Over six families without stores
703 CARROLL STREET
BROOKLYN · BIN 3020382
💬 Discuss this project
1920Year Built
4Stories
C1Building Class
R6BZoning
7,524 sfGross Floor Area
8Units
Rent Stabilized19 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: THE BERKELEY CARROLL SCHOOL · 2,750 sf lot · 2.74 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof61p · 2 filings · 20 docs
Floor 452p · 4 filings · 20 docs
Floor 348p · 2 filings · 20 docs
Floor 249p · 1 filing · 20 docs
Floor 147p · 1 filing · 20 docs
Cellar67p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
REPUBLIC EXTERIOR SERVICES3407/08/2026
BERKELEY CARROLL SCHOOL12007/08/2026
OWNER OF 703 CARROLL ST203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/30/2014$4.6M—Private party → THE BERKELEY CARROLL SCHOOL$611/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
1100ARCHITECT PC1108/11/2025
COSENTINI ASSOCIATES1105/16/2025
URBAN INTEGRATIONS1009/23/2024
ANCORA ENGINEERING, PLLC211/13/2023
GEODESIGN INC. PC206/14/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WILLIAM VITACCO ASSOCIATES4803/21/2026
Rigid Structural Design, LLC1203/21/2026
DOMANI CONSULTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARCHSTONE BUILDERS LLCGeneral Contractor5107/08/2026
REPUBLIC EXTERIOR SERVICEGeneral Contractor1707/08/2026
NATIONWIDE MECHANICAL INCPlumbing307/08/2026
M C ELECTRICAL NY INC 004377General Contractor203/22/2026
BEDROCK MECHANICAL INCFire Protection207/08/2026
JAVIER VALERA ACEROElectrical203/21/2026
NATIONWIDE MECHANICAL INCFire Protection107/08/2026
BEDROCK MECHANICALPlumbing103/22/2026
BEDROCK PLBG. & HTG., INCPlumbing107/08/2026
TUXEDO ELEC'L CONTR'G INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOCOTEC ENGINEERING4983908/11/2025
DNA CONTROLLED INSPECTION5541105/16/2025
ANCORA ENGINEERING, PLLC6818211/13/2023
GEODESIGN, INC., P.C.627106/14/2023
DELTA TESTING LABS687111/01/2021
Building Lifecycle
All (212)Filed (36)Permit Issued (44)Signed Off (15)Violation (33)Inspection (12)Objection (42)Special Inspection (30)
05/04/2026
Violation issued (HPD, open)
A
02/24/2026
Signed off — Alteration CO
SPRINKLER WORK IN CONJUNCTION WITH ALT-CO B08051313-I1
B08051313-S2
02/24/2026
Violation issued (FDNY_ORDER, closed)
11/19/2025
Violation issued (HPD, open)
I
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/10/2025
Signed off — Alteration
B00892505-I1
10/23/2025
Signed off — Alteration CO
SPRINKLER WORK IN CONJUNCTION WITH ALT-CO B08051313-I1
B08051313-S3
10/23/2025
Signed off — Alteration CO
SPRINKLER WORK IN CONJUNCTION WITH ALT-CO B08051313-I1
B08051313-S4
08/19/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
ALEXIS SCHLESSINGERMAN
08/19/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
ALEXIS SCHLESSINGERMAN
08/19/2025
Special inspection requirement — Fenestration air leakage
ALEXIS SCHLESSINGERMAN
08/19/2025
Special inspection requirement — Fire-Resistance Rated Construction
ALEXIS SCHLESSINGERMAN
08/19/2025
Special inspection requirement — Sprayed fire-resistant materials
ALEXIS SCHLESSINGERMAN
08/19/2025
Special inspection requirement — Air barrier — testing
ALEXIS SCHLESSINGERMAN
08/19/2025
Special inspection requirement — Fenestration areas
ALEXIS SCHLESSINGERMAN
08/19/2025
Special inspection requirement — Air barrier - visual inspection
ALEXIS SCHLESSINGERMAN
08/19/2025
Special inspection requirement — Interior lighting power
