← Back
Elevator apt, converted
Empire Building
71 BROADWAY · BIN 1000810
💬 Discuss this project
1898Year Built
23Stories
D5Building Class
C5-5Zoning
303,086 sfGross Floor Area
245Units
LL97 CoveredRent Stabilized40 Open Violations 34 unresolved · 6 paperwork only ▸FISP: SWARMPFDNY Report ↗
Elevator apt, converted · Owner of record: EQR-71 BROADWAY A, L.L.C. · 13,967 sf lot · 21.7 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 7 docs
Floor 213p · 2 filings · 20 docs
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 111p · 3 filings · 20 docs
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EQUITY RESIDENTIAL8709/13/2026
SHALBRO CONSTRUCTION GROUP407/08/2026
XINOS CONSTRUCTION404/09/2026
NEW YORK LADDER & SCAFFOLD503/22/2026
EQR-71 BROADWAY1103/22/2026
EQR 71 BROADWAY A LLC/EQU203/22/2026
JT MAGEN COMPANY103/22/2026
HIGHLAND DEVELOPMENT1503/22/2026
PROPERTY MANAGER C/O BOBB103/22/2026
HIGHLAND DEVEL. CORP.703/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KUSHNER STUDIOS603/21/2026
S M EXPEDITING203/21/2026
DOMANI CONSULTING403/21/2026
CONVERSANO ASSOCIATES, INC.1003/21/2026
A1 EXPEDITING SERVICE203/21/2026
ATLANTIC BUILDING SUPPLY INC.203/21/2026
BMB BUILDING CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SHALBRO CONSTRUCTION GROUPGeneral Contractor407/08/2026
LV CONTRACTING SOLUTIONSGeneral Contractor404/09/2026
XINOS CONSTRUCTION CORPGeneral Contractor309/13/2026
MICHAEL ASPRAS CREATIVEGeneral Contractor307/08/2026
COOPER WORKS INCGeneral Contractor205/27/2026
BEDROCK MECHANICAL INCFire Protection207/08/2026
NEW YORK LADDER & SCAFFOLDGeneral Contractor203/21/2026
IRONBO, INCGeneral Contractor203/21/2026
ACCURATE MECHANICAL INCFire Protection107/08/2026
BINDELA CONSTRUCTION LLCGeneral Contractor107/08/2026
ACCURATE MECHANICAL INCPlumbing107/08/2026
AURA PLUMBING INCPlumbing107/08/2026
STAR PLUMBING & HTNG LLCPlumbing107/08/2026
WILLIAM C. GERAKARIS P&HPlumbing107/08/2026
ALPHONSE, MICHAELElectrical103/21/2026
UNITECH DESIGNScaffold107/08/2026
COSIMO CURCIOElectrical103/21/2026
CURCIO COSIMOElectrical103/21/2026
INFINITI ELECTRIC CORPElectrical103/22/2026
INTERSTATE ELECTRIC, LLCElectrical103/22/2026
PEREIRA, WESLLEYElectrical103/21/2026
POWELL, ADRIANElectrical103/21/2026
TORTORELLI, WILLIAMElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CROSSCHECK INSPECTION SER544603/13/2026
BANGASH ASSOCIATES INC8488311/09/2025
MG NEW YORK ARCHITECTS, P3444106/13/2025
QUEENS ENGINEERING PLLC8898205/14/2025
NY RESTORATION TECHNOLOGY6187103/27/2025
PIRO STUDIO LLC7503212/19/2023
DOMANI INSPECTION SERVICE843406/05/2020
EK ENGINEERING, P.C.6883110/28/2019
STEEL CORE ENGINEERING PL1098109/09/2019
Building Lifecycle
All (185)Filed (26)Permit Issued (24)Signed Off (11)Facade (FISP) (12)Violation (60)Inspection (14)Objection (38)
09/11/2026
Permit issued — General Construction
M01155144-I1-GC
07/08/2026
Violation issued (HPD, open)
B
05/06/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/04/2026
Signed off — Alteration
The purpose of this filing is to refurbish existing commercial space as per drawings. No change to egress, use, or occupancy.
M01255672-I1
05/04/2026
Signed off — Alteration
The purpose of this filing is to refurbish existing commercial space as per drawings. No change to egress, use, or occupancy.
