← Back
Office with commercial, 1-6 stories
709 8 AVENUE
MANHATTAN · BIN 1024992
💬 Discuss this project
1928Year Built
3Stories
O5Building Class
C6-4Zoning
29,268 sfGross Floor Area
5Units
LL97 Covered12 Open Violations 6 unresolved · 6 paperwork only ▸
Office with commercial, 1-6 stories · Owner of record: HACELS, LLC · 10,041 sf lot · 2.91 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingLandscape
Floor 12p · 1 filing · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HACELS5008/29/2026
KAJ NY CONSTRUCTION INC503/22/2026
OWNER OF 709 8 AVE203/22/2026
OWNER OF 711 8TH AVENUE103/22/2026
BEEF STEAK CHARLIES OF 45103/22/2026
JAV BUILDING SERVICES103/22/2026
HACEL1103/21/2026
713-8TH OPERATING503/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CNY ENGINEERING P.C205/13/2026
AMERITESTING LLC103/19/2025
SYED ENGINEERING, P.C.111/14/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MERCURE CONSULTING203/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KAJ NY CONSTRUCTION INCGeneral Contractor303/21/2026
HANK CHENGElectrical103/21/2026
KAN ELEVATOR INCElectrical103/21/2026
NOBLE ELECL CONTRG CO INCElectrical103/22/2026
R.C.M. ELECTRIC CORP.Electrical103/22/2026
RICHARD NEUElectrical103/21/2026
ROBERT MARCHISOTTOElectrical103/21/2026
SCHNEIDER, ALLANElectrical103/21/2026
GRECO, STEVEElectrical103/21/2026
W5 GROUP LLCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CNY ENGINEERING P.C3304105/13/2026
Building Lifecycle
All (48)Filed (4)Permit Issued (2)Violation (34)Objection (6)Special Inspection (2)
05/13/2026
Filed — Alteration
JOB FILED FOR INTERIOR RENOVATION TO REMOVE ALL NON-LOAD BEARING PARTITIONS,REPLACE STOREFRONT AND FIXTURES PER PLAN ON THE 1ST FLOOR.NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01355768-S1
05/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
YUE ZHOU
03/24/2026
Objection raised — Admin
03/24/2026
Objection resolved — Resolved
03/24/2026
Objection raised — Cost
03/24/2026
Objection resolved — Resolved
03/24/2026
Objection raised — Scope
03/24/2026
Objection resolved — Resolved
03/05/2026
Filed — Alteration
JOB FILED FOR INTERIOR RENOVATION TO REMOVE ALL NON-LOAD BEARING PARTITIONS,REPLACE STOREFRONT AND FIXTURES PER PLAN ON THE 1ST FLOOR.NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01355768-I1
10/01/2025
Permit issued — General Construction
M01184726-I1-GC
03/19/2025
Filed — Alteration
M01184726-I1
02/21/2025
Special inspection requirement — Final
JORGE ARTEAGA
11/18/2019
Permit issued — Sidewalk Shed
M00263094-I1-SH
11/14/2019
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00263094-I1
07/25/2018
Violation issued (ECB, open)
Construction
02/08/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/16/2017
Violation issued (ECB, open)
Unknown
02/24/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/27/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/27/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/27/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2016
Violation issued (ECB, closed)
Construction
05/02/2016
Violation issued (ECB, closed)
Plumbing
05/02/2016
Violation issued (ECB, closed)
Plumbing
02/12/2016
Violation issued (ECB, open)
Unknown
06/08/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/17/2015
Violation issued (ECB, open)
Construction
06/04/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/30/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/06/2013
Violation issued (ECB, open)
Elevators
04/29/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/08/2010
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/17/2000
Violation issued (ECB, closed)
Construction
07/17/2000
Violation issued (ECB, closed)
Construction
07/17/2000
Violation issued (DOB, closed)
VW*-VIOLATION - WORK W/O PERMIT DISMISSED
10/06/1999
Violation issued (ECB, closed)
Construction
11/06/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/04/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/03/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/06/1991
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/21/1991
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/21/1991
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/15/1990
Violation issued (ECB, open)
Public Assembly
01/09/1990
Violation issued (ECB, closed)
Public Assembly