ALEXIS SCHLESSINGERMAN
08/19/2025
Special inspection requirement — Energy Code Compliance Inspections
ALEXIS SCHLESSINGERMAN
08/19/2025
Special inspection requirement — Protection of exposed foundation insulation
ALEXIS SCHLESSINGERMAN
08/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
08/19/2025
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
ALEXIS SCHLESSINGERMAN
08/19/2025
Special inspection requirement — Exterior lighting power
ALEXIS SCHLESSINGERMAN
08/19/2025
Special inspection requirement — Insulation placement and R values
ALEXIS SCHLESSINGERMAN
08/19/2025
Special inspection requirement — Electrical motors and elevators
ALEXIS SCHLESSINGERMAN
08/19/2025
Special inspection requirement — Lighting controls
ALEXIS SCHLESSINGERMAN
08/11/2025
Filed — Alteration CO
SPRINKLER WORK IN CONJUNCTION WITH ALT-CO B08051313-I1
B08051313-A4
08/11/2025
Special inspection requirement — Insulation placement and R values
ALEXIS SCHLESSINGERMAN
08/11/2025
Special inspection requirement — Interior lighting power
ALEXIS SCHLESSINGERMAN
08/11/2025
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
ALEXIS SCHLESSINGERMAN
08/11/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
ALEXIS SCHLESSINGERMAN
08/11/2025
Special inspection requirement — Electrical motors and elevators
ALEXIS SCHLESSINGERMAN
08/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
08/11/2025
Special inspection requirement — Lighting controls
ALEXIS SCHLESSINGERMAN
08/11/2025
Special inspection requirement — Air barrier - visual inspection
ALEXIS SCHLESSINGERMAN
08/11/2025
Special inspection requirement — Fenestration air leakage
ALEXIS SCHLESSINGERMAN
08/11/2025
Special inspection requirement — Fire-Resistance Rated Construction
ALEXIS SCHLESSINGERMAN
08/11/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
ALEXIS SCHLESSINGERMAN
08/11/2025
Special inspection requirement — Protection of exposed foundation insulation
ALEXIS SCHLESSINGERMAN
08/11/2025
Special inspection requirement — Fenestration areas
ALEXIS SCHLESSINGERMAN
08/08/2025
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
07/25/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/17/2025
Signed off — Alteration CO
SPRINKLER WORK IN CONJUNCTION WITH ALT-CO B08051313-I1
B08051313-S1
07/10/2025
Objection resolved — Addressed
07/01/2025
Objection raised — Other
06/18/2025
Filed — Alteration CO
SPRINKLER WORK IN CONJUNCTION WITH ALT-CO B08051313-I1
B08051313-A3
06/09/2025
Violation issued (HPD, open)
A
06/02/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/28/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/16/2025
Filed — Alteration CO
SPRINKLER WORK IN CONJUNCTION WITH ALT-CO B08051313-I1
B08051313-A1
05/01/2025
Permit issued — Sprinklers
B08051313-S4-EW-SP
04/25/2025
Filed — Alteration CO
SPRINKLER WORK IN CONJUNCTION WITH ALT-CO B08051313-I1
B08051313-P9
04/03/2025
Filed — Alteration CO
SPRINKLER WORK IN CONJUNCTION WITH ALT-CO B08051313-I1
B08051313-P6
03/26/2025
Permit issued — Protection and Mechanical Methods
B00892505-I1-PMM
03/25/2025
Signed off — Alteration
Installation of a temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00894021-I1
03/13/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/10/2025
Permit issued — Structural
B08051313-S1-ST
03/05/2025
Signed off — Alteration
Filing for replacement of plumbing fixtures on floors Cel, 1 thru 4. No change to use, egress, or occupancy.
