← Back
Miscellaneous educational facility
701 CARROLL STREET
BROOKLYN · BIN 3020357
💬 Discuss this project
1900Year Built
3Stories
W9Building Class
R6BZoning
23,700 sfGross Floor Area
1Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Miscellaneous educational facility · Owner of record: THE BERKELEY CARROLL SCHOOL · 14,000 sf lot · 1.69 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneralOther
Roof80p · 4 filings · 20 docs
Floor 379p · 4 filings · 20 docs
Floor 277p · 5 filings · 20 docs
Floor 176p · 4 filings · 20 docs
Cellar92p · 5 filings · 20 docs
Basement1p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BERKELEY CARROLL SCHOOL7207/08/2026
BERKELEY CARROLL ST SCHOOL103/22/2026
BERKEL203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RIGID STRUCTURAL DESIGN, LLC206/06/2025
SILMAN203/03/2025
COSENTINI ASSOCIATES1002/11/2025
1100ARCHITECT PC802/11/2025
GEODESIGN INC. PC105/16/2024
STUDIO PARALLEL LLC208/06/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AGOUTI CONSTRUCTION CONSULTING203/21/2026
Rigid Structural Design, LLC303/21/2026
WILLIAM VITACCO ASSOCIATES4003/21/2026
DOMANI CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARCHSTONE BUILDERS LLCGeneral Contractor907/08/2026
BEDROCK MECHANICAL INCFire Protection207/08/2026
REPUBLIC SCAFFOLD&HOIST CGeneral Contractor204/09/2026
BEDROCK PLBG. & HTG., INCPlumbing207/08/2026
ANDREW CONSTRUCTION SERVIGeneral Contractor107/08/2026
WILLDAN ELECTRICAL OF NYElectrical103/22/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DNA CONTROLLED INSPECTION554703/03/2025
SOCOTEC ENGINEERING4983702/11/2025
AR-TECH ENGINEERING, P.C.6659108/04/2021
Building Lifecycle
All (191)Filed (25)Permit Issued (14)Signed Off (10)Violation (19)Inspection (13)Objection (80)Special Inspection (30)
08/14/2026
Signed off — Alteration
Filing for new structural work at the cellar, floors 1 thru 3, Roof. Work includes new slab, removal of load bearing walls, sistering joists, new headers, timmers, lintels. No change to use, egress, or occupancy.
B01032699-S2
07/22/2026
Signed off — Alteration
FILING TO SHOW THE OCCUPANCY & LAWFUL EGRESS CONDITIONS FOR BOTH 699-701 & 703 CARROLL BUILDINGS PRIOR TO TCO AT 703 CARROLL ST. APPLICATION WILL SHOW TEMP WALLS NEEDED TO CREATE SAFE CONDITIONS DURING THIS PHASE OF OCCUPANCY. REFER TO B00941665-I1.
B01122176-I1
05/18/2026
Signed off — Alteration
Filing for new structural work at the cellar, floors 1 thru 3, Roof. Work includes new slab, removal of load bearing walls, sistering joists, new headers, timmers, lintels. No change to use, egress, or occupancy.
B01032699-S3
05/18/2026
Signed off — Alteration
Filing for mechanical work at cellar, floors 1 thru 3. No change to use, egress, or occupancy.
B01171737-S1
10/24/2025
Signed off — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01236829-I1
10/24/2025
Signed off — Alteration
B01057645-I1
08/11/2025
Violation issued (FDNY_ORDER, closed)
07/08/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/07/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/30/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/06/2025
Filed — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01236829-I1
06/06/2025
Permit issued — Supported Scaffold
B01236829-I1-SF
05/01/2025
Permit issued — Plumbing
B01032699-S2-PL
04/17/2025
Permit issued — General Construction
B00941665-I1-GC
03/28/2025
Permit issued — Sprinklers
B01171737-S1-EW-SP
03/27/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/27/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/26/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/21/2025
Permit issued — Mechanical Systems
B01171737-I1-MS
03/13/2025
Objection resolved — Addressed
03/13/2025
Objection resolved — Addressed
03/10/2025
Objection resolved — Addressed
03/10/2025
Objection resolved — Addressed
03/10/2025
Objection resolved — Addressed
03/04/2025
Special inspection requirement — Structural Steel - Details
WILLIAM FITZJOHN
03/04/2025
Special inspection requirement — Structural Steel - Welding
WILLIAM FITZJOHN
03/04/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
WILLIAM FITZJOHN
03/04/2025
Special inspection requirement — Structural Steel - High Strength Bolting
WILLIAM FITZJOHN
03/04/2025
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
03/04/2025
Special inspection requirement — Post-installed Anchors
WILLIAM FITZJOHN
03/04/2025
Special inspection requirement — Structural Cold-Formed Steel
WILLIAM FITZJOHN
03/04/2025
Special inspection requirement — Structural Wood Frame
WILLIAM FITZJOHN
03/03/2025
Filed — Alteration
Filing for new structural work at the cellar, floors 1 thru 3, Roof. Work includes new slab, removal of load bearing walls, sistering joists, new headers, timmers, lintels. No change to use, egress, or occupancy.
