Roof1p · 2 filings · 12 docs
ArchitectureGeneral
Structural modification on the 3rd and 4th Floors (Harry Winston) as per plans, no change to use egress or occupancy.
On file for this project
7 documents · 1 drawing sheet
Install 2 new Verizon GPS antennas on roof. Related equipment added in proposed equipment room on lower level 3, filed under job # M00614665. Fiber conduit run from lower level 3 through roof.
On file for this project
5 documents · 1 drawing sheet
Floor 505p · 3 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanical
Modifications to the existing HVAC system on the 50th floor (Solamere Management Office) as per plans. No change to use, egress or occupancy.
On file for this project
8 documents · 2 drawing sheets
Modifications to the existing sprinkler system on the 50th floor (Solamere Management Office) as per plans. No change to use, egress or occupancy
On file for this project
8 documents · 1 drawing sheet
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 50th floor (Solamare Management office) as per plans. No change to use, egress or occupancy
On file for this project
6 documents · 2 drawing sheets
Floor 4913p · 3 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanical
Modifications to the existing HVAC system on the 49th floor (ABRDN) as per plans. No change to use, egress or occupancy
On file for this project
7 documents · 2 drawing sheets
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 49th floor (ABRDN) as per plans. No change to use, egress or occupancy
On file for this project
5 documents · 9 drawing sheets
Modifications to the existing sprinkler system on the 49th floor (ARBDN) as per plans. No change to use, egress or occupancy.
On file for this project
8 documents · 2 drawing sheets
Floor 4818p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Modifications to the existing plumbing system on the 19th & 48th floors (Pre-build/Turnkey) as per plans. No change to use, egress or occupancy. No change to use, egress or occupancy
On file for this project
9 documents · 1 drawing sheet
Modifications to the existing HVAC system on the 19th & 48th floors (Pre-build/Turnkey) as per plans. No change to use, egress or occupancy
On file for this project
4 documents · 1 drawing sheet
Modifications to the existing sprinkler system on the 19th & 48th floors (Pre-build/Turnkey) as per plans. No change to use, egress or occupancy
On file for this project
10 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 4713p · 5 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbing
Installation of new plumbing fixtures and associated piping 47th floor (Three Cairns) as per plans. No change to use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Installation of new sprinkler heads and associated piping on the 47th floor (Three Cairns) as per plans. No change to use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Modifications to the existing HVAC system on the 47th floor (Three Cairns) as per plans. No change to use, egress or occupancy.
On file for this project
14 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 46Under Construction9p · 4 filings · 19 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Plumbing · Sprinklers
Modifications to the existing sprinkler system on the 21st, 43rd, 44th, 46th Floors as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Modifications to the existing plumbing system on the 21st, 43rd, 44th, 46th Floors as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Minor demolition and whitebox of existing office space, with installation of new walls, ceilings, partitions, and finishes on Floors 21, 43, 44, 46, as per plans. No change to use, egress, or occupancy.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 45Under Construction24p · 4 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Modification to the sprinkler system on the 45th floor as per plans. No change to use, egress or occupancy.
On file for this project
3 documents
Modification to the existing plumbing system on the 45th floor as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 2 drawing sheets
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 45th floor as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 10 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 44Under Construction14p · 7 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Plumbing · Sprinklers
Installation of new plumbing fixtures and associated piping on the 41st and 42nd floors (Woodline- Marketing Floors 43 & 44) as per plans. No change to use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Installation of a new sprinkler system on the 41st and 42nd floors (Woodline- Marketing Floors 43 & 44) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Installation of new partitions, doors, ceilings and finishes on the 41st and 42nd floors (Woodline- Marketing Floors 43 & 44) as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 3 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 43Under Construction18p · 10 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Plumbing · Sprinklers
Modifications to the existing sprinkler system on the 21st, 43rd, 44th, 46th Floors as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Modifications to the existing plumbing system on the 21st, 43rd, 44th, 46th Floors as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Minor demolition and whitebox of existing office space, with installation of new walls, ceilings, partitions, and finishes on Floors 21, 43, 44, 46, as per plans. No change to use, egress, or occupancy.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 42Under Construction43p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Installation of new plumbing fixtures and associated piping on the 41st and 42nd floors (Woodline- Marketing Floors 43 & 44) as per plans. No change to use, egress or occupancy.
