← Back
BuildNYC
Elevator apt, semi-fireproof without stores
711 BRIGHTWATER COURT
BROOKLYN · Brighton Beach · BIN 3245128
💬 Discuss this project
1935Year Built
6Stories
D1Building Class
R7-1Zoning
58,000 sfGross Floor Area
55Units
LL97 CoveredRent Stabilized33 Active Violations 32 unresolved · 1 paperwork only ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: 711 Realty Associates · 12,000 sf lot · 4.83 FAR built · Flood zone AE
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 1 filing · 20 docs
CellarRumal Realty Co;inc.8p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Rumal Realty CO;INC1607/08/2026
711 Realty603/22/2026
711 Brightwater Court203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Philip Toscano Architects312/05/2022
Csanad Bodnar Architect107/02/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Philip Toscano Architects303/21/2026
Codecomplinace203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MKNK Waste RemovalGeneral Contractor303/21/2026
MKNK Waste Removalspecialty_contractor303/21/2026
Davrial EnterprisesGeneral Contractor103/21/2026
Joseph Ferrigno P HPlumbing103/21/2026
C.R.C. Plumbing & HeatingPlumbing107/08/2026
Watson's Plumbing, Heating, & BuildingPlumbing107/08/2026
Joesph Ferrigno Plum. & HeatingPlumbing108/28/1998
New York StairliftsGeneral Contractor106/19/2015
Skyworx ContractingGeneral Contractor107/27/2016
Squan Construction ServicesGeneral Contractor109/25/2015
Wireless Sites DevelopmentGeneral Contractor110/18/2012
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Philip Toscano, Architect2474312/05/2022
Building Lifecycle
10/05/2026
Elevator Category 1 inspection report filed
09/08/2026
Water in pit and unsecure sump pump (2.2.2.6). Unreadable main line fuses (nec 620). Main line can be opened when power on (nec 620). Proper…
ECB violation · open
08/08/2026
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL AND CEILING IN THE 4th ROOM FROM…
HPD violation · open
08/08/2026
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR…
HPD violation · closed
08/08/2026
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE 4th ROOM FROM EAST AT NORTH…
HPD violation · open
143 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offMKNK Waste Removal07/22/2022
DOB NOWMechanical SystemsSigned-offMKNK Waste Removal01/04/2022
DOB NOWPlumbingSigned-offC.R.C. Plumbing & Heating12/06/2021
DOB NOWPlumbingPermit IssuedWatson's Plumbing, Heating, & Building08/04/2020
BISEQISSUEDSkyworx Contracting07/27/2016
BISOTISSUEDSquan Construction Services09/25/2015
BISOTISSUEDNew York Stairlifts06/19/2015
BISFBISSUEDApproved Oil Co of Brooklyn01/02/2013
BISPLISSUEDJoseph Ferrigno P&H01/02/2013
BISOTISSUEDWireless Sites Development New10/18/2012
BISOTISSUEDDavrial Enterprises02/27/2007
BISPLISSUEDJoesph Ferrigno Plum. & Heating08/28/1998
BISFBISSUEDStar Stillwell Service08/28/1998
BISFSISSUEDStar Industrial Service06/17/1997
BISOTISSUEDState Environmental Services07/29/1994
1 project · most recent 02/05/2022
General Wiring
FiledStatusContractorScope
02/05/2022CompleteMac Elect'l ContractingGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/05/2022Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
08/03/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/27/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/27/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
03/06/2023Mechanical SystemsPHILIP TOSCANOspecial
03/06/2023Fire-Resistant Penetrations and JointsPHILIP TOSCANOspecial
03/06/2023FinalPHILIP TOSCANOprogress
03/06/2023Energy Code Compliance InspectionsPHILIP TOSCANOprogress
03/06/2023Ventilation and air distribution systemPHILIP TOSCANOenergy_progress
03/06/2023Air barrier - visual inspectionPHILIP TOSCANOenergy_progress
03/06/2023Fenestration air leakagePHILIP TOSCANOenergy_progress
03/06/2023Fenestration and door U-factor and product ratingsPHILIP TOSCANOenergy_progress
08/11/2022Fire-Resistant Penetrations and JointsPHILIP TOSCANOspecial
08/11/2022Mechanical SystemsPHILIP TOSCANOspecial
08/11/2022Energy Code Compliance InspectionsPHILIP TOSCANOprogress
08/11/2022FinalPHILIP TOSCANOprogress
08/11/2022Ventilation and air distribution systemPHILIP TOSCANOenergy_progress
08/11/2022Air barrier - visual inspectionPHILIP TOSCANOenergy_progress
08/11/2022Fenestration air leakagePHILIP TOSCANOenergy_progress
08/11/2022Fenestration and door U-factor and product ratingsPHILIP TOSCANOenergy_progress
09/16/2021Fire-Resistant Penetrations and JointsPHILIP TOSCANOspecial
09/16/2021Energy Code Compliance InspectionsPHILIP TOSCANOprogress
09/16/2021HVAC-R and service water piping design and insulationPHILIP TOSCANOenergy_progress
83 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account