M01255672-S1
04/21/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/13/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/27/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/13/2026
Filed — Alteration
ALTERATION OF THE EXISTING SPRINKLER SYSTEM AS PER THE DRAWINGS FILED HEREIN.
M01211920-P2
03/09/2026
Permit issued — General Construction
M01255672-I1-GC
02/11/2026
Violation issued (HPD, open)
A
02/05/2026
Violation issued (ECB, open)
Elevators
02/05/2026
Violation issued (ECB, open)
Elevators
02/05/2026
Violation issued (ECB, open)
Elevators
01/29/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/27/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/31/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
12/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/15/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
12/04/2025
Permit issued — Plumbing
M01255672-S1-PL
11/25/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
11/09/2025
Filed — Alteration
The purpose of this filing is to refurbish existing commercial space as per drawings. No change to egress, use, or occupancy.
M01255672-P1
10/27/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/10/2025
Violation issued (ECB, open)
Construction
10/10/2025
Violation issued (ECB, open)
Construction
09/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/22/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/09/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/05/2025
Violation issued (HPD, open)
B
09/05/2025
Violation issued (HPD, open)
B
09/05/2025
Violation issued (HPD, open)
B
09/05/2025
Violation issued (HPD, open)
B
09/05/2025
Violation issued (HPD, open)
B
08/21/2025
Signed off — Alteration
Filing herewith for the renovation of existing first floor .
M01236651-I1
08/18/2025
Permit issued — General Construction
M01255672-I1-GC
07/24/2025
Permit issued — Sprinklers
M01211920-S3-EW-SP
07/24/2025
Permit issued — Plumbing
M01211920-S1-PL
07/24/2025
Permit issued — General Construction
M01211920-I1-GC
07/24/2025
Permit issued — Mechanical Systems
M01211920-S2-MS
07/17/2025
Filed — Alteration
The purpose of this filing is to refurbish existing commercial space as per drawings. No change to egress, use, or occupancy.
M01255672-I1
07/17/2025
Filed — Alteration
The purpose of this filing is to refurbish existing commercial space as per drawings. No change to egress, use, or occupancy.
M01255672-S1
07/07/2025
Filed — Alteration
ALTERATION OF THE EXISTING SPRINKLER SYSTEM AS PER THE DRAWINGS FILED HEREIN.
M01211920-P1
07/07/2025
Permit issued — General Construction
M01236651-I1-GC
06/18/2025
Objection resolved — Addressed
06/17/2025
Permit issued — General Construction
M01155144-I1-GC
06/16/2025
Objection resolved — Addressed
06/16/2025
Objection resolved — Addressed
06/16/2025
Objection resolved — Addressed
06/16/2025
Objection resolved — Addressed
06/16/2025
Objection resolved — Addressed
06/16/2025
Objection resolved — Addressed
06/16/2025
Objection resolved — Addressed
06/16/2025
Objection resolved — Addressed
06/16/2025
Objection resolved — Addressed
06/13/2025
Filed — Alteration
Filing herewith for the renovation of existing first floor .
M01236651-I1
06/12/2025
Objection resolved — Addressed
06/11/2025
Objection resolved — Addressed
06/10/2025
Objection raised — Fire_Protection
06/10/2025
Objection raised — Fire_Protection
06/10/2025
Objection raised — Cost
Latest 60 of 185 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedXINOS CONSTRUCTION CORP09/11/2026
DOB NOWGeneral ConstructionSigned-offLV CONTRACTING SOLUTIONS03/09/2026
DOB NOWPlumbingSigned-offSTAR PLUMBING & HTNG LLC12/04/2025
DOB NOWGeneral ConstructionSigned-offLV CONTRACTING SOLUTIONS08/18/2025
DOB NOWSprinklersSigned-offACCURATE MECHANICAL INC07/24/2025
DOB NOWPlumbingSigned-offANTHONY DISABATO07/24/2025
DOB NOWGeneral ConstructionSigned-offCOOPER WORKS07/24/2025
DOB NOWMechanical SystemsSigned-offCOOPER WORKS07/24/2025