10/26/1988
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/26/1988
Violation issued (ECB, closed)
Public Assembly
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedW5 GROUP LLC10/01/2025
DOB NOWSidewalk ShedPermit IssuedKAJ NY CONSTRUCTION INC11/18/2019
BIS—ISSUEDDANIEL O'CONNOR ARCHITECT08/23/2018
BISPLISSUEDTRI STATE PLBG & HTG INC05/25/2018
BISOTISSUEDSUPER POWER CONSTRUCTION05/25/2018
BISOTISSUEDSUPER POWER CONSTRUCTION02/11/2016
BISPLISSUEDTRI STATE PLBG & HTG INC02/11/2016
BISFPISSUEDUNIQUE FIRE SYSTEMS INC03/04/2014
BISSPISSUEDTOMKAT PLUMBING HEATING LLC08/02/2013
BISPLISSUEDPREMIER PIPE SOLUTIONS06/26/2013
BISMHISSUEDTAIWAN HENAN CONSTRUCTION05/28/2013
BISEQISSUEDTAIWAN HENAN CONSTRUCTION05/28/2013
BISOTISSUEDTAIWAN HENAN CONSTRUCTION05/28/2013
BISOTISSUEDTAIWAN HENAN CONSTRUCTION05/28/2013
BISPLISSUEDDYCKMAN PLBG AND HTG INC05/23/2013
BISOTISSUEDTAIWAN HENAN CONSTRUCTION03/19/2013
BISFPISSUEDPINNACLE PLBG & HTG CORP02/13/2013
BISOTISSUEDTAIWAN HENAN CONSTRUCTION01/26/2013
BISSPISSUEDDYCKMAN PLBG AND HTG INC04/24/2012
BISPLISSUEDDYCKMAN PLBG AND HTG INC04/23/2012
BISEQISSUEDTAIWAN HENAN CONSTRUCTION03/19/2012
BISOTISSUEDTAIWAN HENAN CONSTRUCTION03/19/2012
BISMHISSUEDKABACK ENTERPRISES INC06/09/2011
BISPLISSUEDDALTON PUMBING & HTG INC05/13/2010
BISOTISSUEDCAMILLERI INTERIORS CORP04/05/2010
BIS—ISSUEDDANIEL O'CONNOR ARCH.12/19/2008
BISOTISSUEDARO CONSTRUCTION CORP09/01/2006
BISMHISSUEDCAUCIG UTILITIES INC.10/07/2003
BISFPISSUEDMEGA FIRE PROT. INC.07/31/2003
BISEQISSUEDROCKLEDGE SCAFFOLD CORP07/10/2003
BISMHISSUEDTRANE U.S. INC11/06/2002
BISMHISSUEDDYNAMIC SHEET METAL LTD05/29/2002
BISEQISSUEDSPRING SCAFFOLDING05/09/2002
BISEQISSUEDSPRING SCAFFOLDING05/09/2002
BISEQISSUEDSPRING SCAFFOLDING_INC.05/03/2001
BISPLISSUEDI.M.P. PLBG. & HTG. CORP12/11/2000
BISOTISSUEDARO CONSTRUCTION09/01/2000
BISEQISSUEDARO CONSTRUCTION07/06/2000
BISFPISSUEDGEBHARDT INC02/29/2000
BISOTISSUEDCHAU'S CORPORATION10/29/1999
+ 11 more permits on file
1 project · most recent 05/13/2026
Water/Sanitary
FiledStatusContractorScope
05/13/2026——Water/Sanitary
3 projects · most recent 02/11/2020
General Wiring
FiledStatusContractorScope
02/11/2020Permit IssuedR.C.M. ELECTRIC CORP.—
11/13/2019Permit IssuedRICHARD NEU—
10/09/2018CompleteNOBLE ELECL CONTRG CO INCGeneral Wiring
1 project · most recent 11/14/2019
Sidewalk Shed
FiledStatusContractorScope
11/14/2019Permit IssuedKAJ NY CONSTRUCTION INCSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
05/11/2026Fire-Resistant Penetrations and JointsYUE ZHOUspecial
02/21/2025FinalJORGE ARTEAGAprogress
▾Documents — 234 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch3
08/24/2026M01184726-I1Request digital key ↗
08/17/2026M01355768-I1Request digital key ↗
08/17/2026M01355768-S1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00263094-I1Request digital key ↗
▸Applications & Permits57
▸BISWORK PERMIT APPLICATION27
08/23/2018110400209Open ↗
05/29/2018122646770Open ↗
05/29/2018122646770Open ↗
Showing 3 of 27 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION24
03/14/2019110400209Open ↗
11/09/2018110400209Open ↗
11/17/2017110400209Open ↗
Showing 3 of 24 on file for this type
▸BISPLACE OF ASSEMBLY3
12/04/2018123242954Open ↗
12/04/2018123242954Open ↗
11/20/2017123242954Open ↗
▸DOB NOWHPD Certification Letter or CPC Special Permit2
08/13/2026M01355768-I1Open ↗
08/13/2026M01184726-I1Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
10/07/2019110400209Open ↗
▸Seals & Professional Certifications41
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION17
12/04/2018123242954Open ↗
11/20/2017123242954Open ↗
02/01/2016122646770Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
01/28/2016122646770Open ↗
02/20/2014121905643Open ↗
03/19/2012121006945Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
03/16/2012121006945Open ↗
06/15/2011120718580Open ↗
05/10/2010120342389Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/24/2026M01184726-I1Open ↗
08/17/2026M01355768-S1Open ↗
08/13/2026M01355768-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
02/20/2014121905643Open ↗
03/14/2013140062161Open ↗
12/31/2012140046340Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
03/14/2013140062161Open ↗
12/31/2012140046340Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
03/14/2013140062161Open ↗