B00575684-I1
01/29/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/16/2025
Signed off — Alteration
Filing for the removal of radiators and louver. No change to use, egress, or occupancy.
B00575652-I1
01/15/2025
Signed off — Alteration CO
SPRINKLER WORK IN CONJUNCTION WITH ALT-CO B08051313-I1
B08051313-S9
Latest 60 of 212 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offBEDROCK MECHANICAL INC05/01/2025
DOB NOWProtection and Mechanical MethodsSigned-offREPUBLIC EXTERIOR SERVICE03/26/2025
DOB NOWStructuralSigned-offARCHSTONE BUILDERS LLC03/10/2025
DOB NOWGeneral ConstructionPermit IssuedARCHSTONE BUILDERS LLC01/03/2025
DOB NOWGeneral ConstructionSigned-offARCHSTONE BUILDERS LLC12/16/2024
DOB NOWMechanical SystemsSigned-offARCHSTONE BUILDERS LLC12/16/2024
DOB NOWMechanical SystemsSigned-offARCHSTONE BUILDERS LLC12/13/2024
DOB NOWPlumbingSigned-offNATIONWIDE MECHANICAL INC10/04/2024
DOB NOWSupported ScaffoldSigned-offREPUBLIC EXTERIOR SERVICE07/17/2024
DOB NOWProtection and Mechanical MethodsSigned-offREPUBLIC EXTERIOR SERVICE07/16/2024
DOB NOWSidewalk ShedSigned-offREPUBLIC EXTERIOR SERVICE07/16/2024
DOB NOWConstruction FenceSigned-offREPUBLIC EXTERIOR SERVICE07/15/2024
DOB NOWPlumbingSigned-offBEDROCK PLBG. & HTG., INC01/25/2024
DOB NOWSprinklersSigned-offBEDROCK MECHANICAL INC01/24/2024
DOB NOWSupport of ExcavationSigned-offARCHSTONE BUILDERS LLC12/27/2023
DOB NOWGeneral ConstructionSigned-offARCHSTONE BUILDERS LLC12/27/2023
DOB NOWStructuralSigned-offARCHSTONE BUILDERS LLC12/27/2023
DOB NOWGeneral ConstructionSigned-offARCHSTONE BUILDERS LLC12/27/2023
DOB NOWFoundationSigned-offARCHSTONE BUILDERS LLC12/27/2023
DOB NOWFoundationSigned-offARCHSTONE BUILDERS LLC12/27/2023
DOB NOWMechanical SystemsSigned-offARCHSTONE BUILDERS LLC12/27/2023
DOB NOWGeneral ConstructionPermit IssuedARCHSTONE BUILDERS LLC12/27/2023
DOB NOWMechanical SystemsSigned-offARCHSTONE BUILDERS LLC12/27/2023
DOB NOWGeneral ConstructionSigned-offARCHSTONE BUILDERS LLC09/26/2023
DOB NOWStructuralSigned-offARCHSTONE BUILDERS LLC09/25/2023
DOB NOWPlumbingSigned-offNATIONWIDE MECHANICAL INC09/21/2023
DOB NOWSprinklersSigned-offNATIONWIDE MECHANICAL INC09/20/2023
DOB NOWFoundationSigned-offARCHSTONE BUILDERS LLC09/19/2023
DOB NOWMechanical SystemsSigned-offARCHSTONE BUILDERS LLC09/18/2023
DOB NOWFoundationSigned-offARCHSTONE BUILDERS LLC07/20/2023
DOB NOWSupport of ExcavationSigned-offARCHSTONE BUILDERS LLC07/17/2023
DOB NOWSupported ScaffoldSigned-offREPUBLIC EXTERIOR SERVICE07/15/2023
DOB NOWSidewalk ShedSigned-offREPUBLIC EXTERIOR SERVICE07/14/2023
DOB NOWConstruction FenceSigned-offREPUBLIC EXTERIOR SERVICE07/14/2023
DOB NOWProtection and Mechanical MethodsSigned-offREPUBLIC EXTERIOR SERVICE07/13/2023
DOB NOWGeneral ConstructionPermit IssuedARCHSTONE BUILDERS LLC06/17/2023
DOB NOWStructuralSigned-offARCHSTONE BUILDERS LLC06/14/2023
DOB NOWGeneral ConstructionSigned-offARCHSTONE BUILDERS LLC01/09/2023
DOB NOWMechanical SystemsSigned-offARCHSTONE BUILDERS LLC01/09/2023
DOB NOWGeneral ConstructionSigned-offARCHSTONE BUILDERS LLC12/03/2021
+ 10 more permits on file
1 project · most recent 08/11/2025
Sprinkler System
FiledStatusContractorScope
08/11/2025Signed-offBEDROCK MECHANICAL INCSprinkler System
1 project · most recent 08/11/2025