DOB NOWGeneral ConstructionSigned-offMICHAEL ASPRAS CREATIVE07/07/2025
DOB NOWGeneral ConstructionPermit IssuedXINOS CONSTRUCTION CORP06/17/2025
DOB NOWSuspended ScaffoldPermit IssuedXINOS CONSTRUCTION CORP04/04/2025
DOB NOWSidewalk ShedPermit IssuedXINOS CONSTRUCTION CORP03/05/2025
DOB NOWMechanical SystemsSigned-offMICHAEL ASPRAS CREATIVE12/07/2023
DOB NOWStructuralSigned-offBINDELA CONSTRUCTION LLC01/17/2022
DOB NOWGeneral ConstructionSigned-offMICHAEL ASPRAS CREATIVE06/09/2021
DOB NOWConstruction FenceSigned-offNEW YORK LADDER & SCAFFOL04/13/2021
DOB NOWPlumbingSigned-offAURA PLUMBING INC02/25/2021
DOB NOWSprinklersSigned-offBEDROCK MECHANICAL INC02/16/2021
DOB NOWSidewalk ShedSigned-offSHALBRO CONSTRUCTION GROU04/01/2020
DOB NOWMechanical SystemsSigned-offIRONBO01/15/2020
DOB NOWPlumbingSigned-offBEDROCK MECHANICAL INC01/14/2020
DOB NOWSprinklersSigned-offWILLIAM C. GERAKARIS P&H01/14/2020
DOB NOWSidewalk ShedSigned-offSHALBRO CONSTRUCTION GROU10/24/2019
DOB NOWSignSigned-offUNITECH DESIGN INC05/10/2018
BISOTISSUEDAMAZING BUILDERS AND RENO01/29/2021
BISOTISSUEDBINDELA CONSTRUCTION LLC01/05/2021
BISOTISSUEDTALISEN CONSTRUCTION CORP05/04/2020
BISOTISSUEDTALISEN CONSTRUCTION CORP01/30/2020
BISOTISSUEDAMAZING BUILDERS AND RENO01/23/2020
BISOTISSUEDSHALBRO CONSTRUCTION GROUP12/20/2019
BISOTISSUEDAMAZING BUILDERS AND RENO01/22/2019
BISPLISSUEDACCESS PLUMBING CORP06/27/2018
BISPLISSUEDACCESS PLUMBING CORP06/14/2018
BISSPISSUEDFIRE DESIGN OF NEW JERSEY06/04/2018
BISMHISSUEDRIDGE CONSTRUCTION CORP05/24/2018
BISOTISSUEDRIDGE CONSTRUCTION CORP05/24/2018
BISOTISSUEDCOAST BUILDING MANAGEMENT04/16/2018
BISOTISSUEDAMAZING BUILDERS AND RENO03/20/2018
BISPLISSUEDAMC PLBG, HTG & CLNG, INC12/04/2017
BISSPISSUEDALLSTATE SPRINKLER LLC11/16/2017
+ 34 more permits on file
2 projects · most recent 03/13/2026
Heating and Air Conditioning Systems Ventilation Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/13/2026Signed-offCOOPER WORKS INCHeating and Air Conditioning Systems, Ventilation Systems—
10/28/2019——Air Conditioning Systems
Cooling
Comfortmaker N4A360*HC3 60,000 BTU · Condensing Unit ×3
1 project · most recent 03/13/2026
Sprinkler System
FiledStatusContractorScope
03/13/2026Signed-offACCURATE MECHANICAL INCSprinkler System
2 projects · most recent 03/13/2026
Water/Sanitary
FiledStatusContractorScope
03/13/2026Signed-offQPR MECHANICAL INCWater/Sanitary
11/09/2025Signed-offSTAR PLUMBING & HTNG LLCWater/Sanitary
14 projects · most recent 11/07/2025
General Wiring
FiledStatusContractorScope
11/07/2025Permit IssuedSTEADFAST ELECTL CONT CORGeneral Wiring
08/25/2025CompleteGREEN APPLE ELECL SVCS LL—
08/12/2025CompleteGREEN APPLE ELECL SVCS LLGeneral Wiring
07/08/2025CompleteINTERSTATE ELECTRIC, LLCGeneral Wiring
07/08/2025Permit IssuedINTERSTATE ELECTRIC, LLC—
04/10/2025Permit IssuedTOWER ELECTRIC INC.—
01/31/2025Permit IssuedINFINITI ELECTRIC CORP1 meters, 1 new_meters
11/15/2019CompleteLIVE WIRE ELECTRIC 1 LLCGeneral Wiring
10/23/2019Permit IssuedRICHARD NEU—
01/24/2019Permit IssuedDIFAZIO ELECTRIC NY, INCGeneral Wiring
10/15/2018CompleteMADISON ELECTRIC, INC—
08/14/2018CompleteINFINITY ELECTRIC, INCGeneral Wiring
06/18/2018CompleteMADISON ELECTRIC, INC—
05/02/2018CompleteMADISON ELECTRIC, INC—
1 project · most recent 03/04/2025
Sidewalk Shed
FiledStatusContractorScope
03/04/2025Permit IssuedXINOS CONSTRUCTION CORPSidewalk Shed
1 project · most recent 05/14/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
05/14/2025Permit IssuedXINOS CONSTRUCTION CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
05/06/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/21/2026Pass-Final General Construction Non-Directive 14PassView ↗
04/13/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/27/2026Fail-Final General Construction Non-Directive 14FailView ↗
01/29/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/27/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/31/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