B01032699-P4
02/21/2025
Objection resolved — Addressed
02/21/2025
Objection resolved — Addressed
02/21/2025
Objection resolved — Addressed
02/21/2025
Objection resolved — Addressed
02/21/2025
Objection resolved — Addressed
02/21/2025
Objection resolved — Addressed
02/21/2025
Objection resolved — Addressed
02/21/2025
Objection resolved — Addressed
02/21/2025
Objection resolved — Addressed
02/21/2025
Special inspection requirement — Protection of exposed foundation insulation
ALEXIS SCHLESSINGERMAN
02/21/2025
Special inspection requirement — Sprayed fire-resistant materials
ALEXIS SCHLESSINGERMAN
02/21/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
ALEXIS SCHLESSINGERMAN
02/21/2025
Special inspection requirement — Lighting controls
ALEXIS SCHLESSINGERMAN
02/21/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
ALEXIS SCHLESSINGERMAN
02/21/2025
Special inspection requirement — Insulation placement and R values
ALEXIS SCHLESSINGERMAN
02/21/2025
Special inspection requirement — Exterior lighting power
ALEXIS SCHLESSINGERMAN
02/21/2025
Special inspection requirement — Fenestration air leakage
ALEXIS SCHLESSINGERMAN
02/21/2025
Special inspection requirement — Interior lighting power
ALEXIS SCHLESSINGERMAN
02/21/2025
Special inspection requirement — Air barrier - visual inspection
ALEXIS SCHLESSINGERMAN
02/21/2025
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
ALEXIS SCHLESSINGERMAN
02/21/2025
Special inspection requirement — Maintenance information
ALEXIS SCHLESSINGERMAN
02/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
02/21/2025
Special inspection requirement — Fenestration areas
ALEXIS SCHLESSINGERMAN
02/21/2025
Special inspection requirement — Fire-Resistance Rated Construction
ALEXIS SCHLESSINGERMAN
02/21/2025
Special inspection requirement — Air barrier — testing
ALEXIS SCHLESSINGERMAN
02/20/2025
Objection raised — Fire_Protection
02/20/2025
Objection raised — Zoning
Latest 60 of 191 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offREPUBLIC SCAFFOLD&HOIST C06/06/2025
DOB NOWPlumbingSigned-offBEDROCK PLBG. & HTG., INC05/01/2025
DOB NOWGeneral ConstructionPermit IssuedARCHSTONE BUILDERS LLC04/17/2025
DOB NOWSprinklersSigned-offBEDROCK MECHANICAL INC03/28/2025
DOB NOWMechanical SystemsSigned-offARCHSTONE BUILDERS LLC03/21/2025
DOB NOWGeneral ConstructionSigned-offARCHSTONE BUILDERS LLC01/02/2025
DOB NOWStructuralSigned-offARCHSTONE BUILDERS LLC08/23/2024
DOB NOWSprinklersSigned-offBEDROCK MECHANICAL INC06/03/2024
DOB NOWSidewalk ShedSigned-offREPUBLIC SCAFFOLD&HOIST C05/30/2024
DOB NOWPlumbingSigned-offBEDROCK PLBG. & HTG., INC05/22/2024
DOB NOWMechanical SystemsSigned-offARCHSTONE BUILDERS LLC05/21/2024
DOB NOWGeneral ConstructionSigned-offARCHSTONE BUILDERS LLC05/21/2024
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP11/20/2021
DOB NOWGeneral ConstructionSigned-offANDREW CONSTRUCTION SERVI11/04/2021
BIS—ISSUEDPAUL SIGNS, INC05/03/2013
BISOTISSUEDRICHARD DATTNER & PARTNERS09/25/2006
BIS—ISSUEDS DIGIACOMO AND SON01/24/2001
BISSPISSUEDNATIONAL SPRINKLER CORP.09/23/1999
BISOTISSUEDS DIGIACOMO AND SON08/05/1999
BISPLISSUEDDUO PLUMBING & HTG CORP.05/21/1999
BISOTISSUEDS DIGIACOMO AND SON03/09/1999
BISOTISSUEDS DIGIACOMO AND SON01/29/1999
BIS—ISSUEDS DIGIACOMO AND SON12/10/1998
3 projects · most recent 03/03/2025
Ventilation Systems Heating and Air Conditioning Systems Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
03/03/2025Signed-offARCHSTONE BUILDERS LLCVentilation Systems
Ventilation
Greenheck SP-A50-90-VG 75 CFM · Exhaust Fan ×2
02/11/2025Permit IssuedARCHSTONE BUILDERS LLCAssociated Ducts and Piping, Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Hitachi HIDM018B23S 17,800 BTU · Vrf Indoor ×12
HIDM012B23S 11,800 BTU · Fan Coil Indoor ×6
HIDM006B23S 5,900 BTU · Vrf Outdoor ×4
HIDM024B23S 23,600 BTU · Vrf Indoor ×4
HVAHR120B32S 120,000 BTU · Vrf Outdoor ×4
HIDM027B23S 27,900 BTU · Vrf Outdoor ×1
HIDM036B23S 35,500 BTU · Fan Coil Indoor ×1