On file for this project
5 documents
Installation of a new sprinkler system on the 41st and 42nd floors (Woodline- Marketing Floors 43 & 44) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents
Installation of new partitions, doors, ceilings and finishes on the 41st and 42nd floors (Woodline- Marketing Floors 43 & 44) as per plans. No change to use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 7 filings on this floor.
Floor 41Under Construction38p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Installation of new plumbing fixtures and associated piping on the 41st and 42nd floors (Woodline- Marketing Floors 43 & 44) as per plans. No change to use, egress or occupancy.
On file for this project
5 documents
Installation of a new sprinkler system on the 41st and 42nd floors (Woodline- Marketing Floors 43 & 44) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents
Installation of new partitions, doors, ceilings and finishes on the 41st and 42nd floors (Woodline- Marketing Floors 43 & 44) as per plans. No change to use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 4 filings on this floor.
Floor 40
Floor 39
Floor 3829p · 13 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction
Modifications to the existing HVAC system and associated ducts and piping on the 38th Floor (Prime Therapeutics), as per plans. No change to use, egress or occupancy.
On file for this project
7 documents · 2 drawing sheets
Minor demolition with installation of new walls, ceilings, partitions, and finishes on the 38th Floor (Prime Therapeutics), as per plans. No change to use, egress, or occupancy.
On file for this project
4 documents · 4 drawing sheets
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 30th, 32nd and 38th floors as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 3730p · 5 filings · 20 docs
ArchitectureDMMechanicalPlumbing
Issued Permit Scope
General Construction
Modification to the existing plumbing system on the 37th floor (LSV) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 3 drawing sheets
Minor demolition with enclosing the existing interconnecting stair between 36th & 37th floors (Riverstone) as per plans. No change to use, egress or occupancy.
On file for this project
9 documents · 3 drawing sheets
Modifications to the existing HVAC system on the 36th & 37th floors (Riverstone) as per plans. No change to use, egress or occupancy.
On file for this project
7 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 3617p · 2 filings · 16 docs
ArchitectureMechanical
Issued Permit Scope
General Construction
Minor demolition with enclosing the existing interconnecting stair between 36th & 37th floors (Riverstone) as per plans. No change to use, egress or occupancy.
On file for this project
9 documents · 1 drawing sheet
Modifications to the existing HVAC system on the 36th & 37th floors (Riverstone) as per plans. No change to use, egress or occupancy.
On file for this project
7 documents · 2 drawing sheets
Floor 355p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbing
Modifications to the existing sprinkler system on the 35th floor (TSG) as per plans. No change to use, egress or occupancy.
On file for this project
12 documents · 1 drawing sheet
Modifications to the existing plumbing system on the 35th floor (TSG) as per plans. No change to use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Removal and disposal of existing ductwork and AC units on the 35th floor as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 34Under Construction65p · 10 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 20th and 34th floors as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Modifications to the existing HVAC system on the 20th and 34th floors as per plans. No change to use, egress or occupancy.
On file for this project
14 documents · 2 drawing sheets
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 19th, 22nd and 34th floors as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 338p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbing
Modifications to the existing sprinkler system on the 33rd floor (Pre-Built) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Modifications to the existing HVAC system on the 33rd floor (Pre-Built) as per plans. No change to use, egress or occupancy.
On file for this project
12 documents · 1 drawing sheet
Modifications to the existing HVAC system on the 33rd floor (Arbor Investments) as per plans. No change to use, egress or occupancy.
On file for this project
10 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 3213p · 6 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Modifications to the existing sprinkler system on the 30th floor (Clipway & Pre-Built) as per plans. No change to use, egress or occupancy.
On file for this project
23 documents · 1 drawing sheet
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 30th, 32nd and 38th floors as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 6 drawing sheets
Modifications to the existing plumbing system on the 30th, 32nd and 38th floors as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 3115p · 4 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Modifications to the existing plumbing system on the 28th and 31st floors as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 2 drawing sheets
Modifications to the existing sprinkler system on the 28th and 31st floors as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 2 drawing sheets
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 28th and 31st floors as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 9 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 309p · 4 filings · 20 docs
ArchitectureDMGeneralMechanicalPlumbing
Modifications to the existing sprinkler system on the 30th floor (Clipway & Pre-Built) as per plans. No change to use, egress or occupancy.
