← Back
BuildNYC
Office with commercial, 7-19 stories
70 WEST 40TH STREET
MANHATTAN · BIN 1016059
💬 Discuss this project
1922Year Built
16Stories
O6Building Class
C6-4.5Zoning
68,081 sfGross Floor Area
21Units
LL97 Covered1 Active Violation 0 unresolved · 1 paperwork only 3 old, status unconfirmed ▸FISP: SAFE
Office with commercial, 7-19 stories · Owner of record: Milltex Distributors · 5,036 sf lot · 13.52 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsPipe scaffold1 filing
Roof15th floor roof work1p · 1 filing · 7 docs
Floor 16Ellis Lake Capital4p · 2 filings · 20 docs
Floor 15
Floor 14Free People, Madison Square Garden7p · 5 filings · 20 docs
Floor 13
Floor 12
Floor 11Mechanical ductwork and piping2p · 3 filings · 14 docs
Floor 10Office fit-out tenant improvement1 filing · 6 docs
Floor 9
Floor 8Widgeon Management Corp.Under Construction2p · 2 filings · 10 docs
Floor 7Toilet renovation and new ADA toilet2 filings · 14 docs
Floor 6
Floor 5Masonry opening and roll down door installation3p · 7 filings · 20 docs
Floor 4
Floor 3Arch Street Capital Advisors1 filing · 6 docs
Floor 2
Floor 1Widgeon Management1 filing · 3 docs
MezzanineActum16p · 4 filings · 19 docs
CellarWidgeon Management3p · 1 filing · 3 docs
Site & exteriorSidewalk shed installation1 filing · 2 docs
Filed — no permit issuedGranite replacement at main entrance1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Milltex Distributors Co17909/13/2026
Widgedon Management Corp Milltex Dist11703/21/2026
58 to 64 40th St1003/21/2026
Vanguard Development USA407/08/2026
40th St103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Friedman Engineering907/30/2026
Jack Green Associates906/24/2026
Leibin Architecture306/12/2026
Alsa Architecture206/12/2026
EDG205/14/2025
Omer Fenik, RA604/09/2025
Kevin K. Herbert, P.E311/20/2023
Anthony Mrkic110/13/2023
David A Levy & Associates108/01/2023
Janko Rasic Architects501/03/2023
Walter Hollien Architect207/16/2020
Enthink Engineers207/16/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Municipal Building Consultants2003/21/2026
Oef Consultants1203/21/2026
EDG303/21/2026
HS Design Studio203/21/2026
Rethy Associates403/21/2026
AE Design Solution403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
W.J. Regan & CompanyGeneral Contractor807/08/2026
Everest ScaffoldingScaffold803/21/2026
Brennan OperatingGeneral Contractor707/10/2026
PJM and SonsGeneral Contractor507/08/2026
Giovanni Martini ContractingGeneral Contractor407/08/2026
Burdg Dunham & AssociatesGeneral Contractor403/21/2026
E.J. YorkGeneral Contractor407/11/2026
Construction ManagementGeneral Contractor303/21/2026
Premier SanitationGeneral Contractor303/21/2026
Cma Plumbing & HeatingFire Protection307/08/2026
Bedrock Plumbing & HeatingPlumbing106/28/2026
CN PlumbingPlumbing107/01/2026
Orbit Plumbing & HeatingPlumbing107/08/2026
L&B Electrical InternationalElectrical103/21/2026
Paramount Plumbing & HeatingPlumbing107/08/2026
Citywide Electrical WiringElectrical103/22/2026
Can-Do Electric, ContractingElectrical103/21/2026
Salzman Electric CoElectrical103/21/2026
L&B Electrical InternationalElectrical103/22/2026
New Century Electrical ContractingElectrical103/21/2026
BLZ ElectricElectrical103/21/2026
Philip A. RobinsonElectrical103/21/2026
Walton Electrical ConstructionElectrical103/21/2026
Advanced Plumbing, Mechanical & SprinklerFire Protection106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EDG2578806/24/2026
Jack Green Associates422605/14/2026
Amaracon Testing & Inspec58421108/28/2025
Oef Consultants3735604/09/2025
David A. Levy & Associates4854311/20/2023
Building Lifecycle
All (223)Filed (46)Permit Issued (36)Signed Off (17)Facade (FISP) (15)Violation (50)Inspection (8)Objection (21)Special Inspection (30)
09/09/2026
Signed off — Alteration
Modification of the plumbing system as shown on the drawings filed herewith. No change in use, egress, or occupancy.