RAS-4.0PNNBDH1 36,000 BTU · Condensing Unit ×1
RPK-4.0PNN1DH 36,000 BTU · Vrf Indoor ×1
TIWM008B22S 7,400 BTU · Fan Coil Indoor ×1
Aaon RN-015 13 tons · Rooftop Unit ×1
RNC-030 25 tons · Rooftop Unit ×1
02/11/2025Signed-offARCHSTONE BUILDERS LLCHeating and Air Conditioning Systems
Heat / Cool
Hitachi HIDM006B23S 653 CFM · Vrf Outdoor ×6
3 projects · most recent 03/03/2025
Sprinkler System
FiledStatusContractorScope
03/03/2025Signed-offBEDROCK MECHANICAL INC8 heads
02/11/2025——Sprinkler System
02/11/2025Signed-offBEDROCK MECHANICAL INC30 heads
2 projects · most recent 03/03/2025
Water/Sanitary Gas Storm
FiledStatusContractorScope
03/03/2025Signed-offBEDROCK PLBG. & HTG., INCWater/Sanitary
02/11/2025——Gas, Storm, Water/Sanitary
6 projects · most recent 06/15/2026
General Wiring
FiledStatusContractorScope
06/15/2026CompleteM.C. ELECTRICAL NY INCGeneral Wiring
01/02/2026CompleteTF ELECTRICAL CORPGeneral Wiring
12/19/2025CompleteM.C. ELECTRICAL NY INC1 meters
12/04/2025CompleteSMALLS MECH & ELECL SVCGeneral Wiring
02/18/2020CompleteWILLDAN ELECTRICAL OF NY—
03/15/2019CompleteWILLDAN ELECTRICAL OF NYGeneral Wiring
2 projects · most recent 03/03/2025
Steel Concrete Masonry
FiledStatusContractorScope
03/03/2025Signed-offBEDROCK PLBG. & HTG., INCSteel, Concrete
02/11/2025Permit IssuedARCHSTONE BUILDERS LLCSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
07/08/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/07/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/30/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/27/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/27/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/26/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/31/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/11/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/05/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/28/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/07/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/06/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/06/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 73
DateRequirementInspectorRole
03/04/2025Structural Cold-Formed SteelWILLIAM FITZJOHNspecial
03/04/2025Structural Steel - DetailsWILLIAM FITZJOHNspecial
03/04/2025Structural Stability – Alterations of existing buildingsWILLIAM FITZJOHNspecial
03/04/2025Structural Steel - WeldingWILLIAM FITZJOHNspecial
03/04/2025Structural Steel - High Strength BoltingWILLIAM FITZJOHNspecial
03/04/2025Post-installed AnchorsWILLIAM FITZJOHNspecial
03/04/2025Structural Wood FrameWILLIAM FITZJOHNprogress
03/04/2025FinalALEXIS SCHLESSINGERMANprogress
02/21/2025Air barrier - visual inspectionALEXIS SCHLESSINGERMANenergy_progress
02/21/2025Fenestration areasALEXIS SCHLESSINGERMANenergy_progress
02/21/2025Interior lighting powerALEXIS SCHLESSINGERMANenergy_progress
02/21/2025Maintenance informationALEXIS SCHLESSINGERMANenergy_progress
02/21/2025Fire-Resistance Rated ConstructionALEXIS SCHLESSINGERMANprogress
02/21/2025Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
02/21/2025Exterior Insulation and Finish Systems (EIFS)ALEXIS SCHLESSINGERMANspecial
02/21/2025Exterior lighting powerALEXIS SCHLESSINGERMANenergy_progress
02/21/2025Air barrier — testing ALEXIS SCHLESSINGERMANenergy_progress
02/21/2025Fenestration air leakageALEXIS SCHLESSINGERMANenergy_progress
02/21/2025Mastic and Intumescent Fire-resistant CoatingsALEXIS SCHLESSINGERMANspecial
02/21/2025Sprayed fire-resistant materialsALEXIS SCHLESSINGERMANspecial
02/21/2025Insulation placement and R valuesALEXIS SCHLESSINGERMANenergy_progress
02/21/2025Protection of exposed foundation insulationALEXIS SCHLESSINGERMANenergy_progress
02/21/2025Fenestration and door U-factor and product ratingsALEXIS SCHLESSINGERMANenergy_progress
02/21/2025Lighting controlsALEXIS SCHLESSINGERMANenergy_progress
01/30/2025Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
Latest 25 of 73.
