← Back
BuildNYC
Elevator cooperative
The Willow Glen
72-81 113TH STREET · Forest Hills · BIN 4052718
💬 Discuss this project
1950Year Built
7Stories
D4Building Class
R6Zoning
122,606 sfGross Floor Area
174Units
LL97 CoveredRent Stabilized60 Active Violations 2 likely answered 3 old, status unconfirmed ▸FISP: SAFE
Elevator cooperative · Owner of record: Meadowglen Realty Co · 62,600 sf lot · 1.96 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofGarage RepairsUnder Construction5p · 3 filings · 20 docs
Floor 7Parapet, brickwork, roofing replacement, and apartment finis3p · 1 filing · 6 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Interior renovation and window replacement2p · 1 filing · 12 docs
Site & exteriorParapet, brickwork, roofing replacement, and apartment finis22p · 3 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Seminole Owners2203/21/2026
Meadowglen Realty Co103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Joseph Farahnik Consulting Engineering304/16/2026
Ashraf205/08/2025
S Associates101/31/2024
Green Design110/16/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sheikh Expediting603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Star Diamond ConstructionGeneral Contractor310/14/2026
Proto Restoration ConstructionGeneral Contractor207/08/2026
Everest ScaffoldingScaffold203/21/2026
Geo USA ConstructionScaffold204/09/2026
Everbright ElectricElectrical103/21/2026
Astro Electrical ContractorsElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Joseph Farahnik Consulting3544205/09/2024
S Architecture8913101/31/2024
Structural Engineering Integ4174101/31/2024
Building Lifecycle
All (107)Filed (8)Permit Issued (9)Signed Off (3)Facade (FISP) (12)Violation (60)Inspection (1)Objection (2)Special Inspection (12)
10/13/2026
Permit issued — General Construction
Q00950887-I1-GC
04/24/2026
Signed off — Alteration
CONSTRUCTION EQUIPMENT - SCAFFOLD PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01030379-I1
04/21/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/21/2026
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Farahnik
04/21/2026
Special inspection requirement — Fire-Resistance Rated Construction
Joseph Farahnik
04/16/2026
Filed — Alteration
New roofing membrane at entry, replace lintels at garage entry, rebuild roof drain well and reflash drain, restore fireproofing at beams at garage, provide flashing at walls, provide pavers from fire escapes to exit.
Q00950887-P1
04/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/27/2026
Special inspection requirement — Fire-Resistance Rated Construction
Joseph Farahnik
09/12/2025
Signed off — Alteration
INTERIOR RENOVATION AND WINDOW REPLACEMENT
Q00984451-I1
06/16/2025
Permit issued — General Construction
Q01030379-I1-GC
05/13/2025
Permit issued — Supported Scaffold
Q01030379-S1-SF
05/08/2025
Filed — Alteration
CONSTRUCTION EQUIPMENT - SCAFFOLD PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01030379-S1
04/21/2025
Permit issued — Sidewalk Shed
Q01192727-S1-SH
04/16/2025
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01192727-S1
04/01/2025
Permit issued — Suspended Scaffold
Q01192727-I1-SC
03/28/2025
Objection resolved — Addressed
03/24/2025
Objection raised — Other
03/22/2025
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01192727-I1
03/11/2025
Permit issued — General Construction
Q01030379-I1-GC
03/07/2025
Permit issued — General Construction
Q00984451-I1-GC
12/07/2024
Violation issued (HPD, open)
B
12/07/2024
Violation issued (HPD, closed)
C
10/21/2024
Violation issued (HPD, open)
A
10/21/2024
Violation issued (HPD, open)
A
08/19/2024
Violation issued (HPD, closed)
C
08/19/2024
Violation issued (HPD, closed)
C
08/19/2024
Violation issued (HPD, open)
C
08/19/2024
Violation issued (HPD, open)
C
07/24/2024
Violation issued (HPD, open)
B
07/24/2024
Violation issued (HPD, closed)
C
07/24/2024
Violation issued (HPD, open)
B
07/24/2024
Violation issued (HPD, closed)
C
06/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/09/2024
Filed — Alteration
CONSTRUCTION EQUIPMENT - SCAFFOLD PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01030379-I1
03/06/2024
Permit issued — General Construction
Q00984451-I1-GC
02/23/2024
Cycle 9 facade report signed — SAFE
02/07/2024
Violation issued (HPD, open)
C
02/07/2024
Violation issued (HPD, open)
B
02/07/2024
Violation issued (HPD, open)
C
02/07/2024
Violation issued (HPD, closed)
A
02/07/2024
Violation issued (HPD, open)
C