M01213249-I1
08/12/2026
Objection resolved — Resolved
08/11/2026
Objection raised — Scope
07/30/2026
Filed — Alteration
Plumbing work for restroom renovations in office space.
M01397352-S2
07/30/2026
Special inspection requirement — HVAC-R and service water heating equipment
07/30/2026
Special inspection requirement — Energy Code Compliance Inspections
07/30/2026
Special inspection requirement — Electrical motors and elevators
07/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
07/30/2026
Special inspection requirement — Maintenance information
07/30/2026
Special inspection requirement — Shutoff dampers
07/30/2026
Special inspection requirement — HVAC-R and service water heating system controls
07/23/2026
Special inspection requirement — Final
07/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/23/2026
Special inspection requirement — Mechanical Systems
07/22/2026
Signed off — Alteration
Modification of the sprinkler system as shown on the drawings filed herewith. No change in use, egress, or occupancy.
M01213263-I1
07/10/2026
Permit issued — General Construction
M01397352-I1-GC
07/10/2026
Permit issued — General Construction
M01387847-I1-GC
07/08/2026
Signed off — Alteration
Masonry opening and installation of roll down door between separate tax and zoning lots 85 and 81. Easement agreement not required as opening does not affect egress, light & air or party wall. 3-hour fire rated roll down door separation for fire and smoke
M01211054-I1
07/08/2026
Permit issued — General Construction
M01211054-I1-GC
06/29/2026
Permit issued — Plumbing
M01397352-S1-PL
06/24/2026
Filed — Alteration
Modification of the plumbing system as shown on the drawings filed herewith. No change in use, egress, or occupancy.
M01213249-P2
06/12/2026
Filed — Alteration
ROOF REPAIRS
M01388769-I1
06/12/2026
Filed — Alteration
Plumbing work for restroom renovations in office space.
M01397352-S1
06/12/2026
Special inspection requirement — Air barrier - visual inspection
Roy Sokoloski
06/12/2026
Special inspection requirement — Insulation placement and R values
Roy Sokoloski
06/03/2026
Signed off — Alteration
Modification of the mechanical system to install ductwork and supply register/diffusers and returns as shown on the drawings filed herewith, No change in use, egress, or occupancy.
M01213267-I1
05/20/2026
Filed — Alteration
Plumbing work for restroom renovations in office space.
M01397352-I1
05/14/2026
Filed — Alteration
Modification of the sprinkler system as shown on the drawings filed herewith. No change in use, egress, or occupancy.
M01213263-P2
05/14/2026
Filed — Alteration
Modification of the plumbing system as shown on the drawings filed herewith. No change in use, egress, or occupancy.
M01213249-P1
05/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anthony Stasio
05/14/2026
Special inspection requirement — Sprinkler Systems
LAWRENCE GREEN
05/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anthony Stasio
05/06/2026
Special inspection requirement — Post-installed Anchors
Anthony Stasio
05/06/2026
Special inspection requirement — Sprinkler Systems
LAWRENCE GREEN
05/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anthony Stasio
05/04/2026
Filed — Alteration
Demolition of partitions, floors and ceilings of office on the 8th floor. The tenant will construct the space under a separate application.
M01387847-I1
04/28/2026
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
04/24/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/22/2026
Special inspection requirement — Final
Roy Sokoloski
04/15/2026
Special inspection requirement — Final
Bradford Leibin
04/02/2026
Filed — Alteration
Modification of the sprinkler system as shown on the drawings filed herewith. No change in use, egress, or occupancy.
