← Back
BuildNYC
Banking facility, with or without parking
7114 NEW UTRECHT AVENUE
BROOKLYN · Bensonhurst · BIN 3157770
💬 Discuss this project
1957Year Built
1Stories
K7Building Class
C4-4LZoning
8,960 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Banking facility, with or without parking · Owner of record: NYC School Construction Authority · 14,160 sf lot · 0.63 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingFire ProtectionCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofP.S. 3431 filing · 5 docs
Floor 1P.S. 3439p · 3 filings · 14 docs
CellarSprinkler modification work8p · 1 filing · 15 docs
Site & exteriorSprinkler modification work3p · 1 filing · 15 docs
Filed — no permit issuedSite removals and demolition9p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Capital One Bank703/21/2026
Greenpoint Savings Bank303/21/2026
NYC School Construction Authority110/04/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Eretz Builders Assistance803/21/2026
City Expediting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LS Independent ServicesGeneral Contractor107/08/2026
Plumbing P & HPlumbing107/08/2026
Safety Fire SprinklerFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M. International Engineering3129510/12/2023
Building Lifecycle
All (108)Filed (8)Permit Issued (3)Signed Off (1)Violation (31)Inspection (4)Objection (36)Special Inspection (25)
07/24/2026
Objection raised — Other
07/16/2026
Filed — Alteration
REMOVAL OF EXISTING FEATURES ON SITE, SOIL, EROSION SEDIMENT CONTROL, SITE PREPERATION & GRADING.
B01415244-I1
06/05/2026
Objection raised — Other
06/03/2026
Filed — Alteration
K343- REMOVAL OF BUILDING COMPONENTS ABOVE GRADE (PHASE 1)
B01410345-I1
06/01/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/01/2026
Special inspection requirement — Final
05/05/2026
Filed — Alteration
B01396933-I1
10/24/2023
Signed off — Alteration CO
INTERIOR RENOVATION TO CONVERT FROM COMMERCIAL TO SCHOOL. PARTITIONS AND PLUMBING AS PER PLANS.NO CHANGE TO BULK.
B00745615-S2
10/17/2023
Special inspection requirement — HVAC-R and service water heating equipment
NANIK MASSAND
10/17/2023
Special inspection requirement — Maintenance information
NANIK MASSAND
10/17/2023
Special inspection requirement — HVAC-R and service water heating system controls
NANIK MASSAND
10/17/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NANIK MASSAND
10/12/2023
Filed — Alteration CO
INTERIOR RENOVATION TO CONVERT FROM COMMERCIAL TO SCHOOL. PARTITIONS AND PLUMBING AS PER PLANS.NO CHANGE TO BULK.
B00745615-P3
10/09/2023
Special inspection requirement — HVAC-R and service water heating system controls
NANIK MASSAND
10/09/2023
Special inspection requirement — Maintenance information
NANIK MASSAND
10/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NANIK MASSAND
10/09/2023
Special inspection requirement — HVAC-R and service water heating equipment
NANIK MASSAND
09/21/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/11/2023
Objection resolved — Addressed
09/08/2023
Objection raised — Admin
09/05/2023
Filed — Alteration CO
INTERIOR RENOVATION TO CONVERT FROM COMMERCIAL TO SCHOOL. PARTITIONS AND PLUMBING AS PER PLANS.NO CHANGE TO BULK.
B00745615-P1
09/01/2023
Special inspection requirement — Maintenance information
NANIK MASSAND
09/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NANIK MASSAND
09/01/2023
Special inspection requirement — HVAC-R and service water heating system controls
NANIK MASSAND
09/01/2023
Special inspection requirement — HVAC-R and service water heating equipment
NANIK MASSAND
08/04/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/04/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/14/2023
Permit issued — Plumbing
B00745615-S2-PL
06/13/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/01/2023
Objection resolved — Addressed
06/01/2023
Objection resolved — Addressed
05/31/2023
Objection resolved — Addressed
05/31/2023
Objection resolved — Addressed
05/31/2023
Objection resolved — Addressed
05/31/2023
Objection resolved — Addressed
05/23/2023
Objection raised — Fire_Protection
05/23/2023
Objection raised — Admin
05/23/2023
Objection raised — Admin
05/23/2023
Objection raised — Scope
05/23/2023
Objection raised — Mechanical
05/23/2023
Objection raised — Scope
05/19/2023
Filed — Alteration CO
INTERIOR RENOVATION TO CONVERT FROM COMMERCIAL TO SCHOOL. PARTITIONS AND PLUMBING AS PER PLANS.NO CHANGE TO BULK.