02/07/2024
Violation issued (HPD, open)
C
02/07/2024
Violation issued (HPD, open)
C
02/07/2024
Violation issued (HPD, open)
B
02/07/2024
Violation issued (HPD, open)
B
02/07/2024
Violation issued (HPD, open)
B
02/07/2024
Violation issued (HPD, open)
B
02/07/2024
Violation issued (HPD, open)
C
02/07/2024
Violation issued (HPD, open)
C
02/07/2024
Violation issued (HPD, open)
B
02/07/2024
Violation issued (HPD, open)
C
01/31/2024
Filed — Alteration
INTERIOR RENOVATION AND WINDOW REPLACEMENT
Q00984451-I1
01/17/2024
Cycle 9 facade report submitted
01/12/2024
Cycle 9 facade inspection completed
01/02/2024
Special inspection requirement — Fire-Resistance Rated Construction
Joanna Szymanska
01/02/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Joanna Szymanska
01/02/2024
Special inspection requirement — Tenant Protection Plan Compliance
Joanna Szymanska
01/02/2024
Special inspection requirement — Lighting controls
Joanna Szymanska
01/02/2024
Special inspection requirement — Lighting in dwelling units
Joanna Szymanska
01/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chris Yiu
Latest 60 of 107 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedStar Diamond Construction10/13/2026
DOB NOWGeneral ConstructionSigned-offStar Diamond Construction06/16/2025
DOB NOWSupported ScaffoldPermit IssuedGeo USA Construction05/13/2025
DOB NOWSidewalk ShedPermit IssuedGeo USA Construction04/21/2025
DOB NOWSuspended ScaffoldPermit IssuedStar Diamond Construction04/01/2025
DOB NOWGeneral ConstructionSigned-offStar Diamond Construction03/11/2025
DOB NOWGeneral ConstructionSigned-offProto Restoration Construction03/07/2025
DOB NOWGeneral ConstructionSigned-offProto Restoration Construction03/06/2024
DOB NOWSidewalk ShedSigned-offEverest Scaffolding10/22/2020
BISOTISSUEDLS General Restoration C*11/18/2020
BISOTISSUEDLS General Restoration C*09/01/2020
BISPLISSUEDBell Fuel Oil06/29/2020
BISPLISSUEDBell Fuel Oil06/28/2019
BISOTISSUEDEmg Industrial Chimney06/28/2019
BISPLISSUEDOrbit Plumbing & Heating06/28/2017
BISOTISSUEDDracon Construction06/01/2017
BISOTISSUEDSuper Power Construction05/21/2014
BISPLISSUEDTri State Plumbing & Heating05/21/2014
BISPLISSUEDD.D.S. Mechanical PBG & Heating08/23/2012
BISOTISSUEDSMK Associates08/02/2012
BISOTISSUEDSkyline Restoration03/31/2010
BISEQISSUEDEverest Scaffolding03/29/2010
BISOTISSUEDA Interonational03/01/2007
BISEQISSUEDEmpire Scaffolding System10/07/2004
BISOTISSUEDSkyline Restoration04/19/2004
BISEQISSUEDEmpire Scaffolding System10/23/2003
BISEQISSUEDEmpire Scaffolding System06/16/2003
6 projects · most recent 04/17/2026
General Wiring Boiler Controls
FiledStatusContractorScope
04/17/2026CompleteS.A.L. Electric Co—
05/22/2025Permit IssuedRichard Neu—
07/07/2023CompleteRJ Electrical ContractorsGeneral Wiring
10/22/2020CompleteBorowide Elect'l Contractors—
09/18/2019CompleteAbilene ElectricBoiler Controls
05/16/2019CompleteAbilene Electric—
2 projects · most recent 05/08/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
05/08/2025Signed-offStar Diamond ConstructionScaffold
04/16/2025Permit IssuedGeo USA ConstructionSidewalk Shed
1 project · most recent 04/16/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
04/16/2025Permit IssuedGeo USA ConstructionSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
04/21/2026Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
04/21/2026Tenant Protection Plan ComplianceJoseph Farahnikspecial
04/21/2026Fire-Resistance Rated ConstructionJoseph Farahnikprogress
04/16/2026Tenant Protection Plan Compliance—special
03/27/2026Fire-Resistance Rated ConstructionJoseph Farahnikprogress
01/02/2024Fire-Resistance Rated ConstructionJoanna Szymanskaprogress
01/02/2024Fenestration and door U-factor and product ratingsJoanna Szymanskaenergy_progress
01/02/2024Tenant Protection Plan ComplianceJoanna Szymanskaspecial
01/02/2024Lighting controlsJoanna Szymanskaenergy_progress
01/02/2024Lighting in dwelling unitsJoanna Szymanskaenergy_progress
01/02/2024Fire-Resistant Penetrations and JointsChris Yiuspecial
01/02/2024FinalJoanna Szymanskaprogress
01/02/2024Energy Code Compliance InspectionsJoanna Szymanskaprogress
▾Documents — 154 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch7
08/23/2026Q00984451-I1Request digital key ↗
08/20/2026Q01192727-S1Request digital key ↗
08/20/2026Q01192727-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/27/2026Q00414734-I1Request digital key ↗
▸Applications & Permits23
▸BISWORK PERMIT APPLICATION11