M01213263-P1
03/31/2026
Objection resolved — Resolved
03/25/2026
Signed off — Alteration
EXISTING RESTROOMS FINISHES AND PARTIAL WALL REMOVAL AT LEVEL 5. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M01203790-I1
03/09/2026
Violation issued (ECB, open)
Construction
03/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anthony Stasio
03/09/2026
Special inspection requirement — Sprinkler Systems
LAWRENCE GREEN
02/27/2026
Objection resolved — Addressed
11/07/2025
Objection raised — Admin
10/30/2025
Objection resolved — Addressed
10/30/2025
Objection resolved — Addressed
10/28/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/28/2025
Objection raised — Scope
10/28/2025
Objection raised — Scope
10/03/2025
Permit issued — Mechanical Systems
M01256910-I1-MS
08/28/2025
Filed — Alteration
Mechanical work for landlord HVAC prep & floor heat electrification only. Replace Water Cooled DX AC w/ new Water Source Heat Pump, Plate-Frame Heat Exchange & secondary loop circulator pump Add Perimeter Fan Powered Boxes & ERV. (R) all steam radiator
M01256910-I1
08/27/2025
Special inspection requirement — Electrical motors and elevators
Philip Friedman
08/27/2025
Special inspection requirement — HVAC-R and service water heating equipment
Philip Friedman
08/27/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Philip Friedman
08/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CONNIE PISANI
08/27/2025
Special inspection requirement — HVAC-R and service water heating system controls
Philip Friedman
Latest 60 of 223 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedE.J. York07/10/2026
DOB NOWGeneral ConstructionPermit IssuedE.J. York07/10/2026
DOB NOWGeneral ConstructionSigned-offBrennan Operating07/08/2026
DOB NOWPlumbingPermit IssuedCN Plumbing06/29/2026
DOB NOWMechanical SystemsPermit IssuedPJM and Sons10/03/2025
DOB NOWMechanical SystemsSigned-offBrennan Operating07/10/2025
DOB NOWGeneral ConstructionSigned-offBrennan Operating07/10/2025
DOB NOWMechanical SystemsPermit IssuedBartosz Winsko07/02/2025
DOB NOWSprinklersSigned-offAdvanced Plumbing, Mechanical & Sprinkler06/27/2025
DOB NOWPlumbingSigned-offBedrock Plumbing & Heating06/23/2025
DOB NOWMechanical SystemsSigned-offBrennan Operating06/05/2025
DOB NOWGeneral ConstructionSigned-offBrennan Operating06/05/2025
DOB NOWMechanical SystemsPermit IssuedBartosz Winsko02/12/2025
DOB NOWMechanical SystemsPermit IssuedBartosz Winsko01/13/2025
DOB NOWSuspended ScaffoldPermit IssuedCentral Construction Management02/07/2024
DOB NOWSprinklersSigned-offCma Plumbing & Heating11/06/2023
DOB NOWMechanical SystemsPermit IssuedPJM and Sons10/30/2023
DOB NOWGeneral ConstructionSigned-offConstruction Management10/25/2023
DOB NOWSprinklersSigned-offCma Plumbing & Heating09/29/2023
DOB NOWGeneral ConstructionPermit IssuedEJ York09/21/2023
DOB NOWSprinklersSigned-offCma Plumbing & Heating08/30/2023
DOB NOWPlumbingSigned-offParamount Plumbing & Heating08/16/2023
DOB NOWGeneral ConstructionSigned-offBurdg Dunham Associates08/09/2023
DOB NOWMechanical SystemsSigned-offBurdg Dunham Associates08/09/2023
DOB NOWMechanical SystemsPermit IssuedPJM and Sons05/18/2022
DOB NOWMechanical SystemsSigned-offPJM and Sons03/29/2022
DOB NOWGeneral ConstructionSigned-offW.J. Regan & Company01/07/2022
DOB NOWGeneral ConstructionSigned-offW.J. Regan & Company12/29/2021
DOB NOWGeneral ConstructionSigned-offPremier Sanitation05/14/2021
DOB NOWGeneral ConstructionSigned-offW.J. Regan & Company04/01/2021
DOB NOWGeneral ConstructionSigned-offW.J. Regan & Company02/26/2021
DOB NOWSidewalk ShedSigned-offEverest Scaffolding03/30/2020
DOB NOWSidewalk ShedSigned-offEverest Scaffolding12/20/2019
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating11/04/2019
DOB NOWSupported ScaffoldSigned-offEverest Scaffolding07/17/2019
DOB NOWSidewalk ShedSigned-offEverest Scaffolding01/02/2019
BISOTISSUEDOne Ten Group10/20/2021