12/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/15/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
11/25/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
10/27/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/09/2025Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 60
DateRequirementInspectorRole
03/20/2026Tenant Protection Plan ComplianceEUGENE BIFULCOspecial
03/20/2026FinalEUGENE BIFULCOprogress
03/20/2026Fire-Resistance Rated ConstructionEUGENE BIFULCOprogress
03/20/2026Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
03/11/2026Tenant Protection Plan Compliance—special
03/11/2026Fire-Resistance Rated ConstructionEUGENE BIFULCOprogress
03/11/2026FinalEUGENE BIFULCOprogress
03/11/2026Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
11/13/2025Tenant Protection Plan ComplianceFAZAL BANGASHspecial
11/13/2025Fire-Resistant Penetrations and JointsFAZAL BANGASHspecial
11/04/2025Fire-Resistant Penetrations and JointsFAZAL BANGASHspecial
11/04/2025Tenant Protection Plan ComplianceFAZAL BANGASHspecial
07/16/2025Fire-Resistant Penetrations and JointsFAZAL BANGASHspecial
07/16/2025Interior lighting powerFAZAL BANGASHenergy_progress
07/16/2025Tenant Protection Plan ComplianceFAZAL BANGASHspecial
07/14/2025FinalEUGENE BIFULCOprogress
07/14/2025Mechanical SystemsEUGENE BIFULCOspecial
07/14/2025Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
07/14/2025Tenant Protection Plan ComplianceEUGENE BIFULCOspecial
07/14/2025FinalFAZAL BANGASHprogress
06/05/2025Tenant Protection Plan ComplianceMICHAEL GADALETAspecial
06/05/2025Fire-Resistant Penetrations and JointsMICHAEL GADALETAspecial
06/05/2025Fire-Resistance Rated ConstructionMICHAEL GADALETAprogress
06/05/2025Energy Code Compliance InspectionsMICHAEL GADALETAprogress
06/05/2025FinalMICHAEL GADALETAprogress
Latest 25 of 60.
▾Documents — 588 on file (BIS + DOB NOW)
▸Plans & Drawings28
▸DOB NOWPlans/Sketch19
09/06/2026M00041752-I1Request digital key ↗
09/03/2026M00491746-I1Request digital key ↗
09/03/2026M00491300-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/05/2026M00193365-I1Request digital key ↗
09/05/2026M00226874-I1Request digital key ↗
09/05/2026M00226874-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
09/04/2026M00224621-I1Request digital key ↗
09/04/2026M00224621-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/04/2026M00224621-I1Request digital key ↗
09/04/2026M00224621-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00251028-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00212142-I1Request digital key ↗
▸Applications & Permits106
▸BISWORK PERMIT APPLICATION45
01/06/2021123770277Open ↗
01/30/2020123816825Open ↗
01/24/2020122768237Open ↗
Showing 3 of 45 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION43
12/27/2021121989429Open ↗
11/17/2020123770277Open ↗
11/12/2020123770277Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWLPC Approval/Permit18
09/05/2026M00226874-P1Open ↗
09/05/2026M00226874-I1Open ↗
09/04/2026M00224621-I1Open ↗
Showing 3 of 18 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISZONING DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications168
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION69
01/06/2021123770277Open ↗
01/24/2020123156814Open ↗
01/24/2020123156814Open ↗
Showing 3 of 69 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature26
09/06/2026M00041752-I1Open ↗
09/05/2026M00226874-P1Open ↗
09/05/2026M00226874-I1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature25
09/25/2026M01236651-I1Open ↗
09/25/2026M01236651-I1Open ↗
09/02/2026M01202329-P1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWProgress Inspector Seal & Signature20
09/25/2026M01236651-I1Open ↗
09/25/2026M01236651-I1Open ↗
09/25/2026M01236651-I1Open ↗
Showing 3 of 20 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT14
01/13/2020123816825Open ↗