09/01/2020421728232Open ↗
06/27/2019440554847Open ↗
06/27/2019440554847Open ↗
Showing 3 of 11 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION10
06/27/2019440554847Open ↗
06/26/2019421728232Open ↗
04/27/2017421470982Open ↗
Showing 3 of 10 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
04/06/2015420982850Open ↗
03/10/2011420167704Open ↗
▸Seals & Professional Certifications41
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
06/26/2019421728232Open ↗
07/24/2017421470982Open ↗
06/06/2017421470982Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
08/28/2026Q00950887-I1Open ↗
08/23/2026Q00984451-I1Open ↗
08/23/2026Q00984451-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/27/2026Q00414734-I1Open ↗
08/23/2026Q00984451-I1Open ↗
08/20/2026Q01192727-S1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
06/26/2019421728232Open ↗
05/29/2014420982850Open ↗
05/22/2013420847891Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
06/27/2019440554847Open ↗
06/26/2019421728232Open ↗
05/29/2014420982850Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
05/22/2013420847891Open ↗
03/30/2010420167704Open ↗
03/29/2010420167571Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/28/2026Q00950887-I1Open ↗
08/23/2026Q00984451-I1Open ↗
08/23/2026Q00984451-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/27/2019440554847Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/27/2019440554847Open ↗
▸Trade Schedules & Equipment7
▸BISSCHEDULE B - PLUMBING2
06/27/2019440554847Open ↗
05/22/2013420847891Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
04/19/2017421470982Open ↗
05/29/2014420982850Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
08/28/2014420982850Open ↗
08/20/2014420982850Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
06/27/2019440554847Open ↗
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes3
06/26/2019421728232Open ↗
04/19/2017421470982Open ↗
06/27/2019440554847Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026Q00414734-I1Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/23/2026Q00984451-I1Open ↗
08/17/2026Q00950887-P1Open ↗
08/13/2026Q00950887-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
06/26/2019421728232Open ↗
04/19/2017421470982Open ↗
05/29/2014420982850Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
06/27/2019440554847Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
03/29/2010420167571Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
05/22/2013420847891Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
03/30/2010420167704Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
06/26/2019421728232Open ↗
07/24/2017421470982Open ↗
04/19/2017421470982Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
08/30/2022421728232Open ↗
10/07/2020440554847Open ↗
07/24/2017421470982Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
08/30/2022421728232Open ↗
10/07/2020440554847Open ↗
06/27/2019440554847Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
10/07/2020440554847Open ↗
▸BISTR8: Energy Code Progress Inspections1
05/22/2013420847891Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/27/2019440554847Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
08/30/2022421728232Open ↗
10/07/2020440554847Open ↗
06/27/2019440554847Open ↗
▸Approvals, Objections & Sign-offs12
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
08/31/2022421728232Open ↗
10/07/2020440554847Open ↗
08/21/2017421470982Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
05/29/2014420982850Open ↗
05/22/2013420847891Open ↗
03/30/2010420167704Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
04/27/2011420167571Open ↗
03/10/2011420167704Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT13
08/30/2022421728232Open ↗
10/07/2020440554847Open ↗
06/27/2019440554847Open ↗
Showing 3 of 13 on file for this type
▸Filing & Intake Forms10
▸BISEFILING COVER SHEET6
06/25/2019421728232Open ↗
04/19/2017421470982Open ↗
05/29/2014420982850Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION3
10/07/2020440554847Open ↗
04/14/2010420167704Open ↗
04/09/2010420167704Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
06/27/2019440554847Open ↗
▸Other Documents6
▸DOB NOWDHCR Document4
08/17/2026Q00950887-P1Open ↗
08/13/2026Q00950887-I1Open ↗
08/13/2026Q00984451-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWManufacturer's Specifications1
08/13/2026Q01192727-I1Open ↗
▸DOB NOWCalculations1
08/13/2026Q01192727-I1Open ↗