B00745615-S2
05/11/2023
Permit issued — Sprinklers
B00745615-S1-EW-SP
05/04/2023
Violation issued (ECB, closed)
Construction
05/02/2023
Permit issued — General Construction
B00745615-I1-GC
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/23/2022
Special inspection requirement — Fire-Resistance Rated Construction
NANIK MASSAND
11/23/2022
Special inspection requirement — Energy Code Compliance Inspections
NANIK MASSAND
11/17/2022
Filed — Alteration CO
INTERIOR RENOVATION TO CONVERT FROM COMMERCIAL TO SCHOOL. PARTITIONS AND PLUMBING AS PER PLANS.NO CHANGE TO BULK.
B00745615-S1
11/15/2022
Special inspection requirement — Sprinkler Systems
NANIK MASSAND
11/15/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
NANIK MASSAND
09/12/2022
Objection raised — Zoning
09/12/2022
Objection resolved — Addressed
08/08/2022
Objection raised — Fire_Protection
Latest 60 of 108 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPlumbing P & H06/14/2023
DOB NOWSprinklersPermit IssuedSafety Fire Sprinkler05/11/2023
DOB NOWGeneral ConstructionPermit IssuedLS Independent Services05/02/2023
BISPLISSUEDEnobrac Plumbing01/20/2017
BISBLISSUEDEnobrac Plumbing01/13/2017
BISBLISSUEDEnobrac Plumbing09/04/2015
BISPLISSUEDEnobrac Plumbing09/04/2015
BISMHISSUEDAir Stream Air Conditioning09/01/2015
BIS—ISSUEDAmerican Sign & Electrical Con03/04/2008
BIS—ISSUEDAmerican Sign & Electrical Con03/04/2008
BIS—ISSUEDAmerican Sign & Electrical Con03/04/2008
BIS—ISSUEDAmerican Sign & Electrical Con03/04/2008
BISEQISSUEDAliox Contracting Co10/11/1996
BISOTISSUEDAliox Contracting Co10/11/1996
BIS—ISSUEDGoing Sign Co03/10/1995
BIS—ISSUEDGoing Sign Co03/07/1995
BISMHISSUEDS. Digiacomo & Son12/07/1994
BISPLISSUEDDuo Plumbing & Heating08/06/1993
BIS—ISSUEDS Digiacomo & Son07/02/1993
BIS—ISSUEDGoing Sign Co05/07/1991
BIS—ISSUEDGoing Sign Co05/07/1991
BISSPISSUEDAcme Sprinkler Company02/11/1991
BISEQISSUEDYork Scaffolding & Equipment02/01/1991
1 project · most recent 10/12/2023
Sprinkler System
FiledStatusContractorScope
10/12/2023Permit IssuedSafety Fire SprinklerSprinkler System
1 project · most recent 10/12/2023
Water/Sanitary
FiledStatusContractorScope
10/12/2023Signed-offPlumbing P & HWater/Sanitary
1 project · most recent 05/08/2023
General Wiring
FiledStatusContractorScope
05/08/2023Permit IssuedAccurate ElectricalGeneral Wiring
1 project · most recent 06/03/2026
FiledStatusContractorScope
06/03/2026——1 scope_items
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
09/21/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/04/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/04/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/13/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
06/01/2026Structural Stability – Alterations of existing buildings—special
06/01/2026Final—progress
10/17/2023HVAC-R and service water heating equipmentNANIK MASSANDenergy_progress
10/17/2023Maintenance informationNANIK MASSANDenergy_progress
10/17/2023HVAC-R and service water heating system controlsNANIK MASSANDenergy_progress
10/17/2023Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
10/09/2023HVAC-R and service water heating system controlsNANIK MASSANDenergy_progress
10/09/2023Maintenance informationNANIK MASSANDenergy_progress
10/09/2023Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
10/09/2023HVAC-R and service water heating equipmentNANIK MASSANDenergy_progress
09/01/2023Maintenance informationNANIK MASSANDenergy_progress
09/01/2023Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
09/01/2023HVAC-R and service water heating system controlsNANIK MASSANDenergy_progress
09/01/2023HVAC-R and service water heating equipmentNANIK MASSANDenergy_progress
11/23/2022Fire-Resistance Rated ConstructionNANIK MASSANDprogress
11/23/2022Energy Code Compliance InspectionsNANIK MASSANDprogress
11/15/2022Sprinkler SystemsNANIK MASSANDspecial
11/15/2022Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
05/25/2022Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
05/25/2022Lighting controlsNANIK MASSANDenergy_progress
05/25/2022Interior lighting powerNANIK MASSANDenergy_progress
05/25/2022Maintenance informationNANIK MASSANDenergy_progress
05/25/2022Exterior lighting powerNANIK MASSANDenergy_progress
05/25/2022MeteringNANIK MASSANDenergy_progress
05/25/2022Structural Stability – Alterations of existing buildingsNANIK MASSANDspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.S. 343EducationFloor 1, Roof