BISSPISSUEDDNA Plumbing Contractors10/09/2020
BISSPISSUEDCN Plumbing09/14/2020
BISPLISSUEDDNA Plumbing Contractors06/24/2020
+ 46 more permits on file
4 projects · most recent 07/30/2026
Heating and Air Conditioning Systems Ventilation Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
07/30/2026Permit IssuedE.J. YorkHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Trane Axiom Water Source Heat Pump GEHV12031 137,190 BTU · Heat Pump Outdoor ×1
Ventilation
Mitsubishi Electric LGH-F470RVX2-E 470 CFM · Erv ×1
08/28/2025Permit IssuedPJM and SonsHeating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Heat / Cool
Trane Axiom Standard Water Source Heat Pump GEHV 12031 10 tons · Heat Pump Outdoor ×1
Heating
Titus DTFS 1,150 CFM · Fan Powered Box ×2
Ventilation
Mitsubishi Electric LGH-F600RVX2-E 600 CFM · Erv ×1
09/11/2023Permit IssuedPJM and SonsHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric TPEFYP024MA143A 24,000 BTU · Vrf Indoor ×4
PEFYP24NMAU-E4 24,000 BTU · Vrf Indoor ×1
PMFY-P06NBMU-E 6,000 BTU · Vrf Indoor ×1
PQRY-P120THMU-A1 12,000 BTU · Vrf Outdoor ×1
TPEFY012MA143A 12,000 BTU · Vrf Indoor ×1
— BP430-96 126,600 BTU · Heat Exchanger ×1
08/22/2023——Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric TPVFYP048AM141A 102,000 BTU · Vrf Indoor ×2
PKFY-P06NLMU-ETH 12,700 BTU · Vrf Indoor ×1
TPEFYP024MA144A 51,000 BTU · Fan Coil Indoor ×1
TQRYP1203AL41AN 255,000 BTU · Vrf Outdoor ×1
— BP430-96 126,600 BTU · Heat Exchanger ×1
2 projects · most recent 05/14/2026
FiledStatusContractorScope
05/14/2026Signed-offAdvanced Plumbing, Mechanical & Sprinkler312 heads
01/11/2023——33 heads
4 projects · most recent 07/30/2026
Water/Sanitary
FiledStatusContractorScope
07/30/2026Permit IssuedCN PlumbingWater/Sanitary
06/24/2026Signed-offBedrock Plumbing & HeatingWater/Sanitary
05/14/2026———
08/01/2023Signed-offParamount Plumbing & HeatingWater/Sanitary
16 projects · most recent 02/19/2026
General Wiring
FiledStatusContractorScope
02/19/2026CompleteNew Century Electrical ContractingGeneral Wiring
07/10/2025CompleteL&B Electrical InternationalGeneral Wiring
05/14/2025CompleteNew Century Electrical ContractingGeneral Wiring
04/24/2025Permit IssuedPrecision Electrical ContGeneral Wiring
10/23/2023CompletePatriot ElectricGeneral Wiring
10/23/2023CompletePatriot Electric—
10/17/2023Permit IssuedExecutive Electl ServicesGeneral Wiring
01/31/2022Permit IssuedNew Century Electrical ContractingGeneral Wiring
01/31/2022Permit IssuedNew Century Electrical Contracting—
04/03/2021Permit IssuedNew Century Electrical ContractingGeneral Wiring
11/08/2019CompleteAP Electl Ser & MaintenanceGeneral Wiring
09/09/2019Permit IssuedAgir Electl SolutionGeneral Wiring
08/26/2019Permit IssuedLebo ElectricGeneral Wiring
01/02/2019CompleteBorowide Elect'l Contractors—
10/23/2018CompleteSalzman Electric CoGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/28/2026Pass-Final SP - Up to 3 Requested FloorsPassView ↗
04/24/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/28/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/13/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/08/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/07/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/07/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/01/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 99
DateRequirementInspectorRole
07/30/2026Energy Code Compliance Inspections—progress
07/30/2026Shutoff dampers—energy_progress
07/30/2026Maintenance information—energy_progress
07/30/2026HVAC-R and service water piping design and insulation—energy_progress
07/30/2026Electrical motors and elevators—energy_progress
07/30/2026HVAC-R and service water heating equipment—energy_progress
07/30/2026HVAC-R and service water heating system controls—energy_progress
07/23/2026Mechanical Systems—special
07/23/2026Final—progress