12/31/2012140046340Open ↗
▸BISProfessional and Owner Certification (POC3)1
01/28/2016122646770Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/26/2026M01184726-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026M01355768-S1Open ↗
▸Trade Schedules & Equipment17
▸BISSCHEDULE B - PLUMBING7
03/08/2013121006945Open ↗
01/31/2013121006945Open ↗
12/31/2012140046340Open ↗
Showing 3 of 7 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
10/10/2013121006945Open ↗
08/13/2013121006945Open ↗
08/08/2013121006945Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
10/12/2016122646770Open ↗
01/28/2016122646770Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA2
06/19/2014121905643Open ↗
06/19/2013121483723Open ↗
▸BISEQUIPMENT USE PERMITS1
06/27/2011120718580Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
12/31/2012140046340Open ↗
▸BISEQUIPMENT USE APPLICATION-PERMIT1
06/27/2011120718580Open ↗
▸Safety & Tenant Protection12
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist5
08/17/2026M01355768-S1Open ↗
08/17/2026M01355768-I1Open ↗
08/13/2026M01355768-I1Open ↗
Showing 3 of 5 on file for this type
▸BISANTI-HARASSMENT CHECKLIST: CLINTON2
01/28/2016122646770Open ↗
06/15/2011120718580Open ↗
▸BISST-1 Street Tree Checklist2
05/10/2010120342389Open ↗
03/15/2010120288679Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
05/10/2010120342389Open ↗
▸BISHPD-1 - Anti-Harassment Area Checklist1
03/15/2010120288679Open ↗
▸BISSTREET TREE CHECKLIST1
01/16/2013121483723Open ↗
▸Environmental & Asbestos13
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
01/16/2013121483723Open ↗
05/10/2010120342389Open ↗
03/15/2010120288679Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
03/14/2013140062161Open ↗
12/31/2012140046340Open ↗
03/19/2012121006945Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/24/2026M01184726-I1Open ↗
08/17/2026M01355768-S1Open ↗
08/13/2026M01355768-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
06/15/2011120718580Open ↗
06/15/2011120718580Open ↗
▸BISASBESTOS: EXEMPTION (ASB4)1
01/28/2016122646770Open ↗
▸Energy Compliance12
▸BISTR8: Energy Code Progress Inspections3
03/19/2013140062161Open ↗
01/22/2013140046340Open ↗
03/19/2012121006945Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
02/01/2016122646770Open ↗
01/16/2013121483723Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
03/14/2013140062161Open ↗
12/31/2012140046340Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
03/14/2013140062161Open ↗
12/31/2012140046340Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
06/19/2013121483723Open ↗
▸BISNYCECC ANALYSIS1
12/31/2012140046340Open ↗
▸BISTECHNICAL REPORT: ENERGY1
06/15/2011120718580Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY2
03/14/2013140062161Open ↗
12/31/2012140046340Open ↗
▸BIS2008 CODE TR1 REQUIRED1
12/31/2012140046340Open ↗
▸Approvals, Objections & Sign-offs25
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST13
01/29/2020110400209Open ↗
10/07/2019110400209Open ↗
07/10/2019110400209Open ↗
Showing 3 of 13 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
03/15/2013121006945Open ↗
01/16/2013121483723Open ↗
03/19/2012121006945Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
11/17/2017110400209Open ↗
11/17/2017110400209Open ↗
Showing 2 of 3 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
06/15/2011120718580Open ↗
06/15/2011120718580Open ↗
▸Cost, Insurance & Ownership14
▸BISCOST AFFIDAVIT14
01/28/2016122646770Open ↗
06/19/2014121905643Open ↗
02/20/2014121905643Open ↗
Showing 3 of 14 on file for this type
▸Filing & Intake Forms29
▸BISBOROUGH INTAKE FORM12
01/29/2020110400209Open ↗
10/07/2019110400209Open ↗
07/10/2019110400209Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING COVER SHEET8
01/28/2016122646770Open ↗
02/20/2014121905643Open ↗
01/16/2013121483723Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION7
04/09/2019110400209Open ↗
11/13/2018110400209Open ↗
11/09/2018110400209Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
03/14/2013140062161Open ↗
12/31/2012140046340Open ↗
▸Other Documents7
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
10/07/2019110400209Open ↗
12/04/2018123242954Open ↗
12/04/2018123242954Open ↗
Showing 3 of 6 on file for this type
▸BISPlot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type