▾Documents — 177 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch26
09/01/2026B00556196-S1Request digital key ↗
09/01/2026B00556196-I1Request digital key ↗
08/25/2026B01057645-I1Request digital key ↗
Showing 3 of 26 on file for this type
▸Applications & Permits9
▸BISPLAN / WORK APPROVAL APPLICATION6
05/20/2022321851082Open ↗
05/18/2022321851082Open ↗
04/11/2019321954248Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
05/18/2022321851082Open ↗
10/11/2019321851082Open ↗
▸BISWORK PERMIT APPLICATION1
05/06/2013320503969Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram3
08/24/2026B00941665-P2Open ↗
08/13/2026B00941665-I1Open ↗
08/13/2026B00941665-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/24/2026B00941665-P2Open ↗
08/13/2026B00941665-P1Open ↗
08/13/2026B00941665-I1Open ↗
▸Seals & Professional Certifications48
▸DOB NOWDPL-1: Design Professional Seal & Signature26
09/01/2026B00556196-S1Open ↗
09/01/2026B00556196-I1Open ↗
08/25/2026B01057645-I1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
08/29/2026B00941665-S4Open ↗
08/28/2026B01032699-S2Open ↗
08/27/2026B01032699-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/27/2026B01032699-I1Open ↗
08/27/2026B01032699-I1Open ↗
08/25/2026B01032699-S4Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
08/16/2013320503969Open ↗
08/07/2012320503969Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/24/2026B00941665-P2Open ↗
08/13/2026B00941665-S7Open ↗
08/13/2026B00941665-I1Open ↗
Showing 3 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
10/28/2024321851082Open ↗
06/25/2020321954248Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/24/2026B00941665-P2Open ↗
08/13/2026B00941665-S7Open ↗
08/13/2026B00941665-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos20
▸DOB NOWDEP ACP-5: Asbestos Assessment Report18
09/01/2026B00556196-I1Open ↗
09/01/2026B00556196-S1Open ↗
08/24/2026B00941665-P2Open ↗
Showing 3 of 18 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/07/2020321954248Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/23/2026B01171713-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00556196-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00941665-S5Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B00941665-S5Open ↗
▸Approvals, Objections & Sign-offs29
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter26
09/01/2026B00556196-S1Open ↗
09/01/2026B00556196-I1Open ↗
08/24/2026B00941665-P2Open ↗
Showing 3 of 26 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
10/07/2020321954248Open ↗
08/16/2013320503969Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
08/07/2012320503969Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
06/25/2020321954248Open ↗
04/11/2019321954248Open ↗
10/19/2018321851082Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET4
04/11/2019321954248Open ↗
10/19/2018321851082Open ↗
01/22/2013320699641Open ↗
Showing 3 of 4 on file for this type
▸Other Documents17
▸DOB NOWPlot Diagram6
08/24/2026B00941665-P2Open ↗
08/13/2026B00941665-S6Open ↗
08/13/2026B00941665-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSite Survey: Initial4
08/24/2026B00941665-P2Open ↗
08/13/2026B00941665-S7Open ↗
08/13/2026B00941665-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/24/2026B00941665-P2Open ↗
08/13/2026B00941665-I1Open ↗
08/13/2026B00941665-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification3
08/24/2026B00941665-P2Open ↗
08/24/2026B00941665-I1Open ↗
08/24/2026B00941665-P1Open ↗