07/23/2026Fire-Resistant Penetrations and Joints—special
06/12/2026Air barrier - visual inspectionRoy Sokoloskienergy_progress
06/12/2026Insulation placement and R valuesRoy Sokoloskienergy_progress
05/14/2026Sprinkler SystemsLAWRENCE GREENspecial
05/14/2026Fire-Resistant Penetrations and JointsAnthony Stasiospecial
05/06/2026Post-installed AnchorsAnthony Stasiospecial
05/06/2026Fire-Resistant Penetrations and JointsAnthony Stasiospecial
05/06/2026Fire-Resistant Penetrations and JointsAnthony Stasiospecial
05/06/2026Sprinkler SystemsLAWRENCE GREENspecial
04/22/2026FinalRoy Sokoloskiprogress
04/15/2026FinalBradford Leibinprogress
03/09/2026Sprinkler SystemsLAWRENCE GREENspecial
03/09/2026Fire-Resistant Penetrations and JointsAnthony Stasiospecial
08/27/2025Shutoff dampersPhilip Friedmanenergy_progress
08/27/2025Fire-Resistant Penetrations and JointsCONNIE PISANIspecial
08/27/2025HVAC-R and service water heating equipmentPhilip Friedmanenergy_progress
Latest 25 of 99.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Free PeopleRetailFloor 14
Project M00922944 Alteration · LOC Issued · 08/29/2023
Project M00892973 Alteration · LOC Issued · 08/01/2023
Project M00892977 Alteration · LOC Issued · 08/01/2023
Project M00892984 Alteration · Permit Entire · 08/01/2023
Madison Square GardenOfficeFloor 14
Project M00906530 Alteration · Approved · 08/22/2023
ActumOfficeMezzanine
Project M08002143 Alteration · Approved · 09/23/2022
Ellis Lake CapitalOfficeFloor 16
Project M00462311 Alteration · LOC Issued · 02/10/2021
Project M00450293 Alteration · LOC Issued · 02/09/2021
Arch Street Capital AdvisorsOfficeFloor 3
Project M00209915 Alteration · Permit Entire · 08/14/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,104 on file (BIS + DOB NOW)
▸Plans & Drawings45
▸DOB NOWPlans/Sketch36
09/03/2026M00515944-I1Request digital key ↗
09/03/2026M00592943-I1Request digital key ↗
09/03/2026M00640578-I1Request digital key ↗
Showing 3 of 36 on file for this type
▸DOB NOWPlans/Sketch - General Construction4
09/03/2026M00462311-P2Request digital key ↗
09/03/2026M00462311-P3Request digital key ↗
09/03/2026M00462311-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/05/2026M00209915-I1Request digital key ↗
08/15/2026M00209915-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/14/2026M00450293-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00191038-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00114182-I1Request digital key ↗
▸Applications & Permits163
▸BISPLAN / WORK APPROVAL APPLICATION91
05/05/2022123433025Open ↗
04/11/2022123433025Open ↗
07/22/2021123601520Open ↗
Showing 3 of 91 on file for this type
▸BISWORK PERMIT APPLICATION72
05/12/2021123433025Open ↗
10/09/2020123810938Open ↗
09/14/2020123433025Open ↗
Showing 3 of 72 on file for this type
▸Seals & Professional Certifications313
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION143
08/30/2019123671936Open ↗
08/06/2019123671936Open ↗
08/01/2019123671936Open ↗
Showing 3 of 143 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature44
09/04/2026M00450293-I1Open ↗
09/03/2026M00462311-P3Open ↗
09/03/2026M00462311-P2Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWProgress Inspector Seal & Signature40
09/23/2026M01256910-I1Open ↗
09/23/2026M01256910-I1Open ↗
09/01/2026M00946091-I1Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature25
09/23/2026M01256910-I1Open ↗
08/30/2026M01213263-I1Open ↗
08/30/2026M01213263-I1Open ↗
Showing 3 of 25 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST24
07/05/2019123810947Open ↗
07/05/2019123810938Open ↗
04/01/2019123733932Open ↗
Showing 3 of 24 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT16
08/01/2019140862528Open ↗
07/05/2019123810947Open ↗
07/05/2019123810947Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
08/01/2019140862528Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
08/01/2019140862528Open ↗
