← Back
BuildNYC
Elevator apt, fireproof with stores
705 COLUMBUS AVENUE
MANHATTAN · BIN 1079518
💬 Discuss this project
1968Year Built
26Stories
D6Building Class
C1-9Zoning
374,550 sfGross Floor Area
252Units
LL97 CoveredRent Stabilized8 Active Violations ▸
Elevator apt, fireproof with stores · Owner of record: Syracuse Leasing Limited Liability Compa NY · 52,067 sf lot · 7.19 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofThe Dwight-school74p · 12 filings · 20 docs
BulkheadConvert roof to recreation area for education use2p · 2 filings · 20 docs
Floor 9New split system heat/cool unit and duct renovation1p · 1 filing · 20 docs
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1The Dwight-school19p · 10 filings · 20 docs
CellarThe Dwight-school5 filings · 17 docs
Site & exteriorThe Dwight-school35p · 7 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Lefrak7007/08/2026
Syracuse Leasing Limited Liability Compa NY103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Laurence G. Jones Architects1202/11/2026
Christies410/06/2025
New York & Company1108/07/2025
FL&M Engineering Design & Inspection408/28/2024
AG Engineering107/21/2023
Bauer Dermel Architect406/26/2023
Severud Associates106/26/2023
Mottola Rini Engineers608/17/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Municipal Building Consultants3803/21/2026
Millennium Designs of New York403/21/2026
Arsenal Building Consultants203/21/2026
Millennium Designs403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
3-G ServicesGeneral Contractor1307/08/2026
Specialty Construction SYGeneral Contractor1107/08/2026
Adriano Plumbing & Heatingspecialty_contractor607/08/2026
MC SuperstructureScaffold207/08/2026
Beam EnterprisesGeneral Contractor204/09/2026
3-G Servicesspecialty_contractor207/08/2026
Specialty Construction SYScaffold107/08/2026
Dinaco ContractingGeneral Contractor107/08/2026
Kings Group NYScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Christie Engineering57951002/11/2026
Laurence G. Jones55601002/11/2026
New York Engineers38681108/07/2025
Bergman Consulting Engineering253507/17/2025
Trolydia Testing & Inspec4422206/26/2023
Mottola Rini Engineers, P3251408/17/2022
Building Lifecycle
06/08/2026
Elevator Category 1 inspection report filed
04/09/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/11/2026
Filed — Alteration CO
ALT CO FILED TO CONVERT THE EXISTING ROOF TO A RECREATION AREA IN CONJUNCTION WITH THE EDUCATION USE ON THE FIRST FLOOR AS PER THE PLANS FILED HEREWITH. ALL CONSTRUCTION WORK FILED UNDER SEPARATE APPLICATIONS; GC #M01046071 & ST #M01058382.
M01212971-P1
01/29/2026
Objection resolved — Addressed
01/06/2026
Signed off — Alteration
M08031327-I1
168 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBeam Enterprises12/05/2025
DOB NOWGeneral ConstructionPermit IssuedBeam Enterprises12/02/2025
DOB NOWGeneral ConstructionPermit Issued3-G Services10/02/2025
DOB NOWSprinklersSigned-offAdriano Plumbing & Heating07/08/2025
DOB NOWPlumbingSigned-offAdriano Plumbing & Heating02/19/2025
DOB NOWStructuralSigned-off3-G Services08/19/2024
DOB NOWConstruction FenceSigned-offMC Superstructure08/09/2024
DOB NOWSidewalk ShedSigned-offMC Superstructure07/26/2024
DOB NOWPlumbingSigned-offAdriano Plumbing & Heating07/12/2024
DOB NOWMechanical SystemsSigned-off3-G Services07/10/2024
DOB NOWSprinklersSigned-offAdriano Plumbing & Heating07/05/2024
DOB NOWGeneral ConstructionSigned-off3-G Services05/31/2024
DOB NOWGeneral ConstructionSigned-offSpecialty Construction SY04/17/2024
DOB NOWSidewalk ShedSigned-offKings Group NY07/22/2023
DOB NOWStructuralSigned-offSpecialty Construction SY07/08/2023
DOB NOWGeneral ConstructionSigned-offSpecialty Construction SY04/26/2023
DOB NOWGeneral ConstructionSigned-offSpecialty Construction SY03/06/2023
DOB NOWGeneral ConstructionSigned-offSpecialty Construction SY11/17/2022
DOB NOWConstruction FenceSigned-offSpecialty Construction SY11/17/2022
DOB NOWStructuralSigned-off3-G Services08/20/2022
DOB NOWGeneral ConstructionPermit Issued3-G Services08/18/2022
DOB NOWMechanical SystemsSigned-off3-G Services07/13/2022