08/28/2019123770277Open ↗
12/21/2018123156814Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST12
01/13/2020123816825Open ↗
08/28/2019123770277Open ↗
12/21/2018123156814Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment22
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
05/24/2018123567620Open ↗
05/24/2018123567639Open ↗
01/18/2018123196503Open ↗
Showing 3 of 8 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEQUIPMENT USE PERMITS2
10/09/2018123118036Open ↗
10/09/2018123118036Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA2
10/22/2019123095088Open ↗
06/17/2019123095088Open ↗
▸BISSIGN HANGER CERTIFICATE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT1
10/09/2018123118036Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection15
▸BISTenant Protection Plan and Notes8
01/13/2020123816825Open ↗
08/28/2019123770277Open ↗
12/21/2018123156814Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWTenant Protection Plan6
09/05/2026M00226874-P1Open ↗
09/05/2026M00226874-I1Open ↗
09/04/2026M00224621-I1Open ↗
Showing 3 of 6 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos39
▸BISASBESTOS: CERTIFICATION (DEP ACP5)14
01/13/2020123816825Open ↗
08/28/2019123770277Open ↗
12/21/2018123156814Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
09/06/2026M00041752-I1Open ↗
09/05/2026M00226874-P1Open ↗
09/05/2026M00226874-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
08/13/2026M01236651-I1Open ↗
08/13/2026M01211920-S1Open ↗
08/13/2026M01211920-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISASBESTOS INSPECTION REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance38
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS23
01/24/2020123156814Open ↗
01/24/2020123156814Open ↗
01/16/2020123816825Open ↗
Showing 3 of 23 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS10
08/23/2021122768237Open ↗
08/06/2021123816825Open ↗
01/24/2020123156814Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
08/23/2021122768237Open ↗
08/06/2021123816825Open ↗
▸BISENERGY CODE 1ST REVIEW COMPLETE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00491300-I1Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
03/15/2022123770277Open ↗
08/23/2021122768237Open ↗
08/06/2021123816825Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs53
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST18
03/15/2022123770277Open ↗
08/23/2021122768237Open ↗
08/06/2021123816825Open ↗
Showing 3 of 18 on file for this type
▸BISLANDMARKS APPROVAL17
01/24/2020123156814Open ↗
01/13/2020123816825Open ↗
08/28/2019123770277Open ↗
Showing 3 of 17 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
07/23/2018122470584Open ↗
Showing 1 of 5 on file for this type
▸BISLANDMARKS SIGNOFF3
03/15/2022123770277Open ↗
08/23/2021122768237Open ↗
07/23/2018122470584Open ↗
▸BISFINAL2
03/15/2022123770277Open ↗
03/14/2022123770277Open ↗
▸Cost, Insurance & Ownership49
▸BISCOST AFFIDAVIT48
08/23/2021122768237Open ↗
08/06/2021123816825Open ↗
01/24/2020123156814Open ↗
Showing 3 of 48 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
03/14/2022123770277Open ↗
▸Filing & Intake Forms53
▸BISEFILING COVER SHEET28
01/13/2020123816825Open ↗
08/28/2019123770277Open ↗
12/21/2018123156814Open ↗
Showing 3 of 28 on file for this type
▸BISBOROUGH INTAKE FORM14
01/06/2021123770277Open ↗
01/24/2020123156814Open ↗
10/22/2019123095088Open ↗
Showing 3 of 14 on file for this type
▸BISADDITIONAL INFORMATION11
11/20/2020123770277Open ↗
11/12/2020123770277Open ↗
07/29/2020123816825Open ↗
Showing 3 of 11 on file for this type
▸Other Documents11
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWProof of Historic Building3
08/18/2026M01211920-I1Open ↗
08/13/2026M01211920-P2Open ↗
08/13/2026M01236651-I1Open ↗
▸DOB NOWCalculations2
08/13/2026M01202329-P1Open ↗
08/13/2026M01202329-I1Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026M01202329-P1Open ↗
08/13/2026M01202329-I1Open ↗