On file for this project
23 documents · 6 drawing sheets
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 30th, 32nd and 38th floors as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Modifications to the existing plumbing system on the 30th, 32nd and 38th floors as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 29
Floor 2819p · 13 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Modifications to the existing plumbing system on the 28th and 31st floors as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 2 drawing sheets
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 28th and 31st floors as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 3 drawing sheets
Modifications to the existing HVAC system on the 28th and 31st floors as per plans. No change to use, egress or occupancy.
On file for this project
7 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 27
Floor 268p · 3 filings · 12 docs
ArchitectureDMMechanicalPlumbing
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 26th floor (Lindbrook) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 6 drawing sheets
Modifications to the existing HVAC system on the 26th Floor (Lindbrook) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Modifications to the existing plumbing system on the 26th floor (Lindbrook) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Floor 255p · 2 filings · 20 docs
DMMechanicalPlumbing
Modifications to the existing HVAC system on the 25th floor (Pictet) as per plans. No change to use, egress or occupancy.
On file for this project
24 documents · 3 drawing sheets
Modifications to the existing plumbing system on the 25th floor (Pictet) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 2 drawing sheets
Floor 2416p · 4 filings · 19 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Modifications to the existing sprinkler system on the 24th floor as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 24th floor as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 10 drawing sheets
Modifications to the existing plumbing system on the 24th floor as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 23
Floor 2214p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 19th, 22nd and 34th floors as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 9 drawing sheets
Modifications to the existing plumbing system on the 19th, 22nd and 34th floors as per plans. No change to use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Modifications to the existing sprinkler system on the 19th, 22nd and 34th floors as per plans. No change to use, egress or occupancy.
On file for this project
7 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 21Under Construction14p · 8 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Plumbing · Sprinklers
Modifications to the existing HVAC system on the 19th Floor (Marketing Floor 21) as per plans. No change to use, egress or occupancy..
On file for this project
7 documents · 1 drawing sheet
Modifications to the existing sprinkler system on the 21st, 43rd, 44th, 46th Floors as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Modifications to the existing plumbing system on the 21st, 43rd, 44th, 46th Floors as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 20Under Construction54p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Modification to the existing plumbing system on the 20th and 34th floors as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 20th and 34th floors as per plans. No change to use, egress or occupancy.
On file for this project
4 documents
Modifications to the existing HVAC system on the 20th and 34th floors as per plans. No change to use, egress or occupancy.
On file for this project
14 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 19Under Construction50p · 11 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Installation of new partitions, doors, ceilings and finishes on the 19th floor (Marketing Floor 21) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 18 drawing sheets
Modifications to the existing plumbing system on the 19th & 48th floors (Pre-build/Turnkey) as per plans. No change to use, egress or occupancy. No change to use, egress or occupancy
On file for this project
9 documents · 1 drawing sheet
Modifications to the existing HVAC system on the 19th & 48th floors (Pre-build/Turnkey) as per plans. No change to use, egress or occupancy
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 18
Floor 17
Floor 16
Floor 15
Floor 145p · 4 filings · 19 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Plumbing
Modifications to the existing plumbing system on the 14th floor as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Minor demolition and white box of existing office space on the 14th floor, as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Modifications to the existing HVAC system and associated ducts and piping the 14th floor, as per plans. No change to use, egress or occupancy.
On file for this project
7 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 13
Floor 1219p · 6 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Modifications to the existing sprinkler system on the 12th floor (TFMG) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Modifications to the existing plumbing system on the 12th floor (TFMG) as per plans. No change to use, egress or occupancy.
On file for this project
8 documents · 2 drawing sheets
Installation of new partitions, doors, suspended ceilings and finishes on the 12th floor (TFMG) as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 13 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 11
Floor 10
Floor 918p · 11 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbing
MECHANICAL MODIFICATIONS TAKING PLACE ON THE 9TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
7 documents · 1 drawing sheet
Removal of existing plumbing fixtures and associated piping on the 6th and 9th floors as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Modifications to the existing sprinkler system on the 6th and 9th floors as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 8Under Construction8p · 4 filings · 16 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Removal of existing plumbing fixtures and associated piping on the 8th floor as per plans. No change to use, egress or occupancy.
