetrations and JointsAnthony Stasiospecial
05/14/2026Sprinkler SystemsLAWRENCE GREENspecial
05/06/2026Post-installed AnchorsAnthony Stasiospecial
05/06/2026Fire-Resistant Penetrations and JointsAnthony Stasiospecial
05/06/2026Sprinkler SystemsLAWRENCE GREENspecial
05/06/2026Fire-Resistant Penetrations and JointsAnthony Stasiospecial
04/22/2026FinalRoy Sokoloskiprogress
04/15/2026FinalBradford Leibinprogress
03/09/2026Fire-Resistant Penetrations and JointsAnthony Stasiospecial
03/09/2026Sprinkler SystemsLAWRENCE GREENspecial
08/27/2025Shutoff dampersPhilip Friedmanenergy_progress
08/27/2025HVAC-R and service water heating system controlsPhilip Friedmanenergy_progress
08/27/2025Fire-Resistant Penetrations and JointsCONNIE PISANIspecial
Latest 25 of 99.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Free PeopleOfficeFloor 14
Project M00922944 Alteration · LOC Issued · 08/29/2023
Ellis Lake CapitalOfficeFloor 16
Project M00462311 Alteration · LOC Issued · 02/10/2021
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 1,104 on file (BIS + DOB NOW)
▸Plans & Drawings45
▸DOB NOWPlans/Sketch36
09/03/2026M00515944-I1Request digital key ↗
09/03/2026M00592943-I1Request digital key ↗
09/03/2026M00640578-I1Request digital key ↗
Showing 3 of 36 on file for this type
▸DOB NOWPlans/Sketch - General Construction4
09/03/2026M00462311-I1Request digital key ↗
09/03/2026M00462311-P1Request digital key ↗
09/03/2026M00462311-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/05/2026M00209915-I1Request digital key ↗
08/15/2026M00209915-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/14/2026M00450293-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00191038-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00114182-I1Request digital key ↗
▸Applications & Permits163
▸BISPLAN / WORK APPROVAL APPLICATION91
05/05/2022123433025Open ↗
04/11/2022123433025Open ↗
07/22/2021123601520Open ↗
Showing 3 of 91 on file for this type
▸BISWORK PERMIT APPLICATION72
05/12/2021123433025Open ↗
10/09/2020123810938Open ↗
09/14/2020123433025Open ↗
Showing 3 of 72 on file for this type
▸Seals & Professional Certifications313
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION143
08/30/2019123671936Open ↗
08/06/2019123671936Open ↗
08/01/2019123671936Open ↗
Showing 3 of 143 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature44
09/04/2026M00450293-I1Open ↗
09/03/2026M00462311-P2Open ↗
09/03/2026M00462311-P1Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWProgress Inspector Seal & Signature40
09/23/2026M01256910-I1Open ↗
09/23/2026M01256910-I1Open ↗
09/01/2026M00946091-I1Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature25
09/23/2026M01256910-I1Open ↗
08/30/2026M01213263-I1Open ↗
08/30/2026M01213263-I1Open ↗
Showing 3 of 25 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST24
07/05/2019123810947Open ↗
07/05/2019123810938Open ↗
04/01/2019123733932Open ↗
Showing 3 of 24 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT16
08/01/2019140862528Open ↗
07/05/2019123810947Open ↗
07/05/2019123810947Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
08/01/2019140862528Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
08/01/2019140862528Open ↗
Showing 1 of 2 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment96
▸BISSELF-CERT PLUMBING NOTICE31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 31 on file for this type
▸BISSCHEDULE B - PLUMBING15
05/26/2020123433025Open ↗
05/21/2020123433025Open ↗
Showing 2 of 15 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA12
04/17/2020123601520Open ↗
07/05/2019122489976Open ↗
Showing 2 of 12 on file for this type
▸BISEQUIPMENT USE PERMITS11
02/10/2021123489073Open ↗
02/10/2021123489073Open ↗
02/10/2021123489073Open ↗
Showing 3 of 11 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT11
02/10/2021123489073Open ↗
02/08/2021123489073Open ↗
09/09/2020123733932Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE10
07/05/2019123810947Open ↗
07/05/2019123810938Open ↗
Showing 2 of 10 on file for this type
▸BISSPRINKLER INSP REPORT : FP-854
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Environmental & Asbestos85
▸BISASBESTOS: CERTIFICATION (DEP ACP5)28
08/01/2019140862528Open ↗
07/05/2019123810947Open ↗
07/05/2019123810938Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report26
09/03/2026M00462311-P1Open ↗
09/03/2026M00462311-P3Open ↗
09/03/2026M00462311-I1Open ↗
Showing 3 of 26 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form13
09/01/2026M08002143-I1Open ↗
09/01/2026M00691113-I1Open ↗
09/01/2026M00691113-S1Open ↗
Showing 3 of 13 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance101
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS45
07/05/2019123810947Open ↗
07/05/2019123810947Open ↗
04/01/2019123733932Open ↗
Showing 3 of 45 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS25
02/08/2021123489073Open ↗
02/08/2021123489073Open ↗
01/21/2021122605644Open ↗
Showing 3 of 25 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY12
02/08/2021123489073Open ↗
02/08/2021123489073Open ↗
01/21/2021122605644Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: ENERGY7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.4
09/03/2026M00462311-I1Open ↗
08/14/2026M00450293-I1Open ↗
08/13/2026M00515944-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
08/01/2019140862528Open ↗
Showing 1 of 2 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/12/2020123671936Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
02/08/2021123489073Open ↗
▸BISNYCECC ANALYSIS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports21
▸BISTECHNICAL REPORT: RESPONSIBILITY21
02/18/2021123810938Open ↗
02/08/2021123489073Open ↗
02/08/2021123489073Open ↗
Showing 3 of 21 on file for this type
▸Approvals, Objections & Sign-offs70
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST47
02/18/2021123810938Open ↗
02/08/2021123489073Open ↗
01/21/2021122605644Open ↗
Showing 3 of 47 on file for this type
▸BISADMINISTRATIVE OBJECTIONS21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/31/2019123671936Open ↗
▸Cost, Insurance & Ownership106
▸BISCOST AFFIDAVIT104
02/18/2021123810938Open ↗
02/08/2021123489073Open ↗
01/21/2021122605644Open ↗
Showing 3 of 104 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
02/08/2021123489073Open ↗
11/12/2020123671936Open ↗
▸Filing & Intake Forms96
▸BISEFILING COVER SHEET56
07/05/2019123810947Open ↗
07/05/2019123810947Open ↗
07/05/2019123810938Open ↗
Showing 3 of 56 on file for this type
▸BISADDITIONAL INFORMATION22
05/05/2022123433025Open ↗
01/15/2021123433025Open ↗
09/01/2020123733932Open ↗
Showing 3 of 22 on file for this type
▸BISBOROUGH INTAKE FORM16
05/12/2021123433025Open ↗
04/17/2020123601520Open ↗
02/24/2020123433025Open ↗
Showing 3 of 16 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
08/01/2019140862528Open ↗
Showing 1 of 2 on file for this type
▸Other Documents5
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCalculations1
08/13/2026M01001018-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01001018-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/16/2026M01388769-I1Open ↗