Project B01410345 Alteration · Objections · 06/03/2026
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 138 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/26/2026B00745615-P3Request digital key ↗
08/26/2026B00745615-S1Request digital key ↗
08/26/2026B00745615-S2Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits20
▸BISPLAN / WORK APPROVAL APPLICATION13
10/27/2023300282717Open ↗
10/20/2023300282717Open ↗
10/20/2023300551917Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION6
08/30/2023321081217Open ↗
08/30/2023321081217Open ↗
01/13/2017321081217Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
12/14/2016321081217Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00745615-I1Open ↗
▸Seals & Professional Certifications33
▸DOB NOWProgress Inspector Seal & Signature16
08/29/2026B00745615-P3Open ↗
08/29/2026B00745615-P3Open ↗
08/29/2026B00745615-P3Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/26/2026B00745615-P1Open ↗
08/26/2026B00745615-P3Open ↗
08/26/2026B00745615-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/29/2026B00745615-P3Open ↗
08/25/2026B00745615-S2Open ↗
08/25/2026B00745615-S1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/03/2015321081217Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/03/2015321081217Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
09/03/2015321081217Open ↗
▸Trade Schedules & Equipment7
▸BISEQUIPMENT USE APPLICATION/PERMIT2
10/10/2023321081217Open ↗
09/14/2023321081217Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
09/14/2023321081217Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
09/03/2015321081217Open ↗
▸BISEQUIPMENT USE PERMITS1
10/10/2023321081217Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
09/03/2015321081217Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
09/14/2023321081217Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist1
08/13/2026B00745615-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00745615-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00745615-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00745615-I1Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/03/2015321081217Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
09/21/2023321081217Open ↗
09/21/2023321081217Open ↗
09/14/2023321081217Open ↗
Showing 3 of 4 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
09/14/2023321081217Open ↗
▸BIS* HVAC INSULATION AND SEALING1
09/14/2023321081217Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/14/2023321081217Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
09/03/2015321081217Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00745615-I1Open ↗
▸Inspections & Test Reports24
▸BISTECHNICAL REPORT: RESPONSIBILITY20
10/16/2023300282717Open ↗
10/16/2023300551917Open ↗
10/13/2023300282717Open ↗
Showing 3 of 20 on file for this type
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19752
10/24/2023300282717Open ↗
10/12/2023300551917Open ↗
▸BISMECHANICAL SYSTEMS1
09/14/2023321081217Open ↗
▸BIS* TR2: CONCRETE TEST CYLINDERS TECHNICAL REPORT1
10/12/2023300282717Open ↗
▸Approvals, Objections & Sign-offs11
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
10/17/2023300551917Open ↗
10/11/2023321081217Open ↗
▸BISSUPERSEDING LETTER2
08/30/2023321081217Open ↗
08/30/2023321081217Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)2
08/15/2026B01415244-I1Open ↗
08/15/2026B01410345-I1Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/15/2026B01415244-I1Open ↗
08/15/2026B01410345-I1Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)2
08/15/2026B01415244-I1Open ↗
08/15/2026B01410345-I1Open ↗
▸BISFINAL1
09/14/2023321081217Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT (FINAL): PW31
09/14/2023321081217Open ↗
▸BISCOST AFFIDAVIT1
09/03/2015321081217Open ↗
▸Filing & Intake Forms14
▸BISADDITIONAL INFORMATION9
08/06/2018300082121Open ↗
08/06/2018300082130Open ↗
08/06/2018300416486Open ↗
Showing 3 of 9 on file for this type
▸BISBOROUGH INTAKE FORM4
08/06/2018300082121Open ↗
08/06/2018300082130Open ↗
08/06/2018300416486Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET1
09/03/2015321081217Open ↗
▸Other Documents5
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal2
08/15/2026B01415244-I1Open ↗
08/15/2026B01410345-I1Open ↗
▸BIS* FIRE STOPS 27-3451
10/12/2023300551917Open ↗
▸BIS* * SUBGRADE 27-723,DIRC 15/711
10/12/2023300282717Open ↗
▸DOB NOWProperty Ownership Certification1
08/14/2026B00745615-I1Open ↗