On file for this project
4 documents
Removal of existing sprinkler system with installation of a temporary loop on the 8th floor as per plans. No change to use, egress or occupancy.
On file for this project
4 documents
Removal and disposal of interior partitions, doors, ceilings and finishes on the 8th floor as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 71p · 2 filings · 14 docs
Mechanical
Design of the mechanical, electrical, plumbing/sprinkler systems associated with construction of new offices and conf. room on 7th floor and new offices on 6th floor. No change in use, egress, or occupancy
On file for this project
7 documents · 1 drawing sheet
Relocation and adding of supply ductwork and air outlets.
On file for this project
7 documents · 1 drawing sheet
Floor 637p · 6 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction
Design of the mechanical, electrical, plumbing/sprinkler systems associated with construction of new offices and conf. room on 7th floor and new offices on 6th floor. No change in use, egress, or occupancy
On file for this project
7 documents · 1 drawing sheet
Architectural modifications to existing atrium as per plans. No change to use, egress or occupancy.
On file for this project
16 documents · 1 drawing sheet
Removal of existing plumbing fixtures and associated piping on the 6th and 9th floors as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 59p · 5 filings · 20 docs
ArchitectureCivilDMMechanicalStructural
Issued Permit Scope
General Construction · Structural
Architectural modifications (Phase 2) as per plans. No change to use, egress or occupancy.
On file for this project
12 documents · 3 drawing sheets
Structural modifications (Phase 2) as per plans. No change to use, egress or occupancy.
On file for this project
20 documents · 2 drawing sheets
Structural modifications to existing atrium as per plans. No change to use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 4161p · 20 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Structural
Architectural modifications (Phase 2) as per plans. No change to use, egress or occupancy.
On file for this project
12 documents · 3 drawing sheets
Structural modifications (Phase 2) as per plans. No change to use, egress or occupancy.
On file for this project
20 documents · 2 drawing sheets
HVAC modifications to existing atrium as per plans. No change to use, egress or occupancy.
On file for this project
4 documents
Latest 3 of 8 filings on this floor.
Floor 3174p · 21 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Architectural modifications (Phase 2) as per plans. No change to use, egress or occupancy.
On file for this project
12 documents · 3 drawing sheets
Structural modifications (Phase 2) as per plans. No change to use, egress or occupancy.
On file for this project
20 documents · 2 drawing sheets
Sprinkler modifications to existing atrium as per plans. No change to use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 2163p · 18 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
Architectural modifications (Phase 2) as per plans. No change to use, egress or occupancy.
On file for this project
12 documents · 3 drawing sheets
Structural modifications (Phase 2) as per plans. No change to use, egress or occupancy.
On file for this project
20 documents · 3 drawing sheets
Modifications to the existing HVAC system (Phase 1) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 19p · 14 filings · 20 docs
ArchitectureCivilDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Earth Work · General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Structural modifications (Phase 2) as per plans. No change to use, egress or occupancy.
On file for this project
20 documents · 3 drawing sheets
Sprinkler modifications to existing atrium as per plans. No change to use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
HVAC modifications to existing atrium as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
CellarUnder Construction9p · 23 filings · 20 docs
ArchitectureCivilDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Earth Work · General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Modifications to the existing plumbing system (Phase 2) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Architectural modifications (Phase 2) as per plans. No change to use, egress or occupancy.
On file for this project
12 documents · 3 drawing sheets
Structural modifications (Phase 2) as per plans. No change to use, egress or occupancy.
On file for this project
20 documents · 4 drawing sheets
Latest 3 of 8 filings on this floor.
Sub-Cellar59p · 4 filings · 20 docs
ArchitectureMechanicalStructural
Issued Permit Scope
General Construction · Structural
Architectural modifications (Phase 1C) as per plans. No change to use, egress or occupancy.
On file for this project
12 documents · 3 drawing sheets
Structural modifications (Phase 1C) as per plans. No change to use, egress or occupancy.
On file for this project
6 documents
Modifications to the existing HVAC system (Phase 1) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.