Showing 1 of 2 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment96
▸BISSELF-CERT PLUMBING NOTICE31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 31 on file for this type
▸BISSCHEDULE B - PLUMBING15
05/26/2020123433025Open ↗
05/21/2020123433025Open ↗
Showing 2 of 15 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA12
04/17/2020123601520Open ↗
07/05/2019122489976Open ↗
Showing 2 of 12 on file for this type
▸BISEQUIPMENT USE PERMITS11
02/10/2021123489073Open ↗
02/10/2021123489073Open ↗
02/10/2021123489073Open ↗
Showing 3 of 11 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT11
02/10/2021123489073Open ↗
02/08/2021123489073Open ↗
09/09/2020123733932Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE10
07/05/2019123810947Open ↗
07/05/2019123810938Open ↗
Showing 2 of 10 on file for this type
▸BISSPRINKLER INSP REPORT : FP-854
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Environmental & Asbestos85
▸BISASBESTOS: CERTIFICATION (DEP ACP5)28
08/01/2019140862528Open ↗
07/05/2019123810947Open ↗
07/05/2019123810938Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report26
09/03/2026M00462311-P2Open ↗
09/03/2026M00462311-P3Open ↗
09/03/2026M00462311-I1Open ↗
Showing 3 of 26 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form13
09/01/2026M08002143-I1Open ↗
09/01/2026M00691113-I1Open ↗
09/01/2026M00691113-S1Open ↗
Showing 3 of 13 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance101
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS45
07/05/2019123810947Open ↗
07/05/2019123810947Open ↗
04/01/2019123733932Open ↗
Showing 3 of 45 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS25
02/08/2021123489073Open ↗
02/08/2021123489073Open ↗
01/21/2021122605644Open ↗
Showing 3 of 25 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY12
02/08/2021123489073Open ↗
02/08/2021123489073Open ↗
01/21/2021122605644Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: ENERGY7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.4
09/03/2026M00462311-I1Open ↗
08/14/2026M00450293-I1Open ↗
08/13/2026M00515944-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
08/01/2019140862528Open ↗
Showing 1 of 2 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/12/2020123671936Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
02/08/2021123489073Open ↗
▸BISNYCECC ANALYSIS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports21
▸BISTECHNICAL REPORT: RESPONSIBILITY21
02/18/2021123810938Open ↗
02/08/2021123489073Open ↗
02/08/2021123489073Open ↗
Showing 3 of 21 on file for this type
▸Approvals, Objections & Sign-offs70
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST47
02/18/2021123810938Open ↗
02/08/2021123489073Open ↗
01/21/2021122605644Open ↗
Showing 3 of 47 on file for this type
▸BISADMINISTRATIVE OBJECTIONS21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/31/2019123671936Open ↗
▸Cost, Insurance & Ownership106
▸BISCOST AFFIDAVIT104
02/18/2021123810938Open ↗
02/08/2021123489073Open ↗
01/21/2021122605644Open ↗
Showing 3 of 104 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
02/08/2021123489073Open ↗
11/12/2020123671936Open ↗
▸Filing & Intake Forms96
▸BISEFILING COVER SHEET56
07/05/2019123810947Open ↗
07/05/2019123810947Open ↗
07/05/2019123810938Open ↗
Showing 3 of 56 on file for this type
▸BISADDITIONAL INFORMATION22
05/05/2022123433025Open ↗
01/15/2021123433025Open ↗
09/01/2020123733932Open ↗
Showing 3 of 22 on file for this type
▸BISBOROUGH INTAKE FORM16
05/12/2021123433025Open ↗
04/17/2020123601520Open ↗
02/24/2020123433025Open ↗
Showing 3 of 16 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
08/01/2019140862528Open ↗
Showing 1 of 2 on file for this type
▸Other Documents5
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCalculations1
08/13/2026M01001018-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01001018-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/16/2026M01388769-I1Open ↗