DOB NOWGeneral ConstructionPermit Issued3-G Services06/13/2022
DOB NOWSprinklersSigned-offAdriano Plumbing & Heating05/18/2022
DOB NOWPlumbingSigned-offAdriano Plumbing & Heating05/13/2022
DOB NOWGeneral ConstructionSigned-off3-G Services03/10/2022
DOB NOWGeneral ConstructionSigned-offDinaco Contracting02/23/2022
5 projects · most recent 04/29/2025
General Wiring
FiledStatusContractorScope
04/29/2025CompleteUltra ElectricGeneral Wiring
07/27/2024CompleteNash Electric Services—
07/24/2023CompleteHigh Quality Electric—
07/19/2022CompleteUltra ElectricGeneral Wiring
05/18/2022CompleteUltra ElectricGeneral Wiring
1 project
FiledStatusContractorScope
————
▾Field Inspections (DOB CAP) — 20
DateTypeResultReport
04/09/2026Pass-Final CND-Occupancy InspectionPassView ↗
10/24/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/09/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/28/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/25/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
07/08/2025Fail-Final SP - Up to 3 Requested FloorsFailView ↗
04/04/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/26/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/29/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/29/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/05/2022Pass-Final CND-Occupancy InspectionPassView ↗
09/09/2022Pass-Final CND-Occupancy InspectionPassView ↗
09/08/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/06/2022Pass-Final SP - Up to 3 Requested FloorsPassView ↗
09/01/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/30/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/19/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/15/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/24/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 106
DateRequirementInspectorRole
10/06/2025Structural Steel - DetailsRICHARD CHRISTIEspecial
10/06/2025Structural Stability – Alterations of existing buildingsRICHARD CHRISTIEspecial
10/06/2025Structural Steel - WeldingRICHARD CHRISTIEspecial
10/06/2025FinalRICHARD CHRISTIEprogress
10/06/2025Concrete - Cast-In-PlaceRICHARD CHRISTIEspecial
10/06/2025Structural Steel - High Strength BoltingRICHARD CHRISTIEspecial
10/06/2025Post-installed AnchorsRICHARD CHRISTIEspecial
09/17/2025Structural Stability – Alterations of existing buildingsRICHARD CHRISTIEspecial
09/17/2025Post-installed AnchorsRICHARD CHRISTIEspecial
09/17/2025Concrete - Cast-In-PlaceRICHARD CHRISTIEspecial
09/17/2025FinalRICHARD CHRISTIEprogress
09/17/2025Structural Steel - Details—special
09/17/2025Structural Steel - WeldingRICHARD CHRISTIEspecial
09/17/2025Structural Steel - High Strength BoltingRICHARD CHRISTIEspecial
08/07/2025Fire-Resistant Penetrations and JointsMichael Tobiasspecial
08/07/2025Sprinkler SystemsMichael Tobiasspecial
08/07/2025Fire-Resistant Penetrations and JointsMichael Tobiasspecial
08/04/2025Fire-Resistant Penetrations and JointsMichael Tobiasspecial
08/04/2025Sprinkler SystemsMichael Tobiasspecial
08/04/2025Fire-Resistant Penetrations and JointsMichael Tobiasspecial
07/15/2025Post-installed AnchorsJACOB BERGMANspecial
07/15/2025Fire-Resistant Penetrations and JointsMichael Tobiasspecial
07/15/2025Sprinkler SystemsMichael Tobiasspecial
07/08/2025Public Assembly Emergency LightingLaurence Jonesprogress
06/09/2025Sprinkler SystemsMichael Tobiasspecial
Latest 25 of 106.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
The Dwight-schoolEducationCellar, Floor 1, Roof
Project M01046071 Alteration · LOC Issued · 05/24/2024
Project M00717063 Alteration · LOC Issued · 07/01/2022
Project M00685898 Alteration · LOC Issued · 05/20/2022
Project M00673700 Alteration CO · Permit Entire · 05/11/2022
Project M00718057 Alteration · LOC Issued · 05/10/2022
Project M00718062 Alteration · LOC Issued · 05/10/2022
Project M00679313 Alteration · LOC Issued · 03/02/2022
Project M00685908 Alteration · Filing Withdrawn
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
249 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account