Two family brick
710 PRESIDENT STREET
BROOKLYN · Park Slope · BIN 3020303
💬 Discuss this project
1899Year Built
3Stories
B1Building Class
R6BZoning
3,545 sfGross Floor Area
2Units
Rent Stabilized2 Open Violations ▸FDNY Report ↗
Two family brick · 1,775 sf lot · 2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Roof20p · 2 filings · 18 docs
Floor 333p · 5 filings · 20 docs
Floor 234p · 5 filings · 20 docs
Floor 17p · 1 filing · 20 docs
Cellar10p · 1 filing · 20 docs
Basement7p · 1 filing · 20 docs
Site & exterior9p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
J G CONSTRUCTION SRVCS607/08/2026
NAIM CONSTRUCTION407/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RAAD401/09/2024
PALETTE ARCHITECTURE301/03/2024
CELIN MUNOZ CONSULTING ENGINEER, PC106/27/2023
ROMIT GAJJAR103/08/2022
MOHAMMAD AHEAD, PE102/11/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEXUS CONSULTING NYC, INC203/21/2026
MUNICIPAL BUILDING CONSULTANTS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J S REMODELING NY INCGeneral Contractor1007/08/2026
J & G CONSTRUCTION SVCSGeneral Contractor407/08/2026
NAIM CONSTRUCTION LLCGeneral Contractor107/08/2026
PLBG P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RAAD7727701/09/2024
CELIN MUNOZ CONSULTING EN1064106/27/2023
Building Lifecycle
All (75)Filed (10)Permit Issued (7)Signed Off (6)Violation (16)Inspection (6)Special Inspection (30)
05/05/2026
Violation issued (HPD, open)
A
11/19/2025
Violation issued (HPD, closed)
I
06/10/2025
Violation issued (HPD, closed)
A
04/11/2024
Violation issued (HPD, closed)
A
04/03/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/25/2024
Signed off — Alteration
APPLICATION TO REPAIR FIRE DAMAGE AND RELATED RENOVATIONS. CHANGE OF USE FROM THREE TO TWO-FAMILY RESIDENCE TO BE PERFORMED ON A SEPARATE ALT-1 APPLICATION.WORK INCLUDES RECNGFIGURATION OF COMMON STAIR AND ADDITION OF A NEW INTERNAL STAIR
B00848837-I1
01/24/2024
Signed off — Alteration
Installation of plumbing fixtures
B00858823-I1
01/09/2024
Filed — Alteration
Installation of plumbing fixtures
B00858823-P2
01/09/2024
Special inspection requirement — Metering
Peter Miller
01/09/2024
Special inspection requirement — Lighting in dwelling units
Peter Miller
01/09/2024
Special inspection requirement — Fenestration air leakage
Peter Miller
01/09/2024
Special inspection requirement — Lighting controls
Peter Miller
01/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NICHOLAS AZADIAN
01/09/2024
Special inspection requirement — Energy Code Compliance Inspections
Peter Miller
01/09/2024
Special inspection requirement — Interior lighting power
Peter Miller
01/09/2024
Special inspection requirement — Insulation placement and R values
Peter Miller
01/09/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Peter Miller
01/04/2024
Special inspection requirement — Energy Code Compliance Inspections
NICHOLAS AZADIAN
01/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NICHOLAS AZADIAN
01/04/2024
Special inspection requirement — HVAC-R and service water heating system controls
NICHOLAS AZADIAN
01/04/2024
Special inspection requirement — HVAC-R and service water heating equipment
NICHOLAS AZADIAN
01/04/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
NICHOLAS AZADIAN
01/03/2024
Filed — Alteration CO
APPLICATION TO CONVERT THREE FAMILY INTO A TWO FAMILY HOUSE AS PER PLANS FILED HEREWITH. RELATED WORK PERFORMED UNDER APPLICATION B00848837
B00858025-P1
01/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NICHOLAS AZADIAN
01/02/2024
Special inspection requirement — Metering
Peter Miller
01/02/2024
Special inspection requirement — Lighting in dwelling units
Peter Miller
01/02/2024
Special inspection requirement — Fenestration air leakage
Peter Miller
01/02/2024
Special inspection requirement — Lighting controls
Peter Miller
01/02/2024
Special inspection requirement — Interior lighting power
Peter Miller
01/02/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Peter Miller
01/02/2024
Special inspection requirement — Insulation placement and R values
Peter Miller
01/02/2024
Special inspection requirement — Energy Code Compliance Inspections
Peter Miller
12/28/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/15/2023
Signed off — Alteration
STRUCTURAL WORK INCLUDING FRAMING FOR NEW HARCH AND STAIR CASE OPENING, DESIGN OF WOOD BEARING WALL AT 2ND FLOOR AND REINFORCEMENT/REPLACEMENT OF EXISITNG FRAMING AS REQUIRED.
B00859142-I1
12/04/2023
Signed off — Alteration
Installation of mechanical systems
B00858335-I1
11/30/2023
Permit issued — Mechanical Systems
B00858335-I1-MS
11/28/2023
Permit issued — General Construction
B00858025-I1-GC
11/20/2023
Violation issued (HPD, closed)
I
11/16/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/11/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/20/2023
Filed — Alteration
Installation of plumbing fixtures
B00858823-P1
08/31/2023
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC.