Storm Water/Sanitary
FiledStatusContractorScope
08/11/2025Signed-offBEDROCK PLBG. & HTG., INCStorm, Water/Sanitary
4 projects · most recent 07/01/2025
General Wiring
FiledStatusContractorScope
07/01/2025CompleteM.C. ELECTRICAL NY INCGeneral Wiring
01/20/2025CompleteTUXEDO ELEC'L CONTR'G INC—
08/03/2023CompleteNASH ELECTRIC SERVICES IN—
10/13/2021CompleteCROSSWIRE ELECTRICAL INC—
1 project · most recent 08/11/2025
Steel Concrete Masonry
FiledStatusContractorScope
08/11/2025Signed-offBEDROCK MECHANICAL INCSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
08/08/2025Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
07/25/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/02/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/28/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/13/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/29/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/04/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/04/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/28/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/28/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/28/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/17/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 121
DateRequirementInspectorRole
08/19/2025Lighting controlsALEXIS SCHLESSINGERMANenergy_progress
08/19/2025Fenestration and door U-factor and product ratingsALEXIS SCHLESSINGERMANenergy_progress
08/19/2025Air barrier - visual inspectionALEXIS SCHLESSINGERMANenergy_progress
08/19/2025Fenestration air leakageALEXIS SCHLESSINGERMANenergy_progress
08/19/2025Mastic and Intumescent Fire-resistant CoatingsALEXIS SCHLESSINGERMANspecial
08/19/2025Sprayed fire-resistant materialsALEXIS SCHLESSINGERMANspecial
08/19/2025Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
08/19/2025Exterior Insulation and Finish Systems (EIFS)ALEXIS SCHLESSINGERMANspecial
08/19/2025Fire-Resistance Rated ConstructionALEXIS SCHLESSINGERMANprogress
08/19/2025Energy Code Compliance InspectionsALEXIS SCHLESSINGERMANprogress
08/19/2025Interior lighting powerALEXIS SCHLESSINGERMANenergy_progress
08/19/2025Exterior lighting powerALEXIS SCHLESSINGERMANenergy_progress
08/19/2025Air barrier — testing ALEXIS SCHLESSINGERMANenergy_progress
08/19/2025Insulation placement and R valuesALEXIS SCHLESSINGERMANenergy_progress
08/19/2025Protection of exposed foundation insulationALEXIS SCHLESSINGERMANenergy_progress
08/19/2025Electrical motors and elevatorsALEXIS SCHLESSINGERMANenergy_progress
08/19/2025Fenestration areasALEXIS SCHLESSINGERMANenergy_progress
08/11/2025Fenestration areasALEXIS SCHLESSINGERMANenergy_progress
08/11/2025Protection of exposed foundation insulationALEXIS SCHLESSINGERMANenergy_progress
08/11/2025Fenestration air leakageALEXIS SCHLESSINGERMANenergy_progress
08/11/2025Air barrier - visual inspectionALEXIS SCHLESSINGERMANenergy_progress
08/11/2025Electrical motors and elevatorsALEXIS SCHLESSINGERMANenergy_progress
08/11/2025Fenestration and door U-factor and product ratingsALEXIS SCHLESSINGERMANenergy_progress
08/11/2025Interior lighting powerALEXIS SCHLESSINGERMANenergy_progress
08/11/2025Insulation placement and R valuesALEXIS SCHLESSINGERMANenergy_progress
Latest 25 of 121.