B00678346-I1
07/01/2023
Permit issued — Structural
B00859142-I1-ST
06/27/2023
Filed — Alteration
STRUCTURAL WORK INCLUDING FRAMING FOR NEW HARCH AND STAIR CASE OPENING, DESIGN OF WOOD BEARING WALL AT 2ND FLOOR AND REINFORCEMENT/REPLACEMENT OF EXISITNG FRAMING AS REQUIRED.
B00859142-I1
06/20/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/20/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/31/2023
Permit issued — Plumbing
B00858823-I1-PL
05/16/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Celin Munoz
05/16/2023
Special inspection requirement — Masonry
Celin Munoz
05/16/2023
Special inspection requirement — Post-installed Anchors
Celin Munoz
05/16/2023
Special inspection requirement — Structural Steel - Details
Celin Munoz
05/16/2023
Special inspection requirement — Structural Steel - High Strength Bolting
Celin Munoz
05/16/2023
Special inspection requirement — Structural Steel - Welding
Celin Munoz
05/16/2023
Special inspection requirement — Structural Wood Frame
Celin Munoz
05/12/2023
Signed off — Alteration
Herewith filing a new alt2 for restoration repair to the front facade, stoop, and cornice. All in accordance with submitted plans. No changes to use, egress, or occupancy.
B00690096-I1
05/03/2023
Filed — Alteration
Installation of plumbing fixtures
B00858823-I1
05/03/2023
Filed — Alteration
Installation of mechanical systems
B00858335-I1
04/25/2023
Filed — Alteration CO
APPLICATION TO CONVERT THREE FAMILY INTO A TWO FAMILY HOUSE AS PER PLANS FILED HEREWITH. RELATED WORK PERFORMED UNDER APPLICATION B00848837
B00858025-I1
03/24/2023
Violation issued (HPD, closed)
A
03/23/2023
Filed — Alteration
APPLICATION TO REPAIR FIRE DAMAGE AND RELATED RENOVATIONS. CHANGE OF USE FROM THREE TO TWO-FAMILY RESIDENCE TO BE PERFORMED ON A SEPARATE ALT-1 APPLICATION.WORK INCLUDES RECNGFIGURATION OF COMMON STAIR AND ADDITION OF A NEW INTERNAL STAIR
B00848837-I1
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offJ S REMODELING NY INC11/30/2023
DOB NOWGeneral ConstructionPermit IssuedJ S REMODELING NY INC11/28/2023
DOB NOWStructuralSigned-offJ S REMODELING NY INC07/01/2023
DOB NOWPlumbingSigned-offPLBG P & H INC05/31/2023
DOB NOWGeneral ConstructionSigned-offNAIM CONSTRUCTION LLC03/11/2022
DOB NOWSidewalk ShedSigned-offJ & G CONSTRUCTION SVCS02/11/2022
DOB NOWSidewalk ShedSigned-offJ & G CONSTRUCTION SVCS02/11/2022
BISMHISSUEDJ S REMODELING NY INC06/17/2021
BISSPISSUEDBRUCHE MECHANICAL NY LLC02/03/2021
BISPLISSUEDPLBG P & H INC11/12/2019
BISSPISSUEDBRUCHE MECHANICAL NY LLC11/12/2019
BISSPISSUEDBRUCHE MECHANICAL NY LLC02/06/2017
BISMHISSUEDNIC DESIGN INC01/31/2017
BISPLISSUEDPLBG P & H INC07/28/2016
BISOTISSUEDIHOME IMPROVEMENT & WINDO07/27/2016
BISOTISSUEDIHOME IMPROVEMENT & WINDO07/19/2016
2 projects · most recent 11/22/2023
General Wiring
FiledStatusContractorScope
11/22/2023CompleteKJK ELECTRIC INCGeneral Wiring
01/03/2023CompleteALL WAYS ELECTRIC CORP.W—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/03/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/28/2023Pass-Final CND-Occupancy InspectionPassView ↗
11/16/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/11/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/20/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/20/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
01/09/2024MeteringPeter Millerenergy_progress
01/09/2024Lighting in dwelling unitsPeter Millerenergy_progress
01/09/2024Fenestration air leakagePeter Millerenergy_progress
01/09/2024Lighting controlsPeter Millerenergy_progress
01/09/2024Fire-Resistant Penetrations and JointsNICHOLAS AZADIANspecial
01/09/2024Energy Code Compliance InspectionsPeter Millerprogress
01/09/2024Interior lighting powerPeter Millerenergy_progress
01/09/2024Insulation placement and R valuesPeter Millerenergy_progress
01/09/2024Fenestration and door U-factor and product ratingsPeter Millerenergy_progress
01/04/2024Energy Code Compliance InspectionsNICHOLAS AZADIANprogress
01/04/2024Fire-Resistant Penetrations and JointsNICHOLAS AZADIANspecial
01/04/2024HVAC-R and service water heating system controlsNICHOLAS AZADIANenergy_progress
01/04/2024HVAC-R and service water heating equipmentNICHOLAS AZADIANenergy_progress
01/04/2024HVAC-R and service water piping design and insulationNICHOLAS AZADIANenergy_progress
01/02/2024Fire-Resistant Penetrations and JointsNICHOLAS AZADIANspecial
01/02/2024MeteringPeter Millerenergy_progress
01/02/2024Lighting in dwelling unitsPeter Millerenergy_progress
01/02/2024Fenestration air leakagePeter Millerenergy_progress
01/02/2024Lighting controlsPeter Millerenergy_progress
01/02/2024Interior lighting powerPeter Millerenergy_progress
01/02/2024Fenestration and door U-factor and product ratingsPeter Millerenergy_progress
01/02/2024Insulation placement and R valuesPeter Millerenergy_progress
01/02/2024Energy Code Compliance InspectionsPeter Millerprogress
05/16/2023Structural Stability – Alterations of existing buildingsCelin Munozspecial
05/16/2023MasonryCelin Munozspecial
Latest 25 of 49.
▾Documents — 186 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/31/2026B00678346-I1Request digital key ↗
08/31/2026B00690096-I1Request digital key ↗
08/27/2026B00848837-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits24
▸BISPLAN / WORK APPROVAL APPLICATION15
11/04/2020321375187Open ↗
10/21/2020321375187Open ↗
10/13/2020321375187Open ↗
Showing 3 of 15 on file for this type
▸BISWORK PERMIT APPLICATION9
06/18/2021321375187Open ↗
06/18/2021321375187Open ↗
11/13/2019321375187Open ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISZONING DIAGRAM1
07/27/2016321375187Open ↗
▸Seals & Professional Certifications60
▸DOB NOWProgress Inspector Seal & Signature31
09/23/2026B00690096-I1Open ↗
09/22/2026B00858025-I1Open ↗
09/22/2026B00858025-I1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/22/2026B00858025-I1Open ↗
08/29/2026B00858335-I1Open ↗
08/28/2026B00859142-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/27/2026B00858823-P2Open ↗
08/27/2026B00858823-P1Open ↗
08/27/2026B00858823-I1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
05/04/2017321375187Open ↗
05/04/2017321375187Open ↗
04/27/2016321375187Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
04/27/2016321375187Open ↗
04/27/2016321375187Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
06/01/2016340384097Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/27/2016321375187Open ↗
▸Trade Schedules & Equipment11
▸BISSCHEDULE B - PLUMBING5
10/21/2020321375187Open ↗
10/13/2020321375187Open ↗
07/27/2020321375187Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
03/20/2020321375187Open ↗
02/21/2020321375187Open ↗
04/27/2016321375187Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION2
06/01/2021321375187Open ↗
05/25/2021321375187Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
05/14/2021321375187Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST2
03/17/2021321375187Open ↗
04/27/2016321375187Open ↗
▸DOB NOWStreet Tree Checklist2
08/13/2026B00858025-P1Open ↗
08/13/2026B00858025-I1Open ↗
▸BISTenant Protection Plan and Notes1
04/27/2016321375187Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/27/2026B00858823-P2Open ↗
08/27/2026B00858823-P1Open ↗
08/27/2026B00858823-I1Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
06/01/2016340384097Open ↗
04/27/2016321375187Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
06/01/2021321375187Open ↗
06/01/2021321375187Open ↗
05/25/2021321375187Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
05/04/2017321375187Open ↗
05/04/2017321375187Open ↗
04/27/2016321375187Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
01/22/2021340384097Open ↗
05/04/2017321375187Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY7
05/25/2021321375187Open ↗
05/25/2021321375187Open ↗
05/25/2021321375187Open ↗
Showing 3 of 7 on file for this type
▸BISHYDRO FLOW TEST LETTER1
09/14/2016340384097Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
10/12/2016340384097Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
06/21/2021321375187Open ↗
02/12/2021340384097Open ↗
05/04/2017321375187Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT7
05/25/2021321375187Open ↗
01/22/2021340384097Open ↗
05/04/2017321375187Open ↗
Showing 3 of 7 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)2
06/21/2021321375187Open ↗
07/21/2016321375187Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE2
06/18/2021321375187Open ↗
07/21/2016321375187Open ↗
▸Filing & Intake Forms21
▸BISADDITIONAL INFORMATION18
11/23/2020340384097Open ↗
10/15/2020340384097Open ↗
10/15/2020340384097Open ↗
Showing 3 of 18 on file for this type
▸BISEFILING COVER SHEET2
04/27/2016321375187Open ↗
04/27/2016321375187Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
06/01/2016340384097Open ↗
▸Other Documents9
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION3
03/13/2020321375187Open ↗
03/13/2020321375187Open ↗
01/21/2020321375187Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
08/14/2017321375187Open ↗
06/30/2016321375187Open ↗
06/30/2016321375187Open ↗
▸DOB NOWProperty Ownership Certification2
08/26/2026B00858025-P1Open ↗
08/26/2026B00858025-I1Open ↗
▸BISPLOT DIAGRAM1
04/27/2016321375187Open ↗