▾Documents — 228 on file (BIS + DOB NOW)
▸Plans & Drawings36
▸DOB NOWPlans/Sketch36
09/01/2026B00575684-I1Request digital key ↗
09/01/2026B00575652-I1Request digital key ↗
09/01/2026B00575652-P1Request digital key ↗
Showing 3 of 36 on file for this type
▸Applications & Permits4
▸BISWORK PERMIT APPLICATION3
09/15/2010310048043Open ↗
12/11/2007310048043Open ↗
12/11/2007310048043Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
11/14/2007310048043Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026B08051313-I1Open ↗
08/13/2026B08051313-A4Open ↗
▸DOB NOWRestrictive Declaration/Easement 22
08/13/2026B08051313-A4Open ↗
08/13/2026B08051313-I1Open ↗
▸DOB NOWRestrictive Declaration/Easement 32
08/13/2026B08051313-I1Open ↗
08/13/2026B08051313-A4Open ↗
▸Seals & Professional Certifications75
▸DOB NOWDPL-1: Design Professional Seal & Signature36
09/01/2026B00575684-P1Open ↗
09/01/2026B00575684-I1Open ↗
09/01/2026B00575551-P2Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
09/29/2026B00575551-P1Open ↗
09/23/2026B08051313-S1Open ↗
09/02/2026B08051313-P5Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
09/29/2026B00575551-P1Open ↗
09/29/2026B00575551-P1Open ↗
09/23/2026B08051313-S1Open ↗
Showing 3 of 18 on file for this type
▸Trade Schedules & Equipment4
▸BISSELF-CERT PLUMBING NOTICE2
02/28/2011310048043Open ↗
02/22/2011310048043Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
11/14/2007310048043Open ↗
▸BISSCHEDULE B - PLUMBING1
11/14/2007310048043Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist6
08/13/2026B08051313-A4Open ↗
08/13/2026B08051313-P3Open ↗
08/13/2026B08051313-S9Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form9
09/01/2026B00575684-I1Open ↗
09/01/2026B00575652-I1Open ↗
08/21/2026B08051313-S9Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/21/2026B08051313-S7Open ↗
08/21/2026B08051313-S6Open ↗
08/21/2026B08051313-S5Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
11/14/2007310048043Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports4
▸BISNOTIF-PROPOSED STEAM-HOT WATER INSPECTION2
03/07/2011310048043Open ↗
11/14/2007310048043Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B08051313-S6Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B08051313-S6Open ↗
▸Approvals, Objections & Sign-offs35
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter26
09/01/2026B00575684-I1Open ↗
09/01/2026B00575652-P1Open ↗
09/01/2026B00575652-I1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDEP Variance (V5) letter6
09/01/2026B00575684-I1Open ↗
09/01/2026B00575652-I1Open ↗
08/15/2026B00575551-I1Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
02/28/2011310048043Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/07/2011310048043Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
11/14/2007310048043Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
03/07/2011310048043Open ↗
12/11/2007310048043Open ↗
▸Other Documents42
▸DOB NOWDHCR Document37
08/27/2026B00894021-I1Open ↗
08/15/2026B00575551-P1Open ↗
08/15/2026B00575551-I1Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWProperty Ownership Certification4
08/21/2026B08051313-A4Open ↗
08/21/2026B08051313-A3Open ↗
08/21/2026B08051313-P6Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026B08051313-S6Open ↗